Alpharetta City Council regular meeting, August 17, 2026

6:30 PM · 31 pages

These are the minutes as Alpharetta City Council posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Alpharetta City Council.

Copy for LLM, View as markdown, and Send to AI use the Markdown version: the summary Georgia Commons wrote, under a heading that names it, then the record as posted. View raw is the record alone.

Records of this meeting

Each link opens the body's own website or meeting portal.

Summary

Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.

Council approved a 195-townhome rezoning on Old Milton Parkway 6-1 and awarded a $15,991,962 Alpha Loop trail contract, plus several other contracts and approvals.

The council approved a master plan amendment, land use plan amendment, and rezoning at 3842 Old Milton Parkway for up to 195 for-sale townhomes by a 6-1 vote, with 25 conditions. Condition 14 was amended so the public trail must be finished by the 90th certificate of occupancy. It also approved a sign exception for Howard Capital at 415 South Broad Street and a gated subdivision with private streets for the 41-lot Verdant development. All were unanimous. Under new business, the council awarded the Alpha Loop trail design-build contract (up to $15,991,962) and an agreement with True North 400, storm pipe lining and cleaning contracts, a $4,093,950.56 milling and resurfacing contract, and a $372,391.27 Microsoft agreement, all unanimously. The council also recessed for a closed session on litigation, and the consent agenda was approved.

Topics taken up: Old Milton Parkway townhome rezoning; Camden Pond master plan amendment; Howard Capital sign exception; Verdant gated subdivision; Alpha Loop trail design-build contract; True North 400 agreement; storm pipe lining services; storm pipe cleaning services; fiscal year 2027 milling and resurfacing; Microsoft Enterprise Agreement.

Decisions the minutes record (8)

Each decision is followed by the sentence of the minutes that records it, copied word for word.

  1. Approved master plan amendment, land use amendment, and rezoning to R-10M for up to 195 for-sale townhomes at 3842 Old Milton Parkway, with 25 conditions

    Adopted6-1

    The minutes: “Mayor Pro Tem Merkel offered a motion to approve MP-26-05/CLUP-26-03/Z-26-03 Empire Old Milton Pkwy/Camden Pond, subject to the following conditions:”

    Read this item in the minutes

  2. Awarded Alpha Loop trail design-build contract (Encore Parkway to Lakeview Lake) to Reeves Young, up to $15,991,962, and approved True North 400 agreement

    Adoptedunanimous (7-0)

    The minutes: “Council Member Reeves offered a motion to approve of the award of RFP 26-107 for Alpha Loop Trail Design-Build from Encore Pkwy to Morrison Lake to Reeves Young with a contract term of 18.5-month, in an amount not to exceed $15,991,962.00, and approve the Agreement with True North 400, and to authorize the Mayor to execute all necessary documents.”

    Read this item in the minutes

  3. Approved sign exception for an additional wall sign for Howard Capital at 415 South Broad Street, with conditions

    Adoptedunanimous (7-0)

    The minutes: “Mayor Pro Tem Merkel offered a motion to approve E-26-01 Howard Capital Sign Exception, subject to the following conditions:”

    Read this item in the minutes

  4. Approved gated subdivision with private streets for the 41-lot Verdant subdivision at 12265 Charlotte Drive, with conditions

    Adoptedunanimous (7-0)

    The minutes: “Mayor Pro Tem Merkel offered a motion to approve PH-26-14 Verdant Gated Subdivision, subject to the following conditions:”

    Read this item in the minutes

  5. Awarded on-call storm pipe lining contracts to NGI (CIPP) and Utility Asset Management (Spincast), with up to $1,927,089.92 for NGI's FY 2027 task order

    Adoptedunanimous (7-0)

    The minutes: “Council Member Reeves offered a motion to approve the award of RFP 26-115 for On-Call Storm Pipe Lining Services to NGI Trenchless Pipe and Sewer Repair, Inc. for CIPP and Utility Asset Management (UAM) for Spincast for a one year contract with the option of four one year renewals; approval of funding to NGI for FY 2027 CIPP Task Order No. 1 in an amount not to exceed $1,927,089.92, and to authorize the Mayor to execute all necessary documents.”

    Read this item in the minutes

  6. Awarded FY 2027 milling and resurfacing contract to C.W. Matthews Contractors for $4,093,950.56

    Adoptedunanimous (7-0)

    The minutes: “Council Member Reeves offered a motion to award ITB 27-001 FY 27 Milling and Resurfacing to C.W. Matthews Contractors FY 27 Milling and Resurfacing in an amount totaling $4,093,950.56, and to authorize the Mayor to execute all necessary documents.”

    Read this item in the minutes

  7. Approved Microsoft Enterprise Agreement through Dell Marketing LP for $372,391.27, one year plus two annual renewals

    Adoptedunanimous (7-0)

    The minutes: “Council Member DeRito offered a motion to approve the procurement of the Microsoft Enterprise Agreement from Dell Marketing LP for one year, plus two renewal periods that are renewed annually for the amount of $372,391.27 using state contract number 9999-SPD-SPD0000060-0006, and to authorize the Mayor to execute all necessary documents.”

    Read this item in the minutes

  8. Awarded on-call storm pipe cleaning contract to NGI with FY 2027 task order up to $150,000

    Adoptedunanimous (7-0)

    The minutes: “Council Member Reeves offered a motion to award RFP 26-117 for On-Call Storm Pipe Cleaning Services to NGI Trenchless Pipe and Sewer Repair, Inc.; approval of funding for FY 2027 Task Order No. 1 in an amount not to exceed $150,000.00, and to authorize the Mayor to execute all necessary documents.”

    Read this item in the minutes

Agenda items (12)

Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.

