Walker County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 22 - LAND DEVELOPMENT / Article VIII - POST-DEVELOPMENT STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT / Division 2 - POST-DEVELOPMENT STORMWATER MANAGEMENT PERMIT PROCEDURES AND REQUIREMENTS
Sec. 22-734. Modifications for off-site facilities.
About this text
- As published by Municode, current through 2026-07-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Every applicant shall provide for on-site post-development stormwater management as required by division 3 of this article unless provisions are made to manage stormwater by an off-site or regional facility. The off-site or regional facility is required to be in place, to be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices and there is a legally-obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. A stormwater management plan must be submitted to Walker County, which shows the adequacy of the off-site or regional facility. To be eligible for a modification, the applicant must demonstrate to the satisfaction of Walker County that the modification will not result in the following impacts to downstream areas:
(1) Increased threat of flood damage to public health, life, and property;
(2) Deterioration of existing culverts, bridges, dams, and other structures;
(3) Accelerated streambank or streambed erosion or siltation;
(4) Degradation of in-stream biological functions or habitat;
(5) Water quality impairment in violation of State water quality standards, and/or violation of any State or Federal regulations.
History
(Ord. of 12-1-2004, § 3.8)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.