Skip to content
Georgia Commons
Menu

Murray County · Code of Ordinances

Murray County Code of Ordinances

This document is shown whole, as one text: its source does not cut it into sections.

About this text

  • As published by Municode, current through 2025-12-20
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Part 2 of 5. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Commercial building means any type of building other than residential.

Construction means the erection of a new building or the alteration of an existing building in connection with its repair or renovation or in connection with making an addition to an existing building and shall include the replacement of a malfunctioning, unserviceable or obsolete faucet, showerhead, toilet or urinal in an existing building.

Plumbing fixtures means any toilet, urinal, showerhead, bathroom, lavatory and kitchen faucet and replacement aerators.

Residential building means any building or unit of a building intended for occupancy as a dwelling but shall not include a hotel or motel.

Toilet means any fixture consisting of a water-flushed bowl with a seat, used for the disposal of human waste.

Urinal means any fixture consisting of a water-flushed bowl used for the disposal of human waste.

(Ord. No. 14, § 1, 2-28-1992) Sec. 18-153. Standards for fixtures.

No plumbing fixture shall be installed which does not meet the standards listed in this section or the state plumbing code, whichever is stricter. This includes all plumbing fixtures installed in newly constructed buildings or when replacing plumbing fixtures during remodeling or renovation of existing buildings, except as noted in section 18-155. The effective date of this requirement for residential buildings shall be April 1, 1992, and for commercial buildings the effective date shall be July 1, 1992.

(1) All plumbing fixtures installed as referred to in this section shall not exceed the following maximum water use rates:

a. Toilets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.6 gallons per flush

b. Urinals . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.0 gallon per flush

c. Showerheads . . . . . . . . . . . . . . . . . . . . . . . 2.5 gallons per minute at 60 psi gauge pressure

d. Kitchen faucets. . . . . . . . . . . . . . . . . . . . . 2.5 gallons per minute

e. Bathroom and lavatory faucets . . . . . . 2.0 gallons per minute

(2) The flow restriction device in a showerhead must be a permanent and integral part of the showerhead and must not be removable to allow flow rates in excess of that stated in subsection (1) of this section.

18:12

(3) Lavatory faucets located in restrooms intended for use by the general public shall be of the metering or self-closing type, in addition to the flow requirement listed in subsection (1) of this section.

(4) The flow rates for all showerheads, kitchen, bathroom, and lavatory faucets shall be determined in accordance with ANSI/ASME A112.18.1M-1989 Plumbing Fixture Fittings, as amended; except that maximum flow rates may not exceed those given in subsection (1) of this section.

(5) All toilets and urinals shall be certified to meet the hydraulic performance standards for low-consumption water closets specified in ANSI/ASME A112.19.2-1990 Vitreous China Plumbing Fixtures, as amended, and ANSI/ASME A112.19.6-1990 Hydraulic Requirements for Water Closets and Urinals, as amended.

(Ord. No. 14, § 2, 2-28-1992) Sec. 18-154. Product certification.

The manufacturer shall certify compliance with the standards in section 18-153 by labeling the fixture and packaging as described in this section and providing, upon request, appropriate certification by an independent national testing organization acceptable to the county building official. Effective April 1, 1992, all toilets, urinals, showerheads, or faucets shall be clearly labeled to indicate the maximum flow rate or water usage of the fixture at the specified test pressure. Toilets and urinals shall additionally be labeled ASME A112.19.2M, as prescribed in section 8 of such standard. The label shall be affixed to the fixture and remain there until the proper building and/or plumbing inspections have been conducted.

Also, the packaging must be clearly marked to identify water use rates when offered for retail.

(Ord. No. 14, § 4, 2-28-1992) Sec. 18-155. Exceptions.

Permission for the exceptions listed in this section must be obtained from the building official. New construction and the repair or renovation of an existing building may be exempt from the standards of section 18-153 for the following:

(1) Showers and faucets installed for safety purposes, such as emergency eye wash stations, etc.

(2) Plumbing fixtures specifically designed for the physically handicapped.

(3) Fixtures specifically designed to withstand unusual abuse or for installation in a correctional institution which may require more water for proper operation.

(4) Instances of building renovation where significant plumbing modifications would be required to accommodate the lower flows or for specialized purposes that cannot be accommodated by existing technology.

(Ord. No. 14, § 5, 2-28-1992) 18:13 Sec. 18-156. Enforcement; penalty for violation of article.

Citations for violations of this article may be issued by the building official or his authorized representative. Any person violating this article shall be tried before the magistrate court. Upon conviction, such person found guilty of a violation of this article shall be punished as provided in section 1-19.

(Ord. No. 14, § 6, 2-28-1992) Secs. 18-157—18-175. Reserved.

ARTICLE IV. TELECOMMUNICATIONS ANTENNAS AND TOWER STANDARDS*

Sec. 18-176. Purposes.

The purposes of this article shall be to:

(1) Provide for the appropriate location and development of tower facilities in such locations which promote public safety and general welfare and serve the residents and businesses of the county, while complying with state law.

(2) Promote tower safety through proper engineering and siting.

(3) Promote and maximize the shared-use or collocation of new and existing towers.

(4) Encourage the use of existing structures for antenna locations as an alternative to the development of additional single use towers.

(5) Accommodate the increased demand for tower facility development.

(6) Ensure that towers and telecommunications facilities are compatible with surrounding land use.

(Ord. No. 45, § 1.1, 4-10-2001) Sec. 18-177. Definitions.

The following words, terms, and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Alternative tower structures means manmade structures such as clock towers, bell towers, church steeples, water towers, light poles, manmade trees, existing conforming towers, warehouses, factories, commercial buildings, multifamily buildings 50 feet or more in height and public structures such as police and fire stations, libraries, community centers, civic centers, utilities structures, elevated roadways, bridges, flag poles, schools and hospitals and other structures which can, from the stand point of structural integrity and engineering safety, be used for the mounting of an antenna or serving a similar function as a tower.

Antenna means any exterior apparatus designed for wireless communication, radio, or television communications through the sending and/or through the sending and/or receiving of electromagnetic waves.

Erected includes the words "constructed," "located," or "relocated."

FAA means the Federal Aviation Administration.

FCC means the Federal Communications Commission.

Guy tower means a tower supported, in whole or in part, by guy wires and ground anchors.

Height means the vertical distance of any tower as measured from the bottom of the base of the tower at ground level to the highest point of such tower.

Lattice tower means a telecommunications tower having open-framed supports on three or four sides and constructed without guy wires and ground anchors.

Monopole tower means a telecommunications tower constructed of a single pole without guy wires or ground anchors.

Parcel includes the word "plot" or "lot".

Preexisting towers and antennas means any conforming, preexisting tower or antenna for which a permit has been properly issued. Any nonconforming, preexisting tower or antenna which sustains a casualty equaling 50 percent or more of its value shall not be reconstructed or moored unless otherwise in conformity with this article.

Tower means any vertical structure which is designed and constructed primarily for the purpose of supporting one or more antennas, including self-supporting lattice towers, guy towers, or monopole towers. This general term includes radio, television, microwave, common carrier, P.C.S., analog digital, cellular telephone, alternative tower structures and the like.

Used or occupied includes the words "intended, arranged or designed to be used or occupied."

(Ord. No. 45, § 1.2, 4-10-2001) Sec. 18-178. Location and construction requirements.

The location and construction of towers governed by this article shall comply with the following requirements:

(1) Construction /inspections. Towers shall be constructed and maintained in compliance with applicable building codes, industry standards, and standards for towers published by the Electronic Industries Association, as amended from time to time.

Tower owners shall conduct and be solely responsible for periodic written inspections of such towers at least every 12 months to ensure structural integrity. Such inspections shall be conducted by a structural engineer with a current license issued 18:15

by the state. The results of such inspection shall be submitted to the building inspector and shall be maintained by the tower owner and available for public review upon request.

(2) Bringing tower into compliance or removal. If upon a review of the results of such inspections or upon physical inspection the building inspector concludes that a tower fails to comply with such codes and standards and poses a danger to persons or property, then, upon written notice thereof to the owner, the owner shall have 30 days to bring such tower into compliance. Should the owner fail to bring the tower into compliance within 30 days, the county may remove such tower at the owners expense pursuant to O.C.G.A. §§ 41-2-8—41-2-12

(3) Regulatory compliance. Tower owners shall provide documentation showing each tower is in compliance with standards and regulations of the FAA, the FCC, and any other agency of the state or federal government with the authority to regulate towers and antennae. Such evidence of compliance shall be submitted to the building inspector every 12 months. If such standards and regulations are changed, then the owners of towers and antennas governed by this article shall bring such towers or antennas into compliance with such revised standards and regulations unless a different compliance is mandated by the controlling agency.

(4) Security fencing/anticlimbing devices. All towers and supporting equipment shall be enclosed by fencing not less than six feet in height and shall also be equipped with appropriate anticlimbing devices. Fencing shall be of chain link, wood, or other approved alternative.

(5) Advertising. Except for the owner's identifying name plate, including emergency telephone number to be located upon the gate or security fence surrounding the tower base, advertising on towers shall be prohibited.

(6) Access. Access for maintenance vehicles shall be the right-of-way which would most minimize interference with public traffic. Proposed sites which lack frontage on a public or private road shall provide an easement at least 25 feet wide with at least 12 feet graveled or paved travel way.

(7) Hazardous volatile substances. Use of a lot by a tower shall be prohibited when another principal use, on the same lot, includes the storage, distribution, or sale of volatile, flammable, explosive, or hazardous material such as propane, gasoline, natural gas, dangerous chemicals, or hazardous waste when such materials are not part of an emergency power source for the tower facilities.

(8) Maintenance/operation structures. Maintenance/operation structures adjacent to any tower facility area shall be used only to house equipment and other supplies directly in support of the tower. Such structures shall not be used for offices, vehicle storage, or for any continuous human occupation. Any equipment not used in direct support of a tower shall not be stored on the site.

(Ord. No. 45, §§ 1.3.1—1.3.3, 1.4—1.8, 4-10-2001) Sec. 18-179. Historical sites.

Tower facilities shall not be attached to or mounted to historically significant buildings, structures, or places identified by placement upon the National Register of Historic Places, designation as an historical site, by designation by the Whitfield/Murray County Historical Society as a historic site, or as part of a locally designated historic district.

(Ord. No. 45, § 1.9, 4-10-2001) Sec. 18-180. Setbacks and separations.

All towers shall comply with the following standards, except that existing alternative tower structures are exempt from the minimum setback and separation requirements of this section; provided, however, that such alternative tower structure must be a conforming use within the district in which it is located for this setback exemption to apply as of right:

(1) Setback requirements for towers shall be measured from the base of the tower to the property line of the parcel of land on which it is located:

a. All towers shall set back at least a distance equal to the height of the tower plus 15 feet or 200 total feet, whichever is less, from any private or public property, regardless of whether such distance shall cross any public or private right-ofway or roadway.

b. All towers shall set back at least 750 feet from any residential dwelling.

(2) Proposed towers must meet the following minimum separation requirements from existing tower or towers which have a development permit at the time a development permit is granted pursuant to this article:

a. Monopole tower structures shall be separated from all other towers, whether monopole, self-supporting lattice, or guyed, by a minimum of 750 feet.

b. Self-supporting lattice or guyed tower structure shall be separated from all other self-supporting lattice or guyed towers by a minimum of 1,500 feet.

c. Self-supporting lattice or guyed structures shall be separated from all monopole towers by a minimum of 750 feet

(Ord. No. 45, § 1.11, 4-10-2001) Sec. 18-181. Buffers and screening.

(a) Tower sites shall be landscaped with a buffer of plant material such that the view of the base of the tower and security fence is screened from any view.

(b) In locations where visual impact of the tower would be minimal, this landscaping requirement may be reduced or waived altogether by the building inspector upon specific findings by the building inspector.

18:17

(c) Existing mature growth and natural land formation on the site shall be preserved to the maximum extent possible. In such cases such as towers sited upon large, wooded lots, natural growth around the perimeter of the property may be sufficient if so determined by the building inspector.

(Ord. No. 45, § 1.11, 4-10-2001) Sec. 18-182. Tower lighting.

Illumination is prohibited on towers, except where required by the FCC or FAA as necessary for air traffic safety. When illumination is required, documentation shall be provided to the building inspector identifying the type of illumination required and any available alternatives. The building inspector may review alternative permissible illumination and may approve the design causing the least disturbance to the surrounding uses and views. Provided further, that the lighting on such antennas shall be dimmed or changed to red lights from sunset to sunrise

(Ord. No. 45, § 1.12, 4-10-2001) Sec. 18-183. Maintenance.

(a) Care and methods for preventing failure. Tower owners shall at all times employ ordinary and reasonable care and shall install and maintain and use nothing less than commonly accepted methods and devices for preventing failures and accidents which are likely to cause damage, injuries, or nuisance to the public.

(b) Compliance with requirements. Tower owners shall install and main towers, telecommunication facilities, wires, cables, fixtures, and other equipment in substantial compliance with the requirements of the National Electric Safety Code and all FCC, state and local regulations, and in such manner that will not interfere with the use of other property.

(c) Maintained so as not to become menaces. All towers, telecommunication facilities, and antenna support structures shall at all times be kept and maintained in good condition, order, and repair so that the same shall not menace or endanger the life or property of any person.

(d) By whom performed. All maintenance or construction of towers, telecommunication facilities, or antenna support structures shall be performed by licensed maintenance and construction personnel.

(Ord. No. 45, § 1.13, 4-10-2001) Sec. 18-184. Application procedures.

Applications for a permit for any tower, telecommunications facility, or use as an alternative tower structure shall first be made to the building inspector. Incomplete application shall not be considered. A complete application shall contain the following:

(1) Inventory of applicant's existing towers, including the specific locations, heights, and design of each such tower.

18:18

(2) A description of the proposed tower's area of service.

(3) A site plan or plans to scale specifying the proposed location and dimensions of towers as well as of maintenance/operation buildings or uses, access, parking, fences, landscaping, and plans for existing and adjacent land uses.

(4) A site plan for an alternative tower structure shall show adjacent rights-of-way, buildings and structures, including the structure's height and dimensions, proposed antenna location on the structure or building and adjacent land uses.

(5) A report from a professional engineer, currently licensed in the state, documenting the following:

a. Tower heights and design, including technical, engineering, economic and other pertinent factors governing the proposed tower design.

b. Total anticipated capacity of the structure, including number and types of antennae which can be accommodated.

c. Evidence of structural integrity of the tower structure.

d. Failure characteristics of the tower and demonstration that the site, setbacks, and separation from other uses are of adequate size or distance to protect the safety of the general public and of all nearby landowners.

(6) A written statement from the owner of the tower certifying that the proposed tower site complies with regulations administered by the FAA and FCC or stating that the tower is exempt from these regulations.

(7) Any additional information which may be reasonably requested by the building inspector, planning commission, or county commissioner in order to evaluate fully and to review the proposed tower site and the potential impact of a proposed tower and/or antenna.

(Ord. No. 45, § 1.14, 4-10-2001) Sec. 18-185. Application and permit fees.

Fees shall be $5,000.00 for initial tower permit and $750.00 to co-locate.

(Ord. No. 45, § 1.15, 4-10-2001; Ord. No. 45, Amend. No. 1, 5-3-2005; Ord. No. 45, Amend.

No. 2, 5-1-2007) Sec. 18-186. Removal of abandoned towers and antennas.

(a) Notice of abandoned antennas and structures. The owner or lessee of a tower or antenna shall promptly notify the department of intent to abandon or the abandonment of any tower or antenna.

18:19

(b) Removal of abandoned antennas and towers. Any tower or antenna that is not operated for a continuous period exceeding 12 months shall be considered abandoned, and the owner of such antenna or tower shall remove the structure within 90 days of such abandonment. If such tower or antenna is not removed within such 90 days, the governing authority may take such action as may be deemed necessary to remove, or cause to be removed, such antenna or tower at the owner's expense. If there are two or more users of a single tower, then this provision shall not become effective until all users cease utilizing the tower.

(Ord. No. 45, § 1.16, 4-10-2001) Sec. 18-187. Amateur radio, receive-only antennas.

This article shall not govern a tower, or the installation of any antenna, that is 75 feet or less in height and is owned and operated by a federally licensed amateur radio station operator from the operator's residence or is used exclusively as a receive-only antenna;

provided, however, only one such tower or antenna per residence shall be excluded from this article.

(Ord. No. 45, § 1.17, 4-10-2001) Sec. 18-188. Collocation; availability of suitable existing structures.

No new tower, except amateur radio towers, shall be permitted unless the applicant demonstrates to the satisfaction of the department and governing authority that no existing tower or existing alternative tower structure can accommodate the applicant's proposed antenna. All evidence submitted shall be signed and sealed by appropriately licensed professionals or qualified industry experts. Evidence submitted to demonstrate that no existing tower or structure can accommodate the proposed antenna shall consist of one or more of the following:

(1) No existing towers or suitable alternative tower structures are located within the geographic antenna placement area required to meet the applicant's engineering requirements.

(2) Existing towers or structures are not of sufficient height to meet the applicant's engineering requirements.

(3) Existing towers or structures do not have sufficient structural strength to support the applicant's antenna and related equipment.

(4) The applicant's proposed antenna would cause electromagnetic interference with the antenna on the existing tower or structure or the antenna on the existing tower or structure would cause interference with the applicant's proposed antenna.

