Murray County · Code of Ordinances
Murray County Code of Ordinances
This document is shown whole, as one text: its source does not cut it into sections.
About this text
- As published by Municode, current through 2025-12-20
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
Part 3 of 5. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.
Subdivision means the division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street or roadway.
(Amend. of 3-3-2015) Sec. 26-320. Permit procedures and requirements.
(a) Permit application requirements. No owner or developer shall perform any land development activities without first meeting the requirements of this article prior to commencing the proposed activity. Unless specifically exempted by this article, any owner or developer proposing a land development activity shall submit to the land use administrator or designee a permit application on a form provided by Murray County for that purpose.
Unless otherwise exempted by this article, a permit application shall be accompanied by the following items in order to be considered:
(1) Stormwater management plan in accordance with subsection (c);
(2) Inspection and maintenance agreement in accordance with subsection (d), if applicable;
(3) Performance bond in accordance with subsection (e), if applicable; and
(4) Permit application and plan review fees in accordance with subsection (h).
(b) Stormwater concept plan and consultation meeting. Before any stormwater management permit application is submitted, it is recommended that the land owner or developer shall meet with the land use administrator for a consultation meeting on a concept plan for the post-development stormwater management system to be utilized in the proposed land development project. This consultation meeting shall take place at the time of the 26:55
preliminary plan of subdivision or other early step in the development process. The purpose of this meeting is to discuss the post-development stormwater management measures necessary for the proposed project, as well as to discuss and assess constraints, opportunities and potential ideas for stormwater management designs before the formal site design engineering is commenced.
(c) Stormwater management plan requirements. The stormwater management plan shall detail how post-development stormwater runoff will be controlled or managed and how the proposed project will meet the requirements of this article, including the performance criteria set forth in section 26-322 below.
This plan shall be in accordance with the criteria established in this section and must be submitted with the stamp and signature of a professional engineer (PE) licensed in the State of Georgia, who must verify that the design of all stormwater management facilities and practices meet the submittal requirements outlined in the submittal checklist(s) found in the stormwater design manual.
The stormwater management plan must ensure that the requirements and criteria in this article are being complied with and that opportunities are being taken to minimize adverse post-development stormwater runoff impacts from the development. The plan shall consist of maps, narrative, and supporting design calculations (hydrologic and hydraulic) for the proposed stormwater management system. The plan shall include all of the information required in the stormwater management site plan checklist found in the stormwater design manual. This includes:
(1) Common address and legal description of site.
(2) Vicinity map.
(3) The existing condition hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of existing site conditions with the drainage basin boundaries indicated; acreage, soil types and land cover of areas for each sub-basin affected by the project; all perennial and intermittent streams and other surface water features; all existing stormwater conveyances and structural control facilities; direction of flow and exits from the site; analysis of runoff provided by off-site areas upstream of the project site; and methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. For redevelopment sites, predevelopment conditions shall be modeled using the established guidelines for the portion of the site undergoing land development activities.
(4) Post-development hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of developed site conditions with the post-development drainage basin boundaries indicated; total area of postdevelopment impervious surfaces and other land cover areas for each sub-basin affected by the project; calculations for determining the runoff volumes that need to be addressed for each sub-basin for the development project to meet the post- 26:56
development stormwater management performance criteria in section 26-321;
location and boundaries of proposed natural feature protection and conservation areas; documentation and calculations for any applicable site design credits that are being utilized; methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology.
(5) Description, scaled drawings and design calculations for the proposed postdevelopment stormwater management system, which shall include: A map and/or drawing or sketch of the stormwater management facilities, including the location of nonstructural site design features and the placement of existing and proposed structural stormwater controls, including design water surface elevations, storage volumes available from zero to maximum head, location of inlet and outlets, location of bypass and discharge systems, and all orifice/restrictor sizes; a narrative describing how the selected structural stormwater controls will be appropriate and effective; cross-section and profile drawings and design details for each of the structural stormwater controls in the system, including supporting calculations to show that the facility is designed according to the applicable design criteria; a hydrologic and hydraulic analysis of the stormwater management system for all applicable design storms (including stage-storage or outlet rating curves, and inflow and outflow hydrographs); documentation and supporting calculations to show that the stormwater management system adequately meets the post-development stormwater management performance criteria in section 26-321; drawings, design calculations, elevations and hydraulic grade lines for all existing and proposed stormwater conveyance elements including stormwater drains, pipes, culverts, catch basins, channels, swales and areas of overland flow; and where applicable, a narrative describing how the stormwater management system corresponds with any watershed protection plans and/or local greenspace protection plan.
(6) A downstream peak flow analysis which includes the assumptions, results and supporting calculations to show safe passage of post-development design flows downstream. The analysis of downstream conditions in the report shall address each and every point or area along the project site's boundaries at which runoff will exit the property. The analysis shall focus on the portion of the drainage channel or watercourse immediately downstream from the project. This area shall extend downstream from the project to a point in the drainage basin where the project area is ten percent of the total basin area. In calculating runoff volumes and discharge rates, consideration may need to be given to any planned future upstream land use changes. The analysis shall be in accordance with the stormwater design manual.
(7) An erosion and sedimentation control plan in accordance with chapter 26, article IV of The Code of Murray County. The plan shall also include information on the sequence/phasing of construction and temporary stabilization measures and temporary structures that will be converted into permanent stormwater controls.
26:57
(8) Detailed description of ongoing operations and maintenance procedures for stormwater management facilities and practices to ensure their continued function as designed and constructed or preserved. These plans will identify the parts or components of a stormwater management facility or practice that need to be regularly or periodically inspected and maintained, and the equipment and skills or training necessary. The plan shall include an inspection and maintenance schedule, maintenance tasks, responsible parties for maintenance, funding, access and safety issues. Provisions for the periodic review and evaluation of the effectiveness of the maintenance program and the need for revisions or additional maintenance procedures shall be included in the plan.
(9) The applicant must ensure access from public right-of-way to stormwater management facilities and practices requiring regular maintenance at the site for the purpose of inspection and repair by securing all the maintenance access easements needed on a permanent basis. Such access shall be sufficient for all necessary equipment for maintenance activities. Upon final inspection and approval, a plat or document indicating that such easements exist shall be recorded and shall remain in effect even with the transfer of title of the property.
(10) Unless an on-site stormwater management facility or practice is dedicated to and accepted by Murray County as provided in subsection (d) below, the applicant must execute an easement and an inspection and maintenance agreement binding on all subsequent owners of land served by an on-site stormwater management facility or practice in accordance subsection (d).
(11) The applicant shall certify and provide documentation to the land use administrator or designee that all other applicable environmental permits have been acquired for the site prior to approval of the stormwater management plan.
(d) Stormwater management inspection and maintenance agreements. Prior to the issuance of any permit for a land development activity requiring a stormwater management facility or practice hereunder and for which Murray County requires ongoing maintenance, the applicant or owner of the site must, unless an on-site stormwater management facility or practice is dedicated to and accepted by the Murray County Commissioner, execute an inspection and maintenance agreement, and/or a conservation easement, if applicable, that shall be binding on all subsequent owners of the site.
The inspection and maintenance agreement, if applicable, must be approved by the land use administrator or designee prior to plan approval, and recorded in the deed records upon final plat approval.
The inspection and maintenance agreement shall identify by name or official title the person(s) responsible for carrying out the inspection and maintenance. Responsibility for the operation and maintenance of the stormwater management facility or practice, unless assumed by a governmental agency, shall remain with the property owner and shall pass to any successor owner. If portions of the land are sold or otherwise transferred, legally binding 26:58
arrangements shall be made to pass the inspection and maintenance responsibility to the appropriate successors in title. These arrangements shall designate for each portion of the site, the person to be permanently responsible for its inspection and maintenance.
As part of the inspection and maintenance agreement, a schedule shall be developed for when and how often routine inspection and maintenance will occur to ensure proper function of the stormwater management facility or practice. The agreement shall also include plans for annual inspections to ensure proper performance of the facility between scheduled maintenance and shall also include remedies for the default thereof.
In addition to enforcing the terms of the inspection and maintenance agreement, the land use administrator or designee may also enforce all of the provisions for ongoing inspection and maintenance in section 2-326 of this article.
The Murray County Commissioner in lieu of an inspection and maintenance agreement, may accept dedication of any existing or future stormwater management facility for maintenance, provided such facility meets all the requirements of this article and includes adequate and perpetual access and sufficient area, by easement or otherwise, for inspection and regular maintenance.
(e) Performance and maintenance bonds. Implementing and requiring the posting of bonds or other security to guarantee performance of construction and/or maintenance obligations will be under the discretion of the land use administrator or designee.
(f) Application procedure.
(1) Applications for land development permits shall be filed with the land use administrator or designee.
(2) Permit applications shall include the items set forth in subsection (c) above (two copies of the stormwater management plan and the inspection maintenance agreement, if applicable, shall be included).
(3) The land use administrator or designee shall inform the applicant whether the application, stormwater management plan and inspection and maintenance agreement are approved or disapproved.
(4) If either the permit application, stormwater management plan or inspection and maintenance agreement are disapproved, the land use administrator or designee shall notify the applicant of such fact in writing. The applicant may then revise any item not meeting the requirements hereof and resubmit the same, in which event subsection (3) above and this subparagraph shall apply to such resubmittal.
(5) Upon a finding by the land use administrator or designee that the permit application, stormwater management plan and inspection and maintenance agreement, if applicable, meet the requirements of this article, the land use administrator or designee may issue a permit for the land development project, provided all other legal requirements for the issuance of such permit have been met.
26:59
(6) Notwithstanding the issuance of the permit, in conducting the land development project, the applicant or other responsible person shall be subject to the following requirements:
a. The applicant shall comply with all applicable requirements of the approved plan and this article and shall certify that all land clearing, construction, land development and drainage will be done according to the approved plan;
b. The land development project shall be conducted only within the area specified in the approved plan;
c. The land use administrator or designee shall be allowed to conduct periodic inspections of the project;
d. No changes may be made to an approved plan without review and written approval by the land use administrator or designee; and
e. Upon completion of the project, the applicant or other responsible person shall submit the engineer's report and certificate and as-built plans required by subsection 26-322(b).
(g) Modifications for off-site facilities. The stormwater management plan for each land development project shall provide for stormwater management measures located on the site of the project, unless provisions are made to manage stormwater by an off-site or regional facility. The off-site or regional facility must be located on property legally dedicated for the purpose, must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices and there must be a legally-obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. In addition, on-site measures shall be implemented, where necessary, to protect upstream and downstream properties and drainage channels from the site to the off-site facility.
A stormwater management plan must be submitted to the land use administrator or designee which shows the adequacy of the off-site or regional facility.
To be eligible for a modification, the applicant must demonstrate to the satisfaction of the land use administrator or designee that the use of an off-site or regional facility will not result in the following impacts to upstream or downstream areas:
(1) Increased threat of flood damage to public health, life, and property;
(2) Deterioration of existing culverts, bridges, dams, and other structures;
(3) Accelerated stream bank or streambed erosion or siltation;
(4) Degradation of in-stream biological functions or habitat; or
(5) Water quality impairment in violation of state water quality standards, and/or violation of any state or federal regulations.
26:60
(h) Application review fees. The fee for review of any stormwater management application shall be based on the fee structure established by the Murray County Commissioner and shall be made prior to the issuance of any building permit for the development.
(Amend. of 3-3-2015) Sec. 26-321. Post-development stormwater management performance criteria.
The following performance criteria shall be applicable to all stormwater management plans, unless otherwise provided for in this article:
(1) Water quality. All stormwater runoff generated from a site shall be adequately treated before discharge. It will be presumed that a stormwater management system complies with this requirement if:
a. The stormwater management system shall be designed to retain the first 1.0 inch of rainfall on site, to the maximum extent practicable. The determination by the site design engineer that is infeasible to apply the stormwater runoff quality/reduction standard, on part or all of the project, must be documented with the site plan review documents. If the first 1.0 inch of rainfall can be retained onsite using runoff reduction methods, then additional water quality treatment is not required. If the first 1.0 inch rainfall cannot be retained on site, the remaining runoff from a 1.2 inch rainfall event must be treated to remove at least 80 percent of the calculated average annual post-development total suspended solids (TSS) load or equivalent as defined in the GSMM or equivalent manual.
b. Appropriate structural stormwater controls or nonstructural practices are selected, designed, constructed or preserved, and maintained according to the specific criteria in the Georgia Stormwater Management Manual; and
c. Runoff from hotspot land uses and activities identified by the land use administrator or designee are adequately treated and addressed through the use of appropriate structural stormwater controls, nonstructural practices and pollution prevention practices.
(2) Stream channel protection. Protection of stream channels from bank and bed erosion and degradation shall be provided by using all of the following three approaches:
a. Preservation, restoration and/or reforestation (with native vegetation) of the applicable stream buffer;
b. Twenty-four-hour extended detention storage of the one-year, 24-hour return frequency storm event;
c. Erosion prevention measures such as energy dissipation and velocity control.
(3) Overbank flooding protection. Downstream overbank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour return frequency storm event. If control of the one-year, 24-hour storm under subsection (1) is exempted, then peak discharge rate attenuation of the two-year through the 25-year return frequency storm event must be provided.
(4) Extreme flooding protection. Extreme flood and public safety protection shall be provided by controlling and safely conveying the 100-year, 24-hour return frequency storm event such that flooding is not exacerbated.
(5) Structural stormwater controls. All structural stormwater management facilities shall be selected and designed using the appropriate criteria from the Georgia Stormwater Management Manual. All structural stormwater controls must be designed appropriately to meet their intended function. For other structural stormwater controls not included in the Georgia Stormwater Management Manual, or for which pollutant removal rates have not been provided, the effectiveness and pollutant removal of the structural control must be documented through prior studies, literature reviews, or other means and receive approval from the land use administrator or designee before being included in the design of a stormwater management system. In addition, if hydrologic or topographic conditions, or land use activities warrant greater control than that provided by the minimum control requirements, the land use administrator or designee may impose additional requirements deemed necessary to protect upstream and downstream properties and aquatic resources from damage due to increased volume, frequency, and rate of stormwater runoff or increased nonpoint source pollution loads created on the site in question.
Applicants shall consult the Georgia Stormwater Management Manual for guidance on the factors that determine site design feasibility when selecting and locating a structural stormwater control.
(6) Stormwater credits for nonstructural measures. The use of one or more site design measures by the applicant may allow for a reduction in the water quality treatment volume required under subsection (1). The applicant may, if approved by the land use administrator or designee, take credit for the use of stormwater better site design practices and reduce the water quality volume requirement. For each potential credit, there is a minimum set of criteria and requirements which identify the conditions or circumstances under which the credit may be applied. The site design practices that qualify for this credit and the criteria and procedures for applying and calculating the credits are included in the Georgia Stormwater Management Manual.
(7) Drainage system guidelines. Stormwater conveyance facilities, which may include but are not limited to culverts, stormwater drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutter, swales, channels, ditches, and energy dissipaters shall be provided when necessary for the protection of public right-of-way and private properties adjoining project sites and/or public rights-of-way. Stormwater conveyance facilities that are designed to carry runoff from more than one parcel, existing or proposed, shall meet the following requirements:
a. Methods to calculate stormwater flows shall be in accordance with the stormwater design manual;
b. All culverts, pipe systems and open channel flow systems shall be sized in accordance with the stormwater management plan using the methods included in the stormwater design manual; and
c. Design and construction of stormwater conveyance facilities shall be in accordance with the criteria and specifications found in the stormwater design manual.
(8) Dam design guidelines. Any land-disturbing activity that involves a site which proposes a dam shall comply with the Georgia Safe Dams Act and rules for dam safety as applicable.
(Amend. of 3-3-2015; Amend. of 12-29-2021) Sec. 26-322. Construction inspections of post-development stormwater management system.
(a) Inspections to ensure plan compliance during construction. Periodic inspections of the stormwater management system construction shall be conducted by the land use administrator or designee or conducted and certified by a professional engineer who has been approved by the land use administrator or designee construction inspections shall utilize the approved stormwater management plan for establishing compliance.
All inspections shall be documented with written reports that contain the following information:
(1) The date and location of the inspection;
(2) Whether construction is in compliance with the approved stormwater management plan;
(3) Variations from the approved construction specifications; and
(4) Any other variations or violations of the conditions of the approved stormwater management plan.
If any violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions.
(b) Final inspection and as built plans. Upon completion of a project, and before a certificate of occupancy shall be granted, the applicant is responsible for certifying that the completed project is in accordance with the approved stormwater management plan. All applicants are required to submit actual "as built" plans for any stormwater management facilities or practices after final construction are completed. The plan must show the final design specifications for all stormwater management facilities and practices and must be certified by a professional engineer. A final inspection by the land use administrator or designee is required before the release of any performance securities can occur.
(Amend. of 3-3-2015) Sec. 26-323. Ongoing inspection and maintenance of stormwater facilities and practices.
(a) Long-term maintenance inspection of stormwater facilities and practices. Stormwater management facilities and practices included in a stormwater management plan, which are subject to an inspection and maintenance agreement must undergo ongoing inspections to document maintenance and repair needs and ensure compliance with the requirements of the agreement, the plan and this article.
A stormwater management facility or practice shall be inspected on a periodic basis by the responsible person in accordance with the approved inspection and maintenance agreement.
In the event that the stormwater management facility has not been maintained and/or becomes a danger to public safety or public health, the land use administrator or designee shall notify the person responsible for carrying out the maintenance plan by registered or certified mail to the person specified in the inspection and maintenance agreement. The notice shall specify the measures needed to comply with the agreement and the plan and shall specify the time within which such measures shall be completed. If the responsible person fails or refuses to meet the requirements of the inspection and maintenance agreement, Murray County may correct the violation as provided in subsection (d) hereof.
