Sec. 90-35. Trench backfilling.
About this text
- As published by Municode, current through 2025-11-25
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The utility facility installation trench shall be backfilled carefully after the facility has been installed, in accordance with the standard practice for installing culverts and minor structures. In crossing roadways the backfill will be made in six-inch layers and each layer firmly compacted. Where roadway grass is disturbed, satisfactory replacement will be accomplished
including adequate seeding of new grass.