Oconee County · Code of Ordinances
Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article II - WATER / Division 5 - WATER AND WASTEWATER SYSTEMS
Sec. 66-266. Wastewater lift station.
About this text
- As published by Municode, current through 2026-04-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Lift stations serving two or more buildings. All wastewater lift stations installed in the county which serve two or more buildings shall be designed and constructed in strict conformity to the county standards. Engineering plans shall be prepared for all wastewater lift stations, and such plans shall be approved by the county water system prior to construction.
Following the construction and acceptance by the county of a wastewater lift station, title to the lift station shall be conveyed to the county.
(b) Lift stations serving a single building. Unless otherwise approved by the county, all wastewater lift stations serving a single building shall be owned, operated and maintained by the building owner.
History
(Ord. of 2-4-2003, § 2-86)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.