Whitfield County · Code of Ordinances
Chapter 14 - SITE DESIGN / Article II - PERMITS AND PROCEDURES
Sec. 14-31. Application review.
About this text
- As published by Municode, current through 2026-05-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
(1) (2) The applicant shall submit the required copies of the application, construction drawings and engineering studies (such as drainage analysis and traffic studies.)
A certification from an engineer or surveyor certifying that the plans meet or exceed the standards and specifica- tions of Whitfield County must accompany the plans. The presence of a valid stamp and signature of an engineer or surveyor on said plans shall be prima facie evidence of such certification.
(3) The county engineer will distribute copies of the construction plans to and coordinate with any reviewing personnel or departments, such as the building, zoning and development department, utility comSITE DESIGN § 14-31 panies, and/or the fire department. The
reviewing entities shall review the plans for compliance with their regulations and standards.
(4) Permit applications shall be approved or denied as soon as practicable, but in any event, not later than 30 days after receipt of a completed application and supporting plans and documentation, as set forth herein.
(5) If a permit application is denied, the reasons for denial shall be stated in writing to the applicant. A re-submittal of a denied application shall constitute a new application.
History
(Res. of 6-9-03, § 2-11)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.