Upson County · Código de ordenanzas
Part II - CODE / Chapter 70 - ROADS AND BRIDGES / Article IV - ACCESS OF PRIVATE DRIVEWAYS TO PUBLIC ROADS
Sec. 70-128. Approval; bond deposit or other security.
Sobre este texto
- As published by Municode, current through 2025-11-25
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Upon approval of the driveway location and determination of the size and type of culvert required to be installed, the applicant shall have 30 days to install the driveway and culvert as approved by the superintendent of roads.
(b) If required, the person installing a culvert shall furnish a bond, deposit or other security sufficient to ensure compliance with this article.
(c) It shall be the duty of the person making any installation of culverts as authorized by this article to fill the excavation and restore the surface disturbed to a condition at least equal to the surface prior to the installation of the culvert. The restoration of the ditch area adjacent to the construction site including the removal of all debris and excess soil shall be considered part of the culvert installation.
(d) The maintenance of the culvert shall be the responsibility of the property owners served. This maintenance shall include keeping the culvert pipe open and free of blockages.
Historia
(Ord. No. 147, § 4, 7-26-2001)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.