  1. 1. CALL TO ORDER
  2. 2. ROLL CALL
  3. 4. CONSENT AGENDAAdopted
  4. 5. PUBLIC HEARING
  5. A. Announcement of Public Hearing ProceduresPublic comment
  6. B. MP-26-05/CLUP-26-03/Z-26-03 Empire Old Milton Pkwy/Camden Pond Consideration of a master plan amendment, comprehensive land use plan amendment, and…A vote
  7. C. E-26-01 Howard Capital Sign ExceptionAdopted
  8. D. PH-26-14 Verdant Gated SubdivisionAdopted
  9. 6. NEW BUSINESSA vote
  10. 7. PUBLIC COMMENTPublic comment
  11. 8. REPORTSA presentation
  12. 9. EXECUTIVE SESSION (IF NECESSARY)Adopted
  13. 10.ADJOURNMENTAdopted

Answers are written by AI from this document, and every quotation is checked against it. Not legal advice.

The minutes

As posted on alpharettaga.api.civicclerk.com, read November 11, 2026. Nothing below is written by Georgia Commons.

1. CALL TO ORDER

• Mayor Gilvin called the meeting to order at 6:30 p.m.

2. ROLL CALL

• Council Members o Mayor Jim Gilvin o Mayor Pro Tem Dan Merkel o T. Kirk Driskell o Katie Reeves o Douglas J. DeRito o John Hipes o Fergal M. Brady

• Staff o Chris Lagerbloom, City Administrator o John Robison, Assistant City Administrator o Molly Esswein, City Attorney o Lauren Shapiro, City Clerk o Adam Montgomery, Director of Information Technology City Council Meeting & Public Hearing

AUGUST 17, 2026

OFFICIAL MINUTES

Office of the City Clerk

ALPHARETTA CITY HALL

COUNCIL CHAMBERS | 2 PARK PLAZA | 6:30 PM

OFFICIAL MINUTES

The public is advised that the following minutes are not a verbatim transcription of business presented at the Council Meeting of the date shown; but are a synopsis of pertinent information. The public is further advised that the video recording for said meeting is a matter of public record and is available to be viewed at the City Clerk’s office during normal business hours or viewed online at https://www.youtube.com/user/alpharettagov.

o Brad Dekinger, Chief of Fire o Charlie Jewell, Director of Economic Development o Deanna McKay, Public Communication & Engagement Coordinator o Kathi Cook, Director of Community Development

o Morgan Rodgers, Director of Recreation, Parks, and Cultural Services o Pete Sewczwicz, Director of Public Works

o Trent Lindgren, Chief of Police o Tom Harris, Director of Finance o Michael Woodman, Planning & Development Services Manager

3. PLEDGE TO THE FLAG

4. CONSENT AGENDA

A. City Council Meeting Minutes (Meeting of 08/03/2026) Approval of the City Council meeting minutes from the meeting of August 3, 2026.

PUBLIC COMMENTS:

• There were no public comments.

 Council Member Reeves offered a motion to approve the consent agenda.

o Council Member DeRito seconded the motion.

o The motion was approved unanimously (7-0).

5. PUBLIC HEARING

A. Announcement of Public Hearing Procedures

• City Attorney, Molly Esswein, announced the public hearing procedures.

B. MP-26-05/CLUP-26-03/Z-26-03 Empire Old Milton Pkwy/Camden Pond Consideration of a master plan amendment, comprehensive land use plan amendment, and rezoning in order to construct 202 ‘For-Sale’ townhomes on 29.2 acres. A master plan amendment is requested to the Camden Pond Master Plan to allow for the proposed change in development mix. A comprehensive land use plan amendment is requested from

‘Professional Business Office’ to ‘High Density Residential’ and a rezoning is requested from CUP (Community Unit Plan) to R-10M (Dwelling, ‘For-Rent or ‘For-Sale’ Residential. The property is located at 3842 Old Milton Parkway and is legally described as being located in Land Lots 2, 3, 44, 45 & 49, 1st District, 1st Section, Fulton County, Georgia.

• Planning & Development Services Manager, Michael Woodman, came forward to present this item.

• The applicant, EAH Acquisitions, LLC, is requesting a master plan amendment, comprehensive land use plan amendment, and rezoning to allow for the construction of 195 ‘For-Sale’ townhomes on approximately 29.24 acres. Empire Communities proposes to develop the western half of the property and Toll Brothers would develop the eastern half of the property. A master plan amendment is requested to the Camden Pond Master Plan to change the use of the property from office to residential. A comprehensive land use plan amendment is requested from ‘Professional Business Office’ to ‘High Density Residential’ and a rezoning is requested from CUP (Community Unit Plan) to R-10M (Dwelling, ‘For-Rent’ and ‘For-Sale’, Residential). The property is located at 3842 Old Milton Parkway just north of the intersection at Old Milton Parkway and Cotton Creek Entry.

• This item was considered at the July 30, 2026 Planning Commission meeting. There were several public comments in support, including Andy’s Custard, Portman Holdings, Stoneridge HOA and Camden Pond HOA. Reasons for support included tree saves, tree buffer/setback adjacent to Camden Pond, quality product types, and less traffic impacts.

There were several comments in opposition with concerns over traffic, pedestrian safety, unsafe conditions on Old Milton Parkway, and larger buffer between developments.

After discussion, the Commission recommended approval subject to the staff recommended conditions and accepting a change from the applicant (vote 7-0).

• Staff recommends that Mayor and Council approve MP-26-05/CLUP-26-03/Z-26-03 Empire Old Milton/Camden Pond MP, subject to the following conditions:

1. The approximately 29.24-acre property shall be zoned R-10M and the site shall be developed substantially similar to the site plan prepared by PEC, revised 7/21/26, except for modifications required to comply with the conditions below. However, lot

yield depicted is not guaranteed and subject to meeting all City code requirements and conditions of zoning.

2. Architecture and materials shall be substantially similar to the submitted renderings included in the Amended Application, dated 7/24/26, with final approval by Staff.

Buildings shall have a minimum of 3-sided architecture, details, and materials.

Decorative chimneys shall be provided on the side façade of the endcap units specifically identified on the Chimney Exhibit, dated 7/24/26 and also currently identified as units 6, 11, 12, 16, 17, 22, 23, 27, 105, 106, 136, 140, 141, 146, 147, 153, 154, 174, 179, 185, and 191 on the site plan prepared by PEC, revised 7/21/26.