Inspection programs by the land use administrator or designee may be established on any reasonable basis, including but not limited to: routine inspections; random inspections;
inspections based upon complaints or other notice of possible violations; and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to: reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or water in stormwater management facilities; and evaluating the condition of stormwater management facilities and practices.
(b) Right-of-entry for inspection. The terms of the inspection and maintenance agreement shall provide for the land use administrator or designee to enter the property at reasonable times and in a reasonable manner for the purpose of inspection. This includes the right to enter a property when it has a reasonable basis to believe that a violation of this article is occurring or has occurred and to enter when necessary for abatement of a public nuisance or correction of a violation of this article.
(c) Records of maintenance activities. Parties responsible for the operation and maintenance of a stormwater management facility shall provide records of all maintenance and repairs to the land use administrator or designee.
(d) Failure to maintain. If a responsible person fails or refuses to meet the requirements of the inspection and maintenance agreement, the land use administrator or designee, after 30 days' written notice (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient), may correct a violation of the design standards or maintenance requirements by performing the necessary work to place the facility or practice in proper working condition. Murray County may assess the owner(s) of the facility for the cost of repair work which shall be a lien on the property, and may be placed on the ad valorem tax bill for such property and collected in the ordinary manner for such taxes.
(Amend. of 3-3-2015) Sec. 26-324. Violations, enforcement and penalties.
Any action or inaction which violates the provisions of this article or the requirements of an approved stormwater management plan or permit may be subject to the enforcement actions outlined in this section. Any such action or inaction which is continuous with respect to time is deemed to be a public nuisance and may be abated by injunctive or other equitable relief. The imposition of any of the penalties described below shall not prevent such equitable relief.
(1) Notice of violation. If the land use administrator or designee determines that an applicant or other responsible person has failed to comply with the terms and conditions of a permit, an approved stormwater management plan or the provisions of this article, it shall issue a written notice of violation to such applicant or other responsible person. Where a person is engaged in activity covered by this article without having first secured a permit therefor, the notice of violation shall be served on the owner or the responsible person in charge of the activity being conducted on the site.
The notice of violation shall contain:
a. The name and address of the owner or the applicant or the responsible person;
b. The address or other description of the site upon which the violation is occurring;
c. A statement specifying the nature of the violation;
d. A description of the remedial measures necessary to bring the action or inaction into compliance with the permit, the stormwater management plan or this article and the date for the completion of such remedial action;
e. A statement of the penalty or penalties that may be assessed against the person to whom the notice of violation is directed; and
f. A statement that the determination of violation may be appealed to the land use administrator or designee by filing a written notice of appeal within 30 days after the notice of violation except, that in the event the violation constitutes an immediate danger to public health or public safety, 24-hour notice shall be sufficient).
(2) Penalties. In the event the remedial measures described in the notice of violation have not been completed by the date set forth for such completion in the notice of violation, any one or more of the following actions or penalties may be taken or assessed against the person to whom the notice of violation was directed. Before taking any of the following actions or imposing any of the following penalties, the land use administrator or designee shall first notify the applicant or other responsible person in writing of its intended action, and shall provide a reasonable opportunity, of not less than ten days (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient) to cure such violation. In the event the applicant or other responsible person fails to cure such violation after such notice and cure period, the land use administrator or designee may take any one or more of the following actions or impose any one or more of the following penalties.
a. The land use administrator or designee may issue a stop work order which shall be served on the applicant or other responsible person. The stop work order shall remain in effect until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violation or violations described therein, provided the stop work order may be withdrawn or modified to enable the applicant or other responsible person to take the necessary remedial measures to cure such violation or violations.
b. The Murray County Building Inspector may refuse to issue a certificate of occupancy for the building or other improvements constructed or being constructed on the site until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein.
c. The land use administrator or designee may suspend, revoke or modify the permit authorizing the land development project. A suspended, revoked or modified permit may be reinstated after the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein, provided such permit may be reinstated [upon such conditions as the land use administrator or designee may deem necessary] to enable the applicant or other responsible person to take the necessary remedial measures to cure such violations.
d. In the event the applicant or other responsible person fails to take the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within ten days, or such greater period as the land use administrator or designee shall deem appropriate (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient).
e. For intentional and flagrant violations of this article, the code enforcement officer shall issue a citation to the applicant or other responsible person, requiring such person to appear in Murray County Magistrate Court to answer charges for such violation. Upon conviction, such person shall be punished by a fine not to exceed $1,000.00 or imprisonment for 60 days or both. Each act of violation and each day upon which any violation shall occur shall constitute a separate offense.
(Amend. of 3-3-2015) Secs. 26-325—26-345. Reserved.
Chapters 27—29
RESERVED
27:1 Chapter 30
FLOODS*
30:2
ARTICLE I. IN GENERAL
Secs. 30-1—30-25. Reserved.
ARTICLE II. FLOOD DAMAGE PREVENTION*
DIVISION 1. STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND
OBJECTIVES
Sec. 30-26. Authorization.
Article IX, Section II of the Constitution of the State of Georgia and O.C.G.A. § 36-1-20(a) have delegated the responsibility to local governmental units to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry.
(Ord. of 8-3-2010, Art. 1, § A) Sec. 30-27. Findings of fact.
(a) The flood hazard areas of Murray County, Georgia are subject to periodic inundation which results in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood relief and protection, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare.
(b) These flood losses are caused by the occupancy in flood hazard areas of uses vulnerable to floods, which are inadequately elevated, floodproofed, or otherwise unprotected from flood damages, and by the cumulative effect of obstructions in floodplains causing increases in flood heights and velocities.
(Ord. of 8-3-2010, Art. 1, § B) Sec. 30-28. Statement of purpose.
It is the purpose of this article to promote the public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions designed to:
(1) Require that uses vulnerable to floods, including facilities, which serve such uses, be protected against flood damage at the time of initial construction;
(2) Restrict or prohibit uses which are dangerous to health, safety and property due to water or erosion hazards, or which increase flood heights, velocities, or erosion;
(3) Control filling, grading, dredging and other development which may increase flood damage or erosion, and;
(4) Prevent or regulate the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards to other lands;
(5) Control the alteration of natural floodplains, stream channels, and natural protective barriers, which are involved in the accommodation of floodwaters.
(Ord. of 8-3-2010, Art. 1, § C) Sec. 30-29. Objectives.
The objectives of this article are:
(1) To protect human life and health;
(2) To minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in floodplains;
(3) To help maintain a stable tax base by providing for the sound use and development of floodprone areas in such a manner as to minimize flood blight areas,
(4) To minimize expenditure of public money for costly flood control projects;
(5) To minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public;
(6) To minimize prolonged business interruptions; and
(7) To insure that potential homebuyers are notified that property is in a flood area.
(Ord. of 8-3-2010, Art. 1, § D) Secs. 30-30—30-40. Reserved.
DIVISION 2. GENERAL PROVISIONS
Sec. 30-41. Lands to which this article applies.
This article shall apply to all areas of special flood hazard within the jurisdiction of Murray County, Georgia.
(Ord. of 8-3-2010, Art. 2, § A) Sec. 30-42. Basis for area of special flood hazard.
The areas of special flood hazard identified by the Federal Emergency Management Agency in its flood insurance study (FIS), dated September 29, 2010, with accompanying maps and other supporting data and any revision thereto, are adopted by reference and declared a part of this article.
30:4 For those land areas acquired by a municipality through annexation, the current effective FIS dated September 29, 2010, with accompanying maps and other supporting data and any revision thereto, for Murray County are hereby adopted by reference.
Areas of special flood hazard may also include those areas known to have flooded historically or defined through standard engineering analysis by governmental agencies or private parties but not yet incorporated in a FIS.
The repository for public inspection of the flood insurance study (FIS), accompanying maps and other supporting data is located: Murray County Office of Land Development, 124
N. 4th Ave., Chatsworth, Georgia 30705.
(Ord. of 8-3-2010, Art. 2, § B) Sec. 30-43. Establishment of development permit.
A development permit shall be required in conformance with the provisions of this article prior to the commencement of any development activities.
(Ord. of 8-3-2010, Art. 2, § C) Sec. 30-44. Compliance.
No structure or land shall hereafter be located, extended, converted or altered without full compliance with the terms of this article and other applicable regulations.
(Ord. of 8-3-2010, Art. 2, § D) Sec. 30-45. Abrogation and greater restrictions.
This article is not intended to repeal, abrogate, or impair any existing ordinance, easements, covenants, or deed restrictions. However, where this article and another conflict or overlap, whichever imposes the more stringent restrictions shall prevail.
(Ord. of 8-3-2010, Art. 2, § E) Sec. 30-46. Interpretation.
In the interpretation and application of this article all provisions shall be: (1) considered as minimum requirements; (2) liberally construed in favor of the governing body, and; (3) deemed neither to limit nor repeal any other powers granted under state statutes.
(Ord. of 8-3-2010, Art. 2, § F) Sec. 30-47. Warning and disclaimer of liability.
The degree of flood protection required by this article is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur; flood heights may be increased by manmade or natural causes. This article does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This article shall not create 30:5
liability on the part of Murray County or by any officer or employee thereof for any flood damages that result from reliance on this article or any administrative decision lawfully made hereunder.
(Ord. of 8-3-2010, Art. 2, § G) Sec. 30-48. Penalties for violation.
Failure to comply with the provisions of this article or with any of its requirements, including conditions and safeguards established in connection with grants of variance or special exceptions shall constitute a violation. Any person who violates this article or fails to comply with any of its requirements shall, upon conviction thereof, be fined not more than $1,000.00 or imprisoned for not more than 60 days, or both, and in addition, shall pay all costs and expenses involved in the case. Each day such violation continues shall be considered a separate offense. Nothing herein contained shall prevent Murray County from taking such other lawful actions as is necessary to prevent or remedy any violation.
(Ord. of 8-3-2010, Art. 2, § H) Secs. 30-49—30-60. Reserved.
DIVISION 3. ADMINISTRATION
Sec. 30-61. Designation of ordinance administrator.
The land development officer is hereby appointed to administer and implement the provisions of this article.
(Ord. of 8-3-2010, Art. 3, § A) Sec. 30-62. Permit procedures.
Application for a development permit shall be made to the land development officer on forms furnished by the community prior to any development activities, and may include, but not be limited to the following: Plans in duplicate drawn to scale showing the elevations of the area in question and the nature, location, dimensions, of existing or proposed structures, earthen fill placement, storage of materials or equipment, and drainage facilities.
Specifically, the following information is required:
(1) Application stage.
a. Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures;
b. Elevation in relation to mean sea level to which any non-residential structure will be floodproofed;
c. Design certification from a registered professional engineer or architect that any proposed nonresidential floodproofed structure will meet the floodproofing criteria of subsection 30-72(2);
30:6
d. Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development; and
(2) Construction stage. For all new construction and substantial improvements, the permit holder shall provide to the administrator an as-built certification of the regulatory floor elevation or floodproofing level immediately after the lowest floor or floodproofing is completed. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for nonresidential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same.
Any work undertaken prior to submission of these certifications shall be at the permit holder's risk.
The land development officer shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed. Failure to submit certification or failure to make said corrections required hereby, shall be cause to issue a stop-work order for the project.
(Ord. of 8-3-2010, Art. 3, § B) Sec. 30-63. Duties and responsibilities of the administrator.
Duties of the land development officer shall include, but shall not be limited to:
(1) Review proposed development to assure that the permit requirements of this article have been satisfied.
(2) Review proposed development to assure that all necessary permits have been received from governmental agencies from which approval is required by federal or state law, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334. Require that copies of such permits be provided and maintained on file.
(3) Review all permit applications to determine whether proposed building sites will be reasonably safe from flooding.
(4) When base flood elevation data or floodway data have not been provided in accordance with section 30-42, then the land development officer shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other sources in order to administer the provisions of division 4.
(5) Review and record the actual elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all new or substantially improved structures in accordance with subsection 60-62(2).
30:7
(6) Review and record the actual elevation, in relation to mean sea level to which any new or substantially improved structures have been floodproofed, in accordance with subsection 60-62(2).
(7) When floodproofing is utilized for a structure, the land development officer shall obtain certification of design criteria from a registered professional engineer or architect in accordance with subsection 30-62(1)c. and subsections 30-72(2) or 30-74(2).
(8) Make substantial damage determinations following a flood event or any other event that causes damage to structures in flood hazard areas.
(9) Notify adjacent communities and the Georgia Department of Natural Resources prior to any alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA).
(10) For any altered or relocated watercourse, submit engineering data/analysis within six months to the FEMA to ensure accuracy of community flood maps through the letter of map revision process. Assure flood-carrying capacity of any altered or relocated watercourse is maintained.
(11) Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions) the land development officer shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this article.
(12) All records pertaining to the provisions of this article shall be maintained in the office of the land development officer and shall be open for public inspection.
(Ord. of 8-3-2010, Art. 3, § C) Secs. 30-64—30-70. Reserved.
DIVISION 4. PROVISIONS FOR FLOOD HAZARD REDUCTION
Sec. 30-71. General standards.
In all areas of special flood hazard the following provisions are required:
(1) New construction and substantial improvements of existing structures shall be anchored to prevent flotation, collapse or lateral movement of the structure;
(2) New construction and substantial improvements of existing structures shall be constructed with materials and utility equipment resistant to flood damage;
(3) New construction or substantial improvements of existing structures shall be constructed by methods and practices that minimize flood damage;
30:8
(4) Elevated buildings. All new construction or substantial improvements of existing structures that include any fully enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished or flood-resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwater.
a. Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria:
1. Provide a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding;
2. The bottom of all openings shall be no higher than one foot above grade;
and
3. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both direction.
b. So as not to violate the 1lowest floor1 criteria of this article, the unfinished or flood-resistant enclosure shall only be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area; and
c. The interior portion of such enclosed area shall not be partitioned or finished into separate rooms.
(5) All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding.
(6) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces.
(7) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system;
(8) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters;
(9) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding; and
(10) Any alteration, repair, reconstruction or improvement to a structure, which is not compliant with the provisions of this article, shall be undertaken only if the non-conformity is not furthered, extended or replaced.
(Ord. of 8-3-2010, Art. 4, § A) 30:9 Sec. 30-72. Specific standards.
In all areas of special flood hazard the following provisions are required:
(1) New construction and/or substantial improvements. Where base flood elevation data are available, new construction and/or substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with standards of subsection 30-71(4), 2elevated buildings.2
a. All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated at or above one foot above the base flood elevation.
(2) Nonresidential construction. New construction and/or the substantial improvement of any structure located in A1-30, AE, or AH zones, may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to one foot above the base flood elevation, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the official as set forth above and in subsection 30-63(6).
(3) Standards for manufactured homes and recreational vehicles. Where base flood elevation data are available:
a. All manufactured homes placed and/or substantially improved on: (1) individual lots or parcels, (2) in new and/or substantially improved manufactured home parks or subdivisions, (3) in expansions to existing manufactured home parks or subdivisions, or (4) on a site in an existing manufactured home park or subdivision where a manufactured home has incurred 2substantial damage2 as the result of a flood, must have the lowest floor including basement, elevated no lower than one foot above the base flood elevation.
b. Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision may be elevated so that either:
1. The lowest floor of the manufactured home is elevated no lower than one foot above the level of the base flood elevation; or
2. The manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of at least an equivalent strength) of no less than 36 inches in height above grade.
30:10
c. All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement. (Ref.
subsection 30-71(6) above).
d. All recreational vehicles placed on sites must either:
1. Be on the site for fewer than 180 consecutive days;
2. Be fully licensed and ready for highway use, (a recreational vehicle is ready for highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions); or
3. The recreational vehicle must meet all the requirements for 3new construction,3 including the anchoring and elevation requirements of subsection (3)a., c., above.
(4) Floodway. Located within areas of special flood hazard established in section 30-42, are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, the area must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions shall apply:
a. Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway. Development may be permitted however, provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall not result in any increase in flood levels or floodway widths during a base flood discharge. A registered professional engineer must provide supporting technical data and certification thereof.
b. Only if subsection (4)a. above is satisfied, then any new construction or substantial improvement shall comply with all other applicable flood hazard reduction provisions of division 4.
(Ord. of 8-3-2010, Art. 4, § B) Sec. 30-73. Building standards for streams without established base flood elevations and/or floodway (A zones).
Located within the areas of special flood hazard established in section 30-42, where streams exist but no base flood data have been provided (A zones), or where base flood data have been provided but a floodway has not been delineated, the following provisions apply:
(1) When base flood elevation data or floodway data have not been provided in accordance with section 30-42, then the land development officer shall obtain, review, and reasonably utilize any scientific or historic base flood elevation and floodway data available from a federal, state, or other source, in order to administer the provisions of division 4. Only if data are not available from these sources, then the following provisions (2) and (3) shall apply:
(2) No encroachments, including structures or fill material, shall be located within an area equal to the width of the stream or 20 feet, whichever is greater, measured from 30:11
the top of the stream bank, unless certification by a registered professional engineer is provided demonstrating that such encroachment shall not result in more than a one foot increase in flood levels during the occurrence of the base flood discharge.
(3) In special flood hazard areas without base flood elevation data, new construction and substantial improvements of existing structures shall have the lowest floor of the lowest enclosed area (including basement) elevated no less than three feet above the highest adjacent grade at the building site. (Note: Require the lowest floor to be elevated one foot above the estimated base flood elevation in A-zone areas where a limited detail study has been completed). Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with standards of subsection 30-71(4) 4elevated buildings.4
a. All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated no less than three feet above the highest adjacent grade at the building site.
The land development officer shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file.
(Ord. of 8-3-2010, Art. 4, § C) Sec. 30-74. Standards for areas of special flood hazard (zones AE) with established base flood elevations without designated floodways.