(5) The cost or contractual provisions required by the tower owner to share an existing tower or structure or to adapt an existing tower or structure for sharing exceed the cost of new tower development.

18:20

(6) The applicant adequately demonstrates that there are other limiting factors that render existing towers and structures unsuitable, other than economic reasons.

(Ord. No. 45, § 1.18, 4-10-2001) Secs. 18-189—18-204. Reserved.

ARTICLE V. SOLAR ENERGY SYSTEMS

Sec. 18-205. Purpose and intent.

The purpose of this section is to facilitate the siting, construction, installation, operation, maintenance, and decommissioning of solar energy systems (SESs) in Murray County in a manner that encourages local economic development and protects the health, safety, and welfare of the citizens of Murray County, and at the same time mitigates any adverse impacts to wildlife, agricultural lands, forests, and other natural landscapes. The intent of Murray County is to increase energy security and diversify the energy portfolio, to promote the use of Georgia-based energy resources, to decrease the cost of energy, to bolster local economic development and employment prospects, to increase consumers' choices in energy consumption, to encourage the use of a renewable energy resource, to support Georgia's sustainability agenda, and to reduce air and water pollution. The intent of Murray County is not to compromise or contradict the safety, health, or environmental requirements contained in other federal, state, and local laws and regulations.

(Amend. of 11-6-2018(2)) Sec. 18-206. Applicability.

(a) This section applies to the siting, construction, installation, operation, maintenance, and decommissioning of any new SES within the jurisdiction of Murray County.

(b) Any SES that, prior to the effective date of this ordinance [from which this chapter derives], (1) is currently in operation, (2) has received approval from Murray County to operate, or (3) is being constructed, if no such approval was required, shall be exempt from complying with this ordinance [from which this chapter derives], unless:

(1) The acreage of land occupied by the SES is increased by more than ten percent; or

(2) More than ten percent of the solar panels on the SES are replaced.

(c) Unless otherwise expressly stated herein, an SES shall still comply with all applicable federal, state, and local laws and regulations, including the requirements of the Murray County Zoning Ordinance.

(Amend. of 11-6-2018(2)) 18:21 Sec. 18-207. Definitions.

[The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:]

Building-integrated solar energy system means an SES where solar materials are used in place of traditional building components such that the SES is structurally an integral part of a house, building, or other structure, for example as a building facade, skylight, or shingles.

Ground mounted solar energy system means an SES that is structurally mounted to the ground. For purposes of this chapter, the acreage of land occupied by a ground mounted solar energy system is calculated by drawing a perimeter around the outermost SES solar panels and auxiliary structures. Substations and transmission lines outside this perimeter shall not be included in the calculation.

Intermediate scale ground mounted solar energy system (intermediate scale SES) means a ground mounted SES that occupies between three and 15 acres.

Large scale ground mounted solar energy system (large scale SES) means a ground mounted SES that occupies more than 15 acres.

Ordinance means this solar ordinance.

Permit means any permit required by federal, state, or local law or regulation, including this chapter.

Rooftop solar energy system means an SES that is structurally mounted to the roof of a house, building, or other structure.

Small scale ground mounted solar energy system (small scale SES) means a ground mounted SES that occupies less than three acres.

Solar energy system (SES) means a device or structural design feature that provides for the collection, storage, and distribution of solar energy for electricity generation and for the purposes of this chapter, refers only to (1) photovoltaic SESs that convert solar energy directly into electricity through a semiconductor device or (2) solar thermal systems that use collectors to convert the sun's rays into useful forms of energy for water heating, space heating, or space cooling. SES as used in this chapter excludes concentrated solar systems that use mirrors to focus the energy from the sun to create thermal energy that can be used to produce electricity.

Visual buffer means natural vegetation, plantings, earth berms, and/or decorative fencing that provide a visual and lighting barrier between an SES and a residential property. The visual buffer is not part of the SES and shall not be included when (1) calculating the acreage of land occupied by the SES, or (2) determining whether the SES adheres to applicable setback requirements.

18:22 Zoning authority means the Murray County Land Use Planning Commission, as determined by local ordinance and appeal procedures.

(Amend. of 11-6-2018(2)) Sec. 18-208. General requirements for ground mounted solar energy systems.

The following requirements apply to all small, intermediate, and large-scale ground mounted SESs, in addition to the specific requirements in this chapter that apply to each SES size respectively:

(1) Solar access. A property owner may obtain a solar easement from another property owner for the purpose of ensuring the ground mounted SES adequate exposure to sunlight.

(2) Setbacks. Ground mounted SES shall be located no closer than the setback standards for the underlying zoning district in which the SES is located.

(3) Height. A rooftop SES mounted on a flat roof shall be given an equivalent exemption to the underlying zoning district's height standards as roof-mounted mechanical devices or equipment. A rooftop SES mounted on a sloped roof shall not vertically exceed the highest point of the roof to which it is attached.

(4) Visual buffers.

a. Small ground mounted SES shall require a Type A buffer as outlined under appendix B, article VII of the Code of Murray County.

b. Intermediate and large-scale ground mounted SES shall require a Type B buffer as outlined under appendix B, article VII of the Code of Murray County.

c. All visual buffers shall be in place at the time the SES commences operation.

(5) Lighting. To reduce light pollution, lighting of a ground mounted SES shall:

a. Be limited to the minimum reasonably necessary for its safe operation;

b. Be directed downward where reasonably feasible;

c. Incorporate full cut-off fixtures; and

d. Reasonably utilize motion sensors.

(6) Maintenance. A ground mounted SES shall be maintained in good working order.

(7) Abandonment. A ground mounted SES shall be considered abandoned if it ceases to produce energy on a continuous basis for more than 12 months without prior approval from the governing authority.

(8) Decommissioning. If a ground mounted SES has reached the end of its reasonable life or it is abandoned, then:

a. A small-scale SES and all structures associated with it shall be removed and all materials shall be recycled or otherwise reused to the extent reasonably practicable; and

18:23

b. An intermediate or large-scale SES shall be decommissioned in accordance with the decommissioning plan in the permit application (see section 18-209(5).

(9) Signage. For intermediate and large-scale SES:

a. Shall have warning signs (a) displaying the dangers associated with a SES, (b) identifying the owner or operator of the SES, and (c) providing a 24-hour emergency contact phone number;

b. May have signs that contain educational information about the SES; and

c. Shall not have signs used for displaying any advertisement except for reasonable identification of the manufacturer or operator of the SES.

(10) Electrical connection.

a. If the SES is connected to the public grid, then reasonable efforts shall be made to place underground all utility connections from the SES, depending on appropriate soil conditions, shape, and topography of the property and any requirements of the utility provider.

b. The SES shall be installed by a licensed engineer, a certified electrician shall inspect the electrical connections prior to operation, and the appropriate public utility shall inspect any operating connection to the grid.

(Amend. of 11-6-2018(2)) Sec. 18-209. Plans and permits.

An application for a conditional use review and an electrical permit shall be submitted to the Murray County Land Use Planning Commission and both shall include the following information:

(1) Basic information.

a. If known, the SES operator's name, address, telephone number, and email address;

b. If known, the installation company's name, address, telephone number, email address, and license number; and

c. Evidence of the applicant's control of the property, such as a deed, lease, or option agreement with the landowner.

(2) Site plan.

a. A topographic drawing of the property that indicates how stormwater currently drains from the property, identifies the location of discharge points or areas, and identifies any conditions present on the property that may contribute to significant soil erosion;

b. A map from the Georgia Department of Natural Resources that identifies any habitat for state endangered, threatened, or candidate species on or adjacent to the property;

18:24

c. A map from the U.S. Department of Fish and Wildlife (FWS) and/or the National Oceanic and Atmospheric Administration (NOAA) that identifies any habitat for federally endangered, threatened, or candidate species on or adjacent to the property; and

d. If the SES is located in an agricultural district, a map from U.S. Department of Agriculture Natural Resources Conservation Service (NRCS) identifying prime farmland and farmland of statewide importance on the property.

(3) Mitigation of impacts. The applicant shall submit a mitigation plan that contains the following:

a. A plan for the prevention and mitigation of stormwater runoff and soil erosion;

b. If the SES is located on prime farmland or farmland of statewide importance (as defined by NRCS), a plan to mitigate damage to the soil quality;

c. If the installation of the SES will result in potentially adverse changes to any state or federally endangered, threatened, or candidate species habitat, a mitigation plan, that includes (a) a process for minimizing changes to the species habitat, for example through habitat corridors, (b) a plan to relocate and monitor any impacted species, and (c) a plan to restore the original species habitat after the system is decommissioned; and

d. A map of five nautical miles around the property with the location of any airport in the shown space, and, if an airport is present in that area, a glare hazard analysis result by the solar glare hazard analysis tool or its equivalent.

(4) Certifications. The applicant shall submit an affidavit that provides:

a. Construction and operation of the SES will comply with all applicable federal, state, and local laws and regulations, including the requirements of the underlying zoning ordinance, unless otherwise expressly stated in this chapter;

b. Before operation, a fire safety and evacuation plan will be filed with the appropriate fire code and emergency management officials, and will be available in workplace for reference and review by employees working on the premises; and

c. General liability insurance will be maintained throughout the life of the SES project. If the underlying zoning ordinance does not specify the coverage, such general liability insurance will include, but not be limited to, commercial form, premises-operations, products/completed operations hazard, contractual insurance, broad form property damage, and personal injury.

(5) Decommissioning plan. The applicant shall submit a decommissioning plan that, based on the best available information at the time of the application, contains the following:

a. The name, address, telephone number, and e-mail address of the person(s) or entity(ies) responsible for implementing the decommissioning plan;

18:25

b. A statement of conditions that require the decommissioning plan to be implemented;

c. As part of decommissioning, a removal plan that (a) identifies all structures, components, and non-utility owned equipment that shall be removed, and (b) includes a plan for recycling or otherwise reusing all materials to the extent reasonably practicable; and

d. As part of decommissioning, a restoration plan to return the property to its condition prior to the installation of the SES or to some other condition reasonably appropriate to the designated land use after the SES is removed, including a tree restoration plan to restore the original tree cover with similar tree types and numbers after the system is decommissioned.

(Amend. of 11-6-2018(2)) Sec. 18-210. Severability.

The invalidity or the unenforceability of any section, subsection, paragraph, sentence, clause, provision, or phrase of the aforementioned sections, as declared by the valid judgment of any court of competent jurisdiction, to be unconstitutional or in conflict with any code or regulation governing this subject matter shall not affect the validity or enforceability of any other section, subsection, paragraph, sentence, clause, provision, or phrase, which shall remain in full force and effect.

(Amend. of 11-6-2018(2)) 18:26 Chapter 19

RESERVED

19:1 Chapter 20

CIVIL EMERGENCIES*

20:2

ARTICLE I. IN GENERAL

Sec. 20-1. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Emergency management shall mean the preparation for the carrying out of all emergency functions, other than functions for which the state and federal governments are primarily responsible, to prevent, minimize, and repair injury and damage resulting from emergencies or disasters, or the imminent threat thereof, of manmade or natural origin, caused by enemy attack, sabotage, civil disturbance, fire, flood, earthquake, wind, storm, wave action, oil spill, or other water contamination requiring emergency action to avert danger or damage, epidemic, air contamination, blight, drought, infestation, explosion, riot, or other hostile action, or other causes. These functions include, without limitation, firefighting services, police services, medical and health services, rescue, engineering, warning services, communications, defense from radiological, chemical and other special weapons, evacuation of persons from stricken areas, emergency welfare services, emergency transportation, plan protection, temporary restoration of public utility services and other functions related to civilian protection, together with all other activities necessary or incidental to the preparation for and carrying out of the foregoing functions in the county.

Overcharging means charging prices for goods, materials, services, or housing which are substantially in excess of the customary charges or in applicable cases substantially in excess of the supplier's or provider's costs for such goods, materials, services or housing. The existence of overcharging shall be presumed from a substantial increase in the price at which the goods, materials, services, or housing was offered in the usual course of business immediately prior to the onset of the emergency, but shall not include increases in costs to the supplier directly attributable to higher costs of materials, supplies, and labor costs resulting from the emergency.

State of emergency means pursuant to O.C.G.A. § 38-3-3(7), a condition declared by the governor when, in his judgment, the threat or actual occurrence of a disaster or emergency is of sufficient severity and magnitude as to warrant extraordinary efforts in preventing or alleviating the damage, loss, hardship, or suffering threatened or caused thereby.

Subsequent recovery period means that period during which the disaster continues to cause disruptions in the disaster area, but shall not exceed six months after the emergency declaration has been terminated by the governor unless extended by official action of the county commissioner.

(Amend. of 1-8-2008; Amend. No. 1, 8-14-2012) Sec. 20-2. Organization created; director, duties of.

(a) There is established for the county a local organization for emergency management in accordance with the state emergency management plan and program.

(b) The governing official or officials of the county is authorized to nominate a director for appointment by the governor who shall have direct responsibility for the organization, administration and operation of the county emergency management organization subject to the direction and control of the governing official or officials of the county. The director shall:

(1) Represent the governing official or officials of the county on matters pertaining to emergency management.

(2) Assist county officials in organizing county departments for emergency operation.

(3) Develop, in conjunction with other county departments, the plan for emergency functions set out in section 20-1. Such plan will be in accordance with the state emergency plan and shall be submitted to the governing official or officials for approval and thence to the state director for approval.

(4) Be charged with maintaining the emergency management office and carrying out the day-to-day administration of the emergency management program including the rendering of required reports to the state emergency management division office with copies to the governing official or officials.

(5) Further be charged with submitting such reports as financial, daily activity, etc., as required by governing official or officials in keeping with good business practice.

(6) During periods of declared emergency and under the supervision of the governing official or officials of the county, coordinate the activities of the county emergency operation center staff.

(Amend. No. 1, 8-14-2012) Sec. 20-3. Emergency plans.

The governing official or officials of the county shall assign to the various departments of county government the emergency functions set out in section 20-1 and furnish a copy of the same to the board of commissioners and to the emergency management director. Heads of the department in said plan shall be responsible for developing specific plans to carry out their assigned emergency function, which plan shall be submitted to the governing official or officials and the emergency management director and shall be approved by the governing official or officials.

(Amend. No. 1, 8-14-2012) Sec. 20-4. Emergency powers.

In the event of an actual enemy attack upon the United States or any other disaster which may affect the lives and property of the citizens of the county, the governing official or 20:4

chairman of governing officials, or in the chairman's absence the legally appointed successor, may declare that a state of emergency exists and thereafter shall have and may exercise, for such period as such state of emergency exists or continues, the following emergency powers:

(1) To enforce all rules, laws and regulations relating to emergency management and to assume direct operational control over all emergency management forces.

(2) To seize, take for temporary use, or condemn any property for the protection of the public.

(3) To sell, lend, give or distribute all or any of such property or supplies among the inhabitants, to maintain a strict accounting of property or supplies distributed and for funds received for such property or supplies.

(4) To perform and exercise such other functions and duties, and take such emergency actions as may be necessary, to promote and secure the safety, protection and well-being of the inhabitants.

(Amend. No. 1, 8-14-2012) Sec. 20-5. Overcharging prohibited.

In order to preserve, protect, or sustain the life, health, or safety of persons or their property, it shall be unlawful during the duration of a state of emergency or subsequent recovery period in which the county has been designated as a disaster area for any person, located or doing business in the county to overcharge for any goods, materials, services or housing sold within the county.

(Amend. No. 1, 8-14-2012) Secs. 20-6—20-30. Reserved.

ARTICLE II. EMERGENCY AND DISASTER MUTUAL AID AGREEMENT

Sec. 20-31. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Agreement means the emergency and disaster mutual aid agreement.

Assisting county means the participating county furnishing equipment, services, personnel, or other aid pursuant to this agreement.

Disaster means any natural, technological or civil emergency, or threat thereof, that causes damage or has the potential to cause damage of sufficient severity and magnitude to result in a declaration of a state of emergency by a county, the governor, or the President of the United States.

20:5 Emergency means any occurrence, or threat thereof, whether natural or caused by man, in war or in peace, which results or may result in substantial injury or harm to the population or substantial damage to or loss of property.

Emergency management director means the person appointed by the county governing authority to implement the emergency plan of the county.

Employees means paid, volunteer, and auxiliary employees and emergency management workers.

Participating county means a county that has duly enacted this agreement.

Receiving county means the participating county requesting equipment, services, personnel, or other aid pursuant to this agreement.

Sec. 20-32. Basic agreement; limitations.

Any participating county requested to render mutual aid or requested to participate in exercises and training for mutual aid pursuant to this agreement shall take such action as is necessary to provide and make available the resources covered by this agreement in accordance with the terms hereof; provided, however, that the assisting county may withhold or withdraw those resources necessary to provide protection for such county.

Sec. 20-33. Procedure.

In the event of any emergency or disaster, the emergency management director of any participating county, or the designee of the county governing authority, may request assistance of another participating county by contacting the emergency management director, or the designee of the governing authority, of that county. The provisions of this agreement shall only apply to requests for assistance made by and to official emergency management directors or the designees of the county governing authority. Requests may be verbal or in writing. If verbal, the request shall be confirmed in writing within ten days of the verbal request.

Sec. 20-34. Rights and duties; control.

Each participating county shall afford to the employees of any other participating county, while operating within its jurisdiction under the terms and conditions of this agreement, the same powers, except that of arrest, unless specifically authorized by the receiving county, duties, rights, privileges and immunities as are afforded employees of the receiving county in which they are performing emergency services. Employees of the assisting county will 20:6

continue under the command and control of their regular leaders, but, as a group will come under the operational control of the emergency services authorities of the receiving county, unless the receiving county relinquishes such control.

