Skip to content
Georgia Commons
Menu

Pulaski County · Code of Ordinances

Appendix A - SUBDIVISION ORDINANCE / Chapter 5 - CONFORMANCE WITH COMPREHENSIVE PLAN, IMPROVEMENTS REQUIRED, DESIGN AND CONSTRUCTION STANDARDS FOR ALL SUBDIVISIONS / 5.0 - Conformance With Comprehensive Plan and Other Regulations. / 5.2.10 - Construction Methods—Roadways.

Section 5.2.10.6. Utilities and Subgrades.

About this text

  • As published by Municode, current through 2023-06-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Underground utilities, including sewer services, all water lines, and any cable conduits under the pavement shall be placed in the ground before the base material is in place.

All trenches shall be thoroughly compacted in six-inch (6") layers with mechanical compacting equipment.

All fire hydrants, utility poles, street lights, transformer boxes and pedestals shall be set at a distance not less than six feet (6') from the back of the curb.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:pulaski-county/code/5.2.10.6@2023-06-05-d1f1e46d66

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Pulaski County Code of Ordinances, Section 5.2.10.6. Utilities and Subgrades | Georgia Commons