Sec. 34-220. Restrictions on developments in floodplain.

About this text

  • As published by Municode, current through 2026-06-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

In all special flood hazard areas (SFHA) as shown on the federal insurance rate maps (FIRM), the following provisions apply:

(1) New construction of principal buildings (both residential and nonresidential), including manufactured homes, shall not be allowed if any portion of the structure lies within the limits of the "floodway."

(2) All structures to be located within the 100-year zone "AE" floodplain boundaries or 500-year gray shaded zone "X" floodplain boundaries immediately adjacent to the 100-year zone "AE" shall have approved plans for the construction of such structure that evidences that such structure shall be located upon a lot having a minimum of two acres of land legally subdivided prior to a building permit being issued. All structures located in the 100-year zone "AE" floodplain boundaries shall have the first finished floor elevated to at least three feet above the 100-year base flood elevation. All structures located in the 500-year gray shaded zone "X" floodplain boundaries immediately adjacent to the 100-year zone "AE" shall have the first finished floor elevated to at least one foot above the 100-year zone "AE" base flood elevation. An official elevation certificate shall be submitted at time of building permit application attesting to the fact that the finished floor elevation shall be at least at or above the required elevation.

Exemption: An owner of any lot already legally subdivided and approved by October 1, 2005 will be allowed to apply for a building permit under the relevant applicable provisions for construction on such lot that were applicable immediately prior to October 1, 2005. If a building permit is issued under the provisions of this exemption, a structure may be built in the floodplain under such provisions relating to such construction as were applicable immediately prior to October 1, 2005, providing the construction meets all of the other requirements for then-existing development procedures for construction under the floodplain development ordinance of the county.

History

The history line the source prints at the end of the section.

(Ord. of 8-27-2009)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:lee-county/code/34-220@2026-06-23-be3225e5ba

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Lee County Code of Ordinances, Sec. 34-220. Restrictions on developments in floodplain | Georgia Commons