Putnam County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 46 - ROADS, BRIDGES AND OTHER PUBLIC PROPERTY / Article I - RIGHT-OF-WAY ENCROACHMENT AND EASEMENTS / Division 1 - IN GENERAL
Sec. 46-5. Utility easement.
Sobre este texto
- As published by Municode, current through 2026-02-17
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Any person or entity desiring to place in county road rights-of-way items such as: pipes, mains, conduits, cables, wires, poles, towers or other signs or equipment, facilities or appliances of any utility in, on, along, over or under the public road right-of-way of the county must first obtain all required federal, state, and utility permits. Applicant must provide written proof thereof to the board of commissioners and must obtain a permit from the board of commissioners which meets the guidelines of this chapter as well as meet all other county ordinances and requirements including, but not limited to, soil erosion and sedimentation control, compaction of disturbed soil, driveway repair, land disturbance permits and utility easements. Cutting of improperly located cable by county work crew is the responsibility of the person or entity owning or maintaining the cable.
Historia
(Ord. of 5-19-2020(1))
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.