Lee County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 24 - CERTIFICATES OF OCCUPANCY / Article I - IN GENERAL
Sec. 24-5. Power and utility connection.
About this text
- As published by Municode, current through 2026-06-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Allowances for permanent power connection on commercial, industrial, and institutional projects is allowed:
After an inspection of the electrical panel, mechanical room, and if the panel is complete and can be secured and all devices are installed or capped off the power may be released. The inspection of the electrical system will be performed by members of the county building inspection department.
(b) Utilities: Nothing in this chapter shall be construed to prohibit a utility from connecting its utilities to a building or structure under construction or renovation prior to the issuance of a certificate of occupancy provided that such utility connections are necessary (as determined by the county permitting officer) in connection with such construction or renovation. Notwithstanding the foregoing, such building or structure shall not be occupied for its intended purpose until the requirements of this chapter are met in their entirety.
History
(Ord. of 1-7-02)