Sec. 24-26. Utility installation.

About this text

  • As published by Municode, current through 2026-09-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All utilities shall be installed a minimum of 11 /2 feet from the edge of the pavement or the back of the curb. Utilities, not including service taps, installed beyond the right-of-way due to topographical conditions shall include a utility easement on the lot. All utilities and service taps shall be installed three feet below the working surface while within the right-of-way or easement.

History

The history line the source prints at the end of the section.

(Code 2008, § 22-103)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oglethorpe-county/code/24-26@2026-09-14-e6455293c0

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Oglethorpe County Code of Ordinances, Sec. 24-26. Utility installation | Georgia Commons