Skip to content
Georgia Commons
Menu

Peach County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 34 - PLANNING / Article I - IN GENERAL / Division 2 - ROADS STANDARDS

Sec. 34-14. Design criteria.

About this text

  • As published by Municode, current through 2023-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Plans and specifications are to be prepared based on appropriate planning and applicable planning criteria standards and requirements. All road design not associated with subdivision designs shall be designed in accordance with requirements of articles "XIV Design Standards" and "XV Required Subdivision Improvements" of the Peach County Comprehensive

Land Development Resolution, and plans of such roads prepared by a licensed Georgia professional engineer. Subdivision roads shall be designed in accordance with the Peach County Comprehensive Land Development Resolution. Any road construction requiring [a] disturbed area of one acre or more or the addition of 5,000 square feet of impervious area must meet the requirements of the Georgia Stormwater Management Manual, Peach County Stormwater Design Manual, Georgia Soil and Water Conservation Commission erosion control requirements, and approval of erosion, pollution, and sediment control plans, and Georgia NPDES permit requirements.

History

The history line the source prints at the end of the section.

(Res. of 5-14-2013, § 4)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:peach-county/code/34-14@2023-11-14-598abd198f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Peach County Code of Ordinances, Sec. 34-14. Design criteria | Georgia Commons