Skip to content
Georgia Commons
Menu

Rockdale County · Code of Ordinances

Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 98 - UTILITIES / Article III - WASTEWATER SYSTEM / Division 3 - CONSTRUCTION STANDARDS

Sec. 98-120. Restoration of disturbed public property.

About this text

  • As published by Municode, current through 2026-01-27
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) All wastewater construction work conducted on the public right-of-way or any public property shall be conducted only with proper

permission from the director.

(b) All disturbed areas as a result of such construction shall be restored to a condition that is as good as new. The scheduling of such construction activities shall be as approved by the director if such scheduling approval is determined to be in

the public's best interest.

History

The history line the source prints at the end of the section.

(Ord. No. 2007-07, § 1, 3-27-2007)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:rockdale-county/code/98-120@2026-01-27-55010cdcf4

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.