Newton County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 10 - BUILDINGS AND BUILDING REGULATIONS / Article VII - SOLAR ENERGY
Sec. 10-295. Requirements applicable to solar energy systems.
About this text
- As published by Municode, current through 2023-04-18
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Types of solar energy systems:
(1) Building-integrated solar energy systems;
(2) Rooftop solar energy systems;
(3) Ground-mounted solar energy systems;
a. Small scale solar energy systems: occupies less than three acres;
b. Intermediate scale solar energy systems: occupies three to 15 acres;
c. Large scale solar energy systems: occupies more than 15 acres;
(b) Permissible zoning districts:
Agricultural Residential Office Commercial/ Industrial Building integrated SES A AUP A A Rooftop SES A AUP A A Ground-mounted SES small scale A AUP A A Ground-mounted SES intermediate scale AUP CUP AUP AUP Ground-mounted SES large scale CUP CUP CUP CUP Agricultural Residential Office Commercial/ Industrial A: Allowed use. The SES is allowed in this district.
AUP: Administrative use permit required. If the applicant first obtains an administrative use permit in accordance with section 10-296, the SES is allowed in this district.
CUP: Conditional use permit required. If the applicant first obtains a conditional use permit in accordance with section 10-296, the SES is allowed in this district.
Note: Additional criteria may apply in overlay districts as identified by the county zoning ordinance.
(c) Requirements for building-integrated solar energy systems.
(1) Allowed use. A building-integrated SES is an allowed accessory use, regardless of whether the SES is visible from a public right-of-way.
(2) Solar access. A property owner may obtain a solar easement from another property owner for the purpose of ensuring the building-integrated SES adequate exposure to sunlight.
(d) Requirements for rooftop solar energy systems.
(1) Allowed use. A rooftop SES is an allowed accessory use, regardless of whether the SES is visible from a public right-of-way.
(2) Solar access. A property owner may obtain a solar easement from another property owner for the purpose of ensuring the rooftop SES adequate exposure to sunlight.
(3) Safety. A rooftop SES shall have a clear perimeter between the SES and the roofline to ensure emergency access and egress on the roof and to provide smoke ventilation opportunities. A rooftop SES shall not extend beyond the exterior perimeter of the building, unless the SES is explicitly engineered to do so.
(4) Height. A rooftop SES mounted on a flat roof shall be given an equivalent exemption to the underlying zoning district's height standards as roof-mounted mechanical devices or equipment. A rooftop SES mounted on a sloped roof shall not vertically exceed the highest point of the roof to which it is attached.
(e) General requirements for ground-mounted solar energy systems. The following requirements apply to all small, intermediate, and large scale ground-mounted SESs, in addition to the specific requirements in this article that apply to each SES size respectively:
(1) Solar access. A property owner may obtain a solar easement from another property owner for the purpose of ensuring the ground-mounted SES adequate exposure to sunlight.
(2) Visual buffer. A ground-mounted SES shall require a visual buffer where the SES is visible from a residential property. If the visual buffer utilizes natural vegetation or plantings, it shall be of a size and thickness sufficient to provide a visual and lighting barrier between the SES and the residential property within 12 months from the completion of construction of the SES. All other visual buffers shall be in place at the time the SES commences operation. Opaque fencing with a minimum height of six feet is required to provide a visual barrier for intermediate and large scale ground-mounted SES's which are visible from a residential property or "scenic corridor" and shall be in place at the time the SES commences operation. Such fencing shall be located on the inside edge of the visual buffer.
(3) Impervious surface. An SES shall comply with federal, state, and local stormwater management, erosion, and sediment control provisions and impervious surface coverage requirements. For purposes of compliance with such regulations, an SES shall be considered pervious if it maintains sheet flow and allows for water to infiltrate under and around the panels through a pervious surface and into the subsoil.
(4) Lighting. To reduce light pollution, lighting of a ground-mounted SES shall:
a. Be limited to the minimum reasonably necessary for its safe operation;
b. Be directed downward where reasonably feasible;
c. Incorporate full cut-off fixtures; and
d. Reasonably utilize motion sensors.
(5) Tree removal. The removal or destruction of trees or natural vegetation for an SES shall comply with the requirements of the underlying zoning ordinance. If a ground-mounted SES is built on a lot with more than 25 percent tree coverage, then no more than 50 percent of the existing tree coverage may be removed and replaced.