Located within the areas of special flood hazard established in section 30-42, where streams with base flood elevations are provided but no floodways have been designated, (zones AE) the following provisions apply:
(1) No encroachments, including fill material, new structures or substantial improvements shall be located within areas of special flood hazard, unless certification by a registered professional engineer is provided demonstrating that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the community. The engineering certification should be supported by technical data that conforms to standard hydraulic engineering principles.
(2) New construction or substantial improvements of buildings shall be elevated or floodproofed to elevations established in accordance with section 30-72.
(Ord. of 8-3-2010, Art. 4, § D) Sec. 30-75. Standards for areas of shallow flooding (AO zones).
Areas of special flood hazard established in section 30-42, may include designated 4AO4 shallow flooding areas. These areas have base flood depths of one to three feet above ground, with no clearly defined channel. The following provisions apply:
(1) All new construction and substantial improvements of residential and nonresidential structures shall have the lowest floor, including basement, elevated to the 30:12
flood depth number specified on the flood insurance rate map (FIRM), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, shall be elevated at least three feet above the highest adjacent grade. Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with standards of subsection 30-71(4), 5elevated buildings.5
The land development officer shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file.
(2) New construction or the substantial improvement of a non-residential structure may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to the specified FIRM flood level plus one foot, above highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the official as set forth above and as required in subsections 30-62(1)c. and 30-62(2).
(3) Drainage paths shall be provided to guide floodwater around and away from any proposed structure.
(Ord. of 8-3-2010, Art. 4, § E) Sec. 30-76. Standards for subdivisions.
(a) All subdivision and/or development proposals shall be consistent with the need to minimize flood damage;
(b) All subdivision and/or development proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage;
(c) All subdivision and/or development proposals shall have adequate drainage provided to reduce exposure to flood hazards; and
(d) For subdivisions and/or developments greater than fifty lots or five acres, whichever is less, base flood elevation data shall be provided for subdivision and all other proposed development, including manufactured home parks and subdivisions. Any changes or revisions to the flood data adopted herein and shown on the FIRM shall be submitted to FEMA for review as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable. Upon completion of the project, the developer is responsible for submitting the 5as-built5 data to FEMA in order to obtain the final LOMR.
(Ord. of 8-3-2010, Art. 4, § F) 30:13 Sec. 30-77. Standards for critical facilities.
(a) Critical facilities shall not be located in the 100-year floodplain or the 500-year floodplain.
(b) All ingress and egress from any critical facility must be protected to the 500-year flood elevation.
(Ord. of 8-3-2010, Art. 4, § G) Secs. 30-78—30-90. Reserved.
DIVISION 5. VARIANCE PROCEDURES
Sec. 30-91. Variance procedures.
(a) The board of appeals as established by Murray County shall hear and decide requests for appeals or variance from the requirements of this article.
(b) The board shall hear and decide appeals when it is alleged an error in any requirement, decision, or determination is made by the land development officer in the enforcement or administration of this article.
(c) Any person aggrieved by the decision of the board of appeals may appeal such decision to the Superior Court of Murray County, as provided in O.C.G.A. § 5-4-1.
(d) Variances may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum to preserve the historic character and design of the structure.
(e) Variances may be issued for development necessary for the conduct of a functionally dependent use, provided the criteria of this article are met, no reasonable alternative exists, and the development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety.
(f) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result.
(g) In reviewing such requests, the board of appeals shall consider all technical evaluations, relevant factors, and all standards specified in this and other sections of this article.
(h) Conditions for variances:
(1) A variance shall be issued only when there is:
a. A finding of good and sufficient cause;
b. A determination that failure to grant the variance would result in exceptional hardship; and
30:14
c. A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisance, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances.
(2) The provisions of this article are minimum standards for flood loss reduction;
therefore any deviation from the standards must be weighed carefully. Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief; and, in the instance of an historic structure, a determination that the variance is the minimum necessary so as not to destroy the historic character and design of the building.
(3) Any applicant to whom a variance is granted shall be given written notice specifying the difference between the base flood elevation and the elevation of the proposed lowest floor and stating that the cost of flood insurance will be commensurate with the increased risk to life and property resulting from the reduced lowest floor elevation.
(4) The land development officer shall maintain the records of all appeal actions and report any variances to the federal Emergency Management Agency upon request.
(i) Upon consideration of the factors listed above and the purposes of this article, the board of appeals may attach such conditions to the granting of variances as it deems necessary to further the purposes of this article.
(Ord. of 8-3-2010, Art. 5) Secs. 30-92—30-100. Reserved.
DIVISION 6. DEFINITIONS
Sec. 30-101. Definitions generally.
Unless specifically defined below, words or phrases used in this article shall be interpreted so as to give them the meaning they have in common usage and to give this article its most reasonable application.
Accessory structure means a structure having minimal value and used for parking, storage and other nonhabitable uses, such as garages, carports, storage sheds, pole barns, hay sheds and the like.
Addition (to an existing building) means any walled and roofed expansion to the perimeter of a building in which the addition is connected by a common load-bearing wall other than a firewall. Any walled and roofed addition, which is connected by a firewall or is separated by an independent perimeter load-bearing wall, shall be considered 6new construction.6 Appeal means a request for a review of the land development officer's interpretation of any provision of this article.
30:15 Area of shallow flooding means a designated AO or AH zone on a community's flood insurance rate map (FIRM) with base flood depths from one to three feet, and/or where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident.
Area of special flood hazard is the land in the floodplain within a community subject to a one percent or greater chance of flooding in any given year. In the absence of official designation by the Federal Emergency Management Agency, areas of special flood hazard shall be those designated by the local community and referenced in section 30-42.
Base flood means the flood having a one-percent chance of being equaled or exceeded in any given year.
Base flood elevation (BFE) means the elevation shown on the flood insurance rate map for zones AE, AH, A1-A30, AR, AR/A, AR/AE, AR/A1-A30, AR/AH, AR/AO, V1-V30, and VE that indicates the water surface elevation resulting from a flood that has a one-percent chance of equaling or exceeding that level in any given year.
Basement means that portion of a building having its floor sub grade (below ground level) on all sides.
Building means any structure built for support, shelter, or enclosure for any occupancy or storage.
Critical facility means any public or private facility, which, if flooded, would create an added dimension to the disaster or would increase the hazard to life and health. Critical facilities include:
(1) Structures or facilities that produce, use, or store highly volatile, flammable, explosive, toxic, or water-reactive materials;
(2) Hospitals and nursing homes, and housing for the elderly, which are likely to contain occupants who may not be sufficiently mobile to avoid the loss of life or injury during flood and storm events;
(3) Emergency operation centers or data storage centers which contain records or services that may become lost or inoperative during flood and storm events; and
(4) Generating plants, and other principal points of utility lines.
Development means any manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavating, drilling operations, and storage of materials or equipment.
Elevated building means a nonbasement building built to have the lowest floor of the lowest enclosed area elevated above the ground level by means of fill, solid foundation perimeter walls, pilings, columns, piers, or shear walls adequately anchored so as not to impair the structural integrity of the building during a base flood event.
Existing construction means for the purposes of determining rates, structures for which the 7start of construction7 commenced before August 15, 1990.
30:16 Existing manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum the installation of utilities, the construction of streets, and final site grading or the pouring of concrete pads) is completed before July 3, 1990.
Expansion to an existing manufactured home park or subdivision means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed, including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads.
Flood or flooding means a general and temporary condition of partial or complete inundation of normally dry land areas from:
(1) The overflow of inland or tidal waters; or
(2) The unusual and rapid accumulation or runoff of surface waters from any source.
Flood hazard boundary map (FHBM) means an official map of a community, issued by the Federal Insurance Administration, where the boundaries of areas of special flood hazard have been defined as zone A.
Flood insurance rate map (FIRM) means an official map of a community, issued by the Federal Insurance Administration, delineating the areas of special flood hazard and/or risk premium zones applicable to the community.
Flood insurance study means the official report by the Federal Insurance Administration evaluating flood hazards and containing flood profiles and water surface elevations of the base flood.
Floodplain means any land area susceptible to flooding.
Floodproofing means any combination of structural and nonstructural additions, changes, or adjustments to structures, which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.
Floodway means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.
Freeboard means a factor of safety usually expressed in feet above a flood level for purposes of floodplain management. 8Freeboard8 tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization of the watershed.
Highest adjacent grade means the highest natural elevation of the ground surface, prior to construction, adjacent to the proposed foundation of a building.
30:17 Historic structure means any structure that is:
(1) Listed individually in the National Register of Historic Places (a listing maintained by the U.S. Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;
(2) Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district:
(3) Individually listed on a state inventory of historic places and determined as eligible by states with historic preservation programs which have been approved by the Secretary of the Interior; or
(4) Individually listed on a local inventory of historic places and determined as eligible by communities with historic preservation programs that have been certified either:
1. By an approved state program as determined by the Secretary of the Interior; or
2. Directly by the Secretary of the Interior in states without approved programs.
Lowest floor means the lowest floor of the lowest enclosed area, including basement. An unfinished or flood-resistant enclosure, used solely for parking of vehicles, building access, or storage, in an area other than a basement, is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of other provisions of this Code.
Manufactured home means a building, transportable in one or more sections, built on a permanent chassis and designed to be used with or without a permanent foundation when connected to the required utilities. The term also includes park trailers, travel trailers, and similar transportable structures placed on a site for 180 consecutive days or longer and intended to be improved property.
Manufactured home park or subdivision means a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.
Mean sea level means the average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations within the floodplain. For purposes of the National Flood Insurance Program, the National Geodetic Vertical Datum (NGVD) of 1929 or other datum, to which base flood elevations shown on a community's flood insurance rate map are referenced.
National Geodetic Vertical Datum (NGVD), as corrected in 1929, is a vertical control used as a reference for establishing varying elevations within the floodplain.
New construction means, for the purposes of determining insurance rates, structures for which the 9start of construction9 commenced after August 15, 1990, and includes any 30:18
subsequent improvements to such structures. For floodplain management purposes, :new construction: means structures for which the :start of construction: commenced after July 3, 1990, and includes any subsequent improvements to such structures.
New manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed after July 3, 1990.
North American Vertical Datum (NAVD) has replaced the National Geodetic Vertical Datum of 1929 in existing and future FEMA flood modernization maps.
Recreational vehicle means a vehicle, which is:
(1) Built on a single chassis;
(2) Four hundred square feet or less when measured at the largest horizontal projection;
(3) Designed to be self-propelled or permanently towable by a light duty truck; and
(4) Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use.
Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (Note: accessory structures are not exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
Structure means a walled and roofed building that is principally above ground, a manufactured home, a gas or liquid storage tank.
Subdivision the division of a single lot into two or more lots for the purpose of sale or development.
Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred.
30:19 Substantial improvement means any reconstruction, rehabilitation, addition, or other improvement of a structure, taking place during a five-year period, in which the cumulative cost equals or exceeds 50 percent of the market value of the structure prior to the ;start of construction; of the improvement. Note: The market value of the structure should be (1) the appraised value of the structure prior to the start of the initial repair or improvement, or (2) in the case of damage, the value of the structure prior to the damage occurring. This term includes structures, which have incurred ;substantial damage;, regardless of the actual amount of repair work performed.
For the purposes of this definition, ;substantial improvement; is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the building.
The term does not, however, include (1) those improvements of a structure required to comply with existing violations of state or local health, sanitary, or safety code specifications which are solely necessary to assure safe living conditions and which have been identified by the code enforcement official, and not solely triggered by an improvement or repair project, or (2) any alteration of a ;historic structure; provided that the alteration will not preclude the structure's continued designation as a ;historic structure;.
Substantially improved existing manufactured home parks or subdivisions is where the repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds 50 percent of the value of the streets, utilities and pads before the repair, reconstruction or improvement commenced.
Variance is a grant of relief from the requirements of this article, which permits construction in a manner otherwise prohibited by this article.
Violation means the failure of a structure or other development to be fully compliant with the community's floodplain management regulations. A structure or other development without the elevation certificate, or other certifications, or other evidence of compliance required by this article is presumed to be in violation until such time as that documentation is provided.
(Ord. of 8-3-2010, Art. 6) 30:20 Chapters 31—33
RESERVED
31:1 Chapter 34
HEALTH AND SANITATION*
ARTICLE I. IN GENERAL
Secs. 34-1—34-25. Reserved.
ARTICLE II. INDIVIDUAL SEWAGE DISPOSAL SYSTEMS
Sec. 34-26. Rules, regulations adopted.
There shall be available sufficient unobstructed land area, meeting all requirements for the installation of an on-site sewage management system, to provide for the complete replacement of the absorption field. If the initial installation is by gravity flow, replacement shall be by the same. If the initial installation is by a dosing system, the replacement may be by the same. If the initial installation is by a chamber system, the replacement area shall be of a conventional type of on-site sewage management system.
(Ord. No. 31, § 1, 6-2-1998; Ord. No. 31, Amend. No. 1, 11-19-2003) Sec. 34-27. Official copy.
The office of the county clerk shall maintain an official copy of chapter 290-5-26 of the county board of health on-site sewage management systems, as amended.
(Ord. No. 31, § 2, 6-2-1998) Sec. 34-28. Violations.
Any person who shall violate the regulations adopted in this article shall, upon conviction, be punished as provided in section 1-19 of this Code.
(Ord. No. 31, § 3, 6-2-1998) 34:3 Chapters 35—37
RESERVED
35:1 Chapter 38
MURRAY COUNTY MANUFACTURED HOUSING REGULATIONS*
ARTICLE I. IN GENERAL
DIVISION 1. GENERALLY
Secs. 38-1—38-25. Reserved.
DIVISION 2. PURPOSE; DEFINITIONS
Sec. 38-26. Purpose.
The purpose of this chapter is to provide standards and regulations to protect the health, safety and general welfare of the citizens of Murray County. Murray County recognizes that manufactured housing meets the needs of many county residents for affordable housing and is compatible with site-built housing if developed in accordance with comparable standards.
These regulations shall govern the use and operation of all manufactured homes on single lots or within parks used for permanent residential occupancy in Murray County, Georgia. It is the intent of these regulations to empower the Murray County Land Use Planning Commission, the Murray County Health Department, and the building inspections department to review the development of manufactured home sites and manufactured home parks within Murray County for the purposes stated in this ordinance.
(Ord. No. 54, 8-15-2003) Sec. 38-27. Definitions.
For the purpose of these regulations, the following words and phrases shall have the meanings ascribed to them in this division. Terms not herein defined shall have the meaning customarily assigned to them.
(Ord. No. 54, 8-15-2003) Sec. 38-28. Approved manufactured home space.
Any lot or parcel of land designed and designated for the location of a manufactured home(s) as permitted under the Murray County Land Use District Ordinance, its accessory buildings or structures, and accessory equipment for exclusive use of the home meeting the requirements of this chapter.
(Ord. No. 54, 8-15-2003) Sec. 38-29. Reserved.
Sec. 38-30. Lot.
Lot means a portion of a subdivision, or any other parcel of land, intended as a unit of transfer or ownership, or for development, or both, and shall not include any part of the right-of-way or a street or road.
(Ord. No. 54, 8-15-2003) Sec. 38-31. Manufactured home.
A structure, transportable in one or more sections, which, in the traveling mode, is eight body feet or more in width or 40 body feet or more in length or, when erected on site, is 320 or more square feet and which was manufactured or built after June 15, 1976. Furthermore, manufactured homes are built on a permanent chassis and designed to be used as a dwelling with or without a permanent foundation when connected to required utilities and includes the plumbing, heating, air conditioning, and electrical systems contained therein; except that such term shall include any structure which meets all requirements of this paragraph except the size requirements and with respect to which the manufacturer voluntarily files a certification requirements by the Secretary of Housing and Urban Development and complies with the standards established in the National Mobile Home and Safety Standards Act of 1974, 42 U.S.C., Section 5401, et seq.
(Ord. No. 54, 8-15-2003) Sec. 38-32. Manufactured home park.
For the purpose of this chapter, the placement of two or more manufactured homes on any lot, parcel, or tract of land shall be considered a manufactured home park and shall comply with the manufactured home park requirements.
(Ord. No. 54, 8-15-2003; Amend. of 8-25-2010) Sec. 38-33. Mobile home.
A structure, transportable in one or more sections, which, in the traveling mode, is eight body feet or more in width or 40 body feet or more in length or, when erected on site, is 320 or more square feet and which was manufactured or built before June 15, 1976.
(Ord. No. 54, 8-15-2003) Sec. 38-34. Modular home.
(a) A structure designed to be transported after fabrication and located as a permanent addition to and becoming a part of the real property. Such structure must meet minimum construction requirements of the Uniform Building Code, and must be set on a permanent foundation and is subject to all local building, land management, and housing regulations.
Any such modular home meeting the requirements herein defined is not considered a mobile home or a manufactured home and is not subject to these manufactured home park regulations.
(b) No part of the chassis or frame shall remain under the home. The home shall be set onto a fixed foundation as per the building codes. If any part of the chassis remains affixed to the home, it is and will be considered a manufactured home.
(Ord. No. 54, 8-15-2003; Amend. of 8-25-2010) Sec. 38-35. Nonconforming manufactured home parks.
Any manufactured home park which is not in compliance with these regulations at the time of their enactment.
(Ord. No. 54, 8-15-2003) Sec. 38-36. Stop work orders.
A notice issued from the Murray County Building Inspector, land development officer, code enforcement officer, or their respective designee, that requires all work on a development to cease except corrective measures to the violation stated in the notice.
(Ord. No. 54, 8-15-2003) Sec. 38-37. Street (public).
A right-of-way arising by purchase, dedication, or public which is maintained by a government entity or agency thereof; accessible to, supported and shared by all members of the public.