3. Up to 195 ‘Dwelling, ‘For-Sale’, Attached’ units shall be permitted.

4. Local streets and alleys shall be substantially similar to the site plan prepared by PEC, revised 7/21/26. Local streets shall include minimum 6’ planter, minimum 5’ sidewalks, and decorative pedestrian lighting. New streets and alleys within the approximately 29.24 acres shall be private and maintained by the HOA.

5. Sidewalks within the site shall connect to the public sidewalk along Old Milton Parkway, Cotton Creek Entry, Cotton Mill Place, Whitestone Place, Waters Ferry Drive, and Waters Ferry Way.

6. Minimum 20’ landscape strip shall be required along Old Milton Parkway.

Landscape strip shall include landscaping materials consisting of a mix of evergreen and deciduous trees and shrubs, as approved by Staff. Minimum 10’ landscape strip shall be required along local streets.

7. Tree save and tree planting plan shall be substantially similar to the Concept Tree Plans prepared by Kimley Horn, dated 4/22/26, as approved by Staff.

8. Open space shall be substantially similar to the open space depicted on the site plan prepared by PEC, revised 7/21/26.

9. Retaining walls shall receive architectural façade treatment and/or be heavily landscaped where visible from a public right-of-way, as approved by Staff. Retaining walls visible from developed areas exceeding 16’ in height shall be terraced with landscaped areas between terraces.

10.Development shall not be gated, except that the southernmost site driveway on Cotton Mill Place shall be gated for emergency access only. Gate access shall be provided by siren, keypad, Knox key and meet 2012 IFC 503.6.

11.Developer shall install a minimum 5’ sidewalk along the Old Milton Parkway frontage, with final approval by GDOT and Staff. Developer shall install off-site sidewalk improvements including a minimum 5’ sidewalk along Old Milton Parkway connecting to the existing sidewalk in front of Olde Milton Commons office condominiums and connecting to Camden Way, as approved by GDOT and Staff.

Off-site sidewalk improvements not located along the subject property’s frontage shall be eligible for impact fee credits.

12.Developer shall install an off-site sidewalk improvement including a minimum 5’ sidewalk along the west side of Cotton Creek Entry adjacent to the Andy’s Frozen Custard site between Old Milton Parkway and Waters Ferry Way, as approved by Staff. Off-site sidewalk improvements shall be eligible for impact fee credits.

13.Developer shall improve an enhanced pedestrian crosswalk at the intersection of Old Milton Parkway and Cotton Creek Entry, with final design and materials approved by Staff and GDOT. Improvement shall be eligible for impact fee credits as approved by City Council in a developer’s agreement.

14.Developer shall dedicate a public access easement and construct a minimum 12’ public trail connection as depicted on the site plan prepared by PEC, revised 7/21/26. Given the existing floodplain, trail alignment, design, and materials shall require final approval by Staff. Trail shall be laid out and constructed with the least impact to existing trees. Low impact construction techniques shall be used to minimize impacts to the CRZ of the trees to be conserved, as approved by the City Arborist. Trail connection shall include the improvement of a replacement pedestrian bridge over Big Creek and trail amenities including wayfinding signage and seating.

Trail construction shall be completed by the 25th CO, assuming there are no federal permits required. If a federal permit is required, Developer and Staff will work together to extend the trail connection completion deadline without stopping the Developer from seeking COs. HOA shall be responsible for the maintenance of the trail on the subject property. Off-site public trail and bridge connection shall be

eligible for impact fee credits, as established in a development agreement approved by City Council.

15.Prior to LDP issuance, developer shall seek approval of a road abandonment for the realigned portions of Waters Ferry Way/Waters Ferry Drive, Cotton Mill Place/Cotton Mill Path, and the removal of the cul-de-sac at the end of Cotton Creek Entry. If road abandonment is not approved and developer does not acquire abandoned right-of-way, developer shall revise the site plan to reflect compliance with the minimum 35’ building setback required along the above-referenced public rights-of-way.

16.Developer shall install a stop sign and pedestrian crossing along the Waters Ferry Way approach to the intersection of Waters Ferry Drive and internal Site Driveway 1, as well as at the intersection of Cotton Creek Entry and Cotton Mill Place, as approved by Staff. Waters Ferry Way and Cotton Creek Entry shall remain free flow with applicable signage, striping, and traffic control devices installed, as approved by Staff.

17.Developer shall improve the eastbound left turn lane storage length along Old Milton Parkway at the Cotton Creek Entry/Brookside Parkway intersection to minimum lengths needed to safely accommodate vehicular movements entering the site from the public right-of-way, as approved by GDOT and City Staff.

18.Developer shall install “Do not block the box” striping/signage at the Cotton Creek Entry and Waters Ferry Way intersection, as approved by Staff.

19.Developer shall explore a 3-way stop at Cotton Creek Entry and Cotton Mill Pace, subject to warrant analysis and final approval by Staff at LDP.

20.Developer shall install sculptures at the corners of Cotton Mill Path and Old Milton Parkway and Waters Ferry Drive and Old Milton Parkway. Sculptures shall complement each other and shall be minimum 15’ tall with final approval by the Cultural Arts Commission. Developer shall coordinate sculpture designs with Brookside South/Portman to reflect a cohesive theme.

21.As agreed to by the developer, a 60’ building setback shall be required along the east and north property lines in Pod B south of Whitestone Place, as depicted on the site plan prepared by PEC, revised 7/21/26.

22.As agreed to by the developer, a 25’ undisturbed tree save strip, replanted with screening landscaping where sparse, shall be provided along the east and north property lines in Pod B south of Whitestone Place, as depicted on the site plan prepared by PEC, revised 7/21/26. Developer shall provide sight lines to determine appropriate placement of screening landscaping adjacent to the existing residential communities to the east, with final approval by Staff.

23.As agreed to by the developer, the HOA declaration and covenants shall include a requirement for dogs on leashes, noise limitations, and a requirement for trash receptacle screening.

24.As agreed to by the developer, lighting on the rear facade of the proposed homes abutting the eastern boundary of Pod B south of Whitestone Place shall be shielded to minimize light spillage on adjacent properties.

25. No more than 10% of the residential units shall be permitted to be rented as reflected in the HOA’s declaration and covenants.