Sec. 20-35. Licenses and permits.

Whenever any person holds a license, certificate, or other permit issued by the state, county or other qualified agency evidencing that the individual possesses any required professional, mechanical, or other skills, such person may be permitted by the receiving county to render aid involving such skill in any other participating county to meet an emergency or disaster situation.

Sec. 20-36. Compensation.

In accordance with O.C.G.A. § 38-3-30(b), each participating county shall provide for the payment of compensation and death benefits to injured employees of that county and the representatives of deceased employees in case such employees sustain injuries or are killed while rendering aid pursuant to this agreement, in the same manner and on the same terms as if the injury or death were sustained within their own county.

Sec. 20-37. Payment and Reimbursement.

Reimbursement to the assisting county shall be in accordance with O.C.G.A. § 38-3-30(b).

The receiving county shall pay and reimburse the assisting county for the compensation paid to its employees during the time and rendition of the aid and shall defray the actual traveling and maintenance expenses of the employees while they are rendering the aid. The reimbursement shall include any amounts paid or due for compensation due to personal injury or death while the employees were engaged in rendering the aid. The receiving county shall also be liable for any loss or damage to equipment used in the receiving county pursuant to this agreement and shall pay any expense incurred in the operation or maintenance thereof. No claim for the loss of, damage to, or expense of such equipment shall be allowed unless, within 60 days after the same is sustained or incurred, an itemized notice of the claim under oath is served by mail or otherwise upon the chief fiscal officer of the receiving county.

Sec. 20-38. Immunity.

Neither an assisting county nor, except in cases of willful misconduct, gross negligence, or bad faith, the employees, agents, or representative of any assisting county, nor any unpaid trained personnel or member of any agency engaged in any emergency management activity pursuant to this agreement shall be liable for the death of or injury to a person or for damage to property as a result of such activity.

Secs. 20-39—20-60. Reserved.

20:7

ARTICLE III. EMERGENCY CURFEW

Sec. 20-61. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Curfew means a regulation requiring the withdrawal of any person not otherwise exempt from this article from appearing in certain public areas during specified hours.

Exempt individuals, unless otherwise specified in the resolution implementing the curfew, includes those individuals engaged in the provision of designated, essential services, such as fire, law enforcement, emergency medical services and hospital services, military services and utility emergency repairs. The resolution may, in the discretion of the County Commissioner, also exempt regular employees of local industries traveling to and from their jobs with appropriate identification, news media employees, building and repair contractors, properly registered according to article V of this chapter pertaining to registration and licensing of building and repair services during a state of emergency, performing activities related to construction, repair, renovation or improvement of buildings and other structures damaged during the disaster or emergency.

State of emergency, as defined by O.C.G.A. § 38-3-3(7), means a condition declared by the governor when, in his judgment, the threat or actual occurrence of a disaster, emergency, or energy emergency is of sufficient severity and magnitude as to warrant extraordinary efforts in preventing or alleviating the damage, loss, hardship, or suffering threatened or caused thereby.

(Amend. of 1-8-2008) Sec. 20-62. Institution of curfew.

(a) Upon the declaration of a state of emergency by the governor, or upon the determination by the county commissioner, or his designee, of the existence of an emergency or disaster, the county commissioner, his designee or the emergency interim successor may adopt a resolution instituting a curfew when it is determined necessary to protect and safeguard the people and property of the county.

(b) All of the territory of the unincorporated county shall be subject to the terms of the curfew, unless otherwise specified in the resolution.

(c) The resolution instituting the curfew shall include the dates and hours that the curfew shall be in effect.

20:8 Sec. 20-63. Prohibition.

It shall be prohibited for any person, other than exempt individuals, to appear in public in the territory subject to the curfew, including but not limited to streets, highways, alleys, sidewalks, vacant lots, parks, public buildings or any other public places, in all or a delineated part of the unincorporated county during the stated hours of the curfew.

Secs. 20-64—20-80. Reserved.

ARTICLE IV. SUSPENSION OF LAW AND OTHER FORMALITIES DURING

STATE OF EMERGENCY

Sec. 20-81. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Fees means any fee or rate charged by the county for building permits, land disturbance permits, zoning applications, special land use permits, temporary land use permits, and other fees relating to the reconstruction, repair and clean up of areas impacted by the disaster or emergency. The term fees shall not include those fees collected by the county on behalf of the federal or state government or those fees charged by the county pursuant to a federal or state statute or regulation.

State of emergency, as defined by O.C.G.A. § 38-3-3(7), means a condition declared by the governor when, in his judgment, the threat or actual occurrence of a disaster, emergency, or energy emergency is of sufficient severity and magnitude to warrant extraordinary efforts in preventing or alleviating the damage, loss, hardship, or suffering threatened or caused thereby.

Subsequent recovery period means the period of time that the disaster emergency continues to cause disruptions in the area impacted by the disaster emergency. The subsequent recovery period shall not exceed six months after the state of emergency declaration by the governor is terminated unless extended by official action of the county commissioner.

Temporary dwelling means any mobile or easily movable home, trailer, recreational vehicle or structure not otherwise permitted by the zoning regulations of a particular zoning district.

(Amend. of 1-8-2008) Sec. 20-82. Meetings.

Upon proclamation by the appropriate state official of an emergency or disaster of manmade or natural causes or enemy attack impending on or affecting the state or the 20:9

United States, the affairs and business of the county may be conducted at places other than the regular or usual place thereof, within or outside of the county, when it is not prudent, expedient or possible to conduct business at the regular location. When such meetings occur outside of the county, all actions taken by the county commissioner shall be as valid and binding as if performed within the county.

Sec. 20-83. Purchasing and public works contracts.

Upon the declaration of a state of emergency by the governor, or upon the determination by the county commissioner or his designee, of the existence of an emergency or disaster, the county commissioner, his designee or the emergency interim successor may contract for public works without letting such contract out to the lowest, responsible bidder and without advertising and posting notification of such contract for four weeks; provided, however, that any public works contract entered into pursuant to this section shall be entered on the minutes of the county as soon as practical and the nature of the emergency described therein.

Sec. 20-84. Code enforcement.

Upon the declaration of a state of emergency by the governor, or upon the determination by the county commissioner, or his designee, of the existence of an emergency or disaster, the county commissioner, his designee or the emergency interim successor may temporarily suspend the enforcement of this Code or any portion thereof, where:

(1) The emergency or disaster is of such nature that immediate action outside this Code is required;

(2) Such suspension is consistent with the protection of the public health, safety and welfare; and

(3) Such suspension is not inconsistent with any federal or state statutes or regulations.

Sec. 20-85. Fees.

Upon the declaration of a state of emergency by the governor, or upon the determination by the county commissioner, or his designee, of the existence of an emergency or disaster, the county commissioner, his designee or the emergency interim successor may temporarily reduce or suspend any permit fees, application fees or other rate structures as necessary to encourage the rebuilding of the area impacted by the disaster or emergency.

Sec. 20-86. Temporary dwellings.

Upon the declaration of a state of emergency by the governor, or upon the determination by the county commissioner, or his designee, of the existence of an emergency or disaster, the county commissioner, his designee or the emergency interim successor may issue temporary mobile home, trailer, recreational vehicle or other temporary dwelling structures or parks in 20:10

any zoning district while the primary dwelling is being repaired, provided that such temporary dwellings or parks are designed by an engineer and the plans are approved by the county health department and county building and inspections department. The temporary permit shall not exceed six months in duration. In the case of continuing hardship and in the discretion of the county commissioner or his designee, the permit may be extended for a period for an additional six months. Upon expiration of the temporary permit or an extension, the temporary dwelling shall be removed.

Secs. 20-87—20-110. Reserved.

ARTICLE V. REGISTRATION OF BUILDING AND REPAIR SERVICES

Sec. 20-111. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Building contractor means any person, firm, partnership, corporation or other entity engaging in, undertaking or carrying on any business consisting of or relating to building construction, repair, renovation or making improvements to real property, including dwellings, homes, buildings, structures, or fixtures attached thereto.

Doing business. Any building contractor shall be deemed to be doing business subject to the requirements of this article if:

(1) He has or operates an office, agency, project site or place of business located in the unincorporated areas of the county, whether permanently, temporarily, periodically, or otherwise, that provides the following activities in the unincorporated areas of the county, expressly including but not limited to the construction, renovation or repair of dwellings or buildings or the making of improvements to real property or any fixtures attached thereto; or

(2) He performs the following activities or services in the unincorporated areas of the county, expressly including but not limited to the construction, renovation or repair of dwellings or buildings or the making of improvements to real property or any fixtures attached thereto regardless of the location of the principal office.

State of emergency, pursuant to O.C.G.A. § 38-3-3(7), means a condition declared by the governor when, in his judgment, the threat or actual occurrence of a disaster is of sufficient severity and magnitude as to warrant extraordinary efforts in preventing or alleviating the damage, loss, hardship, or suffering threatened or caused thereby.

20:11 Subsequent recovery period means that period during which the disaster continues to cause disruptions in the disaster area, but shall not exceed three months after the emergency declaration has been terminated by the governor.

(Amend. of 1-8-2008) Sec. 20-112. Penalties.

Any building contractor required by this article to pay a registration fee who engages in business without first registering and receiving a registration certification from the county as required shall be in violation of this article. Violation of this article, upon conviction, shall be punishable as provided in section 1-19. Each day a building contractor does business in the unincorporated areas of the county without complying with this article shall constitute a separate offense.

Sec. 20-113. Building contractor registration required.

No person shall engage in, undertake or carry on any business in whole or in part within the unincorporated areas of the county consisting of or relating to building, constructing, repairing, renovating or making improvements to real property, including dwellings, homes, buildings, structures, or fixtures attached thereto, without having registered the name of the business with the county commissioner and having paid fees as provided by this article.

Sec. 20-114. Registration; certification.

All building contractors doing business or proposing to do business in the unincorporated areas of the county during a state of emergency or the subsequent recovery period shall register and file applications with the county clerk or such other person designated by the county commissioner at the county courthouse or such other place or places designated by the county. The building contractor shall, under oath, provide the county commissioner with a statement describing the general nature of the business to be conducted and give true and correct information as may be called for on the registration form, application or certificate provided by the county.

Sec. 20-115. Registration fees.

Building contractor registration fees shall be as set forth in the schedule of fees and charges on file in the office of the county clerk. Registration fees shall be paid in full at the time of issuance of the registration certification.

Sec. 20-116. Transferability.

Each certification issued under this article is granted to, and shall be accepted by, the building contractor under the condition that the same is not transferable and after issuance no such certification shall be transferred by the county or the building contractor to another individual or entity.

20:12 Sec. 20-117. Display of registration certification.

Each certification issued under this article shall be posted conspicuously by the building contractor in the place of business of the building contractor or shall be carried on his person or the vehicle used in such business. Such certification shall be exhibited to any authorized enforcement officer when so requested.

Sec. 20-118. Revocation; suspension.

Each certification granted under this article is a mere permit to engage in the business only so long as such business is conducted in a lawful manner. The county commissioner hereby reserves the right to revoke or suspend any certification granted under this article, if the building contractor, or the building contractor's agent or employee acting within the scope of his employment, violates this article or any other county, state or federal law. If after issuance of a certification the county desires to revoke such certification, written notice thereof shall be given to the building contractor, which notice shall specify the violation with which the building contractor is charged and a date, time and place at which a hearing shall be held with regard to the violation. The building contractor shall have an opportunity to be heard at such hearing, shall have the right to be represented by counsel, and shall have the right to introduce and submit evidence in opposition to such revocation.

20:13 Chapter 21

RESERVED

21:1 Chapter 22

COURTS*

ARTICLE I. IN GENERAL

Secs. 22-1—22-25. Reserved.

ARTICLE II. CITATIONS

Sec. 22-26. Basis for trial.

Violations of all provisions of this Code and county ordinances shall be tried upon citations issued by the appropriate county official of the county magistrate court, or upon accusations.

(Ord. No. 32, § 1, 6-2-1998) Sec. 22-27. Issuance.

Whenever it is determined that a violation of this Code or a county ordinance has occurred, the appropriate county official of the county magistrate court shall issue a citation therefor, unless the county commissioner determines that the prosecution shall proceed by accusation.

(Ord. No. 32, § 2, 6-2-1998) Sec. 22-28. Procedure.

Citations may be tried by the county magistrate court with or without the appearance of a prosecuting attorney on behalf of the county.

(Ord. No. 32, § 3, 6-2-1998) Sec. 22-29. Accusations.

All accusations shall issue in accordance with O.C.G.A. § 15-10-62(a) with the county attorney or other attorney designated by the county commissioner acting as prosecuting attorney in all cases tried upon accusations.

(Ord. No. 32, § 4, 6-2-1998) 22:3 Chapters 23—25

RESERVED

Chapter 26

ENVIRONMENT*

26:2

ENVIRONMENT

26:3

ARTICLE I. IN GENERAL

Secs. 26-1—26-25. Reserved.

ARTICLE II. NOISE CONTROL

Sec. 26-26. General prohibition.

It shall be unlawful for any person to make, continue or cause to be made or continued in the unincorporated areas of the county, any loud, unnecessary or unusual sound or noise which either annoys, disturbs, injures or endangers the comfort, repose, health, peace or safety of others in the county, and which is plainly audible to a person of normal hearing ability at a distance of 100 feet from the point of origin of the sound or noise, or in the case of real property, beyond the property limits from which such sound or noise emanates, whichever is farthest.

(Amend. of 8-4-2020(2)) Sec. 26-27. Exceptions.

The provisions of this article shall not apply to or be enforced against:

(1) Any vehicle of the county while engaged in necessary public business.

(2) Excavations or repairs of streets by or on behalf of the county or state at night when public welfare and convenience renders it impossible to perform such work during the day; nor work performed by public utility companies under like conditions and circumstances, or when there is urgent necessity therefor.

(3) The reasonable use of amplifiers or loudspeakers in the course of public addresses that are noncommercial in character.

(4) Any parade, celebration or performance.

Sec. 26-28. Enumeration.

The acts contained in this article, among others, shall constitute a violation of this article, but such enumeration shall not be deemed to be exclusive.

Sec. 26-29. Horns; signaling devices.

The following shall be a violation of this article:

(1) The sounding of any horn or signaling device on any automobile, motorcycle or other vehicle on any street or public place in the county except as a danger warning.

(2) The creation of any unreasonably loud or harsh sound by means of any such signaling device and the sounding of any such device for an unreasonable period of time.

(3) The use of any signaling device, except a police whistle or one operated by hand or electricity.

(4) The use of any horn, whistle or other device operated by engine exhaust.

(5) The use of any signaling device when traffic is held up for any reason.

Sec. 26-30. Radios, phonographs, other machines or devices that produce or reproduce sound.

The using, operating, or permitting to be played, used, or operated any radio receiving set, musical instrument, phonograph, or other machine or device for the producing or reproducing of sound in such manner as to disturb the peace, quiet, and comfort of the neighboring inhabitants or at any time with louder volume than is necessary for convenient hearing for the person who is in the room, vehicle, or chamber in which such machine or device is operated and who is a voluntary listener shall be a violation of this article. The operation of any such set, instrument, phonograph, machine, or device in such a manner as to be plainly audible at a distance of 100 feet from the building, structure, or vehicle in which it is located shall be prima facie evidence of a violation of this section.

(Amend. of 8-4-2020(2)) Sec. 26-31. Loudspeakers; amplifiers; other devices for production or reproduction of sound for advertising.

The using, operating, or permitting to be played, used, or operated any radio receiving set, musical instrument, phonograph, loudspeaker, sound amplifier, or other machine or device for the producing or reproducing of sound which is cast upon the public streets for the purpose of commercial advertising or attracting the attention of the public to any building or structure without a special permit from the county clerk or county commissioner shall be a violation of this article. Announcements over loudspeakers can only be made by the announcer, in person, and without the aid of any mechanical device.

Sec. 26-32. Yelling; shouting; hooting; whistling; singing.

Yelling, shouting, hooting, whistling, or singing on the public streets, particularly between the hours of 9:00 p.m. and 7:00 a.m. or at any time or place so as to annoy or disturb the quiet, comfort, or repose of any persons in the vicinity, shall be a violation of this article.

Sec. 26-33. Animals and birds.

The keeping of any animal or bird that will disturb the comfort or repose of any persons in the vicinity by making long, continual, or frequent noise shall be a violation of this article.

Sec. 26-34. Steam whistle.

The blowing of any train whistle or steam whistle attached to any stationary boiler except to give notice of the time to begin or stop work or as a warning of fire or danger or upon request of proper county authorities shall be a violation of this article.

Sec. 26-35. Exhausts.

The discharge into the open air of the exhaust of any steam engine, stationary internal combustion engine, motorboat, or motor vehicle except through a muffler or other device that will effectively prevent loud or explosive noises shall be a violation of this article. The use of a compression release engine brake, compression brake, or decompression brake, shall be a violation of this article.

(Amend. of 12-7-2021) Sec. 26-36. Defect in vehicle or load.

The use of any automobile, motorcycle, or vehicle so out of repair, so loaded, or in such manner as to create loud and unnecessary grating, grinding, rattling, or other noise shall be a violation of this article.

Sec. 26-37. Loading; unloading; opening boxes.

