Skip to content
Georgia Commons
Menu

Paulding County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 74 - WATER / Article II - CONTROL OF BACKFLOW AND CROSS CONNECTIONS

Sec. 74-43. Approval of devices.

About this text

  • As published by Municode, current through 2025-12-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Before any device for the prevention of backflow or backsiphonage is installed, it shall have first been certified by a recognized testing laboratory acceptable to the agency director.

Devices installed in a building potable water supply distribution system for protection against backflow shall be maintained in good working condition by the persons responsible for the maintenance of the system.

(b) The agency director of the director's designee shall inspect routinely such devices and if found to be defective or inoperative shall require the replacement thereof.

History

The history line the source prints at the end of the section.

(Code 1987, § 5-132)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:paulding-county/code/74-43@2025-12-09-6d1a1b1c5b

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Paulding County Code of Ordinances, Sec. 74-43. Approval of devices | Georgia Commons