• The undeveloped property is zoned CUP subject to the Camden Pond Master Plan.

Surrounding properties are zoned CUP to the north and east, O-P (Office-Professional) to the west, and MU (Mixed Use) and O-I (Office-Institutional) to the south. Camden Pond and Stoneridge subdivisions are located to the east, Big Creek & Greenway and Preston Ridge Park are located to the north, Olde Milton Commons office condominiums are located to the west, and Portman Brookside mixed-use development and Mansions at Alpharetta Assisted Living Facility are located to the south. The property has a comprehensive land use plan designation of ‘Professional Business Office’, which requires an amendment to allow a residential development.

• Camden Pond Master Plan (F.K.A. Big Creek Landing) was approved in 1984 allowing a mix of high density residential, office, and commercial. Stoneridge and Camden Pond condominiums were developed on the east side of the Master Plan. C-2 (General Commercial) uses were approved on the outparcels located along Old Milton Parkway and flanking Cotton Creek Entry, which is the primary entrance to the Master Plan. The

undeveloped property representing the subject property surrounds the commercial outparcels and was approved for O-I (Office-Institutional) uses.

• The submitted site plan depicts the 29.24-acre property to be developed with 195 For-Sale’ townhomes. The western half of the property, Pod A, is depicted to be developed with 105 ‘For-Sale’ townhome units in twenty (20), three (3) story buildings. 33 units are front loaded and 72 are rear loaded. The eastern half of the property, Pod B, is depicted to be developed with 90 ‘For-Sale’ townhome units in seventeen (17), three (3) story buildings. 26 units are front loaded and 64 are rear loaded. Townhome units will be between twenty-foot (20’) and 24’ wide. The proposed development does not impact stream buffers and floodplain associated with Big Creek on the north and west sides of the property.

• Access to the site will continue from Cotton Creek Entry, Cotton Mill Place, and Waters Ferry Way. A 65’ setback and twenty-foot (20’) landscape strip is depicted along Old Milton Parkway and a 35’ setback and ten-foot (10’) landscape strip is depicted along Cotton Creek Entry, Cotton Mill Place, and Waters Ferry Way. A series of local streets and alleys will serve the townhomes with a minimum ten-foot (10’) landscape strip and building setback required along local streets (not including alleys). The site plan depicts six-foot (6’) planters and five-foot (5’) sidewalks along local streets. There are missing gaps in the existing sidewalk system along the frontage of the property on Old Milton Parkway, of which sidewalks are not included in GDOT’s future roadway project. A 60’ setback and 25’ undisturbed tree save strip are depicted along the east property line south of Whitestone Place.

• The site plan depicts 12.85 acres of open space, of which 4.39 acres, or fifteen percent (15%) of the site is required to be set aside as open space. Open space in Pod A includes a clubhouse with pool and mail kiosk, common space, sidewalks, trail connection, and large open space areas surrounding the west, south and east sides of the pod. The trail connection is proposed from the Cotton Creek Entry cul-de-sac to the north property line. The size and trail material are not identified. The proposed trail would provide a connection to the Big Creek Greenway and Preston Ridge Park. The trail runs along an existing shared detention pond and stream buffers associated with Bog Creek. Pod B includes a plaza and a 60’ strip of open space depicted along the eastern property line adjacent to Stoneridge and Camden Pond.

• Unified Development Code (UDC) parking regulations require one (1) parking space for each bedroom in a townhome unit, as well as a Code-compliant driveway. Assuming that all units are three (3) bedrooms, a total of 585 parking spaces would be required.

All townhome units have two (2) side-by-side parking spaces in a garage and two (2) spaces on a Code-compliant driveway, for a total of 780 parking spaces. An additional 56 guest spaces are depicted throughout the development.

• The applicant submitted a tree survey, assessment, and tree save plan. A 25’ trees save strip is depicted along the east and north property lines in Pod B south of Whitestone Place. Additional tree save areas are depicted along the north and west sides of Pod A.

Trees in the stream buffers and floodplain will also be saved. There are two (2) existing detention ponds on the property. The detention pond in the southwest corner near Old Milton Parkway serves the commercial outparcels along Old Milton Parkway and the pond straddling the northeast property line serves Stoneridge subdivision. Two (2) additional stormwater facilities are depicted at the north end of Pod A and in the northeast corner of Pod B.

• The applicant submitted renderings of the proposed townhomes to be constructed by Empire Communities and Toll Brothers. The various designs depict the primary exterior material to be brick with some designs including board and batten and siding accents.

A variety of details are depicted on the elevations, including metal roof accents, balconies (inset, projecting, rooftop), decorative metal railings, recessed entries, dark window framing, bay windows and bump outs, decorative lighting, carriage style garage doors, and brick chimneys on building ends.

• The applicant submitted a trip generation report. The proposed townhome development is expected to generate 100 AM Peak Hour trips and 103 PM Peak Hour trips, which represents a 113% decrease in AM Peak Hour trips and 105% decrease in PM Peak Hour trips when compared to the office development approved on the property.

• The submitted traffic impact study analyzed three (3) existing intersections in the Cotton Creek area and identified recommendations for three (3) additional proposed site driveways within the proposed development. The study concludes that no changes or improvements are recommended to the three (3) study intersections due to the impact of site traffic. The results of the submitted traffic operations analysis for future conditions

indicate the signalized study intersection at Old Milton Parkway and Cotton Creek Entry/Brookside Parkway will continue operating at an overall level of service (LOS) “D” or better in the AM and PM peak hours. The study also concludes the stop-controlled right-out only approaches at the two (2) unsignalized study intersections will continue operating at LOS “E” or better with peak hour traffic.

• Residential development is known to increase school enrollment. Fulton County Schools calculated the potential number of children who may live on the property by using their standard calculation to distinguish the number of children that a residential development will generate. Based on the total figure for all school levels, it can be assumed that the proposed development could house approximately 11 – 101 school age children. New Prospect Elementary School and Alpharetta High School have available enrollment capacity; however, Webb Bridge Middle School is currently over capacity.