The creation of a loud and excessive noise in connection with loading or unloading any vehicle or the opening and destruction of bales, boxes, crates, and containers shall be a violation of this article.

Sec. 26-38. Construction or repairing of buildings.

The erection, including excavation, demolition, alteration, or repair, of any building other than between the hours of 6:00 a.m. and 10:00 p.m. on weekdays, except on urgent necessity in the interest of public health and safety, and then only with a permit from the county building official, shall be a violation of this article. Such permit may be granted for a period not to exceed three days or less while the emergency continues and may be renewed by the county commissioner for periods of three days or less while the emergency continues. If the county commissioner determines that the public health and safety will not be impaired by the erection, demolition, alteration, or repair of any building or the excavation of streets and highways from 6:00 p.m. to 7:00 a.m. and further determines that loss or inconvenience would result to any party in interest, the county commissioner may grant permission for such work to be done from 6:00 p.m. to 7:00 a.m., upon application made at the time the permit for the work is applied for or during the progress of the work.

Sec. 26-39. Schools; courts; churches; hospitals.

The creation of any excessive noise on any street adjacent to any school, institution of learning, church, or court while they are in session or adjacent to any hospital, and which unreasonably interferes with the work of such institution or which disturbs or unduly annoys patients in the hospital, provided that conspicuous signs are displayed about such institutions indicating the presence of such institutions, shall be a violation of this article.

Sec. 26-40. Hawkers; peddlers; vendors.

The shouting and crying of hawkers, peddlers, and vendors which disturb the peace and quiet of the neighborhood shall be a violation of this article.

Sec. 26-41. Noises to attract attention.

The use of any drum or other instrument or device for the purpose of attracting attention to any performance, show, or sale by creation of noise shall be a violation of this article.

26:7 Sec. 26-42. Transportation of metal rails, pillars, or columns.

The transportation of rails, pillars, or columns of iron, steel, or other material over and along streets and other public places upon carts, drays, cars, trucks, or in any other manner so loaded as to cause loud noises or as to disturb the peace and quiet of such streets or other public places shall be a violation of this article.

Sec. 26-43. Piledrivers, hammers, other such appliances.

The operation from 6:00 p.m. to 7:00 a.m. of any piledriver, steam shovel, pneumatic hammer, derrick, steam or electric hoist, or other appliance the use of which is attended by loud or unusual noise without a special permit from the county commissioner shall be a violation of this article.

Sec. 26-44. Blowers.

The operation of any noise-creating blower or power fan or any internal combustion engine, the operation of which causes noise due to the explosion of operating gases or fluids, unless the noise from such blower or fan is muffled and such engine is equipped with a muffler device sufficient to deaden such noise, shall be a violation of this article.

Sec. 26-45. Sound trucks.

The use of mechanical loudspeakers or amplifiers on trucks or other moving or standing vehicles for advertising or other commercial purposes and the use of sound trucks for noncommercial purposes during such hours or in such places or with such volume as would constitute such use a public nuisance shall be a violation of this article.

Sec. 26-46. Vehicle repair in residential areas.

The repairing, rebuilding, or testing of any motor vehicle between the hours of 10:00 p.m.

and 7:00 a.m. within any residential area in such a manner as to disturb the peace, quiet, and comfort of the residents of the area, shall be a violation of this article.

Sec. 26-47. Exemptions.

The following uses and activities shall be exempt from noise regulations set forth in this article:

(1) Noises of safety signals and warning devices.

(2) Noises resulting from any authorized emergency vehicle when responding to an emergency call or responding to an emergency.

(3) Noises resulting from emergency work, to be construed as work made necessary to restore property to a safe condition following a public calamity or work required to protect persons or property from an imminent exposure to danger.

(4) Noises resulting from agricultural operations as defined in O.C.G.A 1-3-3.

26:8 Applications for other exemptions should be filed with the county clerk for approval by the county commissioner and should state the time, date, organization, and reason for the request.

(Ord. of 9-6-2005, Amend. No. 2) Sec. 26-48. Injunctions.

The operation or maintenance of any device, vehicle, or machinery in violation of any provision of this article which causes discomfort or annoyance to reasonable persons of normal sensitivity or which endangers the comfort, repose, health, or peace of residents of this county shall be deemed, and is declared to be, a public nuisance and may be subject to abatement summarily by a restraining order or injunction issued by a court of competent jurisdiction.

Sec. 26-49. Complaint—Authorized.

Any person disturbed by noise as provided in this article may file a complaint with the appropriate law enforcement agency.

Sec. 26-50. Same—Form.

The complainant shall submit a complaint form stating the name and address of the complainant, the name and address of the person causing the noise disturbance, a description of the nature of the disturbance and such complaint form shall be accompanied by the following:

(1) A videotape complete with sound which depicts the person causing disturbing and unnecessary noise; or

(2) An audiotape with sounds of the disturbing noise together with the names and addresses of two witnesses who observed the making of the audiotape.

Sec. 26-51. Investigation.

Upon receipt of the complaint under this article, the appropriate law enforcement agency shall conduct an investigation of the complaint and upon determination that a violation has occurred shall issue a warning to the party responsible for the disturbance.

Sec. 26-52. Second complaint.

If within 30 days of the submission of complaint under this article the complainant notifies the appropriate law enforcement agency that such person is again making disturbing and unnecessary noise in violation of this section, the party causing such disturbance shall be subject to citation under this section.

26:9 Sec. 26-53. Warning by officer—Issuance.

If the unreasonably loud, disturbing, and unnecessary noise is heard or observed by an officer, a written warning may be issued to the violator.

Sec. 26-54. Same—Issuance of citation.

If the unreasonably loud, disturbing, and unnecessary noise is heard or observed a second time within 48 hours of a previous written warning as specified in section 26-53, an officer may issue a citation for the incident against the violator.

Sec. 26-55. Violations.

Activities and disturbances in violation of this article in which a citation is issued shall be subject to punishment as provided in section 1-19 of this Code. Each occurrence and activity completed in violation of this section shall be deemed a separate offense.

Secs. 26-56—26-80. Reserved.

ARTICLE III. NUISANCES*

DIVISION 1. GENERALLY

Sec. 26-81. Defined.

A nuisance is anything within the county that causes hurt, inconvenience or damage to another, and the fact that the act done may otherwise be lawful shall not keep it from being a nuisance. The inconvenience complained of shall not be fanciful or such as would affect only one of fastidious taste, but it shall be such as would affect an ordinary, reasonable person. Any such nuisance may be abated as provided in this article.

Sec. 26-82. Enumeration.

(a) The various nuisances described and enumerated in this section shall not be deemed to be exclusive but shall be in addition to all other nuisances described and prohibited in this Code.

(b) The following are declared to be nuisances:

(1) Things interfering with peace or comfort. Sounds, animals, or things that interfere with the peace or comfort or disturb the quiet of the county.

(2) Obnoxious and offensive odors. The emission of obnoxious and offensive odors; the tainting of the air rendering it offensive or unwholesome so as to affect the health or comfort of reasonable persons residing in the neighborhood.

(3) Discharging of offensive matter. The placing or throwing or discharging from any house or premises and flow from or out of any house or premises of any filthy, foul, or offensive matter or liquid of any kind into any street, alley, or public place or upon any adjacent lot or ground.

(4) Water pollution. The obstruction or pollution of any watercourse or source of water supply in the county.

(5) Emission of dense smoke. The emission of dense smoke from any fire, chimney, engine, oil burner, or other agency in the county so as to cause disturbance or discomfort to the public. For the purpose of testing and grading the density of smoke, the Ringelmann Smoke Chart, as published and used by the United States Geological Survey, shall be the standard for such grading, and smoke shall be defined and declared to be dense when it is of a degree of density of number three on the chart, or greater, for more than six minutes in any one hour, whether such period of time is consecutive or not.

(6) Vacant lots. Any vacant lot whereon debris is permitted to accumulate and remain in such a manner as to create a fire hazard or other hazard to the public health, safety and welfare.

(7) Nonconforming structures and machines. Any building, business, thing, machine, or machinery erected, repaired, conducted, maintained, operated, or used contrary to or in violation of any of the fire and safety regulations of this Code, state law or county ordinance.

(8) Animal enclosures. Any enclosure in which any animals are kept, dog kennels or runs, and other animal or fowl pens wherein manure, dung, filth, or litter is allowed to accumulate.

(9) Dead animals. The carcass of any dead animal of any kind on any premises within the county.

(10) Depositing trash, garbage, and refuse on private or public property. The depositing and leaving on private or public property of trash, garbage, refuse, scrap building materials, paper, cardboard containers, brick, cement rubbish, tree residue, cans, containers, or any other rubbish or trash that is a menace to public health and safety in the county or which unreasonably annoys others.

(11) Gutters or spouts. Any gutter or spout that conveys filth into any street, lane or alley of the county.

(12) Light trespass. Light trespass occurs when unwanted light enters one's property, for instance, by shining over a neighbor's fence, wall, etc. A common light trespass problem occurs when a strong light enters the window of one's home from the outside, causing a nuisance.

(Amend. of 5-17-2022(2)) Sec. 26-83. Prohibited.

It shall be unlawful for any person to maintain or permit the existence of any nuisance on any property within the county.

Sec. 26-83.1. [Additional remedies.]

(a) In addition to the remedies mentioned in section 26-84 et seq., the presiding judicial officer shall have the authority to impose sentence, if said person or entity has been adjudicated guilty or entered a plea of guilty, or a plea of nolo contendre, to a violation of section 26-81 et seq., which shall be punishable as a misdemeanor. The presiding judicial officer shall have the discretion of the imposition of sentence, including the ordering of the removal, demolition, or abatement of the nuisance, in accordance with section 26-84 et seq.

In addition to the court ordered removal, demolition, or abatement of the nuisance, and subject to the discretion of the presiding judicial officer, said punishment could be the maximum of a $1,000.00 fine, 60 days in jail, or both. Prior adjudications of quilt, guilty pleas, or nolo contender pleas, for this same type of offense, may be taken into consideration for purposes of implementation of sentence.

(b) The punishment associated with the violation of this article shall be a fine not to exceed $1,000.00, or imprisonment for 60 days, or both. Also, the court may order the removal, demolition, or abatement of any and all nuisances, in accordance with section 26-84 et seq.

(Ord. of 7-5-2005, Amend. No. 1) Sec. 26-84. Issuance of summons for abatement.

Whenever any nuisance exists within the county, or whenever any condition shall exist on any property within the county that is required or subject to be demolished, removed, or abated under any of the ordinances of the county, and the owner or other responsible person refuses or fails after reasonable notice to demolish, remove, or abate the nuisance, the officer having responsibility for enforcement of this article, may issue a summons and cause the summons to be served upon such owner or other person responsible for such condition, describing the condition complained of and specifying the ordinances or parts of ordinances claimed to be violated and requiring such person to appear before the magistrate judge at a time, date, and place specified in the summons to show cause why such condition should not be demolished, removed or abated.

Sec. 26-85. Order for abatement.

(a) If the magistrate judge at the hearing required by section 26-84 shall determine that a condition does exist as alleged that constitutes a nuisance or a condition which under this Code or the ordinances of the county is required or subject to be demolished, removed, or abated, the judge shall issue his order and judgment so finding and shall order the property owner or other responsible person to demolish, remove, or abate the condition within a period of time to be fixed by the judge. The order shall provide how the condition is to be abated, including, but not limited to, rehabilitation or demolition of any buildings or structures located on the property in question. The order shall further provide that if the property owner or other responsible person shall fail to comply with the order within the time specified, the county shall be authorized to proceed without further notice to demolish, remove, or abate such condition and to take whatever action is deemed necessary to demolish, remove, or abate such condition, and the expense shall be charged against the owner of the property in question and shall be a lien against the property upon which the condition existed, ranking equally with the lien for county taxes.

(b) Execution shall issue for such costs as in the case of county taxes, and the procedure for the enforcement of the execution shall thereafter be the same as in the case of county taxes.

Sec. 26-86. Nuisances constituting imminent danger.

Whenever any condition shall exist which constitutes an immediate and grave hazard to public health and safety requiring immediate action, the condition may be abated or otherwise remedied summarily and without following the procedures set forth in sections 26-84 and 26-85.

Sec. 26-87. Service on nonresidents and others.

Whenever it shall be necessary for the county to proceed under sections 26-84 and 26-85 and the owner of the property or other responsible person resides outside the county limits, or cannot be found after diligent search, service of the notice required by section 26-85 shall be made by posting a copy of the notice on the property involved and by publishing the notice in a newspaper having general circulation in the county once a week for four consecutive weeks, the last notice to be not longer than ten days nor less than one day prior to the hearing. Where the address of the person to be served is known, or where there is a last known address, a copy of the notice shall also be mailed to the person at such address by certified mail. In all cases where personal service cannot be made upon such person within the county limits, the case shall proceed as quasi in rem, and the execution shall issue in rem.

Sec. 26-88. Other powers preserved.

Nothing in this article shall in any way affect the power and authority of the magistrate judge to punish for any violations which the conditions may constitute nor shall it affect the power and authority of the magistrate judge to punish by contempt the failure to comply with his order.

Sec. 26-89. Exceptions.

The provisions of this article shall not apply to or be enforced against:

(1) Agricultural area, agricultural operation, agricultural facility, and agricultural support facility as outlined in O.C.G.A. § 41-1-7.

(2) Cultural facility as outlined in O.C.G.A. § 41-1-8.

26:13

(3) Sport shooting range as outlined in O.C.G.A. § 41-1-9 (Ord. of 9-6-2005, Amend. No. 2) Secs. 26-90—26-105. Reserved.

DIVISION 2. VEGETATION

Sec. 26-106. Certain weeds, grasses, and plants declared a nuisance; exemptions.

(a) Any weeds such as jimson, burdock, ragweed, thistle, cocklebur, or other weeds of a like kind found growing in any lot or tract of land in the county and any weeds, grasses, or plants other than trees, bushes, flowers, or other ornamental plants growing to a height exceeding 12 inches anywhere in the county are hereby declared to be a nuisance, subject to abatement as provided in this division.

(b) Garden flowers, vegetables, cultivated agricultural crops, ornamental shrubbery, and trees shall not be considered weeds, grass, or vegetation within the meaning of this section.

(c) The provisions of this division shall apply only to property located within subdivisions of record in the office of the clerk of the superior court of the county and to the original county lots. They shall not apply to undeveloped areas of unsubdivided land within the county.

Sec. 26-107. Height permitted.

It shall be unlawful for the owner, lessee, tenant, or other person having the possession and control of real property or responsible for its management, maintenance, or upkeep to permit the growth and accumulation of weeds, grass, or other vegetation to a height in excess of 12 inches above the ground.

Sec. 26-108. Notice to abate.

(a) For a violation of this division, the owner of the property shall be given notice to remove excess growth within seven days from the receipt of the notice. Such notice may be served personally or may be served by registered or certified mail or by attaching a copy of the notice to the principal entrance of the dwelling and shall contain a description of the location of the property upon which such condition exists.

(b) Where notice is given by registered or certified mail, the depositing of such notice in the United States mail by registered or certified mail, return receipt requested, addressed to the owner of the property at the address shown on the latest ad valorem tax return of such owner for such property shall constitute sufficient service of such notice, where the return receipt shall be duly returned signed by the addressee or someone residing on the premises 26:14

or where the return receipt or other notification from the federal postal service indicates that the notice was refused or that there was a refusal to sign the return receipt or that delivery of the notice at such address could not be made.

Sec. 26-109. Abatement by county; notice of abatement.

(a) Authority to use contractor to abate. Upon the failure to comply within the required time by the owner of the property when properly notified pursuant to the provisions of section 26-108, the county is authorized to have the contractor enter upon the property. The contractor is authorized to enter the property and cut and remove the weeds, grass and vegetation. The county shall issue a lot cleaning order to the contractor, who shall promptly perform the work and submit his bill to the county. The county shall inspect the work, and, if satisfactory, shall approve the bill for payment and forward it to the county treasurer for payment.

(b) Demand for payment. The county treasurer shall promptly send to the owner of the property a statement of account demanding payment on or before a date named in such demand, which shall not be earlier than 15 days nor later than 45 days after payment to the contractor.

(c) Hearing to show cause. If payment under subsection (b) of this section shall not have been made on or before the date named, the county treasurer shall issue a notice directed to the owner of the property and signed by the magistrate judge notifying such owner to show cause before the judge at a time and place and on a date named in the notice why execution should not issue against the property for its approval amount.

(d) Execution. If it shall appear at such hearing that the property was in violation of this division, that the notice required in section 26-108 was given, that the work was performed and the cost paid by the county, and that the county has not been reimbursed, execution shall issue for such amount and shall be executed by the chief of police in the same manner as tax executions are executed.

(e) Procedure when property owner unknown. If the owner of the property is unknown or cannot be located, the provisions of subsections (b) and (c) of this section shall not apply. In lieu thereof a notice shall be published once a week for four weeks in a newspaper of general circulation in the county, which notice shall be addressed !To Whom It May Concern.! Such notice shall describe with reasonable particularity the property involved, shall provide a statement of the amount due for the removal of the weeds, grass, or other vegetation, and shall notify all persons interested to show cause before the magistrate judge at a time and place and on a date named in the notice why execution should not issue in rem against the property for such amount. In such event, subsection (a) of this section will apply, but the execution shall issue against the property in rem.

Sec. 26-110. Remedies.

