Lee County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 34 - ENVIRONMENT / Article V - FLOOD DAMAGE PREVENTION / Division 1 - STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND OBJECTIVES
Sec. 34-220. Restrictions on developments in floodplain.
Sobre este texto
- As published by Municode, current through 2026-06-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
In all special flood hazard areas (SFHA) as shown on the federal insurance rate maps (FIRM), the following provisions apply:
(1) New construction of principal buildings (both residential and nonresidential), including manufactured homes, shall not be allowed if any portion of the structure lies within the limits of the "floodway."
(2) All structures to be located within the 100-year zone "AE" floodplain boundaries or 500-year gray shaded zone "X" floodplain boundaries immediately adjacent to the 100-year zone "AE" shall have approved plans for the construction of such structure that evidences that such structure shall be located upon a lot having a minimum of two acres of land legally subdivided prior to a building permit being issued. All structures located in the 100-year zone "AE" floodplain boundaries shall have the first finished floor elevated to at least three feet above the 100-year base flood elevation. All structures located in the 500-year gray shaded zone "X" floodplain boundaries immediately adjacent to the 100-year zone "AE" shall have the first finished floor elevated to at least one foot above the 100-year zone "AE" base flood elevation. An official elevation certificate shall be submitted at time of building permit application attesting to the fact that the finished floor elevation shall be at least at or above the required elevation.
Exemption: An owner of any lot already legally subdivided and approved by October 1, 2005 will be allowed to apply for a building permit under the relevant applicable provisions for construction on such lot that were applicable immediately prior to October 1, 2005. If a building permit is issued under the provisions of this exemption, a structure may be built in the floodplain under such provisions relating to such construction as were applicable immediately prior to October 1, 2005, providing the construction meets all of the other requirements for then-existing development procedures for construction under the floodplain development ordinance of the county.
Historia
(Ord. of 8-27-2009)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.