Newton County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 10 - BUILDINGS AND BUILDING REGULATIONS / Article VII - SOLAR ENERGY
Sec. 10-296. Plans and permits.
About this text
- As published by Municode, current through 2023-04-18
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Permit application. An application for a conditional administrative use permit or a conditional use permit shall be submitted to the zoning administrator containing the following:
(1) Basic information. The applicant shall submit a document that lists the following:
a. The address of the SES property;
b. The applicant's name, address, telephone number, and email address;
c. The property owner's name, address, telephone number, and email address;
d. If known, the SES operator's name, address, telephone number, and email address;
e. If known, the installation company's name, address, telephone number, email address, and license number; and
f. Evidence of the applicant's control of the property, such as a deed, lease, or option agreement with the landowner.
(2) Site plan. The applicant shall submit a site plan that contains the following:
a. A diagram of the property and directly adjacent properties showing the locations of all existing and proposed structures (including solar arrays, inverters, transformers, electrical substations, and buildings), property lines, rights-of-way, roads, required setbacks, required signage, and required visual buffers;
b. A one-line diagram of the SES that has been stamped and signed by a professional engineer licensed in the state that shows the configuration of the array, the wiring system, the overcurrent protection, the inverter, and the disconnects;
c. A topographical map from the U.S. Geological Survey, or equivalent, that depicts in detail any vegetative cover, watersheds, floodplains, or wetlands on the property;
d. A topographic drawing of the property that indicates how stormwater currently drains from the property, identifies the location of discharge points or areas, and identifies any conditions present on the property that may contribute to significant soil erosion;
e. A map from the state department of natural resources that identifies any habitat for state endangered, threatened, or candidate species on or adjacent to the property;
f. A map from the U.S. Department of Fish and Wildlife (FWS) and/or the National Oceanic and Atmospheric Administration (NOAA) that identifies any habitat for federally endangered, threatened, or candidate species on or adjacent to the property; and
g. If the SES is located in an agricultural district, a map from U.S. Department of Agriculture Natural Resources Conservation Service (NRCS) identifying prime farmland and farmland of statewide importance on the property.
(3) Mitigation of impacts. The applicant shall submit a mitigation plan that contains the following:
a. A plan for the prevention and mitigation of stormwater runoff and soil erosion;
b. If the SES is located on prime farmland or farmland of statewide importance (as defined by NRCS), a plan to mitigate damage to the soil quality;
c. If the installation of the SES will result in potentially adverse changes to any state or federally endangered, threatened, or candidate species habitat, a mitigation plan that includes:
1. A process for minimizing changes to the species habitat, for example through habitat corridors;
2. A plan to relocate and monitor any impacted species; and
3. A plan to restore the original species habitat after the system is decommissioned; and
d. A map of five nautical miles around the property with the location of any airport in the shown space, and, if an airport is present in that area, a glare hazard analysis result by the solar glare hazard analysis tool or its equivalent.
(4) Certifications. The applicant shall submit an affidavit that provides:
a. Construction and operation of the SES will comply with all applicable federal, state, and local laws and regulations, including the requirements of the underlying zoning ordinance, unless otherwise expressly stated in this article;
b. Before operation, a fire safety and evacuation plan will be filed with the appropriate fire code and emergency management officials, and will be available in workplace for reference and review by employees working on the premises; and
c. General liability insurance will be maintained throughout the life of the SES project. If the underlying zoning ordinance does not specify the coverage, such general liability insurance will include, but not be limited to, commercial form, premises-operations, products/ completed operations hazard, contractual insurance, broad form property damage, and personal injury.
(5) Decommissioning plan. The applicant shall submit a decommissioning plan that, based on the best available information at the time of the application, contains the following:
a. The name, address, telephone number, and e-mail address of the person or entity responsible for implementing the decommissioning plan;
b. A statement of conditions that require the decommissioning plan to be implemented;
c. As part of decommissioning, a removal plan that:
1. Identifies all structures, components, and non-utility owned equipment that shall be removed; and
2. Includes a plan for recycling or otherwise reusing all materials to the extent reasonably practicable;
d. As part of decommissioning, a restoration plan to return the property to its condition prior to the installation of the SES or to some other condition reasonably appropriate to the designated land use after the SES is removed, including a tree restoration plan to restore the original tree cover with similar tree types and numbers after the system is decommissioned; and
e. In the event that the SES is not in use for 12 months and the decommissioning plan has not been undertaken, the county is permitted to initiate nuisance property abatement procedures in accordance with article IV of chapter 42.
(b) Administrative use permit review.
(1) Upon receiving an application for an SES, the zoning administrator shall forward the request to the planning commission to review the permit application within 60 days and either approve or deny the applicant as set forth in section 505-015 of the zoning ordinance.
(2) An administrative use permit application may be approved only if the planning commission determines that the SES complies with all applicable federal, state, and local laws and regulations, including the requirements of this article.
(3) The applicant's appeal rights are consistent with those rights expressed in the underlying zoning ordinance.
(c) Conditional use permit review.
(1) Upon receiving an application for an SES, the zoning administrator shall:
a. Provide public notice of the proposed project in accordance with the notice requirements in the underlying zoning ordinance;
b. Schedule and hold a public hearing in accordance with the hearing requirements in the underlying zoning ordinance; and
c. Issue a determination within 120 days of the public hearing on the permit application based on the application and public comments.
(2) A conditional use permit application may be approved only if the board of commissioners determines that the SES complies with all applicable federal, state, and local laws and regulations, including the requirements of this article.
(3) The applicant's appeal rights are consistent with those rights expressed in the underlying zoning ordinance.
History
(Ord. No. O-120418, § 24-106, 12-4-2018)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.