Skip to content
Georgia Commons
Menu

County: Camden County

Camden County Board of Commissioners work session, April 21, 2026

12 pages

These are the minutes as Camden County Board of Commissioners posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Camden County Board of Commissioners.

10 of this record's 12 pages were scanned images, read here by OCR: a letter or a number on them may be misread. The file the body posted is linked below.

Copy for LLM, View as markdown, and Send to AI use the Markdown version: the summary Georgia Commons wrote, under a heading that names it, then the record as posted. View raw is the record alone.

Records of this meeting

Each link opens the body's own website or meeting portal.

Summary

Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.

Commissioners heard a presentation on a proposed data center ordinance in a work session, with no vote recorded on it.

At a work session, the interim planning director presented a PowerPoint overview of a proposed ordinance amending the Unified Development Code to regulate data centers. The presentation covered permitted zones (special use approval only in Industrial Restricted and Industrial General districts), prohibited locations, minimum lot sizes of 50 or 200 acres, setbacks, a 500-foot buffer from residential property lines, noise and lighting limits, a ban on open-loop cooling, water permit requirements, application materials, design standards, and abandonment after 12 months of inactivity. The presenter said the ordinance draws on practices from other jurisdictions. The minutes record no vote on the ordinance and no other decisions. The session adjourned at about 5:49 PM.

Topics taken up: data center ordinance; Unified Development Code amendment; special use approval in industrial districts; data center buffers and setbacks; noise and lighting standards; water use and cooling systems; application requirements; decommissioning of data centers.

Agenda items (8)

Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.

  1. A. DATA CENTERS SHALL MAINTAIN A 500-FOOT BUFFER FROM RESIDENTIALLY ZONED
  2. B. NOISE LEVELS SHALL BE MEASURED:
  3. C. GENERATOR TESTING:
  4. D. FACILITIES PROPOSING GROUNDWATER OR SURFACE WATER WITHDRAWALS IN EXCESS OF 100,000 GALLONS PER DAY MUST DEMONSTRATE THAT WATER USE IS MINIMIZED AND THAT…
  5. E. DETAILED WATER DEMAND ANALYSIS SHOWING DAILY, PEAK, AND
  6. F. COPY OF WATER WITHDRAWAL PERMIT APPLICATION SUBMITTED
  7. G. WATER CONSERVATION PLAN DEMONSTRATING COMPLIANCE
  8. H. ENERGY USE AND SUSTAINABILITY PLAN;Adopted

Answers are written by AI from this document, and every quotation is checked against it. Not legal advice.

The minutes

As posted on www.camdencountyga.gov, read November 25, 2026. Nothing below is written by Georgia Commons.

CAMDEN COUNTY, GEORGIA

BOARD OF COUNTY COMMISSIONERS

WORK SESSION

APRIL 21, 2026, 5:00 PM

Present: Chairman Robbie Cheek; Vice-Chairman Martin Turner; Commissioner Ben

L. Casey; Commissioner Jim Goodman;; Commissioner Cody Smith; Interim County Administrator Joey Yacobacci, Interim Deputy County Administrator Shannon Nettles County Clerk Katie Bishop; Deputy County Clerk Shekia Robinson; and County Attorney Jacqueline Fortier.

Chairman Cheek called the Work Session to order at 5:00 p.m.

Work Session – Discussion regarding an Ordinance to Amend the Camden County Unified Development Code; to Establish Regulations

Governing Data Centers; to Provide for Definitions, Permitted Uses, Development Standards, Performance Criteria, and

Application Requirements; to provide for Severability; to Repeal Conflicting Ordinances; and for other purposes.

At this time, Interim Planning Director Cassie Turpin presented a PowerPoint overview of the Ordinance to Amend the Camden County Unified Development Code; to Establish Regulations Governing Data Centers; to Provide for Definitions, Permitted Uses, Development Standards, Performance Criteria, and Application Requirements;

to provide for Severability; to Repeal Conflicting Ordinances; and for other purposes.

° WHAT ARE DATA CENTERS AND

> WHY ARE THEY IN SUCH HIGH

~ DEMAND?

WHAT IS IT: A BUILDING OR FACILITY HOUSING INFASTRUCTURE FOR

DATA STORAGE, PROCESSING AND OTHER RELATED DIGITAL SERVICES.

WHY ARE THEY IN DEMAND: DUE TO THE INCREASE IN DATA

GENERATION AND CONSUMPTION FROM ARTIFICIAL INTELLIGENCE,

DATA ANALYTICS, CLOUD COMPUTING, ETC.

