Marion County · Código de ordenanzas
Chapter 58 - TELECOMMUNICATIONS / Article II - TELECOMMUNICATIONS FACILITIES
Sec. 58-25. General criteria.
Sobre este texto
- As published by Municode, current through 2022-03-08
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) No special permit or renewal thereof or modification of a current special permit relating to a telecommunications facility shall be authorized by the planning board unless it finds that such telecommunications facility:
(1) Is necessary to meet current or reasonably expected demands for services;
(2) Conforms with all federal and state laws and all applicable rules or regulations promulgated by the Federal Communications Commission (FCC), Federal Aviation Administration (FAA), or any other federal agencies having jurisdiction;
(3) Is considered a public utility in the state;
(4) Is sited, designed and constructed in a manner which minimizes:
a. Visual impact to the extent practical; and
b. Adverse impacts upon migratory and other birds and wildlife;
(5) Complies with all other requirements of this article, unless expressly superseded herein;
(6) Is the most appropriate site among those available within the technically feasible area for the location of a telecommunications facility;
(7) When including the construction of a tower, is designed to accommodate future shared use by at least two other telecommunication service providers.
(b) Any subsequent location of telecommunication equipment by other service providers on existing towers specifically designed for shared use shall not require a new or modified special permit if there would be no increase in the height of the tower and if the tower's original design was adequate to accommodate the proposed additional equipment. At the option of the building and zoning enforcement officer, there may be required, before issuance of a building permit, an engineer's certificate or report to the effect that with the proposed additional equipment the
existing tower continues to be safe and meets all then currently applicable design and construction criteria in accordance with generally accepted good engineering practices and generally accepted industry standards.
Historia
(Ord. of 12-12-2006(02), § 3)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.