Skip to content
Georgia Commons
Menu

Rockdale County · Code of Ordinances

Division 3. CONSTRUCTION STANDARDS

16 sections

Search the Rockdale County codes

Machine-readable https://georgiacommons.org/counties/rockdale/code/~part-ii/~part-a/~chapter-98/~article-iii/~division-3.md · https://georgiacommons.org/counties/rockdale.md · MCP https://mcp.georgiacommons.org/mcp

Contents

  1. Sec. 98-111. Permit required for opening, altering or connecting to public wastewater facilities
  2. Sec. 98-112. Wastewater connection
  3. Sec. 98-113. Separate service to separate buildings
  4. Sec. 98-114. Utilization of previously used wastewater pipes and materials
  5. Sec. 98-115. Compliance with technical codes
  6. Sec. 98-116. Elevation of wastewater connections, check prior to pouring foundation
  7. Sec. 98-117. Conditions to determine if building is served by the public wastewater system
  8. Sec. 98-118. Connection of downspouts, drains, etc., to wastewater system prohibited
  9. Sec. 98-119. Wastewater construction requirements
  10. Sec. 98-120. Restoration of disturbed public property
  11. Sec. 98-121. ReservedReserved
  12. Sec. 98-122. Limitation on construction of permanent structures near wastewater easements
  13. Sec. 98-123. Capping and sealing of discontinued wastewater connections
  14. Sec. 98-124. Wastewater lift stations
  15. Sec. 98-125. All wastewater facilities construction plans must be approved by the county
  16. Secs. 98-126-98-140. ReservedReserved

Georgia Commons is independent and is not affiliated with this county or its publisher. Nothing here is legal advice.