The remedies provided in this division are cumulative of all other remedies the county has for the accomplishment of the objectives set forth in this division. Nothing in this division 26:15

shall be construed as relieving any person from the obligation to comply with this Code, all ordinances, laws, or regulations of the county, or to permit the maintenance by any person of a nuisance, and any nuisance shall be subject to be abated in the manner provided by law.

Sec. 26-111. Award of contracts for clearing of lots by county.

Prior to the commencement of each fiscal year, the county shall obtain bids from contractors or other qualified persons for clearing lots of weeds, grass, and other vegetation not in excess of two inches in diameter and for clearing lots of weeds, grass, and other vegetation in excess of two inches but not in excess of four inches in diameter. The county commissioner shall award a contract to the lowest and best bidder, such contract to remain in effect during the ensuing fiscal year.

Secs. 26-112—26-125. Reserved.

DIVISION 3. MOSQUITO CONTROL

Sec. 26-126. Nuisance declared.

A violation of any provision of this division is a nuisance.

Sec. 26-127. Keeping water in which mosquitoes may breed.

(a) It shall be unlawful to have, keep, maintain, cause, or permit within the county any collection of standing or flowing water in which mosquitoes breed or are likely to breed unless such collection of water is so treated as to effectually prevent such breeding.

(b) The collections of water prohibited by subsection (a) of this section shall be those contained in ditches, pools, ponds, excavations, holes, depressions, open cesspools, privy vaults, fountains, cisterns, tanks, shallow wells, barrels, troughs (except animal troughs in frequent use), urns, cans, boxes, bottles, tubs, buckets, defective house roof gutters, tanks of flush closets, tires, or other similar water containers.

Sec. 26-128. Treatment of collections of water.

The method of treatment of any collections of water that are specified in section 26-127 directed toward the prevention of breeding of mosquitoes shall be approved by the health officer and may be one or more of the following:

(1) Screening with wire netting of at least 16 meshes to the inch each way or with any other material that will effectually prevent the ingress or egress of mosquitoes.

(2) Complete emptying every seven days of unscreened containers, together with their thorough drying and cleaning.

(3) Using a larvicide approved and applied under the direction of the health officer.

(4) Cleaning and keeping sufficiently free of vegetable growth and other obstructions and stocking with mosquito-destroying fish.

26:16

(5) Filling and draining to the satisfaction of the health officer or his agent or accredited representative.

(6) Proper disposal by removal or destruction of tin cans, tin boxes, broken, or empty bottles and similar articles likely to hold water.

Sec. 26-129. Mosquito larvae as evidence of breeding.

The natural presence of mosquito larvae in standing or running water shall be evidence that mosquitoes are breeding there. Failure to prevent such breeding within three days after notice by the health officer or his authorized agent or representative shall be deemed a violation of this division.

Sec. 26-130. Failure to remedy conditions after notice.

Should the person responsible for conditions giving rise to the breeding of mosquitoes fail or refuse to take necessary measures to prevent the breeding of mosquitoes within three days after due notice has been given to him, the health officer or his authorized agent is authorized to do so, and all necessary costs incurred by him for this purpose shall be a charge against the property owner or other person offending, as the case may be.

Sec. 26-131. Right of entry of health officer.

For the purpose of enforcing the provisions of this division, the health officer, or his duly accredited agent under his authority, may at all reasonable times lawfully enter in and upon any premises within his jurisdiction.

Secs. 26-132—26-155. Reserved.

ARTICLE IV. SOIL EROSION AND SEDIMENTATION CONTROL*

Sec. 26-156. Title.

This article will be known as "Murray County Soil Erosion, Sedimentation and Pollution Control Ordinance."

(Ord. of 12-16-2009, § I) Sec. 26-157. Definitions.

The following definitions shall apply in the interpretation and enforcement of this article, unless otherwise specifically stated:

Best management practices (BMPs). These include sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the #Manual for Erosion and Sediment Control in Georgia# published by the commission as of January 1 of the year in which the land-disturbing activity was permitted.

Board. The board of natural resources.

Buffer. The area of land immediately adjacent to the banks of state waters in its natural state of vegetation, which facilitates the protection of water quality and aquatic habitat.

Certified personnel. A person who has successfully completed the appropriate certification course approved by the Georgia Soil and Water Conservation Commission.

Coastal marshlands. Shall have the same meaning as in Code section 12-5-282.

Commission. The Georgia Soil and Water Conservation Commission (GSWCC).

CPESC. Certified professional in erosion and sedimentation control with current certification by EnviroCert, Inc., which is also referred to as CPESC or CPESC, Inc.

Cut. A portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below original ground surface to the excavated surface.

Also known as #excavation.# Department. The Georgia Department of Natural Resources (DNR).

Design professional. A professional licensed by the State of Georgia in the field of:

engineering, architecture, landscape architecture, forestry, geology, or land surveying; or a person that is a certified professional in erosion and sediment control (CPESC) with a current certification by EnviroCert, Inc. Design professionals shall practice in a manner that complies with applicable Georgia law governing professional licensure.

Director. The director of the environmental protection division or an authorized representative.

District. The Limestone Valley Soil and Water Conservation District.

Division. The environmental protection division (EPD) of the department of natural resources.

Drainage structure. A device composed of a virtually nonerodible material such as concrete, steel, plastic or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for stormwater management, drainage control, or flood control purposes.

26:18 Erosion. The process by which land surface is worn away by the action of wind, water, ice or gravity.

Erosion, sedimentation and pollution control plan. A plan required by the Erosion and Sedimentation Act, O.C.G.A. Ch. 12-7, that includes, as a minimum protection, at least as stringent as the state general permit, best management practices, and requirements in subsection 26-159(c) of this article.

Fill. A portion of land surface to which soil or other solid material has been added; the depth above the original ground surface or an excavation.

Final stabilization. All soil disturbing activities at the site have been completed, and that for unpaved areas and areas not covered by permanent structures and areas located outside the waste disposal limits of a landfill cell that has been certified by EPD for waste disposal, 100 percent of the soil surface is uniformly covered in permanent vegetation with a density of 70 percent or greater, or landscaped according to the plan (uniformly covered with landscaping materials in planned landscape areas), or equivalent permanent stabilization measures as defined in the manual (excluding a crop of annual vegetation and seeding of target crop perennials appropriate for the region). Final stabilization applies to each phase of construction.

Finished grade. The final elevation and contour of the ground after cutting or filling and conforming to the proposed design.

Grading. Altering the shape of ground surfaces to a predetermined condition; this includes stripping, cutting, filling, stockpiling and shaping or any combination thereof and shall include the land in its cut or filled condition.

Ground elevation. The original elevation of the ground surface prior to cutting or filling.

Land-disturbing activity. Any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land but not including agricultural practices as described in subsection 26-158(5).

Larger common plan of development or sale. A contiguous area where multiple separate and distinct construction activities are occurring under one plan of development or sale. For the purposes of this paragraph, $plan$ means an announcement; piece of documentation such as a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, or computer design; or physical demarcation such as boundary signs, lot stakes, or surveyor markings, indicating that construction activities may occur on a specific plot.

Local issuing authority. The governing authority of any county or municipality which is certified pursuant to O.C.G.A. § 12-7-8(a).

Metropolitan River Protection Act (MRPA). A state law referenced as O.C.G.A. § 12-5-440 et seq. which addresses environmental and developmental matters in certain metropolitan river corridors and their drainage basins.

26:19 Natural ground surface. The ground surface in its original state before any grading, excavation or filling.

Nephelometric turbidity units (NTU). Numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed or suspended particles are present.

NOI. A notice of intent form provided by EPD for coverage under the state general permit.

NOT. A notice of termination form provided by EPD to terminate coverage under the state general permit.

Operator. The party or parties that have:

(1) Operational control of construction project plans and specifications, including the ability to make modifications to those plans and specifications; or

(2) Day-to-day operational control of those activities that are necessary to ensure compliance with an erosion, sedimentation and pollution control plan for the site or other permit conditions, such as a person authorized to direct workers at a site to carry out activities required by the erosion, sedimentation and pollution control plan or to comply with other permit conditions.

Outfall. The location where stormwater in a discernible, confined and discrete conveyance, leaves a facility or site or, if there is a receiving water on site, becomes a point source discharging into that receiving water.

Permit. The authorization necessary to conduct a land-disturbing activity under the provisions of this article.

Person. Any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, state agency, municipality or other political subdivision of this State of Georgia, [and] any interstate body or any other legal entity.

Phase or phased. Subparts or segments of construction projects where the subpart or segment is constructed and stabilized prior to completing construction activities on the entire construction site.

Project. The entire proposed development project regardless of the size of the area of land to be disturbed.

Property designed. Designed in accordance with the design requirements and specifications contained in the %Manual for Erosion and Sediment Control in Georgia% (manual) published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted and amendments to the manual as approved by the commission up until the date of NOI submittal.

26:20 Roadway drainage structure. A device such as a bridge, culvert, or ditch, composed of a virtually nonerodible material such as concrete, steel, plastic, or other such material that conveys water under a roadway by intercepting the flow on one side of a traveled roadway consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side.

Sediment. Solid material, both organic and inorganic, that is in suspension, is being transported, or has been moved from its site of origin by air, water, ice, or gravity as a product of erosion.

Sedimentation. The process by which eroded material is transported and deposited by the action of water, wind, ice or gravity.

Soil and water conservation district approved plan. An erosion, sedimentation and pollution control plan approved in writing by the Limestone Valley Soil and Water Conservation District.

Stabilization. The process of establishing an enduring soil cover of vegetation by the installation of temporary or permanent structures for the purpose of reducing to a minimum the erosion process and the resultant transport of sediment by wind, water, ice or gravity.

State general permit. The National Pollution Discharge Elimination System (NPDES) general permit or permits for stormwater runoff from construction activities as is now in effect or as may be amended or reissued in the future pursuant to the state's authority to implement the same through federal delegation under the Federal Water Pollution Control Act, as amended, 33 U.S.C. Section 1251 et seq., and [O.C.G.A.] § 12-5-30(f).

State waters. Any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of Georgia which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation.

Structural erosion, sedimentation and pollution control practices. Practices for the stabilization of erodible or sediment-producing areas by utilizing the mechanical properties of matter for the purpose of either changing the surface of the land or storing, regulating or disposing of runoff to prevent excessive sediment loss. Examples of structural erosion and sediment control practices are riprap, sediment basins, dikes, level spreaders, waterways or outlets, diversions, grade stabilization structures and sediment traps, etc. Such practices can be found in the publication Manual for Erosion and Sediment Control in Georgia.

Trout streams. All streams or portions of streams within the watershed as designated by the Wildlife Resources Division of the Georgia Department of Natural Resources under the provisions of the Georgia Water Quality Control Act, O.C.G.A. § 12-5-20, in the rules and regulations for Water Quality Control, Chapter 391-3-6 at www.gaepd.org. Streams designated as primary trout waters are defined as water supporting a self-sustaining population of rainbow, brown or brook trout. Streams designated as secondary trout waters are those in 26:21

which there is no evidence of natural trout reproduction, but are capable of supporting trout throughout the year. First order trout waters are streams into which no other streams flow except springs.

Vegetative erosion and sedimentation control measures. Measures for the stabilization of erodible or sediment-producing areas by covering the soil with:

(1) Permanent seeding, sprigging or planting, producing longterm vegetative cover;

(2) Temporary seeding, producing short-term vegetative cover; or

(3) Sodding, covering areas with a turf of perennial sod-forming grass.

Such measures can be found in the publication &Manual for Erosion and Sediment Control in Georgia.&

Watercourse. Any natural or artificial watercourse, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which water flows either continuously or intermittently and which has a definite channel, bed and banks, and including any area adjacent thereto subject to inundation by reason of overflow or floodwater.

Wetlands. Those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support a prevalence of vegetation typically adapted for life in saturated soil conditions.

Wetlands generally include swamps, marshes, bogs, and similar areas.

(Ord. of 12-16-2009, § II; Amend. of 12-21-2016; Amend. of 1-2-2018) Sec. 26-158. Exemptions.

This article shall apply to any land-disturbing activity undertaken by any person on any land except for the following:

(1) Surface mining, as the same is defined in O.C.G.A. § 12-4-72, &The Georgia Surface Mining Act of 1968;&

(2) Granite quarrying and land clearing for such quarrying;

(3) Such minor land-disturbing activities as home gardens and individual home landscaping, repairs, maintenance work, fences, and other related activities which result in minor soil erosion;

(4) The construction of single-family residences, when such construction disturbs less than one acre and is not a part of a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre and not otherwise exempted under this paragraph; provided, however, that construction of any such residence shall conform to the minimum requirements as set forth in O.C.G.A.

§ 12-7-6 and this paragraph. For single-family residence construction covered by the provisions of this paragraph, there shall be a buffer zone between the residence and any state waters classified as trout streams pursuant to Article 2 of Chapter 5 of the 26:22

'Georgia Water Quality Control Act.' In any such buffer zone, no land-disturbing activity shall be constructed between the residence and the point where vegetation has been wrested by normal stream flow or wave action from the banks of the trout waters. For primary trout waters, the buffer zone shall be at least 50 horizontal feet, and no variance to a smaller buffer shall be granted. For secondary trout waters, the buffer zone shall be at least 50 horizontal feet, but the director may grant variances to no less than 25 feet. Regardless of whether a trout stream is primary or secondary, for first order trout waters, which are streams into which no other streams flow except for springs, the buffer shall be at least 25 horizontal feet, and no variance to a smaller buffer shall be granted. The minimum requirements of O.C.G.A. § 12-7- 6(b) and the buffer zones provided by this paragraph shall be enforced by the local issuing authority;

(5) Agricultural operations as defined in O.C.G.A. § 1-3-3, 'definitions,' to include raising, harvesting or storing of products of the field or orchard; feeding, breeding or managing livestock or poultry; producing or storing feed for use in the production of livestock, including but not limited to cattle, calves, swine, hogs, goats, sheep, and rabbits or for use in the production of poultry, including but not limited to chickens, hens and turkeys; producing plants, trees, fowl, or animals; the production of aqua culture, horticultural, dairy, livestock, poultry, eggs and apiarian products; farm buildings and farm ponds;

(6) Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause or result in land-disturbing or other activities otherwise prohibited in a buffer, as established in subsections 26-159(c)(15) and (16) of this article, no other land-disturbing activities, except for normal forest management practices, shall be allowed on the entire property upon which the forestry practices were conducted for a period of three years after completion of such forestry practices;

(7) Any project carried out under the technical supervision of the Natural Resources Conservation Service (NRCS) of the United States Department of Agriculture;

(8) Any project involving less than one acre of disturbed area; provided, however, that this exemption shall not apply to any land-disturbing activity within a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre or within 200 feet of the bank of any state waters, and for purposes of this paragraph, 'state waters' excludes channels and drainageways which have water in them only during and immediately after rainfall events and intermittent streams which do not have water in them year-round; provided, however, that any person responsible for a project which involves less than one acre, which involves land-disturbing activity, and which is within 200 feet of any such excluded channel or drainageway, must prevent sediment from moving beyond the boundaries of the property on which such project is located and provided, further, 26:23

that nothing contained herein shall prevent the Local Issuing Authority from regulating any such project which is not specifically exempted by subsections (1), (2), (3), (4), (5), (6), (7), (9) or (10) of this section;

(9) Construction or maintenance projects, or both, undertaken or financed in whole or in part, or both, by the department of transportation, the Georgia Highway Authority, or the state road and tollway authority; or any road construction or maintenance project, or both, undertaken by any county or municipality; provided, however, that construction or maintenance projects of the department of transportation or the state road and tollway authority which disturb one or more contiguous acres of land shall be subject to provisions of O.C.G.A. § 12-7-7.1; except where the department of transportation, the Georgia Highway Authority, or the state road and tollway authority is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case a copy of a notice of intent under the state general permit shall be submitted to the local issuing authority, the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders;

(10) Any land-disturbing activities conducted by any electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the public service commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power; except where an electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the public service commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders; and

(11) Any public water system reservoir.

(Ord. of 12-16-2009, § III) Sec. 26-159. Minimum requirements for erosion, sedimentation and pollution control using best management practices.

(a) General provisions. Excessive soil erosion and resulting sedimentation can take place during land-disturbing activities if requirements of the article and the NPDES general permit are not met. Therefore, plans for those land-disturbing activities which are not exempted by this article shall contain provisions for application of soil erosion, sedimenta- 26:24

tion and pollution control measures and practices. The provisions shall be incorporated into the erosion, sedimentation and pollution control plans. Soil erosion, sedimentation and pollution control measures and practices shall conform to the minimum requirements of subsections (b) and (c) of this section. The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed to prevent or control erosion, sedimentation and pollution during all stages of any land-disturbing activity in accordance with requirements of this article and the NPDES general permit.

(b) Minimum requirements/BMPs.

(1) Best management practices as set forth in subsections (b) and (c) of this section shall be required for all land-disturbing activities. Proper design, installation, and maintenance of best management practices shall constitute a complete defense to any action by the director or to any other allegation of noncompliance with paragraph (2) of this subsection or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to O.C.G.A. § 12-5-30(f), the (Georgia Water Quality Control Act.( As used in this subsection the terms (proper design( and (properly designed( mean designed in accordance with the hydraulic design specifications contained in the (Manual for Erosion and Sediment Control in Georgia( specified in O.C.G.A. § 12-7-6(b).

(2) A discharge of stormwater runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained shall constitute a separate violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to of O.C.G.A.

