Skip to content
Georgia Commons
Menu

Upson County · Code of Ordinances

Part II - CODE / Chapter 70 - ROADS AND BRIDGES / Article IV - ACCESS OF PRIVATE DRIVEWAYS TO PUBLIC ROADS

Sec. 70-128. Approval; bond deposit or other security.

About this text

  • As published by Municode, current through 2025-11-25
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Upon approval of the driveway location and determination of the size and type of culvert required to be installed, the applicant shall have 30 days to install the driveway and culvert as approved by the superintendent of roads.

(b) If required, the person installing a culvert shall furnish a bond, deposit or other security sufficient to ensure compliance with this article.

(c) It shall be the duty of the person making any installation of culverts as authorized by this article to fill the excavation and restore the surface disturbed to a condition at least equal to the surface prior to the installation of the culvert. The restoration of the ditch area adjacent to the construction site including the removal of all debris and excess soil shall be considered part of the culvert installation.

(d) The maintenance of the culvert shall be the responsibility of the property owners served. This maintenance shall include keeping the culvert pipe open and free of blockages.

History

The history line the source prints at the end of the section.

(Ord. No. 147, § 4, 7-26-2001)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:upson-county/code/70-128@2025-11-25-88224b0ef7

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.