5.9.2. Sewer.

About this text

  • As published by Municode, current through 2025-03-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A publicly connected sanitary

sewer system shall be installed when the cost of installing such a system does not exceed one hundred fifty (150) percent of the cost of installing septic tanks for all lots in the subdivision and where said system is available from a public

agency subject to regulation by the board of commissioners or as the result of a contract between that board and another public agency or body. Where lots cannot be economically connected with a sewerage system, they must contain adequate area for the installation of on-site

sewage management systems approved by the environmental sanitarian. Sewer lines shall be installed in the center of the road. All sewer facilities shall be installed in accordance with the standards of the environmental protection division, state department of natural resources.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:monroe-county/code/5.9.2@2025-03-04-9fc97a0f40

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Monroe County Code of Ordinances, 5.9.2. Sewer | Georgia Commons