Skip to content
Georgia Commons
Menu

Wilkes County · Code of Ordinances

Part - CODE OF ORDINANCES / Chapter 8 - BUILDINGS AND BUILDING REGULATIONS / Article II - BUILDING PERMITS

Sec. 8-28. Schedule of permit fees.

About this text

  • As published by Municode, retrieved 2026-11-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

On all buildings, structures, or alterations requiring a permit, a fee for each permit shall be paid as required at the time of filing of the application, in accordance with the following schedules.

(1) Buildings and improvements.

a. Single-family (including factory-built housing and industrialized buildings): The permit fees shall be established by the board, from time to time. Note: Mobile homes and pre-fab buildings that already have built-in plumbing may be excluded from the plumbing fee. This exclusion will also apply to built-in mechanical.

b. Non-commercial; outbuildings and swimming pools (e.g.,storage buildings, shops, barns, etc.); structures not attached to homes; single-family dwellings, mobile homes, pre-fab homes; buildings with a value of less than $100,000.00: The permit fees shall be established by the board, from time to time.

c. Commercial, industrial, multi-family, public, and accessory fee schedule: The permit fees shall be established by the board, from time to time.

d. Moving of building or structure. For the moving of a building or other structure, the fee shall be established by the board from time to time.

e. Demolition of building or structure. For the demolition of a building or structure, a permit is required. A complimentary permit shall be issued to the building or structure owner, however failure to obtain the permit prior to the demolition of such building or structure shall constitute a violation of this regulation and require payment to be established by the board, from time to time.

(2) Electrical. The fees for service size shall be established by the board, from time to time.

Each circuit connected in panel shall be in an amount established by the board from time to time, in addition to the charges in this subsection. Double pole circuits shall be considered as one circuit.

History

The history line the source prints at the end of the section.

(Ord. No. 041389B, § 502, 4-13-1989; Ord. No. 07092015B, § 502, 7-9-2015)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:wilkes-county/code/8-28@2026-11-23-ee7e65c377

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Wilkes County Code of Ordinances, Sec. 8-28. Schedule of permit fees | Georgia Commons