(Ord. No. 54, 8-15-2003) Sec. 38-38. Street (private).
A right-of-way which meets all required design standards of a public road as described in the Murray County Road Design and Specifications Requirements but for purposes of controlled access or privacy is not dedicated to public use. Any such right-of-way shown on a plat or deed shall be recorded with a statement on the plan that the road is not intended to be maintained by a government entity or agency thereof.
(Ord. No. 54, 8-15-2003) Sec. 38-39. Permanent foundation or footing.
In any article, paragraph, sentence or any mention of the phrase, permanent foundation or footing in any portion of this article or rules and regulations, the term permanent foundation or footing shall mean the following:
(1) Since foundation or footing is defined as the base of what something is placed upon, all foundations or footings shall be of poured in place concrete of the proper compressive strength mix and the width and depth as determined by the manufacturers specifications, load bearing capacity of the soil where such foundation or footing is dug and per the building code regulations and/or the building inspectors' determination.
(2) In no circumstance is the masonry skirting to be considered a permanent foundation since no part of the home shall rest or be supported by the skirting per the Georgia Rules and Regulations for Manufactured Housing.
(Amend of 9-3-2024(1)) Sec. 38-40. Reserved.
Secs. 38-41—38-50. Reserved.
DIVISION 3. GENERAL PROVISIONS
Sec. 38-51. Mobile home restriction.
No mobile home (see definition) shall be moved into Murray County or moved from one Murray County location to another for the purposes of habitation after the effective date of this chapter. A mobile home can only be moved for the purposes of proper disposal or to be located outside of Murray County.
(Ord. No. 54, 8-15-2003) Sec. 38-52. Manufactured home storage.
Except as permitted by these regulations, no mobile home or manufactured home shall be parked, stored or occupied except in an existing manufactured home park or on an individual site in compliance with these and other Murray County land management regulations, or in conforming manufactured home sales lots or within the confines of a warehouse. In accordance with Law, no mobile/manufactured home shall be used for the purposes of storage.
(Ord. No. 54, 8-15-2003) Sec. 38-53. Requirements for manufactured homes located outside manufactured home parks.
No more than one manufactured home shall be located on an individual lot, parcel or tract of land except in an approved manufactured home park and only in designated areas of the Murray County Land Use District Ordinance. Additionally, no more than one manufactured home shall be located on any lot; parcel or tract of land occupied by any other permanent dwelling or occupied building.
(Ord. No. 54, 8-15-2003) Sec. 38-54. Nonconforming manufactured home parks.
Nonconforming manufactured home parks lawfully existing at the time of adoption of this chapter may be continued, but if such nonconforming use is discontinued for a period of six months, the manufactured home park shall be made to conform to the requirements of these regulations prior to its being occupied again. Any expansion or addition to an existing manufactured home park shall be in compliance with these and other Murray County land management regulations, as amended.
(Ord. No. 54, 8-15-2003) Sec. 38-55. Location disclosures and decal requirement.
Every person holding title to or possessing a manufactured home which is placed or located within the limits of Murray County, shall report the location to, and obtain a location decal for, said manufactured home from the Tax Commissioner of Murray County annually, no later than May 1 of each year, unless the home is listed as a homestead exemption. Such location decal shall be designed in such manner and affixed to the manufactured home in such manner as to cause it to be easily visible for inspection.
(Ord. No. 54, 8-15-2003) Sec. 38-56. Issuance of permit.
An approved building permit must be obtained for a manufactured home, whether locating or relocating said manufactured home, from the Building Inspector of Murray County, as prescribed in sections 38-57 and 38-58, indicating compliance with all applicable codes before any person or persons are authorized to occupy any newly installed manufactured home.
(Ord. No. 54, 8-15-2003) Sec. 38-57. Permit application procedures.
An application for a building permit must be submitted and approved prior to the issuance of a permit to move a manufactured home into or within Murray County. The Murray County Building Official or his designee shall not issue the permit until the following conditions have been met in accordance with established administrative procedures:
(1) An application for a manufactured home building permit must be submitted and a standardized health and safety inspection must be performed by the building official or his designee prior to the home being relocated or moved into Murray County. The process of the inspection will be at the discretion of the building official. If the home fails to meet the requirements of the health and safety inspection, then the application will be denied until which time the home is brought into compliance.
Once all repairs are made and the home complies with all the regulations, including the land use ordinance and environmental health guidelines, then the application will be processed for the issuance of a building permit. The health and safety inspection guidelines will be on file in the building officials office and may be subsequently updated or revised by the building official as needed to ensure the health and safety of individuals and occupants of homes or as needed to comply with state law.
(2) A valid location decal must be issued from the tax commissioner's office and attached as provided in section 38-55.
(3) All manufactured homes must be located at an approved manufactured home space, or in an approved manufactured home park as defined within section 38-32 of this chapter.
(4) For individual lots not approved under the manufactured home park regulations, a sanitary permit must be obtained from the Murray County Health Department for on-site sewage disposal, or in the event that a municipality will provide sewer hookup, that municipality verifying that they will allow public sewer hook-up, must provide a letter.
(5) To re-locate a legally existing manufactured home in Murray County to another location in Murray County, the home shall have been manufactured or built after June 15, 1976.
(Ord. No. 54, 8-15-2003; Ord. No. 54, Amend. No. 1, 7-6-2004; Ord. No. 54, Amend. No. 3, 2-7-2006; Amend. of 8-25-2010)
Sec. 38-58. Regulations for manufactured home installers and movers.
The installer or mover shall comply with the following regulations for placing a manufactured home in the county. If such regulations are not complied with, then the affixed penalties shall be imposed.
(1) All installers and movers of manufactured homes that install or move homes in the county must be state certified per the state regulations and listed on an approved list in the building inspector's office.
(2) All installer's and/or movers must produce their license upon request and license must be current.
(3) Installer's and/or movers are responsible for complying with all local requirements concerning land use, utility connections, site preparation, and acquiring all required permits.
(4) At the time of transport, and during the transport, the installer and/or mover must have in their possession, an approved permit issued by the building inspector of the county.
(5) All permits must have been issued prior to moving the home onto the site.
(6) No manufactured home shall be placed on any tract or parcel of land until an inspection of the pad, where the home shall be sitting, has been performed by an inspector from the building inspection department. The pad shall be graded to remove all vegetation and be on natural soil and it has six inches of fall in ten feet from all sides of the home as per the state regulations. If any pad has been constructed by fill, then compaction of the pad shall be required and documentation of certified test results, with a minimum compaction of 95 percent modified proctor, shall be submitted to the building official prior to the home being set.
If any of these regulations are not complied with, then the penalties listed in section 38-59 shall be imposed.
(Ord. No. 54, 8-15-2003; Ord. No. 54, Amend. of 1-8-2008; Amend. of 8-25-2010) Sec. 38-59. Penalty for violation of section.
For violation of any part of section 38-58, the following penalty shall be imposed:
(1) For the first offense of a violation of any provision of this section, the violator shall be issued a citation to appear in the county magistrate court and, upon conviction, shall be subject to a fine of not less than $600.00 and no more than $1,000.00 or confinement in the county jail not to exceed 60 days as per state law or by both fine and confinement in the discretion of the court.
(2) For a second violation, the fine shall be no less than $1,000.00 dollars and 15 days in jail.
(3) For a third or subsequent violation, the fine shall be no less than $1,000.00 and 30 days in jail and removal from the approved list of installer's and/or movers from the building inspectors office for a period of one year.
(4) In the event a home is installed or moved without a permit, the installer and/or mover, will remove the home from the site and return it to the point of origin and then the proper permits obtained. The installer and/or mover shall be responsible for all costs associated with such removal.
For the purposes of this section, the tax commissioner shall issue the aforementioned location decal, the building inspector shall issue the aforementioned manufactured home permit, and the health department shall issue the aforementioned sanitary permit. Upon the approval and issuance of the above permits, a manufactured home may be moved into the county and installed for occupancy.
(Ord. No. 54, 8-15-2003; Amend. of 8-25-2010) Sec. 38-60. Exception to the issuance of a building permit.
A building permit shall be required to locate a manufactured home in the county except under the following condition:
(1) Manufactured homes may be brought into the county and located on a sales lot of a state approved dealer as listed in the office of the state safety fire commissioner for sale without a building or sanitary permit. However, under no conditions shall any manufactured home, which is located on a sales lot, be occupied unless all permit requirements in these regulations are met. Installation must comply with the Rules and Regulations for Manufactured Homes, Chapter 120-3-7, Appendix A, made and promulgated by the state safety fire commissioner pursuant to authority set forth in
O.C.G.A.
(Ord. No. 54, 8-15-2003) Sec. 38-61. Minimum construction standards.
Each newly installed manufactured home in the county shall conform to the minimum construction standards required by the U.S. Housing and Urban Development, as required by the National Mobile Home and Safety Standards Act of 1974, 42 U.S.C., Section 5401 et seq., before that manufactured home is entitled to receive any utility service to said manufactured home. It is the intent of this section of this chapter to prohibit moving manufactured homes into the county that do not conform to the applicable Housing and Urban Development Construction Standards, as expressed in 42 U.S.C. Section 5401 et seq., and regulations established pursuant to that Act. To that end, no manufactured home shall be allowed to locate for permanent or temporary occupancy in this county unless that manufactured home complies with the minimum construction standards required by the U.S.
Housing and Urban Development, which compliance must be evidenced by the affixation of a permanently affixed label or tag certifying to the compliance as required by 42 U.S.C.
Section 5415. Manufactured homes which do not display the certification required by 42 U.S.C. Section 5415 shall not be eligible for a county manufactured home and/or occupancy permit; provided, however, any manufactured home which legally exists in the county at the time of the passage of this ordinance shall not require said certification. Said existing manufactured home shall be freely transferable and re-locatable in the county, provided that said manufactured home has been inspected and approved by the building inspector for working smoke detector(s), adequate electrical system, and structural integrity, and provided that all installation requirements in sections 38-61 and 38-63 are met to the satisfaction of the building inspector.
(Ord. No. 54, 8-15-2003) Sec. 38-62. Installation requirements.
Each newly installed manufactured home shall be installed according to the manufacturer's recommendations, Guide for Georgia Manufactured Housing and the installation standards adopted by the State of Georgia and administered by the Georgia State Fire Insurance Commissioner's Office, Installation of Manufactured Homes and Mobile Homes, O.C.G.A.
§§ 8-2-160 through 8-2-168.
(Ord. No. 54, 8-15-2003) Sec. 38-63. Inspection for manufactured homes.
The following requirements shall pertain to the installation of manufactured homes on individual lots or in parks:
(1) Foundation. The building inspector shall require the foundation to be inspected to ensure compliance with the Rules and Regulations for Manufactured Homes, as may be subsequently revised. These Rules and Regulations for Manufactured Homes are incorporated as a part of this chapter by reference.
a. Every footing installed for multi-sectional manufactured homes, on any lot or home site, other than an existing site or manufactured home park space, shall be of concrete, poured in place, either in a strip fashion or in pier locations of the required depth, width, and thickness according to the soil bearing capacity of the site. Single wide manufactured homes shall be installed according to the manufacturer's installation guidelines, and the Georgia Rules and Regulations for Installation of Manufactured Homes and at the discretion of the building inspector.
(2) Plumbing. The building inspector shall require the external plumbing system to be inspected, including water and sewage hookups; to ensure compliance with the Rules and Regulations for Manufactured Homes and the 2006 International Plumbing Code with Georgia State Amendments, as may be subsequently revised. Until the plumbing system is inspected and approved by the building inspector, no additional work will be approved.
(3) On-site sewage lot area. Manufactured home lots which are served by individual water supplies and individual on-site sewage management systems shall comply with the Murray County Environmental Health and Murray County Land Use District Ordinance rules and regulations which may be subsequently revised.
(4) Electrical. The building inspector shall require inspection of the electrical system to ensure compliance with the Rules and Regulations for Manufactured Homes and the National Electrical Code, as adopted by the governing authority of the county, and as may be subsequently revised.
a. All electrical connections that are pertinent to the operation of the home must be made by a licensed electrician.
b. All connections of any HVAC units must be made by a licensed HVAC contractor.
(5) Gas. The county building inspector shall require inspection of the gas system to ensure compliance with the standard gas code, as adopted by the county board of commissioners, and as may be subsequently revised.
(6) Underpinning/skirting. Each newly erected manufactured home shall have the area beneath each structure enclosed with masonry, metal, or vinyl type building materials manufactured for such purpose. Any manufactured home that is to have masonry skirting shall have a perimeter footing of concrete poured in place of the minimum depth of six inches and minimum width of 12 inches for skirting constructed of concrete block so that it will support the skirting but shall not provide support for the home. All other masonry type skirting systems shall have a footing that must be approved by the building inspector.
(7) Stairs and landings. Each newly installed manufactured home shall have the area beneath and descending from all egress doors of the home a landing that is a minimum of 36 inches by 48 inches. Said landing with steps shall descend to the ground or ground level. The landing, steps and rails must be constructed of all-weather materials or manufactured kits. All construction and/or manufactured kits shall comply with the requirements of the Georgia State Minimum Standard Codes, including all amendments thereto, as adopted by the county commissioner and as may be subsequently revised.
(8) Erosion and sedimentation. Each newly installed manufactured home shall meet all requirements outlined in the Murray County Soil Erosion and Sedimentation Control Ordinance No. 44.
(9) Driveway. Each lot, tract, or parcel of land where a manufactured home is to be located shall have its own separate driveway that connects to a public road. In manufactured home parks each space or lot shall be served with its own driveway that connects to the main route of ingress or egress through the park.
Until the preceding inspections have been made and the manufactured home is found to be in compliance with all applicable codes, no permanent power may be installed, and no occupancy shall be permitted. Evidence of compliance will be shown by a certificate of occupancy, which includes written documentation provided to the applicant and a sticker attached to the electrical meter base. Occupancy is permitted upon issuance of the certificate of occupancy.
(Ord. No. 54, 8-15-2003; Ord. No. 54, Amend. No. 1, 7-6-2004; Amend. of 1-8-2008; Amend.
of 8-25-2010; Amend. of 10-5-2010; Amend. of 10-4-2011; Amend. of 10-3-2023(3)) Sec. 38-64. Reserved.
Sec. 38-65. [Abandoned or homes in disrepair.]
No mobile or manufactured home shall be left abandoned or in a state of disrepair on any parcel or tract of land for a period longer than six months. Mobile or manufactured homes must be maintained to acceptable standards for occupancy. If such home reaches such state of disrepair, then it must be properly disposed of within six months.
(1) No mobile or manufactured home shall be designated or used as storage buildings.
(2) Reserved.
(3) The property owner of such parcel or tract of land is responsible for removing such homes and properly disposing of them.
(4) If someone other than the property owner has abandoned such home, then the property owner should have a reasonable course of action through a court of competent jurisdiction.
(Ord. No. 54, Amend. No. 2, 12-7-2004) Sec. 38-66. Restrictions on occupancy.
A manufactured home shall not be occupied for dwelling purposes unless it has met the installation requirements in sections 38-61, 38-62, and 38-63 of this chapter, upon inspection by the building official or his designee.
(Amend. of 10-1-2013) Sec. 38-67. Penalty for violation of section.
For violation of any part of section 38-66, the following penalty shall be imposed:
(1) For the first offense of a violation of any provision of this section, the violator shall be issued a citation to appear in the county magistrate court and, upon conviction, shall be subject to a mandatory fine of not less than $600.00 and no more than $1,000.00 or confinement in the county jail not to exceed 60 days as per state law or by both fine and confinement in the discretion of the court.
(Amend. of 10-1-2013) Secs. 38-68—38-100. Reserved.
DIVISION 4. MANUFACTURED HOME PARKS
Sec. 38-101. Procedures for development.
All manufactured home parks developed after adoption of this chapter shall meet the following site plan requirements:
(1) Site plan approval required. All manufactured home park developments shall require site plan approval by the Murray County Land Use Planning Commission in accordance with the procedures and requirements established herein. Site plans required herein for the placement of two or more residential units shall contain the seal of a Georgia Registered Engineer or Surveyor. No building permits shall be issued for sites within any development until final approval is granted subject to all park plan requirements.
(2) Submission of preliminary plan. Prior to making any street improvements or installing any utilities, or other improvements, the developer shall submit six copies of a preliminary plan prepared in accordance with the provisions of this chapter to the Murray County Land Development Officer a minimum of 30 working days prior to the meeting date that the developer desires land use planning commission action.
The preliminary plan shall include the following information:
a. The name of proposed park, and the name, address, and telephone number of the applicant.
b. The name, address, seal and signature of a registered surveyor or engineer certifying the accuracy of the plan.
c. Location map and legal description of the manufactured home park; north point (designated magnetic or true).
d. Complete plans to scale of one inch equals not more than 100 feet and specifications of the proposed park showing:
i. The area and dimensions of the tract of land.
ii. The number, locations, and dimensions of all manufactured home lots.
iii. The location and width of streets; the location and size of drainage mechanisms proposed, including the size of each application drainage area.
iv. The location of service buildings and other proposed structures.
v. The location of water and sewer lines and riser pipes.
vi. Plans and specifications of the water supply and refuse and sewage disposal facilities.
vii. Plans and specifications of all buildings constructed or to be constructed within the manufactured home park.
viii. The location of all streetlights.
ix. The location of bulk refuse containers, perimeter walls, and park identification signs.
x. The location, dimensions, and treatment of all required buffer or screening areas.
xi. A soil erosion and sedimentation plan meeting the requirements of the Murray County Soil Erosion and Sedimentation Control Ordinance, as may be subsequently amended.
xii. Identification of areas of special flood hazard.
xiii. Written tentative approval for an on-site sewage management system by the Murray County Board of Health.