AMENDMENT TO ARTICLE 2

(SUMMARY TABLE)

SEC. 228 — TABLE 2.2: ALLOWED LAND USES BY ZONING DISTRICT

AMEND “DATA PROCESSING, HOSTING AND RELATED SERVICES” AS FOLLOWS:

CURRENT USE - NAICS CODE 518 — USE DATA PROCESSING, HOSTING AND RELATED

SERVICES ALLOWED BY RIGHT IN C-G, I-R & I-G

NEW DIVISION IN ARTICLE 3

(RESTRICTIONS ON PARTICULAR USES)

ARTICLE 3 — DIVISION 5 — DATA CENTERS:

NEW SECTION - SEC. 332 — DATA CENTERS

THE PROVISIONS OF THIS SECTION SHALL APPLY TO ALL DATA CENTERS

AND DATA CENTER CAMPUSES, INCLUDING EXPANSIONS OF EXISTING

FACILITIES, WITHIN THE UNINCORPORATED AREA OF CAMDEN COUNTY.

SEC. 332 (A) PURPOSE.

THE PURPOSE OF THIS DIVISION IS TO ESTABLISH GUIDELINES AND REGULATE THE USE

OF ALL DATA CENTERS AND DATA CENTER CAMPUSES. THE GOALS OF THIS DIVISION

ARE:

ESTABLISH CLEAR DEFINITIONS AND CLASSIFICATIONS FOR DATA CENTER USES;

LIMIT DATA CENTER DEVELOPMENT TO APPROPRIATE ZONING DISTRICTS;

PROTECT GROUNDWATER AND SURFACE WATER RESOURCES THROUGH

CONSERVATION-ORIENTED STANDARDS;

ENSURE ADEQUATE UTILITY CAPACITY;

MINIMIZE ADVERSE NOISE, VISUAL, AND ENVIRONMENTAL IMPACTS;

PROMOTE SUSTAINABLE DESIGN, ENERGY EFFICIENCY, AND RESPONSIBLE LONG-

TERM OPERATION; AND

ENSURE THAT DATA CENTER DEVELOPMENT OCCURS IN A MANNER CONSISTENT

WITH THE PUBLIC INTEREST AND THE LONG-TERM GOALS OF CAMDEN COUNTY.

SEC. 333 — DEFINITIONS

RELATED TO DATA CENTERS

* Closed-Loop Cooling System HYPERSCALE DATA CENTER

Data Center

LOAD

* Data Center, Minor

* Data Center, Medium MEGAWATT (MW)

¢ Data Center, Major SUBSTATION

* Data Center Campus WATER CONSERVATION PLAN

SEC. 334 — GENERAL PROVISIONS

(A) PERMITTED ZONING DISTRICTS.

1. DATA CENTERS SHALL BE PERMITTED ONLY UPON SPECIAL USE

APPROVAL IN THE INDUSTRIAL RESTRICTED (I-R) AND INDUSTRIAL

GENERAL (I-G) ZONING DISTRICTS.

- DATA CENTERS SHALL NOT BE PERMITTED AS A USE BY RIGHT.

SEC. 334 —- GENERAL

PROVISIONS (CONTINUED)

(B) — PROHIBITED LOCATIONS

DATA CENTERS SHALL BE PROHIBITED:

- IN RESIDENTIAL, AGRICULTURAL, AND COMMERCIAL ZONING DISTRICTS;

- WITHIN FEMA-DESIGNATED FLOODWAYS;

. WITHIN COASTAL HIGH HAZARD AREAS (V- ZONES AND COASTAL A

(LIMWA));

- ON BARRIER ISLANDS OR ENVIRONMENTALLY SENSITIVE COASTAL LANDS.

SEC. 334 — GENERAL

PROVISIONS (CONTINUED)

(C) — DEVELOPMENT STANDARDS

(1) MINIMUM LOT SIZE

A. THE MINIMUM LOT SIZE FOR DATA CENTERS WITH LESS THAN 100,000 SQUARE FEET

OF GROSS FLOOR AREA SHALL BE 50 ACRES.

~ THE MINIMUM LOT SIZE FOR DATA CENTERS WITH MORE THAN 100,000 SQUARE

FEET OF GROSS FLOOR AREA SHALL BE 200 ACRES.

