Sec. 90-34. Underground installations.

About this text

  • As published by Municode, current through 2025-11-25
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Underground piping lines or facilities, referred to as "underground installations," will be installed to have at least a 48-inch cover or will be under the paved surface. Longitudinal installations are to be located on uniform alignment, preferably parallel to the roadway at or adjacent to the right-of-way line and no less than three feet beyond the slope lines, ditch lines, or curblines. Underground installations are not to be located within the pavement or between the edge of the pavement and the ditch or toe of the front slope except where no other practical alternative exists and a special request for an exception is submitted.

History

The history line the source prints at the end of the section.

(Ord. No. 23, § 5, 3-4-1983)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:upson-county/code/90-34@2025-11-25-7f1ac052c7

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Upson County Code of Ordinances, Sec. 90-34. Underground installations | Georgia Commons