(3) Approval/disapproval of preliminary plan. The Murray County Land Use Planning Commission shall have 30 days from the date of preliminary plan submission to approve or disapprove the preliminary plan for the proposed manufactured home park. Failure of the land use planning commission to act within 45 days shall be deemed approval of such plan.
(4) Submission of final plan. Approval of the preliminary plan by the Murray County Land Use Planning Commission shall authorize the developer to proceed with actual construction and development of the proposed manufactured home park. Upon completion of all required improvements, the developer shall submit the original and six copies of a final plan to the Murray County Land Use Planning Commission a minimum of 30 working days prior to the meeting date that the developer desires land use planning commission action. The final plan shall be drawn on reproducible material to a scale of one inch equals not more than 100 feet and shall include the following:
a. Name of manufactured home park.
b. Name and address of owner.
c. Scale, north arrow, and date.
d. Location sketch map.
e. Total number of acres in park.
f. Sufficient data to determine readily on the ground the location, bearing, and length of every street line, boundary line, and lot lines; and location of each manufactured home and buildings.
g. Final plan of sewage treatment system including location and size of sewer lines, septic tanks, drain fields, and points of discharge (if applicable).
h. Final plan of storm sewer system with grade, pipe sizes, and location of outlets.
i. Final plan of the water supply system including location and size of water lines, wells, storage tanks, and pumping stations, if any.
j. Final plan of buffer areas and screening, if required.
k. Final plan of the refuse collection system including size and location of dumpsters.
l. Designation and data on any flood hazard areas in accordance with Murray County Flood Damage Prevention Ordinance, as may subsequently be amended.
(5) The final plan shall also include the following certifications:
a. Certification by a registered engineer or surveyor attesting to the accuracy of the plan.
b. Certification(s) of approval of the water supply and sewerage systems by the appropriate authority(ies).
(6) Approval of final plan. Within 30 days after submission of the final plan together with all required supporting data and certifications, the land use planning commission shall review and approve or disapprove the plan. Failure of the land use planning commission to act within 45 days shall be deemed approval of such plan.
(7) Development compliance. At least 100 percent of each phase of all planned spaces, as well as all streets, utilities, and other required improvements necessary to serve them pursuant to these regulations must be completely constructed according to the manufactured home park plan approved by the land use planning commission before the first manufactured home location permit will be issued.
Failure of the developer or applicant to construct this minimum phase within two years after approval by the land use planning commission shall cause such approval to expire.
(Ord. No. 54, 8-15-2003; Amend. of 8-25-2010) Secs. 38-102—38-110. Reserved.
DIVISION 5. MANUFACTURED HOME PARK DESIGN STANDARDS
Sec. 38-111. Soil and ground cover requirements.
Exposed ground surfaces in all parts of every manufactured home park shall be paved, or covered with stone, or other solid material, and must be in compliance with Murray County Soil Erosion and Sedimentation Control Ordinance No. 44.
(Ord. No. 54, 8-15-2003) Sec. 38-112. Location and frontage.
A manufactured home park development shall be located on property with a minimum frontage of 100 feet on a public street which meets the requirements of the Murray County Road Design and Specifications Requirements.
(Ord. No. 54, 8-15-2003) Sec. 38-113. Site drainage requirements.
The ground surfaces in all parts of every manufactured home park shall be graded and equipped to drain all surface water in a safe, and efficient manner. All lots shall comply with the Flood Damage Prevention Ordinance of Murray County.
(Ord. No. 54, 8-15-2003) Sec. 38-114. Streets.
All manufactured home parks shall contain a street system designed to provide convenient circulation within the park, and shall have unobstructed access to public street or highway. The following requirements shall apply to the development of the park system:
(1) All internal streets shall meet the standards for manufactured home park set forth in the Murray County Road Design and Specifications Requirements.
(2) All culs-de-sac shall be constructed with a minimum 50-foot radius.
(3) All park streets shall be maintained in a state of good repair at all times by the owner(s) of the park.
(4) Street design, base preparation, and surface construction materials shall meet the requirements of the county street and road standards, written approval of the street system by the Murray County Land Use Planning Commission shall be required before the first building permit is issued.
(Ord. No. 54, 8-15-2003) Sec. 38-115. Off-street parking requirements.
A minimum of two off-street parking spaces shall be provided in all manufactured home parks for the use of park occupants and guests.
(Ord. No. 54, 8-15-2003) Sec. 38-116. Lot area and width.
A manufactured home park development shall have a minimum area of five contiguous acres. Individual unit spaces served with individual sewage systems shall be in conformance with section 38-63(3), with not less than a 100-foot minimum width at the building setback line and not less than 100 feet of frontage on all streets; with the exception of cul-de-sac lots, which may have a minimum street frontage of 35 feet. Individual lots served by governmental or non-governmental public water and public sewer shall have a minimum lot width and size as follows:
(1) Single section homes—40 feet wide—4,000 sq. ft.
(2) Multi-sectional homes—50 feet wide—5,000 sq. ft.
(Ord. No. 54, 8-15-2003) Sec. 38-117. Recreation and other community facilities.
Not less than ten percent of the total area of the development shall be devoted to recreation and other community use facilities for those manufactured home parks containing 20 or more acres or 25 or more units.
(Ord. No. 54, 8-15-2003) Sec. 38-118. Setbacks required.
(a) No manufactured home or accessory building or structure shall be located closer than 50 feet to any manufactured home park perimeter property boundary.
(b) Each manufactured home shall be setback from any other manufactured home by at least 40 feet.
(c) There shall be a minimum distance of 25 feet between any individual manufactured home and an adjoining street, common parking areas or other common areas.
(d) On-site septic systems shall be allowed to extend into all setback areas, provided a minimum 25 feet setback is maintained from the park perimeter.
(Ord. No. 54, 8-15-2003) Sec. 38-119. Lighting.
All manufactured home parks shall have lighting of appropriate height, spacing and intensity so that each manufactured home site's access and parking is appropriately illuminated. Mercury vapor, or high or low-pressure sodium lights shall be installed at not more than 200-foot intervals with a minimum height of 18 feet.
(Ord. No. 54, 8-15-2003; Amend. of 8-25-2010) Sec. 38-120. Water supply.
All manufactured home parks shall be required to provide an adequate, safe, and potable supply of water that is easily accessible for maintenance, meeting the following minimum requirements:
(1) Governmental public water supply. All manufactured home parks shall connect to a public water system if such system is located within 1,000 feet of the proposed park.
The availability and adequacy of a public water supply shall be confirmed by the applicable agency having jurisdiction. If the public water supply is determined to be unavailable or inadequate for service, the land use planning commission may waive the requirement and allow an alternative water supply source.
(2) Community water system. If a single well is proposed to serve 15 or more service connections, or 25 or more persons, then such well and water distribution system must meet the standards for a Community Water System in accordance with the Rules of Georgia Department of Natural, Environmental Protection Division, Chapter 391-3-5, Rules for Safe Drinking Water, as amended.
(3) Individual wells. If individual wells are used, each well may be permitted to serve up to four service connections, provided that the construction method of each well shall meet the standards in accordance with the Georgia Annotated Code, O.C.G.A.
§§ 12-5-120 through 12-5-138, The Water Well Standard Act of 1991, as amended.
(Ord. No. 54, 8-15-2003) Sec. 38-121. Sewage disposal and treatment.
All manufactured home parks shall be required to provide either:
(1) A public or community sewerage treatment system approved by the appropriate governing agency; or
(2) An on-site sewage management system approved by the Murray County Health Department.
(Ord. No. 54, 8-15-2003) Sec. 38-122. Electricity.
All electric installations shall meet the requirements of the current National Electrical Code, as amended.
Sec. 38-123. Refuse collection facilities.
Each manufactured home park shall be provided with a sanitary method of solid waste collection and disposal. Collection facilities shall be either in the form of bulk containers (dumpsters) of sufficient size and adequately distributed throughout the park to meet the needs of the park residents, or at least two individually covered refuse containers having a capacity of 30 gallons or less for each occupied lot. Bulk containers shall either be screened or sided so as to remain hidden from the public right-of-way enclosed with a minimum four-feet high chain link fence, and placed upon a concrete pad, extending at least 18 inches around each container perimeter. If individual containers are utilized, stands must be provided to hold the refuse containers upright. Collection services shall be provided at least once weekly and conveyed to the nearest approved sanitary landfill. Refuse areas shall be maintained in a clean, sanitary manner so as not to attract, harbor, or breed insects, rodents or any manner of vermin or pest. Refuse areas shall be located a minimum of 50 feet away from any public right-of-way.
(Ord. No. 54, 8-15-2003) Sec. 38-124. Service buildings.
Accessory structures and community service facilities are hereby permitted for the convenience and well being of park residents. Such structures shall conform to the Georgia State Building Codes adopted by Murray County, as amended, and may include, but are not limited to the following uses:
(1) Park management offices, repair shops, and storage.
(2) Community sanitary facilities.
(3) Community postal facilities.
(4) Indoor community recreation areas.
(5) Commercial uses supplying essential goods or services for park residents.
(Ord. No. 54, 8-15-2003) Sec. 38-125. Listings of manufactured homes required.
Every person, or other entity owning or operating a manufactured home park, and each such entity engaged in the sale or rental of manufactured homes or lots upon which to place them, shall furnish the Tax Commissioner of Murray County on January 1 and July 1 of each year with a complete list of all manufactured homes parked, rented or otherwise located upon the property of the entity or in a manufactured home park operated by the entity.
(Ord. No. 54, 8-15-2003) Sec. 38-126. Posting of 911 numbers required.
The owner of a manufactured home park, shall post the correct 911 address of each individual lot or space, and maintain them in a manner so as to be quickly and easily visible.
(Ord. No. 54, 8-15-2003) Sec. 38-127. Restrictions on occupancy.
A manufactured home shall not be occupied for dwelling purposes unless it has met the installation requirements in sections 38-61, 38-62, and 38-63 of this chapter, upon inspection by the building official or his designee.
(Ord. No. 54, 8-15-2003; Amend. of 8-25-2010) Secs. 38-128—38-150. Reserved.
DIVISION 6. RECREATIONAL VEHICLE PARK/CAMPGROUND*
Sec. 38-151. Purpose.
The purpose of this chapter shall be to ensure that recreational vehicle parks / campgrounds are located, developed and occupied in accordance with standards and regulations which will protect the health, safety, general welfare, and convenience of the occupants of such parks as well as residents of the county.
(Amend. of 9-3-2024(1)) Sec. 38-152. Definitions generally.
Unless specifically defined below, words or phrases used in this article shall be interpreted to give them the meaning they have in common usage and to give this article its most reasonable application. All definitions, rules and regulations defined herein, that are in conflict with provisions of other county ordinances, the provisions of the recreational vehicle park ordinance shall prevail. For the purpose of this chapter, the words recreational vehicle park and campground shall be used interchangeably.
Campground means any parcel or tract of land under the control of any person, organization, or governmental entity where two or more camping unit sites are located and available for rent.
A Park model RV is a single living unit that is primarily designed and completed on a single chassis, mounted on wheels, to provide temporary living quarters for recreational, camping, or seasonal use, and is certified by the manufacturer as complying with all applicable requirements of ANSI A119.5. Park model RVs have a gross trailer area not exceeding 400 square feet in the setup mode, or width greater than eight and five tenths feet in transport mode. For the purposes of this chapter, if a unit is not listed in the latest edition of the N.A.D.A. Recreational Vehicle Appraisal guide as a park model, it cannot be considered a park model.
Recreational vehicle (RV) means a vehicular-type camping unit certified by the manufacturer as complying with NFPA 1192 and primarily designed to provide travel and destination, that either has its own motive power or is mounted on or towed by another vehicle. The basic units are camping trailer, fifth wheel trailer, motor home, park trailer, travel trailer, and truck camper. Tents are excluded.
Recreational vehicle/dependent means a recreational vehicle not containing sanitary facilities and devices for connecting said facilities to a community waste disposal system.
Recreational vehicle/independent means a recreational vehicle containing sanitary facilities and devices for connecting said facilities to a community waste disposal system.
This type of RV is also referred to as a self-contained recreational vehicle.
Recreational vehicle park/campground means any parcel or tract of land under the control of any person, organization, or governmental entity wherein two or more camping unit sites are offered for the use of the public or members of an organization by rent or lease, including park-owned recreational vehicles held out for rent. RV parks are primarily designed to accommodate recreational vehicles.
Recreational vehicle site, space or lot means a plot or parcel of ground within a recreational vehicle park intended for temporary location of a recreational vehicle.
(Amend. of 9-3-2024(1)) Sec. 38-153. Permit, design, accessory uses and operation.
Sec. 38-153.1. Permit.
A recreational vehicle park shall be permitted only upon the issuance of a special/ conditional use permit from the Murray County land use planning commission and permit from the Murray County Building Inspection Office. The owner, operator and occupants of a recreational vehicle park shall develop and use the park in strict compliance with the conditions imposed by the permit and all applicable sections of this chapter.
(Amend. of 9-3-2024(1)) Sec. 38-153.4. Design.
The developer of a proposed or expansion of a RV park or campground, shall submit detailed site plans, which shall be drawn at a scale not smaller than 100 feet to one inch.
However, where the size of the proposed development exceeds 100 acres, the scale may be no smaller than 200 feet to one inch. The plans shall include a general location map, north arrow, contact information for the property owner, developer and designer. The location, and width of all internal streets and access. The plans shall be drawn in permanent ink upon reproducible material, unless specifically waived, in whole or in part by the county land development officer. Plans must be submitted for review 30 days prior to filing for a rezone and/or conditional use. The plans shall include the following design elements. Additional information may be required as necessary. The plans shall also conform to all applicable requirements of the Georgia Department of Public Health, Tourist Accommodations, Chapter 511-6-2, as amended.
(1) All recreational vehicle parks must be located with direct access to a paved city, county, state or federal highway. It is the responsibility of the applicant to provide the necessary access where there is no existing improved street or road connecting the recreational park site with an improved existing public street or road. Any street or road improvement required beyond the boundary of the recreational vehicle park shall be improved in accordance with the county road design specification requirements. Entrances and exits to parks shall be designed for safe and convenient movement of traffic into and out of the park and to minimize marginal friction with free movement of traffic on adjacent streets. No material impediment to visibility shall be created or maintained which obscures the view of an approaching driver. All traffic in and out of the park shall be through such entrances and exits. No entrance or exit shall be through a residential district or shall require movement of traffic from the park through a residential district.
(2) If access to a state highway is proposed then the Georgia Department of Transportation (GDOT) shall receive two copies of the proposed plat to determine the feasibility of such access in accordance with O.C.G.A. § 32-6-150 et seq. The planning commission and/or the Murray County Land Development Officer shall include any requirements of the Georgia Department of Transportation (GDOT) in any action taken upon such proposed plat prepared after consultation with the County land development officer and public works director.
(3) Streets in RV parks shall be private, all-weather roadway, constructed with appropriate stabilized material (marble, shell, paving, or other suitable material) and shall be of sufficient width to accommodate one way or two-way traffic as per the designated plans.
(4) Site conditions. Conditions of soil, groundwater level, drainage, and topography shall not create hazards to the property or the health and safety of the occupants. The site shall not be exposed to objectionable smoke, noise, odors, or other adverse influences, and no portion subject to unpredictable and/or sudden flooding, subsidence, or erosion. Drainage plans for the entire tract must be submitted with the application to determine its compatibility with the surrounding existing drainage pattern.
(5) The minimum park size shall be five acres with a maximum density of 15 campsites per acre. Park Model recreational vehicles are permitted in recreational vehicle parks but shall not occupy more than one-fifth (20%) of all available spaces, sites or lots.
(6) Campsites should, to the greatest extent possible, be developed to preserve the natural character of the lot and the surrounding area, and each campsite shall be at least 1,400 square foot in size. Each campsite shall contain a stabilized vehicular parking pad of shell, marble, paving, or other suitable material. No part of an RV or other unit placed on a campsite shall be closer than five feet to a site line.
(7) Separation between recreational vehicles. Recreational vehicles shall be separated by at least ten feet. Any accessory structure such as attached awnings, carports, or individual storage facilities shall, for purposes of this requirement, be considered part of the RV.
(8) Parking requirements. There shall be at least two off-street parking spaces designated in the RV park for each RV site. Off-street parking shall be provided in common parking areas to accommodate additional vehicles or visitors.
(9) Open space and recreational areas. A minimum of eight percent of the gross site area for the RV Park shall be set aside and developed as common use areas for open or enclosed recreation facilities.
(10) Buffer. Each RV Park shall have a 30 foot (thirty) landscaped perimeter buffer used for no other purpose. When needed to enhance aesthetics or to ensure public safety, the RV park shall be enclosed by a fence, wall, landscape screening, earth mounds, or by other designs approved by the county land use planning commission which will complement the landscape and assure compatibility with the adjacent environment.
(11) Lighting. Recreational vehicle parks shall be adequately Illuminated with outdoor lighting located every 150 feet along interior access roads. The first light shall be within 100 feet of the entrance to the RV park.
(12) Utilities. All utilities within the park shall be constructed and maintained in accordance with State and local codes. Engineered plumbing, electrical and sanitary/ sewage plans shall be submitted.
(13) Electricity. Electricity shall be provided to each recreational vehicle site.
(14) Water. Potable, pressurized water shall be provided to each recreational vehicle site.
Each water faucet or supply outlet shall be fitted with a non-removable backsiphonage prevention device. If City or County water is available within 1000 feet of the property it is required that the recreational Vehicle Park connect to that water supply. If water is to be supplied by well, a letter of approval from the Georgia Department of Natural Resources Environmental Protection Division, must be received prior to the final plat approval and signatures.
(15) Watering Station. Each recreational vehicle park shall be provided with one or more easily accessible water supply outlets for filling recreational vehicle water storage tanks, also provided with non-removable back-siphonage prevention device.
