Skip to content
Georgia Commons
Menu

Walker County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 8 - BUILDINGS AND BUILDING REGULATIONS / Article III - CONSTRUCTION AND WASTE MANAGEMENT

Sec. 8-91. Discarded building materials and construction waste disposal requirements.

About this text

  • As published by Municode, current through 2026-07-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Building materials, concrete washout, paint washout, litter, sanitary waste, and other construction site wastes must be properly managed and disposed of to reduce the risk of pollution from materials such as surplus or refuse building materials or hazardous wastes.

(b) Practices such as trash disposal, recycling, proper material handling, and spill prevention and clean up measures must be implemented to reduce the potential for stormwater runoff to mobilize construction site wastes and contaminate surface water or groundwater.

(c) The proper management and disposal of wastes should be practiced at all construction sites to reduce stormwater runoff.

(1) Waste management practices must be used to properly locate refuse piles.

(2) Covered materials that may be displaced by rainfall or stormwater runoff.

(3) All spills and leaks of hazardous wastes must be prevented.

(d) Guidelines for proper handling, storage, and disposal of construction site wastes must be posted in storage and use areas on site.

History

The history line the source prints at the end of the section.

(Ord. of 12-7-2006)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:walker-county/code/8-91@2026-07-09-eed7cf31f9

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.