Paulding County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 66 - SEWERS / Article III - SEWER USE / Division 4 - RESTRICTED USE OF PUBLIC SEWER
Sec. 66-161. Pretreatment.
About this text
- As published by Municode, current through 2025-12-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Persons discharging industrial wastes into the sewerage system may be required to pretreat such wastes. Plans for all pretreatment facilities shall be approved by the director or the state environmental protection division prior to construction. At the time written plans are submitted for approval, written maintenance plans shall also be submitted and approved by the director. The facilities shall be allowed to operate only as long as they are maintained in accordance with the approved maintenance plans. Pretreatment requirements shall be determined on a case-by-case basis and shall include the following facilities as a minimum:
(1) Neutralization. If plans are submitted for the neutralization of strong acid or alkaline wastes, the plans shall include the necessary instrumentation and controls to assure compliance with the above regulations at all times.
(2) Equalization. Holding tanks or equalization basins shall be required ahead of the receiving manhole of the county sewerage system when deemed necessary by the
director to prevent peak flows that exceed the capacity of the system or that result in operational problems.
(3) All pretreatment facilities shall be operated and maintained continuously in satisfactory and effective operation by the owner at his expense.
History
(Code 1987, § 18-7(k))
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.