§ 12-5-30(f), the (Georgia Water Quality Control Act,( for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters.

The turbidity of the receiving waters shall be measured in accordance with guidelines to be issued by the director. This paragraph shall not apply to any land disturbance associated with the construction of single-family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres.

(3) Failure to properly design, install, or maintain best management practices shall constitute a violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to [O.C.G.A.]

§ 12-5-30(f), the (Georgia Water Quality Control Act,( for each day on which such failure occurs.

(4) The director may require, in accordance with regulations adopted by the board, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land disturbing activities occur.

26:25

(5) The LIA may set more stringent buffer requirements than stated in subsections (c)(15), (16) and (17), in light of O.C.G.A. § 12-7-6(c).

(c) The rules and regulations, ordinances, or resolutions adopted pursuant to O.C.G.A.

§§ 12-7-1 et seq. for the purpose of governing land-disturbing activities shall require, as a minimum, protections at least as stringent as the state general permit; and best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the )Manual for Erosion and Sediment Control in Georgia,) published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, as well as the following:

(1) Stripping of vegetation, regarding and other development activities shall be conducted in a manner so as to minimize erosion;

(2) Cut-fill operations must be kept to a minimum;

(3) Development plans must conform to topography and soil type so as to create the lowest practical erosion potential;

(4) Whenever feasible, natural vegetation shall be retained, protected and supplemented;

(5) The disturbed area and the duration of exposure to erosive elements shall be kept to a practicable minimum;

(6) Disturbed soil shall be stabilized as quickly as practicable;

(7) Temporary vegetation or mulching shall be employed to protect exposed critical areas during development;

(8) Permanent vegetation and structural erosion control practices shall be installed as soon as practicable;

(9) To the extent necessary, sediment in runoff water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A.

§§ 12-7-1 et seq.;

(10) Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping of fills;

(11) Cuts and fills may not endanger adjoining property;

(12) Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners;

(13) Grading equipment must cross flowing streams by means of bridges or culverts except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum;

26:26

(14) Land-disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on-site or preclude sedimentation of adjacent waters beyond the levels specified in subsection (b)(2) of this section;

(15) Except as provided in paragraph (16) and (17) of this subsection, there is established a 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the director pursuant to O.C.G.A. § 12-2-8, where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or where bulkheads and sea walls are installed to prevent shoreline erosion on Lake Oconee and Lake Sinclair; or along any ephemeral stream. As used in this provision, the term 'ephemeral stream' means a stream: that under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the groundwater table year round; for which groundwater is not a source of water; and for which runoff from precipitation is the primary source of water flow, unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to part 6 of article 5, chapter 5 of title 12, the *Georgia Water Quality Control Act*, shall remain in force unless a variance is granted by the director as provided in this paragraph. The following requirements shall apply to any such buffer:

a. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all landdisturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and

b. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented:

1. Stream crossings for water lines; or

2. Stream crossings for sewer lines; and 26:27

(16) There is established a 50-foot buffer as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, along the banks of any state waters classified as +trout streams+ pursuant to article 2 of chapter 5 of title 12, the +Georgia Water Quality Control Act,+ except where a roadway drainage structure must be constructed; provided, however, that small springs and streams classified as trout streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25-foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the board, so long as any such pipe stops short of the downstream landowner's property and the landowner complies with the buffer requirement for any adjacent trout streams. The director may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented. The following requirements shall apply to such buffer:

a. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all landdisturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and

b. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented:

1. Stream crossings for water lines; or

2. Stream crossings for sewer lines.

(17) There is established a 25-foot buffer along coastal marshlands, as measured horizontally from the coastal marshland-upland interface, as determined in accordance with chapter 5 of title 12 of this title, the +Coastal Marshlands Protection Act of 1970.+ And the rules and regulations promulgated thereunder, except where the director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the director pursuant to [O.C.G.A.] § 12-2-8, where an alteration within the buffer area has been authorized pursuant to [O.C.G.A] § 12-5-286, for maintenance of any currently serviceable structure, landscaping, or hardscaping, including bridges, roads, parking lots, golf 26:28

courses, golf cart paths, retaining walls, bulkheads, and patios; provided, however, that if such maintenance requires any land-disturbing activity, adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented, where a drainage structure or roadway drainage structure is constructed or maintained; provided, however, that if such maintenance requires any land-disturbing activity, adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented, on the landward side of any currently serviceable shoreline stabilization structure, or for the maintenance of any manmade stormwater detention basin, golf course pond, or impoundment that is located entirely within the property of a single individual, partnership, or corporation; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented. For the purposes of this paragraph maintenance shall be defined as actions necessary or appropriate for retaining or restoring a currently serviceable improvement to the specified operable condition to achieve its maximum useful life. Maintenance includes emergency reconstruction of recently damaged parts of a currently serviceable structure so long as it occurs within a reasonable period of time after damage occurs. Maintenance does not include any modification that changes the character, scope or size of the original design and serviceable shall be defined as usable in its current state or with minor maintenance but not so degraded as to essentially require reconstruction.

a. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed, state of vegetation until all landdisturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat; and

b. The buffer shall not apply to crossings for utility lines that cause a width of disturbance of not more than 50 feet within the buffer, provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented.

c. The buffer shall not apply to any land-disturbing activity conducted pursuant to and in compliance with a valid and effective land-disturbing permit issued subsequent to April 22, 2014, and prior to December 31, 2015; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented or any lot for which the preliminary plat has been approved prior to December 31, 2015 if roadways, bridges, or water and sewer lines have been extended to such 26:29

lot prior to the effective date of this Act and if the requirement to maintain a 25-foot buffer would consume at least 18 percent of the high ground of the platted lot otherwise available for development; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented.

d. Activities where the area within the buffer is not more than 500 square feet or that have a ,minor buffer impact, as defined in section 391-3-7-.01(r), provided that the total area of buffer impacts is less than 5,000 square feet are deemed to have an approved buffer variance by rule. Bank stabilization structures are not eligible for coverage under the variance by rule and notification shall be made to the division at least 14 days prior to the commencement of land disturbing activities.

(d) Nothing contained in O.C.G.A. § 12-7-1 et seq. shall prevent any local issuing authority from adopting rules and regulations, ordinances, or resolutions which contain stream buffer requirements that exceed the minimum requirements in subsections (b) and

(c) of this section.

(e) The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit.

(Ord. of 12-16-2009, § IV; Amend. of 8-4-2015(1); Amend. of 12-21-2016) Sec. 26-160. Application/permit process.

(a) General. The property owner, developer and designated planners and engineers shall design and review before submittal the general development plans. The local issuing authority shall review the tract to be developed and the area surrounding it. They shall review the zoning ordinance, stormwater management ordinance, subdivision ordinance, flood damage prevention ordinance, this article, and any other ordinances, rules, regulations or permits, which regulate the development of land within the jurisdictional boundaries of the local issuing authority. However, the owner and/or operator is the only party who may obtain a permit.

(b) Application requirements.

(1) No person shall conduct any land-disturbing activity within the jurisdictional boundaries of Murray County without first obtaining a permit from the land development officer to perform such activity and providing a copy of notice of intent submitted to EPD if applicable.

(2) The application for a permit shall be submitted to the land development officer and must include the applicant's erosion, sedimentation and pollution control plan with supporting data, as necessary. Said plans shall include, as a minimum, the data specified in subsection (c) of this section. Erosion, sedimentation and pollution control plans, together with supporting data, must demonstrate affirmatively that 26:30

the land disturbing activity proposed will be carried out in such a manner that the provisions of subsections 26-159(b) and (c) of this article will be met. Applications for a permit will not be accepted unless accompanied by five copies of the applicant's erosion, sedimentation and pollution control plans. All applications shall contain a certification stating that the plan preparer or the designee thereof visited the site prior to creation of the plan in accordance with EPD Rule 391-3-7-10.

(3) A fee in the amount of $58.00 shall be charged for each acre or fraction thereof up to ten acres and $12.00 per acre or fraction thereof for the remaining project area. In addition to the local permitting fees, fees will also be assessed pursuant to O.C.G.A.

§ 12-5-23(a)(5), provided that such fees shall not exceed $80.00 per acre of land-disturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the state general permit for each acre of land-disturbing activity included in the planned development or each phase of development. All applicable fees shall be paid prior to issuance of the land disturbance permit. In a jurisdiction that is certified pursuant to O.C.G.A. § 12-7-8(a) half of such fees levied shall be submitted to the division; except that any and all fees due from an entity which is required to give notice pursuant to O.C.G.A. § 12-7-17(9) or (10) shall be submitted in full to the division, regardless of the existence of a local issuing authority in the jurisdiction.

(4) Immediately upon receipt of an application and plan for a permit, the local issuing authority shall refer the application and plan to the district for its review and approval or disapproval concerning the adequacy of the erosion, sedimentation and pollution control plan. The district shall approve or disapprove a plan within 35 days of receipt. Failure of the district to act within 35 days shall be considered an approval of the pending plan. The results of the district review shall be forwarded to the local issuing authority. No permit will be issued unless the plan has been approved by the district, and any variances required by subsections 26-159(c)(15), (16) and (17) have been obtained, all fees have been paid, and bonding, if required as per subsection (b)(6), have been obtained. Such review will not be required if the local issuing authority and the district have entered into an agreement which allows the local issuing authority to conduct such review and approval of the plan without referring the application and plan to the district. The local issuing authority with plan review authority shall approve or disapprove a revised plan submittal within 35 days of receipt. Failure of the local issuing authority with plan review authority to act within 35 days shall be considered an approval of the revised plan submittal.

(5) If a permit applicant has had two or more violations of previous permits, this article section, or the Erosion and Sedimentation Act, as amended, within three years prior to the date of filing the application under consideration, the local issuing authority may deny the permit application.

(6) The local issuing authority may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination 26:31

thereof up to, but not exceeding, $1,500.00 per acre or fraction thereof of the proposed land-disturbing activity, prior to issuing the permit. If the applicant does not comply with this section or with the conditions of the permit after issuance, the local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance. These provisions shall not apply unless there is in effect an ordinance or statute specifically providing for hearing and judicial review of any determination or order of the local issuing authority with respect to alleged permit violations.

(c) Plan requirements.

(1) Plans must be prepared to meet the minimum requirements as contained in subsections 26-159(b) and (c) of this article, or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. The -Manual for Erosion and Sediment Control in Georgia,- is hereby incorporated by reference into this article. The plan for the land-disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and stormwater management facilities, local ordinances and state laws. Maps, drawings and supportive computations shall bear the signature and seal of the certified design professional. Persons involved in land development design, review, permitting, construction, monitoring, or inspections or any land disturbing activity shall meet the education and training certification requirements, dependent on his or her level of involvement with the process, as developed by the commission and in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A.

§ 12-7-20.

(2) Data required for site plan shall include all the information required from the appropriate erosion, sedimentation and pollution control plan review checklist established by the commission as of January 1 of the year in which the landdisturbing activity was permitted.

(d) Permits.

(1) Permits shall be issued or denied as soon as practicable but in any event not later than 45 days after receipt by the local issuing authority of a completed application, providing variances and bonding are obtained, where necessary and all applicable fees have been paid prior to permit issuance. The permit shall include conditions under which the activity may be undertaken.

(2) No permit shall be issued by the local issuing authority unless the erosion, sedimentation and pollution control plan has been approved by the district and the local issuing authority has affirmatively determined that the plan is in compliance with this chapter, any variances required by subsections 26-159(c)(15), (16) and (17) are obtained, bonding requirements, if necessary, as per subsection (b)(6), are met 26:32

and all ordinances and rules and regulations in effect within the jurisdictional boundaries of the local issuing authority are met. If the permit is denied, the reason for denial shall be furnished to the applicant.

(3) Any land-disturbing activities by a local issuing authority shall be subject to the same requirements of this article, and any other ordinances relating to land development, as are applied to private persons and the division shall enforce such requirements upon the local issuing authority.

(4) If the tract is to be developed in phases, then a separate permit shall be required for each phase.

(5) The permit may be suspended, revoked, or modified by the local issuing authority, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in the title is not in compliance with the approved erosion and sedimentation control plan or that the holder or his successor in title is in violation of this article. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the conditions contained in the permit.

(6) The LIA may reject a permit application if the applicant has had two or more violations of previous permits or the Erosion and Sedimentation Act permit requirements within three years prior to the date of the application, in light of O.C.G.A. § 12-7-7(f)(1).

(Ord. of 12-16-2009, § V; Amend. of 12-21-2016) Sec. 26-161. Inspection and enforcement.

(a) The land development officer or designee will periodically inspect the sites of land-disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation. Also, the local issuing authority shall regulate primary, secondary and tertiary permittees as such terms are defined in the state general permit. Primary permittees shall be responsible for installation and maintenance of best management practices where the primary permittee is conducting land-disturbing activities. Secondary permittees shall be responsible for installation and maintenance of best management practices where the secondary permittee is conducting land-disturbing activities. Tertiary permittees shall be responsible for installation and maintenance where the tertiary permittee is conducting land-disturbing activities. If, through inspection, it is deemed that a person engaged in land-disturbing activities as defined herein has failed to comply with the approved plan, with permit conditions, or with the provisions of this article, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article.

26:33

(b) The local issuing authority must amend its ordinances to the extent appropriate within 12 months of any amendments to the Erosion and Sedimentation Act of 1975.

(c) The land development officer or designee shall have the power to conduct such investigations as it may reasonably deem necessary to carry out duties as prescribed in this article, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land-disturbing activities.

(d) No person shall refuse entry or access to any authorized representative or agent of the local issuing authority, the commission, the district, or division who requests entry for the purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties.

(e) The districts or the commission or both shall periodically review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7-8(a). The districts or the commission or both may provide technical assistance to any county or municipality for the purpose of improving the effectiveness of the county's or municipality's erosion, sedimentation and pollution control program. The districts or the commission shall notify the division and request investigation by the division if any deficient or ineffective local program is found.

(f) The division may periodically review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7-8(a). Such review may include, but shall not be limited to, review of the administration and enforcement of a governing authority's ordinance and review of conformance with an agreement, if any, between the district and the governing authority. If such review indicates that the governing authority of any county or municipality certified pursuant to O.C.G.A. § 12-7-8(a) has not administered or enforced its ordinances or has not conducted the program in accordance with any agreement entered into pursuant to O.C.G.A. § 12-7-7(e), the division shall notify the governing authority of the county or municipality in writing. The governing authority of any county or municipality so notified shall have 90 days within which to take the necessary corrective action to retain certification as a local issuing authority. If the county or municipality does not take necessary corrective action within 90 days after notification by the division, the division shall revoke the certification of the county or municipality as a local issuing authority.

(Ord. of 12-16-2009, § VI) Sec. 26-162. Penalties and incentives.

(a) Failure to obtain a permit for land-disturbing activity. If any person commences and land-disturbing activity requiring a land-disturbing permit as prescribed in this article without first obtaining said permit, the person shall be subject to revocation of his business license, work permit or other authorization for the conduct of a business and associated work activities within the jurisdictional boundaries of the local issuing authority.

26:34

(b) Stop work orders.

(1) For the first and second violations of the provisions of this article, the director or the local issuing authority shall issue a written warning to the violator. The violator shall have five days to correct the violation. If the violation is not corrected within five days, the director or the local issuing authority shall issue a stop work order requiring that land-disturbing activities be stopped until necessary corrective action or mitigation has occurred; provided, however, that, if the violation presents an imminent threat to public health or waters of the state or if the land-disturbing activities are conducted without obtaining the necessary permit, the director or the local issuing authority shall issue an immediate stop work order in lieu of a warning;

(2) For a third and each subsequent violation, the director or the local issuing authority shall issue an immediate stop work order;

(3) All stop work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred; and

(4) When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or significant amounts of sediment, as determined by the local issuing authority or by the director or his or her designee, have been or are being discharged into state waters and where best management practices have not been properly designed, installed, and maintained, a stop work order shall be issued by the local issuing authority or by the director or his or her designee. All such stop work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. Such stop work orders shall apply to all land-disturbing activity on the site with the exception of the installation and maintenance of temporary or permanent erosion and sediment controls.

(c) Bond forfeiture. If, through inspection, it is determined that a person engaged in land-disturbing activities has failed to comply with the approved plan, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance with the plan and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article and, in addition to other penalties, shall be deemed to have forfeited his performance bond, if required to post one under the provisions of subsection 26-160(b)(6). The local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance.

(d) Monetary penalties.

(1) Any person who violates any provisions of this article, or any permit condition or limitation established pursuant to this article, or who negligently or intentionally fails or refuses to comply with any final or emergency order of the director issued as provided in this article shall be liable for a civil penalty not to exceed $2,500.00 per day. For the purpose of enforcing the provisions of this article, notwithstanding any 26:35

provisions in any City Charter to the contrary, municipal courts shall be authorized to impose penalty not to exceed $2,500.00 for each violation. Notwithstanding any limitation of law as to penalties which can be assessed for violations of county ordinances, any magistrate court or any other court of competent jurisdiction trying cases brought as violations of this article under county ordinances approved under this article shall be authorized to impose penalties for such violations not to exceed $2,500.00 for each violation. Each day during which violation or failure or refusal to comply continues shall be a separate violation.

(Ord. of 12-16-2009, § VII) Sec. 26-163. Education and certification.

(a) Persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the commission in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20.

