Sec. 58-25. General criteria.

About this text

  • As published by Municode, current through 2022-03-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) No special permit or renewal thereof or modification of a current special permit relating to a telecommunications facility shall be authorized by the planning board unless it finds that such telecommunications facility:

(1) Is necessary to meet current or reasonably expected demands for services;

(2) Conforms with all federal and state laws and all applicable rules or regulations promulgated by the Federal Communications Commission (FCC), Federal Aviation Administration (FAA), or any other federal agencies having jurisdiction;

(3) Is considered a public utility in the state;

(4) Is sited, designed and constructed in a manner which minimizes:

a. Visual impact to the extent practical; and

b. Adverse impacts upon migratory and other birds and wildlife;

(5) Complies with all other requirements of this article, unless expressly superseded herein;

(6) Is the most appropriate site among those available within the technically feasible area for the location of a telecommunications facility;

(7) When including the construction of a tower, is designed to accommodate future shared use by at least two other telecommunication service providers.

(b) Any subsequent location of telecommunication equipment by other service providers on existing towers specifically designed for shared use shall not require a new or modified special permit if there would be no increase in the height of the tower and if the tower's original design was adequate to accommodate the proposed additional equipment. At the option of the building and zoning enforcement officer, there may be required, before issuance of a building permit, an engineer's certificate or report to the effect that with the proposed additional equipment the

existing tower continues to be safe and meets all then currently applicable design and construction criteria in accordance with generally accepted good engineering practices and generally accepted industry standards.

History

The history line the source prints at the end of the section.

(Ord. of 12-12-2006(02), § 3)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:marion-county/code/58-25@2022-03-08-79847837af

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Marion County Code of Ordinances, Sec. 58-25. General criteria | Georgia Commons