Where breaking of pavement has been approved under this article, a minimum eight-inch class B concrete for asphalt surface will be poured over the backfilled trench and will rest on the undisturbed soil a minimum cutback of 12 inches of pavement on each side of the trench.

If the pavement is asphalt, the surface of the eight-inch concrete slab will be two inches below the surface of the abutting pavement. The two-inch section will be replaced with the same type material as the existing surface. The finished surface will be smooth and flush with the abutting pavement. Only one-half of the roadway is to be opened at one time.

History

The history line the source prints at the end of the section.

(Ord. No. 23, § 4, 3-4-1983)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:upson-county/code/90-33@2025-11-25-5345193ee1

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Upson County Code of Ordinances, Sec. 90-33. Excavations in pavement | Georgia Commons