(b) For each site on which land-disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the state general permit, shall have as a minimum one person who is in responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the commission present on site whenever land-disturbing activities are conducted on that site. A project site shall herein be defined as any land-disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit.

(c) Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on site may contract with certified persons to meet the requirements of this article.

(d) If a state general permittee who has operational control of land-disturbing activities for a site has met the certification requirements of O.C.G.A. § 12-7-19(b)(1), then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in O.C.G.A.

§ 12-7-19(b)(4) and shall not be required to meet any educational requirements that exceed those specified in said paragraph [section].

(Ord. of 12-16-2009, § VIII) Sec. 26-164. Administrative appeal; judicial review.

(a) Administrative remedies. The suspension, revocation, modification or grant with condition of a permit by the local issuing authority upon finding that the holder is not in compliance with the approved erosion, sediment and pollution control plan; or that the holder is in violation of permit conditions; or that the holder is in violation of any ordinance;

26:36 shall entitle the person submitting the plan or holding the permit to a hearing before the Murray County Board of Appeals. Such appeal shall be taken within 15 days after receipt of the written decision of the local issuing authority.

(b) Judicial review. Any person, aggrieved by a decision or order of the issuing authority, after exhausting his administrative remedies, shall have the right to appeal denovo to the Superior Court of Murray County.

(Ord. of 12-16-2009, § IX) Sec. 26-165. Effectivity, validity and liability.

(a) Effectivity. This article shall become effective on the 16th day of December, 2009.

(b) Validity. If any section, paragraph, clause, phrase, or provision of this article shall be adjudged invalid or held unconstitutional, such decisions shall not affect the remaining portions of this article.

(c) Liability.

(1) Neither the approval of a plan under the provisions of this article, nor the compliance with provisions of this article shall relieve any person from the responsibility for damage to any person or property otherwise imposed by law nor impose any liability upon the local issuing authority or district for damage to any person or property.

(2) The fact that a land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit.

(3) No provision of this article shall permit any persons to violate the Georgia Erosion and Sedimentation Act of 1975, the Georgia Water Quality Control Act or the rules and regulations promulgated and approved thereunder or pollute any waters of the state as defined thereby.

(Ord. of 12-16-2009, § X) Secs. 26-166—26-250. Reserved.

ARTICLE V. SCRAP TIRES*

Sec. 26-251. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Scrap tire means all tires that are no longer suitable for their original intended purpose because of wear, damage, or defect.

Scrap tire carrier means any person engaged in picking up or transporting scrap tires not otherwise exempted under Georgia Rules for Solid Waste Management, section 391-3- 4.19(5)(G) for the purpose of removal to a scrap tire processor, end user, or disposal facility.

Scrap tire generator means any person who generates scrap tires. Generators may include, but are not limited to, retail tire dealers, retreaders, scrap tire processors, automobile dealers, auto scrap/salvage/junk yards, private company maintenance shops, garages, service stations, and city, county, and state governments.

Structural cover means a permanent shelter designed to shield or protect from natural elements in order to prevent water pooling.

Tire retailer means any person engaged in the business of selling new, retreaded, or used replacement tires.

Used tire means a tire which has a minimum of 1 /16 inch of road tread and which is still suitable for its original purpose or is suitable for retreading.

(Ord. No. 46, § 1, 11-14-2001) Sec. 26-252. Enforcement.

Enforcement of this article shall be the responsibility of the county code enforcement office.

(Ord. No. 46, § 3(a), 11-14-2001) Sec. 26-253. Tire storage, handling, and disposal.

(a) Storage under cover. All persons storing any number of tires shall store such tires under a permanent structural cover.

(b) Collection by county limited. The county landfill will provide a collection site for individual residents of the county and other entities that generate less than 20 scrap tires per month for a fee equal to the cost of transferring to a processor. All other entities shall dispose of scrap tires in accordance with Georgia Rules for Solid Waste Management, chapter 391-3-4 and O.C.G.A. § 12-8-20, cited as the state comprehensive solid waste management act.

(c) Responsibility of owner or occupant. The owner or occupant of any property shall be responsible for the sanitary and lawful handling and disposition of tires on the property.

(d) Disposal in accordance with this article. It shall be unlawful for any person to burn, bury, or otherwise dispose of tires except as provided in this article.

26:38

(e) State rules applicable to generators, carriers, and retailers. In addition to this article, all persons defined as scrap tire generators, scrap tire carriers, and tire retailers shall be subject to rules as defined in O.C.G.A. § 12-8-20, and Georgia Rules for Solid Waste Management, as defined in chapter 391-3-4.

(Ord. No. 46, § 2, 11-14-2001) Sec. 26-254. Right of entry.

(a) Any person authorized to enforce this article shall be empowered to enter any private or public property upon reasonable cause at reasonable times in order to inspect the property for violations of this article, subject to the condition that to allow entry on private property for inspection such officer shall have observed the alleged violation from the public right-of-way or shall have received a complaint alleging a violation of this article.

(b) If such property is occupied, the inspecting officer must first present proper credentials and request entry. If such property is unoccupied, the inspecting officer shall first make a reasonable effort to locate the owner or other person having charge, care, or control of such and request entry. If entry is refused, the investigating officer shall have recourse to every remedy provided by law to secure entry.

(c) When the investigating officer shall have first obtained a proper warrant or other remedy provided by law to secure entry, no owner or occupant or any other person having charge or control shall fail or neglect, after proper request is made as provided in this section, to promptly permit entry therein by the investigating officer for the purpose of inspection and examination pursuant to this article.

(Ord. No. 46, § 3(b), 11-14-2001) Sec. 26-255. Issuance of summons.

The county code enforcement officers shall be authorized to issue summons for hearings on alleged violations of this article in the county magistrate court.

(Ord. No. 46, § 3(c), 11-14-2001) Sec. 26-256. Penalties.

Any person failing to comply with the lawful provisions of this article or doing any act prohibited hereby or failing to do any act mandated hereby shall be guilty of a misdemeanor and shall be subject to any or all of the following penalties:

(1) In the sound discretion of the court, the violator may be ordered to remove from any property for which the violator is responsible the unlawful accumulation of tires and to come in full compliance with this article.

26:39

(2) In the sound discretion of the court, the violator may be ordered to remove from the property of another any unlawful accumulation of tires for which the violator is responsible.

(3) In the sound discretion of the court, the violator may be ordered to provide for the proper storage of tires for which the violator is responsible.

(4) The violation of this article may be punished as provided in section 1-19 of this Code.

The imposition of one penalty for any violation shall not excuse and allow the violation to continue. Each and every time that such a violation is cited it shall be deemed a separate offense. If the court orders corrective action and the violator fails to comply, the court may deem that each day the violation continues to be a separate offense. The order may further provide that if the property owner or other responsible person shall fail to comply with the order within the time specified, the county shall be authorized, in accordance with O.C.G.A. title 41 chapter 2, to proceed to take whatever actions deemed necessary to remove or abate such condition, and the expense shall be charged against the owner of the property in question and shall file a lien against the property upon which the condition existed, ranking equally with the lien for county taxes.

(Ord. No. 46, § 4, 11-14-2001) Secs. 26-257—26-281. Reserved.

ARTICLE VI. MOUNTAIN PROTECTION

Sec. 26-282. Findings of fact.

The mountains of the state are characterized by steep slopes, thin soils, and, because of the natural stresses placed on such environments, they require special protection. Landdisturbing activity on the high elevation, steep slope mountains of the state potentially threatens the public health, safety, welfare, and economic progress of the state. Such land-disturbing activity:

(1) May endanger the quality of surface water by increasing erosion and stream sedimentation;

(2) Has the potential to induce landslides;

(3) Has the potential to adversely affect groundwater due to the difficulty in providing proper sewage disposal in areas of steep slope and high elevation;

(4) May damage the habitat for some species of wildlife (both plants and animals); and

(5) May detract from the mountains' scenic and natural beauty which is vital to the recreation and tourism industry of North Georgia.

(Ord. of 12-5-2006) 26:40 Sec. 26-283. Purpose.

The purpose of this article is to establish measures to guide future growth and development in the areas within protected mountains as defined in this article.

(Ord. of 12-5-2006) Sec. 26-284. Authority.

This article is enacted pursuant to the authority contained in Ga. Const. art. IX, § II, ¶ I and art. IX, § II, ¶ III, and O.C.G.A. §§ 12-2-8(b), 50-8-2(a)(18)(B) and 50-8-7.1(b).

(Ord. of 12-5-2006) Sec. 26-285. Jurisdiction.

This article shall apply to the unincorporated areas of the county and to any incorporated area electing to adopt this article.

(Ord. of 12-5-2006) Sec. 26-286. Cite.

This article shall be known and cited as "Murray County Mountain Protection Ordinance."

(Ord. of 12-5-2006) Sec. 26-287. Interpretation.

This article shall be interpreted in conjunction with federal and state rules, regulations and laws, and other county ordinances contained or referenced in this article.

(Ord. of 12-5-2006) Sec. 26-288. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Designated hazardous waste means any solid waste identified as such in regulations promulgated by the state board of natural resources. The state board of natural resources may identify as designated hazardous waste any solid waste which the board concludes is capable of posing a substantial present or potential hazard to human health or the environment when improperly treated, stored, transported, or disposed of or otherwise managed, based on the factors set forth in regulations promulgated by the administrator of the United States Environmental Protection Agency pursuant to the federal act which are codified as 40 CFR 261.11(a)(3), in force and effect on February 1, 1996, if such solid waste contains any substance which is listed on any one or more of the following lists:

(1) List of hazardous constituents, codified as 40 CFR 261, Appendix VIII, in force and effect on February 1, 1996;

(2) Groundwater monitoring list, codified as 40 CFR 264, Appendix IX, in force and effect on February 1, 1996;

(3) List of hazardous substances and reportable quantities, codified as 40 CFR Table 302.4, and all appendices thereto, in force and effect on February 1, 1996;

(4) List of regulated pesticides, codified as 40 CFR 180, in force and effect on February 1, 1996;

(5) List of extremely hazardous substances and their threshold planning quantities, codified as 40 CFR 355, Appendix A, in force and effect on February 1, 1996; or

(6) List of chemicals and chemical categories, codified as 40 CFR 372.65 in force and effect on February 1, 1996.

Federal act means the federal Solid Waste Disposal Act, as amended, particularly by the Resource Conservation and Recovery Act of 1976 (Public Law 94-580, 42 USC 6901 et seq.), as amended, particularly by but not limited to the Used Oil Recycling Act of 1980 (Public Law 96-463), the Solid Waste Disposal Act Amendments of 1980 (Public Law 96-482), the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (Public Law 96-510), the Hazardous and Solid Waste Amendments of 1984 (Public Law 98-616), and the Superfund Amendments and Reauthorization Act of 1986 (Public Law 99-499), as amended.

Hazardous waste means any solid waste which has been defined as a hazardous waste in regulations promulgated by the administrator of the United States Environmental Protection Agency pursuant to the federal act, which are in force and effect on February 1, 1996, codified as 40 CFR 261.3 and any designated hazardous waste. (Note: This is same definition as used in the Georgia Hazardous Waste Management Act, O.C.G.A. § 12-8-60 et seq.)

Land-disturbing activity means any grading, scraping, excavating, or filling of land;

clearing of vegetation; and any construction, rebuilding, or alteration of a structure. The term "land-disturbing activity" shall not include activities such as ordinary maintenance and landscaping operations, individual home gardens, yard and grounds upkeep, repairs, additions or minor modifications to a single-family dwelling, and the cutting of firewood for personal use.

Local governing authority or local government means the governing authority of a political subdivision.

Mountain Protection Plans means that part of the local comprehensive plan which deals with the mountain protection requirement specified herein.

Multifamily dwelling means a structure that contains multiple dwelling units.

Persons means any individual, partnership, corporation, trust, entity, or authority and shall include the State of Georgia, its political subdivisions, and all of its departments, boards, bureaus, commissions, or other agencies.

Plat map means a large-scale map that shows the location of tracts of land within a jurisdiction, and the tax status of such tracts.

Protected mountain means all land area 1,000 feet or more above mean sea level, that has a percentage slope of 25 percent or greater for at least 500 feet horizontally, and shall include the crests, summits, and ridge tops which lie at elevations higher than any such area.

Quadrangle map means the most recently published U.S. Geological Survey 7.5 minute topographic map prepared at a scale of 1:24,000.

Reforestation plan means a plan, prepared by a registered forester, for replacing of harvested timber by replanting (as described in the Recommended Best Management Practices for Forestry in Georgia, published by the Georgia Forestry Commission) or by natural regenerative processes (such as coppicing, seed trees, etc.)

Sensitive natural area means any area, as identified now or hereafter by the state department of natural resources, which contains one or more of the following:

(1) Habitat, including nesting sites, occupied by rare or endangered species;

(2) Rare or exemplary natural communities;

(3) Significant landforms, hydroforms, or geological features; or

(4) Other areas so designated by the state department of natural resources; and which is sensitive or vulnerable to physical or biological alteration.

Single-family dwelling means a dwelling structure that is designed for the use of one family.

Written notification means a notice to an applicant which shall be given in writing and mailed by certified mail, return receipt requested, to the last known mailing address submitted by applicant to the land development officer. Notice to the land development officer, or his designee, shall be given in writing and mailed by certified mail, return receipt requested, or delivered personally to and a receipt obtained from the land development officer.

(Ord. of 12-5-2006; Amend. of 12-3-2024(1)) Sec. 26-289. Establishment of a protected mountain district.

The mountain protection district is hereby designated and shall comprise all land area within the jurisdiction of the county that is 2,200 feet or more above mean sea level that has a percentage slope of 25 percent or greater for at least 500 feet horizontally. The mountain protection district shall also include the crests, summits, and ridge tops which lie at elevations higher than any such area. The mountain protection district shall be further defined and delineated on the mountain protection district map. The mountain protection district map is hereby incorporated into and made a part of this article by reference.

(Ord. of 12-5-2006; Amend. of 12-3-2024(1)) Sec. 26-290. Protection criteria.

(a) Proposed land-disturbing activity shall meet all applicable requirements of the Erosion and Sedimentation Act of 1975 (O.C.G.A. § 12-7-1 et seq.) and all applicable local ordinances on soil erosion and sedimentation control.

(b) When one or more septic tanks are to be used for individual sewage disposal, the proposed land-disturbing activity shall meet all applicable requirements imposed by the governing authority.

(c) Where one or more wells are to be used for individuals water supply, the proposed land-disturbing activity shall meet all applicable requirements of the Water Well Standards Act of 1985; the requirements of the rules and regulations of the state department of human resources regarding individual or nonpublic wells; and, any more stringent requirements imposed by the governing authority.

(d) If sewage treatment is to be provided by any means other than one or more individual septic tanks, the sewage treatment shall meet all applicable requirements of the Georgia Water Quality Control Act (O.C.G.A. § 12-5-20 et seq.).

(e) If a public water supply system is to be provided, the water supply system shall meet all applicable requirements of the Georgia Safe Drinking Water Act of 1977 (O.C.G.A.

§ 12-5-170 et seq.).

(f) Single-family dwellings shall not be constructed at a density of more than one per one and one-half acre and no such acreage shall be less than 150-feet wide at the building site.

For multifamily dwelling units (duplexes, apartments, ect.) minimum lot size shall be one and one-half acre and shall increase by 25 percent for each unit above the initial unit. All lots, regardless of size shall meet the minimum requirements of the Murray County Board of Health.

(g) This minimum lot size restrictions shall not apply to:

(1) Any lot of less than one and one-half acre, if such a lot was, as of the date of the adoption of the ordinance from which this article is derived [Dec. 5, 2006], owned and described as a discrete parcel of real property according to the instrument of title of the person or persons owning the lot on such date.

(2) Any lot of less than one and one-half acre, if such a lot was, as of the date of the adoption of the ordinance from which this article is derived [Dec. 5, 2006], shown as a discrete parcel of real property on a plat of survey properly recorded in the real property records of the clerk of superior court by the person or persons owning the lot on such date.

(3) Any land, or part of any land, which was contained in or subject to any master plan, planned unit development plan, special approved development plan, or any other development plan if such plan was filed with and approved by the local governing authority prior to the date of the adoption of the ordinance from which this article is derived [Dec. 5, 2006], pursuant to a duly enacted planning and zoning ordinance;

provided further, that any such planning and zoning ordinance must have provided for rules and procedures and governed lot sizes, density, types of buildings, and other limitations usually associated with the implementation of local zoning ordinances.

(h) Structures shall not extend more than 40 feet, as measured from the highest point at which the foundation of such structure intersects the ground, above the uppermost point of the crest, summit, or ridge top of the protected mountain on which the structure in constructed. This height restriction shall not apply to water, radio, or television towers; to any equipment for the transmission of electricity, to minor vertical projections of a parent building, including chimneys, flagpoles, flues spires, steeples, belfries, cupolas, antennas, poles, wires; or to windmills.

(i) Houses and roads shall not be located within 20 feet of the uppermost point of the crest, summit, or ridge-top of the mountain or hill on which said dwelling is constructed.

(j) Any application for a building permit to construct a commercial structure shall contain a detailed landscaping plan. Such landscaping plan shall:

(1) Identify all trees which are to be removed that exceed eight inches in diameter as measured at a point on the tree four and one-half feet above the surface of the ground;

(2) Contain a plan for replacement of any such trees that are removed; and

(3) Include a topographical survey of the project site and an assessment of the effect that the project will have on the environment of the protected mountain after the project has been completed and is in operation.

