Putnam County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 46 - ROADS, BRIDGES AND OTHER PUBLIC PROPERTY / Article I - RIGHT-OF-WAY ENCROACHMENT AND EASEMENTS / Division 1 - IN GENERAL
Sec. 46-5. Utility easement.
About this text
- As published by Municode, current through 2026-02-17
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Any person or entity desiring to place in county road rights-of-way items such as: pipes, mains, conduits, cables, wires, poles, towers or other signs or equipment, facilities or appliances of any utility in, on, along, over or under the public road right-of-way of the county must first obtain all required federal, state, and utility permits. Applicant must provide written proof thereof to the board of commissioners and must obtain a permit from the board of commissioners which meets the guidelines of this chapter as well as meet all other county ordinances and requirements including, but not limited to, soil erosion and sedimentation control, compaction of disturbed soil, driveway repair, land disturbance permits and utility easements. Cutting of improperly located cable by county work crew is the responsibility of the person or entity owning or maintaining the cable.
History
(Ord. of 5-19-2020(1))
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.