Ir al contenido
Georgia Commons
Menú

Wilkes County · Código de ordenanzas

Part - CODE OF ORDINANCES / Chapter 8 - BUILDINGS AND BUILDING REGULATIONS / Article II - BUILDING PERMITS

Sec. 8-28. Schedule of permit fees.

Sobre este texto

  • As published by Municode, retrieved 2026-11-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

On all buildings, structures, or alterations requiring a permit, a fee for each permit shall be paid as required at the time of filing of the application, in accordance with the following schedules.

(1) Buildings and improvements.

a. Single-family (including factory-built housing and industrialized buildings): The permit fees shall be established by the board, from time to time. Note: Mobile homes and pre-fab buildings that already have built-in plumbing may be excluded from the plumbing fee. This exclusion will also apply to built-in mechanical.

b. Non-commercial; outbuildings and swimming pools (e.g.,storage buildings, shops, barns, etc.); structures not attached to homes; single-family dwellings, mobile homes, pre-fab homes; buildings with a value of less than $100,000.00: The permit fees shall be established by the board, from time to time.

c. Commercial, industrial, multi-family, public, and accessory fee schedule: The permit fees shall be established by the board, from time to time.

d. Moving of building or structure. For the moving of a building or other structure, the fee shall be established by the board from time to time.

e. Demolition of building or structure. For the demolition of a building or structure, a permit is required. A complimentary permit shall be issued to the building or structure owner, however failure to obtain the permit prior to the demolition of such building or structure shall constitute a violation of this regulation and require payment to be established by the board, from time to time.

(2) Electrical. The fees for service size shall be established by the board, from time to time.

Each circuit connected in panel shall be in an amount established by the board from time to time, in addition to the charges in this subsection. Double pole circuits shall be considered as one circuit.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 041389B, § 502, 4-13-1989; Ord. No. 07092015B, § 502, 7-9-2015)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:wilkes-county/code/8-28@2026-11-23-ee7e65c377

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Wilkes County Code of Ordinances, Sec. 8-28. Schedule of permit fees | Georgia Commons