SEC. 334 — GENERAL

PROVISIONS (CONTINUED)

(C) — DEVELOPMENT STANDARDS

(2) SETBACKS AND HEIGHT RESTRICTIONS

A. MINIMUM FRONT YARD SETBACK FROM PROPERTY LINE SHALL BE 150 FEET.

MINIMUM SIDE YARD SETBACK FROM PROPERTY LINE SHALL BE 200 FEET.

B

C. MINIMUM REAR YARD SETBACK FROM PROPERTY LINE SHALL BE 200 FEET.

D

MAXIMUM BUILDING HEIGHT SHALL NOT EXCEED 70 FEET.

SEC. 334 — GENERAL

PROVISIONS (CONTINUED)

(C) — DEVELOPMENT STANDARDS

(3) BUFFERS AND SEPARATION

A. DATA CENTERS SHALL MAINTAIN A 500-FOOT BUFFER FROM RESIDENTIALLY ZONED

PROPERTY LINES.

. DATA CENTER SHALL NOT BE LOCATED WITHIN 1,000 FEET OF ANY EXISTING RESIDENTIAL

STRUCTURE.

. REQUIRED BUFFERS SHALL BE MEASURED FROM THE DATA CENTER PROPERTY LINE TO

THE ADJACENT PROPERTY LINE AND SHALL REMAIN UNDISTURBED EXCEPT FOR

APPROVED LANDSCAPING, SCREENING, OR STORMWATER FEATURES.

. REQUIRED BUFFERS SHALL INCLUDE LANDSCAPED AREAS AND SOLID WALLS OR BERMS

DESIGNED TO PROVIDE VISUAL SCREENING AND SOUND ATTENUATION.

SEC. 334 — GENERAL

PROVISIONS (CONTINUED)

(D) OPERATIONAL STANDARDS

(1) NOISE MEASUREMENT STANDARDS

A. MAXIMUM LEVELS AT RESIDENTIAL PROPERTY LINE:

1. 60 DB(A) DAYTIME 7:00 AM TO 6:00 PM

2. 50 DB(A) NIGHTTIME 6:00 PM TO 7:00 AM

B. NOISE LEVELS SHALL BE MEASURED:

1. USING ANSI OR ISO-RECOGNIZED SOUND MEASUREMENT

STANDARDS;

2. BY A QUALIFIED ACOUSTICAL PROFESSIONAL OR LICENSED

ENGINEER; AND

3. DURING NORMAL FACILITY OPERATIONS, EXCLUDING FORCE

MAJEURE EVENTS OR EMERGENCY CONDITIONS.

C. GENERATOR TESTING:

1. EMERGENCY GENERATORS SHALL COMPLY WITH ALL

APPLICABLE EPA EMISSIONS STANDARDS AND SHALL BE

USED ONLY FOR EMERGENCY OPERATIONS, UTILITY

OUTAGES, OR ROUTINE TESTING. ROUTINE TESTING

SHALL OCCUR ONLY BETWEEN 7:00 AM AND 6:00 PM,

SHALL NOT EXCEED 8 TOTAL HOURS PER CALENDAR

MONTH PER SITE, AND SHALL BE CONDUCTED IN A

MANNER THAT MINIMIZES NOISE IMPACTS TO ADJACENT

PROPERTIES. THE PLANNING DIRECTOR OR DESIGNEE

MAY REQUIRE ADVANCE NOTIFICATION OF ROUTINE

TESTING SCHEDULES FOR FACILITIES LOCATED WITHIN

500 FEET OF RESIDENTIAL ZONING DISTRICTS.

SEC. 334 — GENERAL

PROVISIONS (CONTINUED)

(D) OPERATIONAL STANDARDS

(2) LIGHTING

MAXIMUM LEVELS AT RESIDENTIAL PROPERTY LINE:

A. FULL CUT-OFF FIXTURES SHALL BE REQUIRED.

B. MAXIMUM 0.05 FOOTCANDLES SHALL BE ALLOWED AT RESIDENTIAL PROPERTY

LINES.

