Skip to content
Georgia Commons
Menu

Whitfield County · Code of Ordinances

Chapter 7 - COUNTY UTILITIES AND SERVICES / Article II - SEWERS / Division 3 - BUILDING SEWERS AND CONNECTIONS

Sec. 7-51. Guarding excavations; permission to cut surface; restoration.

About this text

  • As published by Municode, current through 2026-05-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) All excavations for building sewer installations shall be adequately guarded with barricades and lights so as to protect the public from hazard.

(b) Prior to excavation, blockage, disruption, or any disturbance of any public road, sidewalk, or other public right-of-way, notification must be made to and approval obtained from the county engineer not less than five days in advance of such excavation, blockage, disruption or disturbance.

(c) Roads, sidewalks, and/or other public property disturbed in the course of the work shall be restored in a manner satisfactory to the county

engineer.

History

The history line the source prints at the end of the section.

(Ord. of 6-16-08, § 1)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:whitfield-county/code/7-51@2026-05-11-082abeeef5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.