• The Citizen Participation Plan Report submitted by the applicant states that letters were mailed to each property owner within 500’ of the subject property stating the applicant’s intent. The applicant also held several meetings with the adjacent Stoneridge and Camden Pond HOAs and residents. The report states that questions and comments were received regarding price points, unit size and type, abandon Cotton Creek Entry cul-de-sac, erosion control, tree removal, traffic, use of amenities, impact to property values, trail connection, stormwater, landscaping and buffering, development timing, and construction hours.

• Staff have received correspondence from Stoneridge and Camden Pond HOAs and residents with concerns over traffic, 3-way stop at Cotton Creek and Cotton Mill Place, public parking at cul-de-sac for greenway access, construction timing and hours, buffer and setback, distance between units and Camden Pond, trash collection, fencing adjacent to Camden Pond, environmental impacts, water quality impacts, stormwater runoff, impact to wetlands and Big Creek, abandon cul-de-sac in favor of more greenspace, noise, GDOT project, nighttime lighting, density, aesthetics, obstruct natural views, minimum 25’ undisturbed buffer replanted where sparse adjacent to Camden Pond, and setback variance should not be granted.

• The Community Zoning Information Meeting was held on January 14, 2026. There were several public comments with comments and concerns related to traffic, greenway

connection, status of existing cul-de-sac, tree buffer to adjacent neighborhoods, environmental impacts, infrastructure impacts, noise, impact on property values, and price points.

• Staff has reviewed the applicant’s proposal against the established review criteria for a master plan amendment, comprehensive land use plan amendment, and rezoning. The proposal is suitable given the development of adjacent and nearby properties, which include Stoneridge and Camden Pond subdivisions, Preston Ridge Park, and the Big Creek Greenway. The Comprehensive Plan identifies Old Milton Parkway east of Georgia 400 as a priority area in need of redevelopment and promotes retrofitting and mixed-use patterns to create activity nodes near or within existing suburban office parks.

Also, the City’s jobs to housing ratio suggests a need for additional housing. The proposed residential development would generate significantly less traffic than an office park and is supported by over twelve (12) acres of open space, as well as being located adjacent to the Big Creek Greenway and Preston Ridge Park. The development proposal would bring residences closer to goods, services, and jobs, effectively minimizing impacts on public facilities and services.

• The following individuals came forward to present on behalf of the application.

 Jessica Hill, attorney with Troutman, Pepper, Locke, 600 Peachtree Street, Atlanta, GA 30308

 Kenneth Wood, 350 Research Court, Peachtree Corners, GA 30092  Adbul Amer, with A&R Engineering 2160 Kingston Court, Marietta, GA 30067

PUBLIC COMMENTS:

In Favor

• Beverly Whisenant, 1105 Whitestone Parkway, Alpharetta, GA 30005

• Darlene Cutlip, 3025 Camden Way, Alpharetta, GA 30005

• Mike Greene, 303 Peachtree Center Avenue, Atlanta, GA 30303 In Opposition

• Ash Battistelli, 3996 Camden Way, Alpharetta, GA 30005

 Mayor Pro Tem Merkel offered a motion to approve MP-26-05/CLUP-26-03/Z-26-03 Empire Old Milton Pkwy/Camden Pond, subject to the following conditions:

1. The approximately 29.24-acre property shall be zoned R-10M and the site shall be developed substantially similar to the site plan prepared by PEC, revised 7/21/26, except for modifications required to comply with the conditions below. However, lot yield depicted is not guaranteed and subject to meeting all City code requirements and conditions of zoning.

2. Architecture and materials shall be substantially similar to the submitted renderings included in the Amended Application, dated 7/24/26, with final approval by Staff.

Buildings shall have a minimum of 3-sided architecture, details, and materials.

Decorative chimneys shall be provided on the side façade of the endcap units specifically identified on the Chimney Exhibit, dated 7/24/26 and also currently identified as units 6, 11, 12, 16, 17, 22, 23, 27, 105, 106, 136, 140, 141, 146, 147, 153, 154, 174, 179, 185, and 191 on the site plan prepared by PEC, revised 7/21/26.

3. Up to 195 ‘Dwelling, ‘For-Sale’, Attached’ units shall be permitted.

4. Local streets and alleys shall be substantially similar to the site plan prepared by PEC, revised 7/21/26. Local streets shall include minimum 6’ planter, minimum 5’ sidewalks, and decorative pedestrian lighting. New streets and alleys within the approximately 29.24 acres shall be private and maintained by the HOA.

5. Sidewalks within the site shall connect to the public sidewalk along Old Milton Parkway, Cotton Creek Entry, Cotton Mill Place, Whitestone Place, Waters Ferry Drive, and Waters Ferry Way.

6. Minimum 20’ landscape strip shall be required along Old Milton Parkway.

Landscape strip shall include landscaping materials consisting of a mix of evergreen and deciduous trees and shrubs, as approved by Staff. Minimum 10’ landscape strip shall be required along local streets.

7. Tree save and tree planting plan shall be substantially similar to the Concept Tree Plans prepared by Kimley Horn, dated 4/22/26, as approved by Staff.

8. Open space shall be substantially similar to the open space depicted on the site plan prepared by PEC, revised 7/21/26.

9. Retaining walls shall receive architectural façade treatment and/or be heavily landscaped where visible from a public right-of-way, as approved by Staff. Retaining walls visible from developed areas exceeding 16’ in height shall be terraced with landscaped areas between terraces.

10.Development shall not be gated, except that the southernmost site driveway on Cotton Mill Place shall be gated for emergency access only. Gate access shall be provided by siren, keypad, Knox key and meet 2012 IFC 503.6.

11.Developer shall install a minimum 5’ sidewalk along the Old Milton Parkway frontage, with final approval by GDOT and Staff. Developer shall install off-site sidewalk improvements including a minimum 5’ sidewalk along Old Milton Parkway connecting to the existing sidewalk in front of Olde Milton Commons office condominiums and connecting to Camden Way, as approved by GDOT and Staff.

Off-site sidewalk improvements not located along the subject property’s frontage shall be eligible for impact fee credits.