(16) Sewer Service. Sewer services shall be provided to all recreational vehicle spaces and lots. A letter of approval for the septic system from the Murray County Environmental Health Department, must be received prior to the final plat approval and signatures.
(17) Sanitary Stations. In addition, each recreational vehicle park shall be provided with one central sanitary dumping station in the ratio of one for every; 100 recreational vehicle sites of fractional part thereof. Sanitary stations shall meet the guidelines outlined in the rules and regulations for Tourist Accommodations by the Georgia Department of Public Health, Chapter 511-6-2, as amended.
(18) Solid Waste Disposal. Refuse containers shall be placed throughout the park in convenient locations. Refuse containers must be screened from public view on three sides. The refuse containers shall be designed or placed to be resistant to bears and other wildlife. All recreational vehicle parks shall be maintained free of litter and garbage. In addition to the refuse containers placed throughout the park, at least a large (4 yards or grater) container shall be located near the management building.
(19) Erosion and sedimentation. All park development shall meet the requirements outlined in the Murray County Soil Erosion and Sedimentation Control As outlined under Chapter 26, Article IV. Soil erosion and sedimentation control.
(Amend. of 9-3-2024(1)) Sec. 38-153.5. Accessory uses.
Management headquarters, recreational facilities, toilets, dumping stations, showers, coin-operated laundry facilities and other uses and structures customarily incidental to operation of a RV park and campground are permitted as accessory uses to the park.
(1) Such establishments and the parking areas primarily related to their operation shall not occupy more than five percent of the gross area of the park.
(2) Such establishments shall be restricted in their use to occupants of the park.
(3) Such establishments shall present no visible evidence from any street outside the park of their commercial character which would attract customers other than occupants of the park.
(4) The structures housing such facilities shall not be located closer than 100 feet to any public street and shall not be directly accessible from any public street but shall be accessible only from a street within the park.
(5) Restroom and shower facilities. Restroom facilities shall be provided and shall meet the guidelines outlined in the rules and regulations for Tourist Accommodations by the Georgia Department of Public Health, Chapter 511-6-2, as amended.
(6) Open space and recreational areas. A minimum of eight percent of the gross site area for the RV Park shall be set aside and developed as common use areas for open or enclosed recreation facilities.
(Amend. of 9-3-2024(1)) Sec. 38-153.6. Operation.
The owner(s) of a recreational vehicle park shall be responsible for the development and maintenance of the park in strict conformity with the approved plan and conditions exclusive use permit, and all applicable laws and ordinances. Each park shall have a manager or security personnel available 24 hours per day, seven days per week. Public Safety personnel and County Officials shall have 24-7 access to the facility. The Park may be subject to Chapter 62, Taxation, Article 2, Hotel-Motel Tax of the code of Murray County.
(1) Operational plans shall be provided, detailing an emergency evacuation plan, trash management, shower and toilet facilities, power provider, source water and whether the site will have public sewer or an on-site septic system.
(2) Directional and informational signage shall be provided and installed prior to beginning operations.
(3) Recreational vehicle parks shall have a maximum length of stay of 14 days.
(Amend. of 9-3-2024(1)) Sec. 38-154. Prohibition on RVs or campers within unincorporated areas of county.
No recreational vehicle, camper, or tent (see definitions) shall be placed on any parcel or tract of land for the purpose of occupancy within the unincorporated areas of the county.
Occupancy of these units will only be allowed in a designated recreational vehicle park or campground. Permanent residency of these lots is prohibited.
(Amend. of 9-3-2024(1)) Secs. 38-155—38-175. Reserved.
DIVISION 7. ENFORCEMENT
Sec. 38-176. Enforcement personnel.
The building inspector, land development officer and department of code enforcement, or their respective designee, are hereby authorized to enforce the provisions of this article.
(Amend. of 9-3-2024(1)) Sec. 38-177. Violations.
In cases where a violation of this chapter has been determined, the building inspector, land development officer, code enforcement officer, or their designee, shall have the authority to issue stop work orders or grant a designated amount of time to correct the violation. Code enforcement officers shall have the authority to issue citations requiring appearance in Murray County Magistrate Court. Violations of the provisions of this article shall be punished as provided in section 1-19 of this code, except violations of section 38-58, which penalties are set forth in section 38-59.
(Amend. of 9-3-2024(1)) Sec. 38-178. Procedure for non-compliance.
In cases where a violation has occurred, and the violator has not remedied the violation within the specified time period, or in cases where stop work orders have not been fully complied with, the Murray County Code Enforcement Officer, upon notification from the building inspector or land development officer of such violation or non-compliance, shall issue a citation requiring appearance in Murray County Magistrate Court. Said citation shall include any and all violations found by the building inspector, land development officer or code enforcement officer.
(Amend. of 9-3-2024(1)) Chapters 39—41
RESERVED
39:1 Chapter 42
OFFENSES AND MISCELLANEOUS PROVISIONS*
42:2
ARTICLE I. IN GENERAL
Sec. 42-1. Disorderly conduct.
(a) Any person who shall do or engage in any of the following acts or things within the unincorporated area of Murray County, Georgia, shall be guilty of disorderly conduct and shall be punished in accord with the provisions of this section. Such acts or things which shall constitute disorderly conduct are more particularly described as follows:
(1) Fighting or quarreling or acting in such a manner as to annoy or disturb the peace, quiet, comfort or repose of persons in any office, school building, hospital or in any dwelling, hotel, or other type residence, or of any persons in the vicinity.
(2) Using any indecent, vulgar, opprobrious, obscene, threatening or abusive words which by their very utterance tend to incite to an immediate breach of the peace, that's to say words that are common knowledge and under normal circumstance will when used to or in front of another person naturally tend to provoke violent resentment that is words commonly called >fighting words>.
(3) Striking or attempting to strike another.
(4) Assemble or congregate with another or with others to cause, provoke, or engage in any fight or brawl.
(5) Collect in bodies or in crowds and engage in unlawful activities and fail to withdraw from the assembly on being lawfully commanded to do so by a peace officer.
(6) Create by or in any manner loud noises which disrupt, disturb, or otherwise interfere with the peace and tranquility of the public.
(7) Interfere, by acts of violence, with another's pursuit of a lawful occupation.
(8) Without provocation, uses obscene and vulgar or profane language in the presence of or by telephone to a person under the age of 14 years which threatens an immediate breach of the peace.
(9) Defecating or urinating or exposing genitals or female breast; on or adjacent to any street or sidewalk or in any public or quasi-public parking lot or in the halls, elevators, stairways, or any other area designated for public passage within any public or commercial buildings or on any property open to public view.
(10) For any person to peddle or sell door to door his or her service or the services of another or any item without a county, state, business, professional or other legal and binding license or permit; unless said individual is raising money for a local not for profit event such as for his/her school, church, etc.
(11) Knowingly invite, allow, permit, a person(s) under the age of 21 to gather, collect, assemble in any building or upon any land for the purpose of consuming alcoholic beverages in violation of state law and or any person(s) to keep and maintain a common, ill-governed, disorderly place which encourages gaming, drinking, misbehavior or disturbance of any neighborhood or orderly citizen(s).
42:3
(12) Any person who commits any act against public safety, morality and decency, or who exhibits any other conduct that is manifestly disorderly that tends to disturb or debauch the morals of any person or persons anywhere in the county.
(Ord. No. 2, §§ 1, 2(a), 9-12-1985; Amend. of 3-8-2016) Sec. 42-2. Loitering or prowling.
(a) A person commits the offense of loitering or prowling when he is in a place at a time or in a manner not usual for law-abiding individuals under circumstances that warrant a justifiable and reasonable alarm or immediate concern for the safety of persons or property in the vicinity.
(b) Among the circumstances which may be considered in determining whether alarm is warranted is the fact that the person takes flight upon the appearance of a law enforcement officer, refuses to identity himself, or manifestly endeavors to conceal himself or any object.
Unless by flight the person or other circumstances make it impracticable, a law enforcement officer shall, prior to any arrest for an offense under this section, afford the person an opportunity to dispel any alarm or immediate concern which would otherwise be warranted by requesting the person to identify himself and explain his presence and conduct. No person shall be convicted of an offense under this section if the law enforcement officer failed to comply with the foregoing procedure or it appears at a trial that the explanation given by the person was true and would have dispelled the alarm or immediate concern.
(Ord. No. 5, 6-2-1987) Sec. 42-3. Public drunkenness.
A person who shall be and appear in an intoxicated condition in any public place or within the cartilage of any private residence not his own other than by invitation of the owner or lawful occupant, which condition is made manifest by boisterousness, by indecent condition or act, or by vulgar, profane, loud, or unbecoming language, is guilty of public drunkenness.
(Ord. No. 4, § 1, 6-2-1987) Sec. 42-4. Obstruction of law enforcement officer or county official.
(a) Definitions. The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning:
County official means any and all employees of Murray County which do not have powers of arrest, including, but not limited to tax assessors, land use officials, building inspectors and public works employees, firefighters, paramedics and emergency medical technicians.
42:4 Law enforcement officer means any and all employees of Murray County, Georgia which have valid powers of arrest, including but not limited to code enforcement officers, police officers, and animal control officers.
Lawful discharge means, as used within this Code section, this term shall mean a person, with valid arrest powers, performing duties and job obligations related to the enforcement of local, state, and federal laws.
(b) It shall be unlawful for any person to obstruct, interfere, or hinder any law enforcement officer, or county official in any form or fashion, while the officer or official is engaged in the lawful discharge of their duties pursuant to the terms and provisions of the Murray County, Georgia Code of Ordinances.
(Ord. No. 57, 6-7-2005; Amend. of 3-8-2016) Sec. 42-5. False alarms.
(a) Definitions.
Automatic response alarm system means a device intended to detect and signal intrusion in a closed premises or upon a premises or to signal a robbery, in which signal and alarm system business, monitoring station or other entity.
Independent alarm system means a device intended to detect and signal intrusion into a closed premises or upon a premises or a robbery, in which does not automatically signal an alarm system business, monitoring station or other entity.
Automatic dialing device means any device connected to an alarm system which automatically sends a pre-recorded message or coded signal indicating the activation of the alarm system to a predetermined location.
False alarm means the activation of a burglary and/or robbery alarm at a time when no burglary or robbery is being committed or attempted on the premises.
Multiple alarm sites means more than one alarm system on the premises.
Response means the dispatch of the county sheriffs deputies or members of the county fire department, either paid or volunteer, to the premise where an alarm system has been activated indicating a burglary and/or robbery in progress on those premises.
(b) Automatic dialers; automatic response alarm systems. It shall be unlawful to key automatic dialer burglar alarms or robbery alarms, or any automatic response alarm system (burglary or robbery) to any county sheriffs department telephone number, including 911, or location. Such alarm shall only be keyed to a private answering service who can then notify the county sheriffs department or 911.
42:5
(c) False alarms.
(1) Fees for response. Per the county sheriffs response to any false alarm of any automatic alarm response system or independent alarm system, the county sheriff or his lawful deputies shall charge and collect from the person, business or legal entity, using or maintaining the automatic response alarm system or independent alarm system, fees as follows:
a. For a first or second response to a premises at which no other false alarm has occurred within a calendar year, no fee shall be charged.
b. For a third response to a false alarm within a calendar year, no fees shall be charged, but notice shall be given to the person or business using or maintaining the alarm system of the false alarms and the requirements of this section, including the fee requirement for any subsequent response to a false alarm response by the county sheriffs department within the calendar year.
c. Upon a fourth response to a false alarm at the premises within a calendar year, a fee of $50.00 shall be charged to the person occupying the premises.
d. Upon a fifth response to a false alarm within the calendar year, a fee of $75.00 shall be charged; and for all succeeding responses within the calendar year a fee of $100.00 shall be charged per response.
(d) Automatic cutoff system. All audible alarms, sirens, bells, or horns shall have an automatic cutoff so that the alarm will not operate for more than 30 continuous minutes after activation.
(e) Penalties. Any person, firm, or corporation violating the provisions of this section shall be fined as provided by subsection (c) above by the magistrate court of the county, for each such offense. No fine or penalty shall be assessed for acts of God, nature or beyond human control as determined in the sole discretion of the county sheriff deputy responding to the alarm.
(Ord. No. 40, §§ 1—5, 11-2-1999) Sec. 42-6. Harassment of a 911 operator, law enforcement officer, firefighter or emergency medical technician.
(a) Definitions. The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning:
Call means any communication, message, signal, or transmission.
False report means the fabrication of an incident or crime or of material information relating to an incident or crime which the person making the report knows to be false at the time of making the report.
Harass means to knowingly and willingly engage in any conduct directed toward a communications officer that is likely to impede or interfere with such communications 42:6
officer's duties, that threatens such communication officer or any member of his or her family, or that places any member of the public served or to be served by 9-1-1 service in danger of injury or delayed assistance.
Harassing means the willful use of opprobrious and abusive language which has no legitimate purpose in relation to imparting information relevant to an emergency call.
9-1-1 means a public safety answering point or the public safety agency which receives incoming 9-1-1 telephone calls and dispatches appropriate public safety agencies to respond to such calls.
The term 9-1-1 also means the digits, address, Internet Protocol address, or other information used to access or initiate a call to a public safety answering point.
(b) It shall be unlawful to knowingly and willfully harass or attempt to harass or mislead any E-911 operator or law enforcement officer or firefighter or emergency medical technician by false alarms or repeatedly dialing 911 and hanging up or any unauthorized use of any device of whatever nature to summon law enforcement, firefighters, or emergency medical provider aid without reasonable cause.
(c) A person commits the offense of unlawful conduct during a 9-1-1 telephone call if he or she:
(1) Without provocation, uses obscene, vulgar, or profane language with the intent to intimidate or harass a 9-1-1 communications officer;
(2) Calls or otherwise contacts 9-1-1, whether or not conversation ensues, for the purpose of annoying, harassing, or molesting a 9-1-1 communications officer or for the purpose of interfering with or disrupting emergency telephone service;
(3) Calls or otherwise contacts 9-1-1 and fails to hang up or disengage the connection for the intended purpose of interfering with or disrupting emergency service;
(4) Calls or otherwise contacts 9-1-1 with the intention to harass a communications officer; or
(5) Calls or otherwise contacts 9-1-1 and makes a false report.
(d) Any violation of subsection (b) of this Code section shall be considered to have been committed in any county where such call to or contact with 9-1-1 originated or in any county where the call to or contact with 9-1-1 was received.
(Amend. of 3-8-2016) Sec. 42-7. Giving false name, address, or birthdate to a law enforcement officer, 911 operator, firefighter or emergency medical technician or other county official.
(a) It shall be unlawful to knowingly and willfully provide a false name, address, date of birth or social security number or any personal identification information in an effort to mislead as to his or her identity or personal identification to the county sheriff, his or her 42:7
lawful deputies, the county marshal, his or her lawful deputies, a county code enforcement or land development officer, animal control officer, animal shelter staff, firefighter, emergency medical technician, paramedic or other arresting officer.
(Amend. of 3-8-2016) Sec. 42-8. Destruction of property.
(a) It shall be unlawful for any person(s) to intentionally damage or deface property owned by any other person(s) in any form, fashion or by any means.
(Amend. of 3-8-2016) Sec. 42-9. Landlords duties as to utilities.
(a) Definitions. The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning:
Landlord(s). A landlord is the owner of a house, apartment, condominium, land or real estate which is rented or leased to an individual or business.
Tenant. One that pays rent to use or occupy land, a building, or other property owned by another. A person who has the use of a house, flat, etc., subject to the payment of rent. Any holder or occupant.
Utilities. As used in this Code section, ?utilities? means heat, light, and water service.
(1) It shall be unlawful for any landlord, knowingly and willfully to suspend the furnishing of utilities to a tenant until after the final disposition of any dispossessory proceedings by the landlord against such tenant. Upon a perceived violation of this section, the authorized law enforcement officer shall attempt to allow landlord to remedy the same in an expedient fashion without citation. However, within the discretion of the authorized law enforcement officer a citation shall issue and the landlord shall be subjected to an emergency Rule Nisi hearing for the landlord to show cause why immediate compliance should not be afforded due to the extreme gravity of the nature of non-compliance and to assess any fines associated with said violation at any time after the landlord is given 24-hour notice, by personal service as the court may demand.
(2) Any person who violates of this Code section shall, upon conviction, be assessed a fine not to exceed $500.00.
(Amend. of 3-8-2016) Sec. 42-10. Enforcement.
This article shall be enforced by any authorized law enforcement officer of the county or the county commissioner.
(Amend. of 3-8-2016) 42:8 Sec. 42-11. Penalty.
Any person violating any provision of this article, except for section 42-9 which carries its own penalty section, shall be punished as provided in section 1-19 of this Code.
(Amend. of 3-8-2016) Secs. 42-12—42-30. Reserved.
ARTICLE II. TOBACCO USE IN COUNTY FACILITIES*
Sec. 42-31. Definitions.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
County facilities, facilities of the county, means all facilities including buildings, grounds and parking lots owned, leased, or operated by Murray County and/or occupied by the county and its agents and employees.
County vehicle means all vehicles owned, leased, or operated by Murray County.
Tobacco use means any act of burning, chewing, dipping, or use of any kind of any tobacco product or related device.
(Amend. of 3-4-2014) Sec. 42-32. Restricted areas.
No person shall use tobacco at any of the following facilities of the county:
(1) Restrooms;
(2) Reception areas and lounges;
(3) Waiting rooms and hallways;
(4) Employee work areas;
(5) Auditoriums, conference and meeting rooms, public assembly and chambers;
(6) Incarceration facilities;
(7) Facility grounds or parking lots.
(Amend. of 3-4-2014) Sec. 42-32.1. Tobacco use in county vehicles.
Tobacco use shall be prohibited in all vehicles owned, leased, or operated by Murray County at all times.
