Skip to content
Georgia Commons
Menu

Oglethorpe County · Code of Ordinances

Chapter 24 / Article II - SUBDIVISION ROAD CONSTRUCTION AND MAINTENANCE / Division 2 - PAVING

Sec. 24-51. Sub-grade.

About this text

  • As published by Municode, current through 2026-09-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Sub-grade work consists of obtaining and placing suitable sub-grade material on the top six inches of the roadway, mixing, compacting and shaping to grade and cross section. This work also includes sub-grade stabilization. The entire surface of the roadway (width of pavement plus one foot left and right) shall be plowed, harrowed and mixed to a depth of at least six inches. After the material has been thoroughly mixed, the sub-grade shall be compacted to 100 percent of the maximum density. Sheep foot rollers are required.

(b) Sub-grade material shall be of a suitable soil as defined by the current state department of transportation specifications. If such material is not available on site, it shall be furnished by the developer. On site materials not meeting the above criteria may be stabilized with crushed stone as defined in the current state department of transportation specifications.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oglethorpe-county/code/24-51@2026-09-14-23ee31c1cf

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Oglethorpe County Code of Ordinances, Sec. 24-51. Sub-grade | Georgia Commons