SEC. 334 — GENERAL

PROVISIONS (CONTINUED)

(D) OPERATIONAL STANDARDS

(3) WATER AND COOLING SYSTEMS

A. OPEN-LOOP COOLING SYSTEMS SHALL BE PROHIBITED

B. ALL COOLING AND VENTILATION SYSTEMS SHALL UTILIZE CLOSED-LOOP SYSTEMS

C. PRIOR TO CONSTRUCTION OR OCCUPANCY, ANY APPLICANT PROPOSING GROUNDWATER OR SURFACE WATER WITHDRAWALS IN EXCESS OF 100,000 GALLONS PER DAY SHALL PROVIDE PROOF OF A VALID GEORGIA ENVIRONMENTAL PROTECTION DIVISION (EPD) WATER USE PERMIT, INCLUDING AN APPROVED WATER CONSERVATION PLAN WHERE REQUIRED. PROOF OF APPLICATION AND A COPY OF ALL PERMIT CONDITIONS MUST BE SUBMITTED TO THE COUNTY BEFORE ANY GRADING, BUILDING PERMIT, OR CERTIFICATE OF OCCUPANCY IS ISSUED.

D. FACILITIES PROPOSING GROUNDWATER OR SURFACE WATER WITHDRAWALS IN EXCESS OF 100,000 GALLONS PER DAY MUST DEMONSTRATE THAT WATER USE IS MINIMIZED AND THAT ANY CONSUMPTIVE USE IS MITIGATED (E.G., REUSE, RETURN TO SOURCE, CLOSED-LOOP SYSTEMS).

E. IF THE PROJECT SITE IS WITHIN THE COASTAL PERMITTING PLAN AREA, APPLICANTS SHALL DOCUMENT COMPLIANCE WITH APPLICABLE COASTAL

WATER CONSERVATION CONDITIONS ADOPTED UNDER THE GEORGIA EPD PLAN.

F. THE COUNTY MAY DENY AN APPLICATION IF ADEQUATE WATER RESOURCES ARE NOT AVAILABLE OR IF THE PROPOSED USE IS DETERMINED TO

ADVERSELY IMPACT EXISTING USERS

SEC. 334 — GENERAL

PROVISIONS (CONTINUED)

(D) OPERATIONAL STANDARDS

(4) POWER GENERATION

A. PRIMARY ON-SITE GENERATION PROHIBITED UNLESS OTHERWISE AUTHORIZED

THROUGH SPECIAL USE APPROVAL. SUCH APPROVAL SHALL REQUIRE A FINDING

THAT THE PROPOSED GENERATION WILL NOT ADVERSELY IMPACT SURROUNDING

PROPERTIES, AIR QUALITY, OR INFRASTRUCTURE.

B. BACKUP GENERATORS SHALL ONLY BE PERMITTED FOR EMERGENCY USE.

C. MUST COMPLY WITH ALL APPLICABLE EPA EMISSIONS STANDARDS.

SEC. 335 - ENVIRONMENTAL AND

EMERGENCY REQUIREMENTS

A. COORDINATION WITH CAMDEN COUNTY FIRE RESCUE AND EMA

SHALL BE REQUIRED

B. AN ENVIRONMENTAL IMPACT ANALYSIS SHALL BE CONDUCTED

C. A WATER WITHDRAWAL PERMIT APPLICATION SHALL BE SUBMITTED

TO EPD (IF THRESHOLDS MET).

SEC. 336 — PUBLIC HEARINGS

IN ADDITION TO SEC. 1211 (PUBLIC NOTICE)

A. ALL ADJACENT PROPERTY OWNERS WITHIN 1,500 FEET OF THE

SUBJECT PROPERTY SHALL BE NOTIFIED VIA FIRST CLASS MAIL NO LESS

THAN 15 DAYS PRIOR TO THE HEARING DATE.

SEC. 337 — APPLICATION

REQUIREMENTS

IN ADDITION TO SEC. 1214 (CONDITIONAL APPROVAL OF ZONING

CHANGES), THE FOLLOWING SHALL BE SUBMITTED:

A. UTILITY LETTERS OF AVAILABILITY;

B. ELECTRICAL INFRASTRUCTURE PLAN IDENTIFYING SUBSTATIONS,

TRANSMISSION LINES, AND COORDINATION WITH THE SERVING

ELECTRIC UTILITY, FACILITIES EXCEEDING 50 MW REQUIRE ENHANCED

REVIEW;

C. NOISE IMPACT ANALYSIS;

D-/WATFER-USE -AND-CONSERVAHON PLAN;

E. DETAILED WATER DEMAND ANALYSIS SHOWING DAILY, PEAK, AND

ANNUAL WATER USE PROJECTIONS.

F. COPY OF WATER WITHDRAWAL PERMIT APPLICATION SUBMITTED

TO EPD (IF THRESHOLDS MET) AND A TIMELINE FOR PERMIT

APPROVAL.

