Sec. 90-35. Trench backfilling.

About this text

  • As published by Municode, current through 2025-11-25
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The utility facility installation trench shall be backfilled carefully after the facility has been installed, in accordance with the standard practice for installing culverts and minor structures. In crossing roadways the backfill will be made in six-inch layers and each layer firmly compacted. Where roadway grass is disturbed, satisfactory replacement will be accomplished

including adequate seeding of new grass.

History

The history line the source prints at the end of the section.

(Ord. No. 23, § 6, 3-4-1983)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:upson-county/code/90-35@2025-11-25-6d6bc0900d