(Amend. of 3-4-2014) Sec. 42-33. Enforcement.
This article shall be enforced by any authorized law enforcement officer of the county or the county commissioner.
(Amend. of 3-4-2014) Sec. 42-34. Penalty.
Any person violating any provision of this article shall be punished as provided in section 1-19 of this Code.
(Amend. of 3-4-2014) Secs. 42-35—42-60. Reserved.
ARTICLE III. OPEN BURNING
Sec. 42-61. Permit required for burning woods, lands, marshes, or other flammable vegetation; exceptions.
(a) How permit obtained. Except as provided in subsections (b) and (c) of this section, any person lawfully entitled to burn any woods, lands, marshes, or any other flammable vegetation, whether in cultivated or uncultivated areas, shall, prior to such burning in the unincorporated area of the county, obtain a permit therefor from the state forest ranger located in the county or from another employee of the state forestry unit serving the county who is authorized by the chief forester of such unit to grant such permits. An applicant for a permit shall provide the state forest ranger or other authorized employee of the forestry unit serving the county with the location and recommended time of the proposed burn. Such information may be provided and the permit may be obtained by a telephone call to the state forest ranger or to another authorized employee of the forestry unit serving the county. The permit shall be given by providing the applicant therefor with a permit number which will grant permission for a control burn to take place at the location specified by the applicant at a time approved by the state forest ranger or by the other authorized employee of the forestry unit serving the county.
(b) Emergencies. It shall not be necessary to obtain a permit otherwise required by subsection (a) of this section if a sudden emergency requires a firing in order to render one's premises safe. In any prosecution under this section, unnecessary firing in a sudden emergency shall constitute an affirmative defense, but the burden of proving such necessity shall rest upon the person asserting it as a defense.
42:10
(c) Fires on improved pastures and crop land. It shall not be necessary to obtain a permit otherwise required by this section to burn improved pastures or residue on cultivated crop land if the person intending to burn such residue shall, prior to such burning, give notice of the approximate time and location thereof to the state forest ranger located in the county or to an employee of the forestry unit serving the county who is authorized to grant permits under subsection (a) of this section.
(d) Permit in addition to other permits and requirements. The notice or permit required by this section shall be in addition to any other notice or permit or other requirement for burning provided for by law.
(Ord. No. 26, § 1, 8-5-1997) Sec. 42-62. Controlled burning by owners over own forest land.
Unless prohibited by the director of the state forestry commission pursuant to provisions of O.C.G.A. § 12-6-17, the owners of any forest land may accomplish controlled burning over their own land when a permit therefor is obtained prior to the requirements of section 41-61 and the fire is not allowed to spread onto or over the land of another or others.
(Ord. No. 26, § 2, 8-5-1997) Sec. 42-63. Restrictions on open burning.
The language in subsection 42-61(a) which allows for the lawful burning of any woods, lands, marshes, or other flammable vegetation, whether in cultivated or uncultivated areas, even when a proper permit is obtained, shall still be limited in that, even with a permit, no person shall cause, suffer, allow, or permit open burning in any area of the unincorporated area of the county except as follows:
(1) Reduction of leaves on the premises on which they fall by the person in control of the premises;
(2) Carrying out recognized agricultural procedures necessary for production or harvesting of crops;
(3) Destruction of combustible demolition or construction materials either on site or transported to a burning facility upon approval by the director of the environmental protection division;
(4) The burning over of any forest land by the owners of such land;
(5) For recreational purposes or cooking food for immediate human consumption;
(6) Fires set for purposes of training firefighting personnel when authorized by the appropriate governmental entity in the guidelines set forth by the director of the environmental protection division are strictly observed;
(7) Disposal of tree limbs from storm damage;
42:11
(8) For weed abatement, disease, and pest prevention;
(9) Operation of devices using open flames such as tar kettles, blow torches, welding torches, portable heaters, and other flame-making equipment;
(10) Setting and maintenance by contractors and tradesmen of miscellaneous small fires necessary to such activities as street paving work installation or repair of utilities, provided that such fires are kept small in size and no smoke emissions exceed 40 percent opacity;
(11) Open burning in other than predominately residential areas for the purposes of land clearing or construction or right-of-way maintenance, provided the following conditions are met:
a. Prevailing winds at the time of the burning are away from the major portion of the area's population;
b. The location of the burning is at least 1,000 feet from any dwelling located in a predominately residential area;
c. The amount of dirt on or in the material being burned is minimized;
d. Heavy oils, asphaltic materials, items containing natural or synthetic rubber, or any materials other than plant growth are not being burned;
e. No more than one pile 60 feet by 60 feet, or equivalent, is being burned within a nine-acre area at one time.
(12) Disposal of all packaging materials previously containing explosives, in accordance with the U.S. Department of Labor Safety Regulations;
(13) Open burning of vegetative material for the purpose of land clearing using an air curtain destructor, provided the following conditions are met:
a. Authorization for such open burning is received from the county fire department as it has local jurisdiction over the open burning location prior to the initiation of any open burning at such location.
b. The location of the air curtain destructor is at least 300 feet from any occupied structure or public road. Air curtain destructors used solely for utility line clearing or road clearing may be located at a lesser distance upon approval of the environmental protection division of the state.
c. No more than one air curtain destructor is operated within a ten-acre area at one time or there must be at least 1,000 feet between any two air curtain destructors.
d. Only wood waste consisting of trees, logs, large brush, and stumps which are relatively free of soil are burned in the air curtain destructor.
e. Tires or other rubber products, plastics, heavy oils or asphaltic based, or impregnated materials are not used to start or maintain the operation of the air curtain destructor.
42:12
f. The air curtain destructor is constructed, installed, and operated in a manner consistent with good air pollution control practice for minimizing emissions of fly ash and smoke.
g. The cleaning out of the air curtain destructor pit is performed in a manner to prevent fugitive dust.
(Ord. No. 26, § 3, 8-5-1997) Sec. 42-64. Burning complaints.
(a) The county fire department and personnel assigned shall have the authority to extinguish any open burning which is in violation of any of the provisions of this article, and/or which constitutes an immediate threat to life and property.
(b) Any complaint requiring the dispatch of fire department units shall be investigated.
After such investigation the officer in charge shall determine if any provision of this article has been violated or constitutes a nuisance.
(c) During the investigation of burning complaints and the officer in charge has determined that a violation exists, the officer may elect to call code enforcement for appropriate action.
(Ord. No. 26, § 4, 8-5-1997) Sec. 42-65. Penalties.
Any person who violates any of the provisions of this article hereby adopted or fails to comply therewith shall, for each and every violation and noncompliance respectively, be guilty of a misdemeanor as defined by the state. The imposition of one penalty for any violation shall not excuse this violation to continue. Penalties cannot exceed $1,000.00 or imprisonment of more than 60 days, or both, with the amount of the fine/imprisonment being within the discretion of the magistrate court of the county based upon the severity or repetition of the infraction.
(Ord. No. 26, § 5, 8-5-1997)
ARTICLE IV. STREET SOLICITATIONS
Sec. 42-66. General provisions Charitable organizations registered in accordance with O.C.G.A. § 43-17-5 and such other organizations exempt from registration in accordance with O.C.G.A. § 43-17-9 are authorized to solicit charitable contributions along, upon or over the public streets, roads, alleys or thoroughfares within the unincorporated portion of Murray County, Georgia, subject to compliance with the requirements of this section.
(Amend. of 3-16-2015) 42:13 Sec. 42-67. Permit requirements and process.
(a) Charitable organizations seeking a permit pursuant to this section shall file an application, upon a form to be provided by Murray County Commissioner's Office, a minimum of seven business days prior to the proposed solicitation event. Such application shall include the name, address, and telephone number of the organization, the officers of the organization, documentary proof of registration of the organization in accordance with O.C.G.A. § 43-17-5 or proof of exemption from such registration in accordance with O.C.G.A.
§ 43-17-9, the date(s), time(s), place(s), and names and ages of participants of the proposed solicitation and shall include an agreement by the organization to hold harmless and to indemnify Murray County from any and all liability for injury or damage arising out of the permitted solicitation. A permit fee of $15.00 per event day shall be paid upon submission of the application.
(1) The sponsoring organization shall hold a current and valid policy of insurance providing compensation to any member or participant or member of the general public suffering bodily injury or damage arising out of the activity of solicitation in an amount not less than $1,000,000.00 single limit or its equivalent. The county shall be an additional named insured on such policy during all solicitation periods and the sponsoring organization shall provide the county with a certificate from the insurer to that effect;
(2) All individuals requesting permission to solicit contributions on behalf of an organization applying for a permit hereunder shall be not less than 21 years of age, and execute and deliver a waiver and release of any liability in favor of the county prior to solicitation;
(3) All individuals authorized to solicit contributions on behalf of organizations pursuant to this section shall wear reflective safety vests or other similar reflective safety apparel at all times;
(4) No location shall be permitted other than the location approved by the Sheriff of Murray County or his delegate;
(5) No permit shall allow the permitted activity at any time other than Monday through Saturday between the hours of 9:00 a.m. and 5:00 p.m.;
(6) Organizations shall maintain a copy of the permit available for inspection during the course of any solicitation;
(7) Permits shall be nontransferable and shall expire not more than 30 days after issuance;
(8) No person or sponsoring organization shall be provided more than ten permits during any calendar year.
(b) Either the sheriff, his duly authorized representative, or the county commissioner may revoke any permit issued to any organization upon receipt of a credible report of the use of vulgar, insulting, offensive, or threatening language during the course of any solicitation 42:14
or upon reasonable cause to believe that such solicitation is causing a potential traffic hazard, danger to motorist(s), danger to any individual involved in the solicitation, or that any other federal, state, or local law, rule, or regulation has been violated during the course of any solicitation.
(Amend. of 3-16-2015) Sec. 42-68. Penalties.
Any person who violates any of the provisions of this article hereby adopted or fails to comply therewith shall, for each and every violation and noncompliance respectively, be guilty of a misdemeanor as defined by the state. The imposition of one penalty for any violation shall not excuse this violation to continue. Penalties cannot exceed $1,000.00 or imprisonment for more than 60 days, or both, with the amount of the fine/imprisonment being within the discretion of the magistrate court of the county based upon the severity or repetition of the infraction.
(Amend. of 3-16-2015) Secs. 42-69—42-85. Reserved.
ARTICLE V. ILLICIT DISCHARGE AND ILLEGAL CONNECTION*
Sec. 42-86. General provisions.
(a) Purpose and intent. The purpose of this article is to protect the public health, safety, environment and general welfare through the regulation of non-stormwater discharges to the county separate storm sewer system to the maximum extent practicable as required by federal law. This article establishes methods for controlling the introduction of pollutants into the (municipal/county) separate storm sewer system in order to comply with requirements of the National Pollutant Discharge Elimination System (NPDES) permit process.
The objectives of this article are to:
(1) Regulate the contribution of pollutants to the county separate storm sewer system by any person;
(2) Prohibit illicit discharges and illegal connections to the county separate storm sewer system;
(3) Prevent non-stormwater discharges, generated as a result of spills, inappropriate dumping or disposal, to the (municipal/county) separate storm sewer system; and
(4) To establish legal authority to carry out all inspection, surveillance, monitoring and enforcement procedures necessary to ensure compliance with this article.
(b) Applicability. The provisions of this article shall apply throughout the jurisdictional limits of Murray County.
(c) Compatibility with other regulations. This article is not intended to modify or repeal any other ordinance, rule, regulation, other provision of law. The requirements of this article are in addition to the requirements of any other ordinance, rule, regulation, or other provision of law, and where any provision of this article imposes restrictions different from those imposed by any other ordinance, rule, regulation, or other provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control.
(d) Severability. If the provisions of any section, subsection, paragraph, subdivision or clause of this article shall be adjudged invalid by a court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this article.
(e) Responsibility for administration. The Murray County Land Use Administrator or designee, shall administer, implement, and enforce the provisions of this article.
(Amend. of 8-4-2015) Sec. 42-87. Definitions.
[The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:]
Accidental discharge means a discharge prohibited by this article which occurs by chance and without planning or thought prior to occurrence.
Clean Water Act means the Federal Water Pollution Control Act (33 U.S.C. § 1251 et seq.), and any subsequent amendments thereto.
Construction activity means activities subject to the Georgia Erosion and Sedimentation Control Act or NPDES general construction permits. These include construction projects resulting in land disturbance. Such activities include but are not limited to clearing and grubbing, grading, excavating, and demolition.
Illicit discharge means any direct or indirect non-stormwater discharge to the county separate storm sewer system, except as exempted in section 42-88 of this article.
Illegal connection means either of the following:
(1) Any pipe, open channel, drain or conveyance, whether on the surface or subsurface, which allows an illicit discharge to enter the storm drain system including but not limited to any conveyances which allow any non-stormwater discharge including sewage, process wastewater, and wash water to enter the storm drain system, 42:16
regardless of whether such pipe, open channel, drain or conveyance has been previously allowed, permitted, or approved by an authorized enforcement agency; or
(2) Any pipe, open channel, drain or conveyance connected to the county separate storm sewer system which has not been documented in plans, maps, or equivalent records and approved by an authorized enforcement agency.
Industrial activity means activities subject to NPDES industrial permits as defined in 40 CFR, Section 122.26 (b)(14).
National Pollutant Discharge Elimination System (NPDES) Storm Water Discharge Permit means a permit issued by the Georgia EPD under authority delegated pursuant to 33 USC § 1342(b) that authorizes the discharge of pollutants to waters of the United States, whether the permit is applicable on an individual, group, or general area-wide basis.
Murray County Separate Storm Sewer System means any facility designed or used for collecting and/or conveying stormwater, including but not limited to any roads with drainage systems, highways, Murray County streets, curbs, gutters, inlets, catch basins, piped storm drains, pumping facilities, structural stormwater controls, ditches, swales, natural and manmade or altered drainage channels, reservoirs, and other drainage structures, and which is:
(1) Owned or maintained by Murray County;
(2) Not a combined sewer; and
(3) Not part of a publicly-owned treatment works.
Non-stormwater discharge means any discharge to the storm drain system that is not composed entirely of stormwater.
Person means, except to the extent exempted from this article, any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other legal entity.
Pollutant means anything which causes or contributes to pollution. Pollutants may include, but are not limited to: paints, varnishes, and solvents; petroleum hydrocarbons;
automotive fluids; cooking grease; detergents (biodegradable or otherwise); degreasers;
cleaning chemicals; non-hazardous liquid and solid wastes and yard wastes; refuse, rubbish, garbage, litter, or other discarded or abandoned objects and accumulations, so that same may cause or contribute to pollution; floatables; pesticides, herbicides, and fertilizers; liquid and solid wastes; sewage, fecal coliform and pathogens; dissolved and particulate metals; animal wastes; wastes and residues that result from constructing a building or structure; concrete and cement; and noxious or offensive matter of any kind.
Pollution means the contamination or other alteration of any water's physical, chemical or biological properties by the addition of any constituent and includes but is not limited to, a change in temperature, taste, color, turbidity, or odor of such waters, or the discharge of any 42:17
liquid, gaseous, solid, radioactive, or other substance into any such waters as will or is likely to create a nuisance or render such waters harmful, detrimental or injurious to the public health, safety, welfare, or environment, or to domestic, commercial, industrial, agricultural, recreational, or other legitimate beneficial uses, or to livestock, wild animals, birds, fish or other aquatic life.
Premises means any building, lot, parcel of land, or portion of land whether improved or unimproved including adjacent sidewalks and parking strips.
State waters means any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface and subsurface water, natural or artificial, lying within or forming a part of the boundaries of the State of Georgia which are not entirely confined and retained completely upon the property of a single person.
Stormwater runoff or stormwater means any surface flow, runoff, and drainage consisting entirely of water from any form of natural precipitation, and resulting from such precipitation.
Structural stormwater control means a structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.
(Amend. of 8-4-2015) Sec. 42-88. Prohibitions.
(a) Prohibition of illicit discharges. No person shall throw, drain, or otherwise discharge, cause, or allow others under its control to throw, drain, or otherwise discharge into the Murray County separate storm sewer system any pollutants or waters containing any pollutants, other than stormwater.
The following discharges are exempt from the prohibition provision above:
(1) Water line flushing performed by a government agency, other potable water sources, landscape irrigation or lawn watering, diverted stream flows, rising ground water, ground water infiltration to storm drains, uncontaminated pumped ground water, foundation or footing drains (not including active groundwater dewatering systems), crawl space pumps, air conditioning condensation, springs, natural riparian habitat or wetland flows, and any other water source not containing pollutants;
(2) Discharges or flows from fire fighting, and other discharges specified in writing by Murray County as being necessary to protect public health and safety;
(3) The prohibition provision above shall not apply to any non-stormwater discharge permitted under an NPDES permit or order issued to the discharger and administered under the authority of the state and the Federal Environmental Protection Agency, provided that the discharger is in full compliance with all requirements of the 42:18
permit, waiver, or order and other applicable laws and regulations, and provided that written approval has been granted for any discharge to the (municipal/county) separate storm sewer system.
(b) Prohibition of illegal connections. The construction, connection, use, maintenance or continued existence of any illegal connection to the county separate storm sewer system is prohibited.
(1) This prohibition expressly includes, without limitation, illegal connections made in the past, regardless of whether the connection was permissible under law or practices applicable or prevailing at the time of connection.
(2) A person violates this article if the person connects a line conveying sewage to the county separate storm sewer system, or allows such a connection to continue.
(3) Improper connections in violation of this article must be disconnected and redirected, if necessary, to an approved onsite wastewater management system or the sanitary sewer system upon written approval of the Chatsworth Water Works Commission.