G. WATER CONSERVATION PLAN DEMONSTRATING COMPLIANCE

WITH STATE GROUNDWATER USE RULES AND ANY APPLICABLE

COASTAL WATER CONSERVATION CONDITIONS.

H. ENERGY USE AND SUSTAINABILITY PLAN;

I. STORMWATER MANAGEMENT PLAN;

J. ENVIRONMENTAL IMPACT ANALYSIS;

K. DECOMMISSIONING AND SITE REUSE PLAN, PROVIDED FOR

PLANNING AND INFORMATIONAL PURPOSES ONLY, IDENTIFYING

POTENTIAL FUTURE REUSE SCENARIOS, ANTICIPATED INFRASTRUCTURE

REMOVAL, AND SITE STABILIZATION MEASURES. SUBMISSION OF A

DECOMMISSIONING AND SITE REUSE PLAN SHALL NOT, BY ITSELF,

IMPOSE A FINANCIAL GUARANTEE OR ABANDONMENT OBLIGATION

UNLESS EXPRESSLY REQUIRED AS A CONDITION OF A SPECIAL USE

PERMIT, DEVELOPMENT AGREEMENT, OR OTHER LEGALLY AUTHORIZED

APPROVAL.

L. THE COUNTY MAY REQUIRE A DEVELOPMENT AGREEMENT FOR ANY

DATA CENTER, PARTICULARLY HYPERSCALE FACILITIES, TO ADDRESS

INFRASTRUCTURE, PUBLIC SERVICES, AND LONG-TERM OPERATIONAL

CONDITIONS.

SEC. 338 — ARCHITECTUAL AND

DESIGN STANDARDS

A. BUILDINGS VISIBLE FROM PUBLIC RIGHTS-OF-WAY SHALL INCORPORATE

ARCHITECTURAL ARTICULATION, FENESTRATION, MURALS, OR GLAZING ON AT LEAST

THIRTY (30) PERCENT OF THE FRONT FACADE.

B. PROHIBITED EXTERIOR MATERIALS INCLUDE CORRUGATED METAL, VINYL SIDING,

UNFINISHED CONCRETE BLOCK, AND SIMILAR LOW-DURABILITY MATERIALS.

C. MECHANICAL AND ROOFTOP EQUIPMENT SHALL BE FULLY SCREENED FROM PUBLIC

VIEW USING ARCHITECTURALLY INTEGRATED ELEMENTS.

SEC. 339 — DECOMMISSIONING

A. FACILITIES INACTIVE FOR 12 MONTHS SHALL BE CONSIDERED

ABANDONED

SEC. 340 - ENFORCEMENT AND

SEVERABILITY

A. ANY VIOLATION OF THIS ORDINANCE SHALL BE SUBJECT TO

ENFORCEMENT AS PROVIDED IN THE CAMDEN COUNTY UNIFIED

DEVELOPMENT CODE.

B. IF ANY SECTION, SUBSECTION, SENTENCE, CLAUSE, OR PHRASE OF THIS

ORDINANCE IS DECLARED INVALID OR UNCONSTITUTIONAL BY A COURT

OF COMPETENT JURISDICTION, SUCH DECISION SHALL NOT AFFECT THE

VALIDITY OF THE REMAINING PORTIONS, WHICH SHALL REMAIN IN FULL

FORCE AND EFFECT.

CONCLUSION

BASED ON OUR REVIEW OF OTHER JURISDICTIONS, INCLUDING

COWETA COUNTY, KINGSLAND, JONES COUNTY, MONROE

COUNTY, AND COLLETON COUNTY, WE BELIEVE THIS ORDINANCE

REFLECTS BEST PRACTICES FROM EACH. IT IS DESIGNED TO ENSURE

THAT, IF DATA CENTERS COME TO CAMDEN COUNTY, THEY DO SO

IN A MANNER THAT IS COMPATIBLE WITH THE COMMUNITY AND

PROTECTIVE OF ENVIRONMENTALLY SENSITIVE AREAS.

Adjournment:

Chairman Cheek adjourned the April 21, 2026 Work Session at approximately 5:49 PM.

The motion carried unanimously.

BY: ______________ _____________________________________________

ROBBIE CHEEK, CHAIRMAN

CAMDEN COUNTY BOARD OF COMMISSIONERS

ATTEST: ______________________________________

KATIE BISHOP, COUNTY CLERK