Ir al contenido
Georgia Commons
Menú

Upson County · Código de ordenanzas

Part II - CODE / Chapter 90 - UTILITIES / Article II - FACILITY INSTALLATIONS

Sec. 90-33. Excavations in pavement.

Sobre este texto

  • As published by Municode, current through 2025-11-25
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Where breaking of pavement has been approved under this article, a minimum eight-inch class B concrete for asphalt surface will be poured over the backfilled trench and will rest on the undisturbed soil a minimum cutback of 12 inches of pavement on each side of the trench.

If the pavement is asphalt, the surface of the eight-inch concrete slab will be two inches below the surface of the abutting pavement. The two-inch section will be replaced with the same type material as the existing surface. The finished surface will be smooth and flush with the abutting pavement. Only one-half of the roadway is to be opened at one time.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 23, § 4, 3-4-1983)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:upson-county/code/90-33@2025-11-25-5345193ee1

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Upson County Code of Ordinances, Sec. 90-33. Excavations in pavement | Georgia Commons