12.Developer shall install an off-site sidewalk improvement including a minimum 5’ sidewalk along the west side of Cotton Creek Entry adjacent to the Andy’s Frozen Custard site between Old Milton Parkway and Waters Ferry Way, as approved by Staff. Off-site sidewalk improvements shall be eligible for impact fee credits.

13.Developer shall improve an enhanced pedestrian crosswalk at the intersection of Old Milton Parkway and Cotton Creek Entry, with final design and materials approved by Staff and GDOT. Improvement shall be eligible for impact fee credits as approved by City Council in a developer’s agreement.

14.Developer shall dedicate a public access easement and construct a minimum 12’ public trail connection as depicted on the site plan prepared by PEC, revised 7/21/26. Given the existing floodplain, trail alignment, design, and materials shall require final approval by Staff. Trail shall be laid out and constructed with the least impact to existing trees. Low impact construction techniques shall be used to minimize impacts to the CRZ of the trees to be conserved, as approved by the City Arborist. Trail connection shall include the improvement of a replacement pedestrian

bridge over Big Creek and trail amenities including wayfinding signage and seating.

Trail construction shall be completed by the 25th CO, assuming there are no federal permits required. If a federal permit is required, Developer and Staff will work together to extend the trail connection completion deadline without stopping the Developer from seeking COs. HOA shall be responsible for the maintenance of the trail on the subject property. Off-site public trail and bridge connection shall be eligible for impact fee credits, as established in a development agreement approved by City Council.

15.Prior to LDP issuance, developer shall seek approval of a road abandonment for the realigned portions of Waters Ferry Way/Waters Ferry Drive, Cotton Mill Place/Cotton Mill Path, and the removal of the cul-de-sac at the end of Cotton Creek Entry. If road abandonment is not approved and developer does not acquire abandoned right-of-way, developer shall revise the site plan to reflect compliance with the minimum 35’ building setback required along the above-referenced public rights-of-way.

16.Developer shall install a stop sign and pedestrian crossing along the Waters Ferry Way approach to the intersection of Waters Ferry Drive and internal Site Driveway 1, as well as at the intersection of Cotton Creek Entry and Cotton Mill Place, as approved by Staff. Waters Ferry Way and Cotton Creek Entry shall remain free flow with applicable signage, striping, and traffic control devices installed, as approved by Staff.

17.Developer shall improve the eastbound left turn lane storage length along Old Milton Parkway at the Cotton Creek Entry/Brookside Parkway intersection to minimum lengths needed to safely accommodate vehicular movements entering the site from the public right-of-way, as approved by GDOT and City Staff.

18.Developer shall install “Do not block the box” striping/signage at the Cotton Creek Entry and Waters Ferry Way intersection, as approved by Staff.

19.Developer shall explore a 3-way stop at Cotton Creek Entry and Cotton Mill Pace, subject to warrant analysis and final approval by Staff at LDP.

20.Developer shall install sculptures at the corners of Cotton Mill Path and Old Milton Parkway and Waters Ferry Drive and Old Milton Parkway. Sculptures shall

complement each other and shall be minimum 15’ tall with final approval by the Cultural Arts Commission. Developer shall coordinate sculpture designs with Brookside South/Portman to reflect a cohesive theme.

21.As agreed to by the developer, a 60’ building setback shall be required along the east and north property lines in Pod B south of Whitestone Place, as depicted on the site plan prepared by PEC, revised 7/21/26.

22.As agreed to by the developer, a 25’ undisturbed tree save strip, replanted with screening landscaping where sparse, shall be provided along the east and north property lines in Pod B south of Whitestone Place, as depicted on the site plan prepared by PEC, revised 7/21/26. Developer shall provide sight lines to determine appropriate placement of screening landscaping adjacent to the existing residential communities to the east, with final approval by Staff.

23.As agreed to by the developer, the HOA declaration and covenants shall include a requirement for dogs on leashes, noise limitations, and a requirement for trash receptacle screening.

24.As agreed to by the developer, lighting on the rear facade of the proposed homes abutting the eastern boundary of Pod B south of Whitestone Place shall be shielded to minimize light spillage on adjacent properties.

25.No more than 10% of the residential units shall be permitted to be rented as reflected in the HOA’s declaration and covenants.

o Council Member Driskell seconded the motion.

o Council Member Reeves offered a friendly amendment to Condition #14 to read as follows:

Developer shall dedicate a public access easement and construct a minimum 12’ public trail connection as depicted on the site plan prepared by PEC, revised 7/21/26. Given the existing floodplain, trail alignment, design, and materials shall require final approval by Staff. Trail shall be laid out and constructed with the least impact to existing trees. Low impact construction techniques shall be used to minimize impacts to the CRZ of the trees to be conserved, as approved by the City Arborist. Trail connection shall include the improvement of a replacement pedestrian

bridge over Big Creek and trail amenities including wayfinding signage and seating.

Trail construction shall be completed by the 90th CO. HOA shall be responsible for the maintenance of the trail on the subject property. Off-site public trail and bridge connection shall be eligible for impact fee credits, as established in a development agreement approved by City Council.

o Mayor Pro Tem Merkel accepts the friendly amendment.

o Council Member Driskell accepts the friendly amendment.

o The motion was approved (6-1; with Council Member Reeves in opposition).

C. E-26-01 Howard Capital Sign Exception

Consideration of a sign exception to allow for an additional wall sign. An exception is requested from Unified Development Code Subsection 2.6.12(C) to allow an additional wall sign. The property is located at 415 South Broad Street and is legally described as being located in Land Lot 1268, 2nd District, 2nd Section, Fulton County, Georgia.

• Director of Community Development, Kathi Cook, came forward to present this item.

• The applicant, Patti Huxford, is requesting consideration of a sign exception to allow for an additional wall sign on an office building for Howard Capital. Unified Development Code (UDC) Subsection 2.6.12(C) allows one (1) wall sign for office buildings with two

(2) stories or more. The subject property is located at 415 South Broad Street at the southeast corner of Highway 9 and South Broad Street.

• Staff recommends that Mayor and Council approve E-26-01 Howard Capital Sign Exception, subject to the following conditions:

1. Wall sign location, number, sign copy area, and illumination shall be limited to the submitted sign plans prepared by The Huxton Group, dated 6/26/26, as approved by Staff.