(4) Any drain or conveyance that has not been documented in plans, maps or equivalent, and which may be connected to the storm sewer system, shall be located by the owner or occupant of that property upon receipt of written notice of violation from the Murray County Land Use Administrator or designee, requiring that such locating be completed. Such notice will specify a reasonable time period within which the location of the drain or conveyance is to be completed, that the drain or conveyance be identified as storm sewer, sanitary sewer or other, and that the outfall location or point of connection to the storm sewer system, sanitary sewer system or other discharge point be identified. Results of these investigations are to be documented and provided to the Murray County Land Use Administrator or designee.
(Amend. of 8-4-2015) Sec. 42-89. Industrial or construction activity discharges.
Any person subject to an industrial or construction activity NPDES stormwater discharge permit shall comply with all provisions of such permit. Proof of compliance with said permit may be required in a form acceptable to the Murray County Land Use Administrator or designee prior to allowing discharges to the county separate storm sewer system.
(Amend. of 8-4-2015) Sec. 42-90. Access and inspection of properties and facilities.
The Murray County Land Use Administrator or designee shall be permitted to enter and inspect properties and facilities at reasonable times as often as may be necessary to determine compliance with this article.
(1) If a property or facility has security measures in force which require proper identification and clearance before entry into its premises, the owner or operator shall make the necessary arrangements to allow access to representatives of the Murray County Land Use Administrator or designee.
42:19
(2) The owner or operator shall allow the Murray County Land Use Administrator or designee ready access to all parts of the premises for the purposes of inspection, sampling, photography, videotaping, examination and copying of any records that are required under the conditions of an NPDES permit to discharge stormwater.
(3) The Murray County Land Use Administrator or designee shall have the right to set up on any property or facility such devices as are necessary in the opinion of the Murray County Land Use Administrator or designee to conduct monitoring and/or sampling of flow discharges.
(4) The Murray County Land Use Administrator or designee may require the owner or operator to install monitoring equipment and perform monitoring as necessary, and make the monitoring data available to the Murray County Land Use Administrator or designee. This sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the owner or operator at his/her own expense. All devices used to measure flow and quality shall be calibrated to ensure their accuracy.
(5) Any temporary or permanent obstruction to safe and easy access to the property or facility to be inspected and/or sampled shall be promptly removed by the owner or operator at the written or oral request of the Murray County Land Use Administrator or designee and shall not be replaced. The costs of clearing such access shall be borne by the owner or operator.
(6) Unreasonable delays in allowing the Murray County Land Use Administrator or designee access to a facility is a violation of this article.
(7) If the Murray County Land Use Administrator or designee has been refused access to any part of the premises from which stormwater is discharged, and the Murray County Land Use Administrator or designee is able to demonstrate probable cause to believe that there may be a violation of this article, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program designed to verify compliance with this article or any order issued hereunder, or to protect the overall public health, safety, environment and welfare of the community, then the Murray County Land Use Administrator or designee may seek issuance of a search warrant from any court of competent jurisdiction.
(Amend. of 8-4-2015) Sec. 42-91. Notification of accidental discharges and spills.
Notwithstanding other requirements of law, as soon as any person responsible for a facility, activity or operation, or responsible for emergency response for a facility, activity or operation has information of any known or suspected release of pollutants or nonstormwater discharges from that facility or operation which are resulting or may result in illicit discharges or pollutants discharging into stormwater, the (municipal/county) separate 42:20
storm sewer system, state waters, or waters of the U.S., said person shall take all necessary steps to ensure the discovery, containment, and cleanup of such release so as to minimize the effects of the discharge.
Said person shall notify the authorized enforcement agency by phone, facsimile or in person no later than 24 hours of the nature, quantity and time of occurrence of the discharge.
Notifications in person or by phone shall be confirmed by written notice addressed and mailed to the Murray County Land Use Administrator or designee within three business days of the phone or in person notice. If the discharge of prohibited materials emanates from a commercial or industrial establishment, the owner or operator of such establishment shall also retain an on-site written record of the discharge and the actions taken to prevent its recurrence. Such records shall be retained for at least three years. Said person shall also take immediate steps to ensure no recurrence of the discharge or spill.
In the event of such a release of hazardous materials, emergency response agencies and/or other appropriate agencies shall be immediately notified. Failure to provide notification of a release as provided above is a violation of this article.
(Amend. of 8-4-2015) Sec. 42-92. Violations, enforcement and penalties.
(a) Violations. It shall be unlawful for any person to violate any provision or fail to comply with any of the requirements of this article. Any person who has violated or continues to violate the provisions of this article, may be subject to the enforcement actions outlined in this section or may be restrained by injunction or otherwise abated in a manner provided by law.
In the event the violation constitutes an immediate danger to public health or public safety, the Murray County Land Use Administrator or designee is authorized to enter upon the subject private property, without giving prior notice, to take any and all measures necessary to abate the violation and/or restore the property. The Murray County Land Use Administrator or designee is authorized to seek costs of the abatement as outlined in section 42-93(e).
(b) Notice of violation. Whenever the Murray County Land Use Administrator or designee finds that a violation of this article has occurred, the Murray County Land Use Administrator or designee may order compliance by written notice of violation.
(1) The notice of violation shall contain:
a. The name and address of the alleged violator;
b. The address when available or a description of the building, structure or land upon which the violation is occurring, or has occurred;
c. A statement specifying the nature of the violation;
d. A description of the remedial measures necessary to restore compliance with this article and a time schedule for the completion of such remedial action;
42:21
e. A statement of the penalty or penalties that shall or may be assessed against the person to whom the notice of violation is directed; and
f. A statement that the determination of violation may be appealed to the Murray County Land Use Administrator or designee by filing a written notice of appeal within 30 days of service of notice of violation.
(2) Such notice may require without limitation:
a. The performance of monitoring, analyses, and reporting;
b. The elimination of illicit discharges and illegal connections;
c. That violating discharges, practices, or operations shall cease and desist;
d. The abatement or remediation of stormwater pollution or contamination hazards and the restoration of any affected property;
e. Payment of costs to cover administrative and abatement costs; and
f. The implementation of pollution prevention practices.
(c) Appeal of notice of violation. Any person receiving a notice of violation may appeal the determination of the Murray County Land Use Administrator or designee, with the Murray County Board of Appeals. The notice of appeal must be received within 15 days from the date of the notice of violation, by filing with the Murray County Land Use Office a written notice of appeal specifying the grounds thereof. A fee of $50.00 shall also be submitted with the notice to cover the advertising cost. Upon the hearing, any party may appear in person or by attorney-at-law, or both. Any person, aggrieved by a decision or order of the board of appeals, after exhausting all administrative remedies, shall be able to apply for certiorari to the Superior Court of Murray County as allowed under O.C.G.A. § 5-4-1.
(d) Enforcement measures after appeal. If the violation has not been corrected pursuant to the requirements set forth in the notice of violation, or, in the event of an appeal, within ten days of the decision of the appropriate authority upholding the decision of the Murray County Land Use Administrator or designee then representatives of the Murray County Land Use Administrator or designee may enter upon the subject private property and are authorized to take any and all measures necessary to abate the violation and/or restore the property. It shall be unlawful for any person, owner, agent or person in possession of any premises to refuse to allow the government agency or designated contractor to enter upon the premises for the purposes set forth above.
(e) Costs of abatement of the violation. Within 15 days after abatement of the violation, the owner of the property will be notified of the cost of abatement, including administrative costs. The property owner may file a written appeal objecting to the assessment or to the amount of the assessment within 15 days of such notice, with the Murray County commissioner. If the amount due is not paid within 30 days after receipt of the notice, or if an appeal is taken, within 30 days after a decision on said appeal, the charges shall become 42:22
a special assessment against the property and shall constitute a lien on the property for the amount of the assessment. Any person violating any of the provisions of this article shall become liable to Murray County by reason of such violation.
(f) Civil penalties. In the event the alleged violator fails to take the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within ten days, or such greater period as the Murray County Land Use Administrator or designee shall deem appropriate, after the Murray County Land Use Administrator or designee has taken one or more of the actions described above, the Murray County Land Use Administrator or designee may impose a penalty not to exceed $1,000.00 (depending on the severity of the violation) for each day the violation remains un-remedied after receipt of the notice of violation.
(g) Criminal penalties. For intentional and flagrant violations of this article, the Murray County Land Use Administrator or designee may issue a citation to the alleged violator requiring such person to appear in Magistrate court to answer charges for such violation.
Upon conviction, such person shall be punished by a fine not to exceed $1,000.00 or imprisonment for 60 days or both. Each act of violation and each day upon which any violation shall occur shall constitute a separate offense.
(h) Violations deemed a public nuisance. In addition to the enforcement processes and penalties provided, any condition caused or permitted to exist in violation of any of the provisions of this article is a threat to public health, safety, welfare, and environment and is declared and deemed a nuisance, and may be abated by injunctive or other equitable relief as provided by law.
(i) Remedies not exclusive. The remedies listed in this article are not exclusive of any other remedies available under any applicable federal, state or local law and the Murray County Land Use Administrator or designee may seek cumulative remedies.
Murray County may recover attorney's fees, court costs, and other expenses associated with enforcement of this article, including sampling and monitoring expenses.
(Amend. of 8-4-2015) Secs. 42-93—42-120. Reserved.
42:23 Chapters 43—45
RESERVED
43:1 Chapter 46
PARKS AND RECREATION*
ARTICLE I. IN GENERAL
Secs. 46-1—46-25. Reserved.
ARTICLE II. PARKS AND RECREATION BOARD
Sec. 46-26. Established, purpose.
Under the authority granted by O.C.G.A. § 36-64-3, there is hereby reconstituted the county parks and recreation board, which shall have the responsibility to develop, equip, and maintain parks, playground, recreation centers, and buildings thereon, to operate all types of recreational facilities, and to conduct recreational activities on behalf of the citizens of the county.
(Res. of 4-3-2001) Sec. 46-27. Composition.
The county parks and recreation board shall be composed of no less than five nor more than seven county citizens.
(Res. of 4-3-2001) Sec. 46-28. Appointment.
The members of the county parks and recreation board shall be appointed by the commissioner. Appointments shall be made in such manner that the City of Chatsworth and the City of Eton are represented and concur in the appointment of their representative. One member of the board shall be the person holding the position of county school system athletic director.
(Res. of 4-3-2001) Sec. 46-29. Terms.
The members of the county parks and recreation board shall be appointed for a term of five years or until their successors are appointed and qualified, except that for the initial term the commissioner is authorized to vary the initial terms of members in such a manner that thereafter the term of at least one member shall expire annually. Members of the board shall be eligible for reappointment.
(Res. of 4-3-2001) Sec. 46-30. Organization.
Immediately after their appointment, the members of the county parks and recreation board shall meet and organize by electing one of their members as chairman and electing other members to such offices as may be necessary.
(Res. of 4-3-2001) 46:3 Sec. 46-31. Powers.
The county parks and recreation board shall have the following powers:
(1) To adopt bylaws for the conduct of its affairs and to make rules and regulations for the proper administration of its duties.
(2) To establish fees from time to time for the use of its equipment and facilities.
(3) To administer all funds made available to the board.
(4) To accept any grant of funds made by the United States or of the state or any agency thereof for the purposes of carrying out any of its functions.
(5) To accept gifts, bequests, devises, or endowments to be used for carrying out its functions, except that if the acceptance thereof for such purpose will subject the commissioner to additional expenses for improvements, maintenance, or renewal, the acceptance of any such gift, bequest, devise, or endowment shall be subject to the approval of the commissioner.
(6) To make recommendations to the commissioner as to the operation of recreation facilities.
(7) To employ play leaders, playground or community center directors, supervisors, recreation superintendents, or such other officers or employees as it deems are needed to carry out the functions of the board.
(8) To prepare an annual budget covering all recreation activities under its supervision, to timely submit such budget to the commissioner for approval, and to follow and comply with the existing purchasing, procurement, and fiscal policies and procedures as set forth in county guidelines.
(9) To prepare annual reports of its accounts and doings for the commissioner, to conduct surveys, to establish a comprehensive plan for the continuing development of recreational facilities to meet the future needs of the citizens of the county, to make recommendations as to the operation of recreational facilities, and to do all other things necessary and proper to perform the duties of the board.
(Res. of 4-3-2001) Sec. 46-32. Compensation.
The members of the county parks and recreation board shall serve without pay.
(Res. of 4-3-2001) Sec. 46-33. Employees.
Employees of the county parks and recreation board shall be considered and classified as county employees and applicable to the county personnel ordinance. All positions under the 46:4
board must be budgeted by the commissioner and assigned within the position and pay grade structure of the county. Direct supervision and evaluation of personnel shall lie with the board.
(Res. of 4-3-2001) Sec. 46-34. Oath.
Due to the authority and responsibilities of managing and accounting for public funds and facilities, each member of the county parks and recreation board shall be required to take an oath of office and execute such oath in writing.
(Res. of 4-3-2001) Sec. 46-35. Removal of member.
The procedures for the removal of any member from the county parks and recreation board shall be identified in the bylaws of the board and may be superseded by the commissioner when it is determined by the commissioner to be in the best interest of the county.
(Res. of 4-3-2001) 46:5 Chapters 47—49
RESERVED
47:1 Chapter 50
PLANNING AND DEVELOPMENT*
ARTICLE I. IN GENERAL
Secs. 50-1—50-25. Reserved.
ARTICLE II. BOARD OF APPEALS*
Sec. 50-26. Creation and appointment of the board of appeals.
There is established a zoning board of appeals consisting of three members who shall be voting and taxpaying residents of the County, and be appointed by the county commissioner, or board of commissioners. The commissioner or commissioners shall appoint one member to a one-year term, and one member to a two-year term and one member to a three-year term to commence immediately upon appointment. Upon expiration of the initial term, all subsequent appointments shall be made for a term of three years. Any vacancy in the membership of the board of appeals shall be filled for the unexpired term in the same manner as the initial appointment.
(Ord. No. 51, 9-26-2002; Amend. of 5-7-2024(1)) Sec. 50-27. Organization and proceedings.
(a) Officers. The board of appeals shall elect one of its members as chairperson, who shall serve for one year or until he or she is re-elected or a successor is elected. The board of appeals shall elect a vice-chairman and secretary. The board of appeals shall adopt rules and bylaws to govern its operation and functions.
(b) Meetings. Meetings of the board shall be held at the call of the chairperson, and at such other times as the board may determine. Two members shall constitute a quorum and two affirmative votes shall be required to approve any issue before the board. The chairperson, or in the chairperson's absence, the vice-chairperson may administer oaths and compel the attendance of witness by subpoena. The board shall keep minutes of its proceedings showing the vote of each member upon each question, or if absent or failing to vote, indicating such fact, and shall keep records of its examinations and other official actions, all of which shall be immediately filed in the office of the board of commissioners and shall be public record. Pursuant to O.C.G.A. § 50-14-1, et seq., all meetings of the board of appeals shall be open to the public.
(Ord. No. 51, 9-26-2002; Amend. of 5-7-2024(1)) Sec. 50-28. Power and duties.
The board of appeals shall have the following powers and duties in regard to any and all ordinances dealing with building and land use requirements, including but not limited to the Building Inspector Ordinance, the Mobile Home Parks Ordinance, Subdivision Regulations Ordinance, Soil and Erosion and Sedimentation Control Ordinance, Zoning Ordinance.
Zoning appeals shall be governed by the regulations outlined under Appendix B, Article III of the Code of Murray County.
(1) Administrative review. To hear and decide appeals where it is alleged that there is error in any order, requirement, decision or determination made by the building inspector or land development officer in the enforcement of any ordinances of Murray County, Georgia.
(2) Variances. To authorize upon appeal and specific cases such as variance from the terms of an ordinance as will not be contrary to the public interest where, owing to special conditions, a literal enforcement of the provisions of an ordinance will in an individual case, result in practical difficulty or unnecessary hardship, so that the spirit of the ordinance shall be observed, public safety and welfare secured, and substantial justice done. Such variance may be granted in such individual case of upon a finding by the board of appeals that all of the following conditions exist:
a. There are extraordinary and exceptional conditions pertaining to the particular piece of property in question because of its size, shape, or topography.
b. The application of an ordinance to the particular piece of property would create an unnecessary hardship.
c. Such conditions are peculiar to the particular piece of property involved.
d. Relief, if granted, would not cause substantial detriment to the public good or impair the purposes and intent of county ordinances.
No provision of this article shall be construed as granting to the board of appeals the ability to grant a variance for deviations from the standard building codes adopted by the governing authority of Murray County.
(Ord. No. 51, 9-26-2002; Amend. of 5-7-2024(1)) Sec. 50-29. Appeals, hearings, notices, and stay of proceedings.
(a) Appeals to the board of appeals may be taken by any person aggrieved or by any officer, department, board or bureau of the county affected by any order, requirement, decision or determination of the building inspector or land development officer. Such appeal shall be taken within 15 days of a written decision of the building inspector or land development officer, by filing with the Clerk of the Murray County Commissioner's Office a written notice of appeal specifying the grounds thereof. A fee of $50.00 shall also be submitted with the notice to cover the advertising cost. The building inspector or land development officer shall forthwith transmit to the board all the documentation constituting a record upon which the action appealed from was taken.
(b) An appeal stays all legal proceedings in furtherance of the action appealed from unless the building inspector or land development officer certifies to the board of appeals after the notice of appeal shall have filed with such inspector, that by reason of facts stated in the certificate, a stay, would in such inspector's opinion, cause imminent peril to life and property.
(c) The board of appeals shall affix a reasonable time for the hearing of the appeal or other matter referred to it, and give at least 15 public days notice of the time and place which shall be published in a newspaper of general circulation in the county and shall also be posted on the property affected. Upon the hearing, any party may appear in person or by attorney-atlaw, or both.
(Ord. No. 51, 9-26-2002) Sec. 50-30. Decisions.
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.