Section 5.2.11. Responsibilities During Construction.

About this text

  • As published by Municode, current through 2023-06-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The developer and the design professional of record have full responsibility for quality control and inspection during construction to ensure substantial conformance with the approved construction plans, County standards, County regulations, and generally accepted construction practices.

The Enforcement Officer will conduct on site inspections to intermittently check the adequacy of the developer's quality control and inspection. The owner or contractor shall make requests for inspections to the Enforcement Officer at least twenty-four (24) hours prior to when the inspection is needed.

Inspections shall be conducted and passed prior to the construction of further activity or proceeding into new phases. Inspections are required of each of the following phases, as applicable to the actual work to be performed under the development permit:

a) Prior to clearing or clearing and grubbing of the property or any portion included under the development permit, inspection of erosion and sedimentation control measures and protective devices for undisturbed areas.

b) Upon completion of street grading, inspection and approval shall be required prior to trenching or continuation with sub-grade preparation.

c) Upon installation of storm drainage pipe, detention, or other storm water facilities.

d) Street curbing and gutter. Inspection shall be requested after the forms of string line have been set. Street width and vertical and horizontal alignment may be spot-checked.

e) Sub-grade of streets. After compaction and receipt of test reports by the Enforcement Officer the sub-grade may be roll tested with and eighteen (18) ton tandem dump truck and shall pass to the satisfaction of the Enforcement Officer.

f) Street base. After receipt of test reports by the Enforcement Officer, the base may be string-lined for depth and crown. The street base may be roll-tested with an eighteen (18) ton tandem dump truck and shall pass to the satisfaction of the Enforcement Officer.

g) Paving. The Enforcement Officer shall be on site during the paving process to check consistency, depth, and workmanship, as applicable. For asphalt paving, the temperature of the material will be monitored and the street will be cored after completion to check thickness and density.

Satisfactory test results of the cores shall be delivered to the Enforcement Officer prior to the approval of a final subdivision plat or certificate of occupancy.

Any construction issues requiring an interpretation and/or change in the plans, standards, and/or regulations are to be resolved by the design professional of record and presented to the Enforcement Officer for written concurrence or approval. Any design changes must be revised on the construction plans and issued as a change to the approved construction plans.

Failure of the developer to provide adequate quality control and inspection which results in a substantial nonconformance with the plans, standards, regulations, or generally accepted construction practices or the endangerment of the public heath, safety, and welfare shall be cause for the Enforcement Officer to issue a stop work order for any or all portions of the construction in accordance with County procedures and ordinances. The order will remain in effect until the developer or design professional of record can demonstrate to the County that adequate quality control and inspection will be provided to address and correct the nonconformance and minimize the potential for further non-conformance issues or endangerment issues.

Each day of continued construction on the scope of work covered by the stop work order under this Ordinance shall be considered a separate violation of this Ordinance.

The developer controls the means, sequence, and methods of construction. As such, the developer has full responsibility for safety on the project site and compliance with all Federal, State, and local regulations pertaining to safety and environmental requirements.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:pulaski-county/code/5.2.11@2023-06-05-b1a994f2c6

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Pulaski County Code of Ordinances, Section 5.2.11. Responsibilities During Construction | Georgia Commons