2. Maximum wall and blade sign area for the office building, not including ground floor retail storefront, shall be limited to no more than 70.25 square feet.

• The property is zoned MU (Mixed Use) subject to the City Center Master Plan. The subject property is developed with a four (4) story, 38,850 square foot office building with ground floor retail. Surrounding properties are zoned MU, except the property to

the south is zoned C-2 (General Commercial). Hen Mother Cookhouse and Citizen Soul are located to the west, Publix is located to the south, City Center parking deck is located to the east, and Chiringa and the City Town Green are located to the north. The comprehensive land use plan designation of the property is ‘Central Business District’.

• For office buildings, Unified Development Code (UDC) Subsection 2.6.12(C) allows, “Buildings of two (2) stories or greater one (1) wall sign located at the top of the building.

The maximum area of the wall sign shall not exceed 20 square feet per floor or story above road grade, not to exceed 240 square feet. Wall signs shall not be internally illuminated. In lieu of a wall sign, up to 50% of the wall sign area allowance may be used for a blade sign.” Currently, there is a 31.25 square foot blade sign on the northwest corner of the building. The office building is four (4) stories; therefore, an 80 square foot wall sign or 40 square foot blade sign are permitted on the building. The applicant proposes a 39 square foot wall sign of the Howard Capital logo on the north elevation of the building. The sign is proposed to be halo-lit.

• The Citizen Participation Plan Report submitted by the applicant states that adjacent property owners were contacted regarding the applicant’s intent. The report states that no comments have been received.

• The Community Zoning Information Meeting was held on July 8, 2026. There were no public comments.

• Staff has reviewed the applicant’s request against the review criteria for a sign exception. The property has peculiar conditions related to its location in a 25-acre mixed-use development, and the application of the ordinance would create an unnecessary hardship. The combined sign area of the proposed wall sign and existing blade sign is less than the total sign area permitted on one (1) wall sign. Also, the existing blade sign is visible from the west and east, but not from the north. The proposed wall sign would facilitate building identification from the Town Green, as well as internal streets within City Center.

• The applicant, Patti Huxford, came forward to present on behalf of the application.

PUBLIC COMMENTS:

• There were no public comments.

 Mayor Pro Tem Merkel offered a motion to approve E-26-01 Howard Capital Sign Exception, subject to the following conditions:

1. Wall sign location, number, sign copy area, and illumination shall be limited to the submitted sign plans prepared by The Huxton Group, dated 6/26/26, as approved by Staff.

2. Maximum wall and blade sign area for the office building, not including ground floor retail storefront, shall be limited to no more than 70.25 square feet.

o Council Member Brady seconded the motion.

o The motion was approved unanimously (7-0).

D. PH-26-14 Verdant Gated Subdivision

Consideration of a request for public hearing to allow a gated subdivision with private streets for a 41-lot subdivision currently under construction. The property is located at 12265 Charlotte Drive and is legally described as being located in Land Lots 1245 & 1246, 2nd District, 2nd Section, Fulton County, Georgia.

• Director of Community Development, Kathi Cook, came forward to present this item.

• The applicant, DRB Group Georgia, LLC, requests consideration to allow a 41-lot single-family detached subdivision to be gated with private streets. According to the applicant, the gated subdivision is consistent with the design intent by creating a controlled residential environment with reduced through traffic, enhanced safety, and improved neighborhood character. The subject property is located at 12265 Charlotte Drive near the northeast corner of Charlotte Drive and Rucker Road.

• Staff recommends that Mayor and Council approve PH-26-14 Verdant Gated Subdivision, subject to the following conditions:

1. Gated subdivision shall be developed substantially as depicted on the site plan prepared by Kimley Horn, dated 6/29/26, except for modifications required to comply with the conditions below. Residential lots adjacent to the entrance shall utilize the proposed alternate driveway locations, as depicted on the site plan prepared by Kimley Horn, dated 6/29/26.

2. Developer shall amend the subdivision plat to reflect that all roads and storm easements are private.

3. Development shall be gated with private streets with gates and street improvements maintained by the HOA.

4. Gate details and entrance landscaping shall be substantially similar to the plan prepared by Kimley Horn, dated 6/29/26, with final approval by Staff.

5. Gate access shall be provided by siren, keypad, Knox key and meet 2012 IFC 503.6.

• The property was rezoned to R-22 (Dwelling, ‘For-Sale’, Residential) in 2024 to allow a 41-lot single-family detached subdivision. Surrounding properties are zoned AG (Agriculture) and R-15 (Dwelling, ‘For-Sale’, Residential) to the north, R-15 to the east, AG, R-12 (Dwelling, ‘For-Sale’, Residential) and R-15 to the south, and R-22 to the west.

Charlotte Estates and two (2) unplatted lots are located to the north, Jennifer Oaks is located to the east, The Oaks on Charlotte Drive and The Preserve on Charlotte Drive are located to the west and unplatted lots and Laurelwood Farm are located to the south.

The comprehensive land use plan designation of the property is ‘Very Low Density Residential’.

• The submitted site plan depicts a 41-lot single-family detached gated subdivision served by private streets. The subdivision is estimated to generate 34 AM Peak Hour trips and 44 PM Peak Hour trips. The entrance to the Verdant subdivision consists of a one-way ingress and a separate one-way egress. The proposed gated entrance provides 85’ of stacking length which is the equivalent of approximately four (4) to five (5) passenger vehicles, as measured from the call box to the property line along Charlotte Drive. The proposed stacking length exceeds the City’s minimum requirement of 80’. The configuration of the subdivision entrance allows for a U-turn accommodating the turning radii of a delivery truck between the call box and gates. The applicant submitted entrance gate details which depict decorative metal gates attached to stone columns.

The four (4) rail horse fencing required along Charlotte Drive is depicted abutting the columns with a pedestrian gate on each side of the gated entrance.

• The City’s Transportation Engineer reviewed the applicant’s proposal and believes that the gated subdivision entrance has been designed with appropriate stacking length,

turnaround radii, and other considerations. The proposed gated entrance was designed to the specifications recommended by Staff (queueing for one (1) delivery truck and one

(1) to two (2) passenger vehicles and U-turn accommodating a delivery truck turning radius).