(6) Maintenance. A ground-mounted SES shall be maintained in good working order.
(7) Abandonment. A ground-mounted SES shall be considered abandoned if it ceases to produce energy on a continuous basis for more than 12 months without prior approval from the zoning administrator.
(8) Decommissioning. If a ground-mounted SES has reached the end of its reasonable life or it is abandoned, then:
a. A small scale SES and all structures associated with it shall be removed and all materials shall be recycled or otherwise reused to the extent reasonably practicable;
b. An intermediate or large scale SES shall be decommissioned in accordance with the decommissioning plan in the permit application (see section 10-117(1)(e)); and
c. In the event that the SES is not in use for 12 months and the decommissioning plan has not been undertaken, the county is permitted to initiate nuisance property abatement procedures in accordance with article IV of chapter 42.
(f) Specific requirements for small scale solar energy systems. Allowed use; a small scale SES is an allowed primary or accessory use.
(g) Specific requirements for intermediate scale solar energy systems.
(1) Permitted use. An intermediate scale SES is a permitted primary or accessory use in any residential zoning district if the applicant obtains a conditional use permit from the zoning authority. In any other zoning district, an intermediate scale SES is a permitted primary or accessory use if the applicant obtains an administrative use permit from the zoning authority.
(2) Setbacks. An intermediate scale SES shall comply with the following setback requirements:
a. The intermediate scale SES shall be located no closer than the lesser of:
1. 25 feet from any property line or easement; or
2. The setback standards for the underlying zoning district, if any;
b. The intermediate scale SES shall be located no closer than the lesser of:
1. 25 feet from any public right of way; or
2. The setback standards for the underlying zoning district, if any; and
c. The intermediate scale SES shall be located no closer than 50 feet from any residential dwelling unit.
(3) Signage. An intermediate scale SES:
a. Shall have warning signs:
1. Displaying the dangers associated with an intermediate scale SES;
2. Identifying the owner or operator of the intermediate scale SES; and
3. Providing a 24-hour emergency contact phone number;
b. May have signs that contain educational information about the intermediate scale SES;
and
c. Any other signage not identified above shall meet the requirements of the county zoning ordinance.
(4) Electrical connections. If the intermediate scale SES is connected to the public grid, then reasonable efforts shall be made to place underground all utility connections from the SES, depending on appropriate soil conditions, shape, and topography of the property and any requirements of the utility provider.
(5) Safe installation. The intermediate scale SES shall be installed by a licensed engineer, a certified electrician shall inspect the electrical connections prior to operation, and the appropriate public utility shall inspect any operating connection to the grid.
(h) Specific requirements for large scale solar energy systems.
(1) Permitted use. A large scale SES is a permitted primary or accessory use in any zoning district if the applicant obtains a conditional use permit from the zoning authority.
(2) Setbacks. A large scale SES shall comply with the following setback requirements:
a. The large scale SES shall be located no closer than the lesser of:
1. 25 feet from any property line or easement; or
2. The setback standards for the underlying zoning district, if any;
b. The large scale SES shall be located no closer than the lesser of:
1. 25 feet from any public right of way; or
2. The setback standards for the underlying zoning district, if any; and
c. The large scale SES shall be located no closer than 100 feet from any residential dwelling unit.
(3) Signage. A large scale SES:
a. Shall have warning signs:
1. Displaying the dangers associated with a large scale SES;
2. Identifying the owner or operator of the large scale SES; and
3. Providing a 24-hour emergency contact phone number;
b. May have signs that contain educational information about the large scale SES; and
c. Any other signage not identified above shall meet the requirements of the county zoning ordinance.
(4) Electrical connection. If the large scale SES is connected to the public grid, then reasonable efforts shall be made to place underground all utility connections from the large scale SES, depending on appropriate soil conditions, shape, and topography of the property and any requirements of the utility provider.
(5) Safe installation. The large scale SES shall be installed by a licensed engineer, a certified electrician shall inspect the electrical connections prior to operation, and the appropriate public utility shall inspect any operating connection to the grid.
History
(Ord. No. O-120418, § 24-105, 12-4-2018)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.