Ir al contenido
Georgia Commons
Menú

Lee County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 24 - CERTIFICATES OF OCCUPANCY / Article I - IN GENERAL

Sec. 24-5. Power and utility connection.

Sobre este texto

  • As published by Municode, current through 2026-06-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Allowances for permanent power connection on commercial, industrial, and institutional projects is allowed:

After an inspection of the electrical panel, mechanical room, and if the panel is complete and can be secured and all devices are installed or capped off the power may be released. The inspection of the electrical system will be performed by members of the county building inspection department.

(b) Utilities: Nothing in this chapter shall be construed to prohibit a utility from connecting its utilities to a building or structure under construction or renovation prior to the issuance of a certificate of occupancy provided that such utility connections are necessary (as determined by the county permitting officer) in connection with such construction or renovation. Notwithstanding the foregoing, such building or structure shall not be occupied for its intended purpose until the requirements of this chapter are met in their entirety.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 1-7-02)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:lee-county/code/24-5@2026-06-23-db7ddf5717

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.