Nothing in this subsection shall be construed to require commercial structures to comply with the density provision of subsections (f) and (g) of this section.

(k) No person engaging in land-disturbing activity shall remove more than 50 percent of the existing trees which exceed eight inches in diameter as measured at a point on such a tree four and one-half feet above the surface of the ground unless such person has filed with the application a plan of reforestation developed by a registered forester.

(l) Trees eight inches in diameter or greater that are adjacent to the house footprint shall be protected with fencing to prevent damage.

(m) Handling areas for the receiving and storage of hazardous waste are prohibited from protected mountains.

(n) Hazardous waste or solid waste disposal facilities are prohibited from protected mountains. Disposal facilities permitted by the state department of natural resources, environmental protection division, prior to the promulgation of a mountain protection plan shall be exempt from this criterion.

(o) All roads on protected mountains shall be designed and constructed to minimize the potential for landslides, erosion and runoff.

(p) Roads and driveways shall be located so that the maximum number of existing trees on the site is preserved.

(q) All exterior lights or light poles shall not exceed the height of surrounding buildings or tree line.

(Ord. of 12-5-2006; Amend. of 12-3-2024(1)) Sec. 26-291. Agriculture and forestry activities.

(a) Agriculture and forestry may be permitted on protected mountains provided that:

(1) Such agriculture and forestry must be consistent with the best management practices established by the Georgia Forestry Commission or the Georgia Soil and Water Conservation Commission;

(2) Agricultural and forestry activity shall be consistent with all state and federal laws, and all regulation promulgated by the Georgia Department of Agriculture.

(b) All roads on protected mountains shall be designed and constructed to minimize the potential for landslides, erosion, and runoff.

(c) Local governments may allow mining activity on protected mountains if such activity is permitted by the department of natural resources.

(Ord. of 12-5-2006; Amend. of 12-3-2024(1)) Sec. 26-292. Administration and enforcement procedures.

(a) Site plans. Application for a local development permit within the mountain protection district shall include a site plan, drawn at a scale of one inch equals 50 feet by a registered land surveyor or professional engineer licensed by the state with the following information:

(1) A map of all planned excavation and fill, including calculations of the volume of cut and fill involved, cross-sectional drawings showing existing and proposed grades.

Elevations, horizontal scale, and vertical scale must be shown on the cross-sectional drawings.

(2) A map of any wetland boundaries occurring within the site must be provided. This boundary may be included on other maps provided by the applicant.

(3) Soil and erosion control plan showing pre- and post-construction site conditions.

(4) The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body.

(5) Elevations of the site within 200 feet of the building site at contour intervals of no greater than two feet; and no greater than one foot for slopes less than or equal to two percent.

(6) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials.

(7) All proposed temporary disruptions or diversions of local hydrology.

(8) The site plan shall contain a surveyor's or engineer's certification that the project site is or is not located within a water supply watershed district, a wetlands protection district, Coosawattee River Corridor Protection District, or the mountain protection district, as applicable.

(b) Activities to comply with site plan. All development activities or site work conducted after approval of the site plan shall conform with the specifications of the site plan.

Significant changes to the site plan that would, alter the amount and velocity of stormwater runoff from the site, increase the amount of impervious surface within the development, alter the overall density of development, result in a considerable increase in the amount of excavation, fill, or removal of the overall appearance of the development as proposed, can be amended only with the approval of the land development officer or his designee. Minor changes, such as the realignment of streets or minor alterations to drainage structures and other infrastructure to meet unexpected conditions are exempted from this requirement.

(c) Exemptions to site plan requirements. The following activities and developments are exempt from the requirement for detailed site plans: Repairs to a facility that is part of a previously approved and permitted development.

(d) Powers of the land development officer. The land development officer, or his designee, shall have the power to enforce the provisions of this article. The land development officer, or his designee, shall have the authority to issue stop work orders and cite violators of this article to court. The land development officer, or his designee, shall have the power to conduct investigations as reasonably deemed necessary to carry out his duties of enforcing this article, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigating and inspecting the site.

(e) Penalties and fines for noncompliance.

(1) When a building or other structure has been constructed in violation of this section, the violator shall be required to remove the structure at the direction of the land development officer, or his designee.

(2) When removal of vegetative cover, excavation, or fill has taken place in violation of this section, the violator shall be required to restore the affected land to its original contours and to restore vegetation, as far as practicable, at the direction of the land development officer, or his designee.

(3) If the land development officer, or his designee, discovers a violation of this article that also constitutes a violation of any provision of the Clean Water Act as amended, the land development officer, or his designee, shall issue written notification of the violation to the U.S. Environmental Protection Agency, the U.S. Army Corps of Engineers, and the landowner.

(4) Any person who violates any provision of this article, or any permit condition or limitation established pursuant to this article shall be punished as provided in 26:47

section 1-19 of the Code of Murray County. Other ordinances referenced in this article may specify other penalties which may govern over this article. Whichever is more restrictive shall govern course of action.

(f) Suspension, revocation. The land development officer or his designee shall suspend or revoke a permit if he finds that the applicant has not complied with the conditions or limitations set forth in the permit or has exceeded the scope of the work set forth in the permit. The land development officer, or his designee, shall issue written notification of denial, issuance, conditional issuance, revocation or suspension to the applicant.

(g) Administrative appeals. Any party aggrieved by any decision of the land development officer may within 30 days thereafter appeal therefrom to the commissioner. The appellant shall furnish the land development officer written notification of appeal specifying the judgment of decision from which appeal is taken. A decision by the commissioner shall be the final administrative appeal and their decision shall be carried out by the land development officer.

(h) Judicial review. All final decisions of the commissioner concerning denial, approval, or conditional approval of a permit shall be reviewable in the superior court of the county.

(i) Amendments. This article and the mountain protection district map may from time to time be amended in accordance with procedures and requirements in the general statutes and as new information becomes available.

(j) Relief assessment. Assessors and board of assessors shall consider requirements of these regulations in determining the fair market value of land.

(k) Variances.

(1) When issued. The commissioner may authorize, upon appeal in individual cases, variances from the terms of this article as will not be contrary to the public interest.

Lot development hardship, not financial cost or personal design and/or location choice, shall be the basis for such a request for and the granting of a variance. Such variance may be granted in individual cases of practical difficulty or unnecessary hardship only upon a finding by the commissioner that all of the following conditions exist:

a. There are extraordinary and exceptional conditions pertaining to the particular piece of property in question because of its size, shape or topography;

b. The application of this article to the particular piece of property would create an unnecessary hardship;

c. Relief if granted, would not cause substantial detriment to the mountains of the county or impair the purposes and intent of this article;

d. The special circumstances surrounding the request for a variance are not the result of acts by the applicant; and

e. The variance is not a request to permit a use of land, buildings or structures that is not permissible in the district involved.

26:48

(2) Conditions. The commissioner may, as a condition of the variance to certain provisions of this article, require that alternative measures be taken by the applicant such that the purposes of this article may be achieved through alternative means.

(Ord. of 12-5-2006) Secs. 26-293—26-317. Reserved.

ARTICLE VII. POST-DEVELOPMENT STORMWATER MANAGEMENT

Sec. 26-318. General provisions.

(a) Purpose and intent. The purpose of this article is to protect, maintain and enhance the public health, safety, environment and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-development stormwater runoff and nonpoint source pollution associated with new development and redevelopment within the designated Urbanized Area of Murray County. It has been determined that proper management of post-development stormwater runoff will minimize damage to public and private property and infrastructure, safeguard public health, the environment and general welfare of the public, and protect water and aquatic resources. This article seeks to meet that purpose through the following objectives:

(1) Establish decision-making processes surrounding land development activities that protect the integrity of the watershed and preserve the health of water resources;

(2) Require that new development and redevelopment maintain the pre-development hydrologic response in their post-development state as nearly as practicable in order to reduce flooding, stream bank erosion, nonpoint source pollution and increases in stream temperature, and maintain the integrity of stream channels and aquatic habitats;

(3) Establish minimum post-development stormwater management standards and design criteria for the regulation and control of stormwater runoff quantity and quality;

(4) Establish design and application criteria for the construction and use of structural stormwater control facilities that can be used to meet the minimum postdevelopment stormwater management standards;

(5) Encourage the use of nonstructural stormwater management and stormwater better site design practices, such as the preservation of greenspace and other conservation areas, to the maximum extent practicable. Coordinate site design plans, which include greenspace, with the county greenspace protection plan;

(6) Establish provisions for the long-term responsibility for and maintenance of structural stormwater control facilities and nonstructural stormwater management practices to ensure that they continue to function as designed, are maintained, and pose no threat to public safety; and,

26:49

(7) Establish administrative procedures for the submission, review, approval and disapproval of stormwater management plans, and for the inspection of approved active projects, and long-term follow up.

(b) Applicability. This article shall be applicable to all land development, including, but not limited to, site plan applications, subdivision applications, and grading applications, unless exempt pursuant to subsection (c) below. These standards apply to any new development or redevelopment site that meets one or more of the following criteria:

(1) New development that involves the creation of 5,000 square feet or more of impervious cover, or that involves other land development activities of one acre or more;

(2) Redevelopment that includes the creation, addition or replacement of 5,000 square feet or more of impervious cover, or that involves other land development activity of one acre or more;

(3) Any new development or redevelopment, regardless of size, that is defined by the land use administrator or designee to be a hotspot land use; or

(4) Land development activities that are smaller than the minimum applicability criteria set forth in items (1) and (2) above if such activities are part of a larger common plan of development, even though multiple, separate and distinct land development activities may take place at different times on different schedules.

(c) Exemptions.The following activities are exempt from this article:

(1) Individual single-family or duplex residential lots that are not part of a subdivision or phased development project;

(2) Additions or modifications to existing single-family or duplex residential structures;

(3) Agricultural or silvicultural land management activities within areas zoned for these activities;

(4) Repairs to any stormwater management facility or practice deemed necessary by the land use administrator or designee;

(5) Re-development that does not create additional impervious cover or increase stormwater runoff above existing land use;

(6) Single-family or duplex residential lots platted prior to the adoption of this article, whether or not they are a part of a subdivision or phased development project; and

(7) Redevelopment that constitutes the replacement of the original square footage of impervious cover and original acreage of other land development activity when: (1) the original development is wholly or partially lost due to natural disaster or other acts of God occurring after [March 3, 2015] and (2) the original development included more than 5,000 square feet of impervious cover or other land development activity of one acre or more.

26:50

(d) Designation of ordinance administrator. The land use administrator or designee is hereby appointed to administer and implement the provisions of this article.

(e) Compatibility with other regulations. This article is not intended to modify or repeal any other ordinance, rule, regulation or other provision of law. The requirements of this article are in addition to the requirements of any other ordinance, rule, regulation or other provision of law, and where any provision of this article imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control.

(f) Severability. If the provisions of any section, subsection, paragraph, subdivision or clause of this article shall be adjudged invalid by a court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this article.

(g) Stormwater design manual. Murray County will utilize the policy, criteria and information including technical specifications and standards in the latest edition of the Georgia Stormwater Management Manual and any relevant local addenda for the proper implementation of the requirements of this article. The manual may be updated and expanded periodically, based on improvements in science, engineering, monitoring and local maintenance experience.

(Amend. of 3-3-2015) Sec. 26-319. Definitions.

[The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:]

Applicant means a person submitting a post-development stormwater management application and plan for approval.

Channel means a natural or artificial watercourse with a definite bed and banks that conducts continuously or periodically flowing water.

Conservation easement means an agreement between a land owner and Murray County or other government agency or land trust that permanently protects open space or greenspace on the owner's land by limiting the amount and type of development that can take place, but continues to leave the remainder of the fee interest in private ownership.

Detention means the temporary storage of stormwater runoff in a stormwater management facility for the purpose of controlling the peak discharge.

Detention facility means a detention basin or structure designed for the detention of stormwater runoff and gradual release of stored water at controlled rates.

Developer means a person who undertakes land development activities.

26:51 Development means a land development or land development project.

Drainage easement means an easement appurtenant or attached to a tract or parcel of land allowing the owner of adjacent tracts or other persons to discharge stormwater runoff onto the tract or parcel of land subject to the drainage easement.

Erosion and sedimentation control plan means a plan that is designed to minimize the accelerated erosion and sediment runoff at a site during land disturbance activities.

Extended detention means the detention of stormwater runoff for an extended period, typically 24 hours or greater.

Extreme flood protection means measures taken to prevent adverse impacts from large low-frequency storm events with a return frequency of 100 years or more.

Flooding means a volume of surface water that is too great to be confined within the banks or walls of a conveyance or stream channel and that overflows onto adjacent lands.

Greenspace or open space means permanently protected areas of the site that are preserved in a natural state.

Hotspot means an area where the use of the land has the potential to generate highly contaminated runoff, with concentrations of pollutants in excess of those typically found in stormwater.

Hydrologic soil group (HSG) means a natural resource conservation service classification system in which soils are categorized into four runoff potential groups. The groups range from group A soils, with high permeability and little runoff produced, to group D soils, which have low permeability rates and produce much more runoff.

Impervious cover means a surface composed of any material that significantly impedes or prevents the natural infiltration of water into soil. Impervious surfaces include, but are not limited to, rooftops, buildings, streets and roads, and any concrete or asphalt surface.

Industrial stormwater permit means a National Pollutant Discharge Elimination System (NPDES) permit issued to an industry or group of industries which regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies.

Infiltration means the process of percolating stormwater runoff into the subsoil.

Jurisdictional wetland means an area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of vegetation typically adapted for life in saturated soil conditions, commonly known as hydrophytic vegetation.

Land development means any land change, including, but not limited to, clearing, digging, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, construction, paving, and any other installation of impervious cover.

26:52 Land development activities means those actions or activities which comprise, facilitate or result in land development.

Land development project means a discrete land development undertaking.

Inspection and maintenance agreement means a written agreement providing for the long-term inspection and maintenance of stormwater management facilities and practices on a site or with respect to a land development project, which when properly recorded in the deed records constitutes a restriction on the title to a site or other land involved in a land development project.

New development means a land development activity on a previously undeveloped site.

Nonpoint source pollution means a form of water pollution that does not originate from a discrete point such as a sewage treatment plant or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to surface water and groundwater via mechanisms such as precipitation, stormwater runoff, and leaching.

Nonpoint source pollution is a by-product of land use practices such as agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources.

Nonstructural stormwater management practice or nonstructural practice means any natural or planted vegetation or other nonstructural component of the stormwater management plan that provides for or enhances stormwater quantity and/or quality control or other stormwater management benefits, and includes, but is not limited to, riparian buffers, open and greenspace areas, overland flow filtration areas, natural depressions, and vegetated channels.

Off-site facility means a stormwater management facility located outside the boundaries of the site.

On-site facility means a stormwater management facility located within the boundaries of the site.

Overbank flood protection means measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e. flow events that exceed the capacity of the channel and enter the floodplain), and that are intended to protect downstream properties from flooding for the two-year through 25-year frequency storm events.

Owner means the legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site.

Permit means the permit issued by Murray County to the applicant which is required for undertaking any land development activity.

26:53 Person means, except to the extent exempted from this article, any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other legal entity.

Post-development refers to the time period, or the conditions that may reasonably be expected or anticipated to exist, after completion of the land development activity on a site as the context may require.

Pre-development refers to the time period, or the conditions that exist, on a site prior to the commencement of a land development project and at the time that plans for the land development of a site are approved by the plan approving authority. Where phased development or plan approval occurs (preliminary grading, roads and utilities, etc.), the existing conditions at the time prior to the first item being approved or permitted shall establish pre-development conditions.

Project means a land development project.

Redevelopment means a land development project on a previously developed site, but excludes ordinary maintenance activities, remodeling of existing buildings, resurfacing of paved areas, and exterior changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution.

Regional stormwater management facility or regional facility means stormwater management facilities designed to control stormwater runoff from multiple properties, where the owners or developers of the individual properties may assist in the financing of the facility, and the requirement for on-site controls is either eliminated or reduced.

Runoff means stormwater runoff.

Site means the parcel of land being developed, or the portion thereof on which the land development project is located.

Stormwater better site design means nonstructural site design approaches and techniques that can reduce a site's impact on the watershed and can provide for nonstructural stormwater management. Stormwater better site design includes conserving and protecting natural areas and greenspace, reducing impervious cover and using natural features for stormwater management.

Stormwater management means the collection, conveyance, storage, treatment and disposal of stormwater runoff in a manner intended to prevent increased flood damage, streambank channel erosion, habitat degradation and water quality degradation, and to enhance and promote the public health, safety and general welfare.

Stormwater management facility means any infrastructure that controls or conveys stormwater runoff.

Stormwater management measure means any stormwater management facility or nonstructural stormwater practice.

26:54 Stormwater management plan means a document describing how existing runoff characteristics will be affected by a land development project and containing measures for complying with the provisions of this article.

Stormwater management system means the entire set of structural and nonstructural stormwater management facilities and practices that are used to capture, convey and control the quantity and quality of the stormwater runoff from a site.

Stormwater retrofit means a stormwater management practice designed for a currently developed site that previously had either no stormwater management practice in place or a practice inadequate to meet the stormwater management requirements of the site.

Stormwater runoff means the flow of surface water resulting from precipitation.

Structural stormwater control means a structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow of such runoff.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:murray-county/code/whole@2025-12-20-34c04c4015

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Murray County Code of Ordinances (the whole text) (Part 2 of 5) | Georgia Commons