Whitfield County · Código de ordenanzas
Chapter 7 - COUNTY UTILITIES AND SERVICES / Article II - SEWERS / Division 3 - BUILDING SEWERS AND CONNECTIONS
Sec. 7-51. Guarding excavations; permission to cut surface; restoration.
Sobre este texto
- As published by Municode, current through 2026-05-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) All excavations for building sewer installations shall be adequately guarded with barricades and lights so as to protect the public from hazard.
(b) Prior to excavation, blockage, disruption, or any disturbance of any public road, sidewalk, or other public right-of-way, notification must be made to and approval obtained from the county engineer not less than five days in advance of such excavation, blockage, disruption or disturbance.
(c) Roads, sidewalks, and/or other public property disturbed in the course of the work shall be restored in a manner satisfactory to the county
engineer.
Historia
(Ord. of 6-16-08, § 1)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.