• The Citizen Participation Plan Report submitted by the applicant states that property owners within 500’ were contacted regarding the applicant’s intent. The report states that no public comments were received.

• The Community Zoning Information Meeting was held on July 8, 2026. There were no public comments.

• Staff has reviewed the applicant’s proposal and finds that it can support the applicant’s request to allow a gated subdivision with private streets. The proposal provides sufficient vehicle stacking and a turnaround area is provided accommodating delivery truck turning movements. If approved, the gated subdivision entrance should include decorative landscaping.

• Richard 55 Highland Avenue The applicant, DRB Group Georgia, LLC, came forward to present on behalf of the application.

PUBLIC COMMENTS:

• There were no public comments.

 Mayor Pro Tem Merkel offered a motion to approve PH-26-14 Verdant Gated Subdivision, subject to the following conditions:

1. Gated subdivision shall be developed substantially as depicted on the site plan prepared by Kimley Horn, dated 6/29/26, except for modifications required to comply with the conditions below. Residential lots adjacent to the entrance shall utilize the proposed alternate driveway locations, as depicted on the site plan prepared by Kimley Horn, dated 6/29/26.

2. Developer shall amend the subdivision plat to reflect that all roads and storm easements are private.

3. Development shall be gated with private streets with gates and street improvements maintained by the HOA.

4. Gate details and entrance landscaping shall be substantially similar to the plan prepared by Kimley Horn, dated 6/29/26, with final approval by Staff.

5. Gate access shall be provided by siren, keypad, Knox key and meet 2012 IFC 503.6.

o Council Member DeRito seconded the motion.

o The motion was approved unanimously (7-0).

6. NEW BUSINESS

A. Request For Proposal 26-107: Alpha Loop/Link Design-Build from Encore Pkwy to Lakeview Lake and Intergovernmental Agreement with True North 400 Consideration of approval of the award of RFP 26-107 for Alpha Loop Trail Design-Build from Encore Pkwy to Morrison Lake to Reeves Young with a contract term of 18.5-month, in an amount not to exceed $15,991,962.00, and approve the Agreement with True North 400, and authorize the Mayor to execute all necessary documents.

• Director of Public Works, Peter Sewczwicz, came forward to present this item.

• The original Request for Proposals (RFP) required design-build teams to submit proposals for the complete design and construction of a 12-foot-wide shared-use path extending from Encore Parkway to Haynes Bridge Road. Because a pedestrian connection exists and is already available from Lakeview Lake to Haynes Bridge Road via Lakeview Development, multiple alignment alternatives were evaluated as part of this project.

These include connections from Encore Parkway to Lakeview Lake and from Lakeview Lake to Haynes Bridge Road. Evaluating these segments independently will allow the City to identify the most cost-effective solution and maximize the project’s value within the available budget.

• The Department of Public Works, with guidance from the Finance Department, prepared RFP 26-107 which was issued on September 25, 2025. RFP 26-107 was advertised through the City’s e-procurement site (Bonfire) as well as the Georgia Procurement Registry and resulted in over 3104 vendor invites and 124 document takers. RFP 26- 107 responses were received on December 18, 2025 and included proposals from 3 firms, listed below, for the complete design and construction of a 12-foot-wide shared-use path extending from Encore Parkway to Haynes Bridge Road:

1. Archer Western $24,433,000.00

2. Reeves Young $25,065,952.00

3. F.H. Pachon $36,567,085.77

• Evaluation Committee members independently evaluated and scored each proposal for all criteria above, excluding cost. Upon completion of the independent evaluations, cost was added to the overall scoring. The Evaluation Committee invited the top two firms to advance to Phase 2 (shortlist). Archer Western and Reeves Young were the highest scoring firms. Phase 2 included committee interviews/ presentations. The Evaluation Committee met with Reeves Young and Archer Western on Tuesday February 24, 2026 and Thursday February 26, 2026, respectively.

• An existing pedestrian walkway currently connects Lakeview Lake to Haynes Bridge Road via the Lakeview Development. Due to budget constraints, the City requested the two highest-ranked design-build teams to provide revised proposals for only the Alpha Loop/Link segment extending from Encore Parkway to the Lakeview Lake. The revised design-build cost proposals for this reduced project scope were subsequently submitted to the City’s Finance Department as follows:

1. Reeves Young $14,732,978.00

2. Archer Western $16,413,000.00

• The evaluation committee met with Reeves Young on March 19, 2026, to further discuss the project scope, schedule, and the City’s expectations. During this meeting, the City requested that the project scope be expanded slightly to include construction of a trailhead plaza at the Encore Parkway entrance and relocation of the curb line along the east side of Fanfare Way, from Encore Parkway to Tempo Lane, to accommodate on-street parking. The property on which the plaza would be constructed was recently acquired through the Georgia Department of Transportation. Traversing the trail through this parcel, the cost of the trail decreased by $700k. The cost to design and construct the plaza is $1,954,822. The plaza combines standards from the Alpha Loop, True North 400, and the Eco District. The Encore area has been a staple for True North 400 Projects, Encore Parkway Bridge and the Encore Greenway and Gateway projects. True North 400 and the City discussed partnering on the Encore Plaza and at the August 4,

2026, True North 400 Board Meeting, the board approved funding of $977,411.00.

An Intergovernmental Agreement (IGA) has been prepared, signed by True North 400, and is included in the attachments for Council’s consideration.

• Reeves Young submitted a revised proposal incorporating the additional scope in the amount of $15,991,962.00. This amount represents the final design-build cost for the Alpha Loop segment from Encore Parkway to the Lakeview Lake, including the trailhead plaza at Encore Parkway and the on-street parking improvements along Fanfare Way.

• The Evaluation Committee recommends award of RFP 26-107 to Reeves Young as the high-scoring proposal. Reeves Young has successfully completed multiple projects similar in scope to this project.

PUBLIC COMMENTS:

• There were no public comments.

 Council Member Reeves offered a motion to approve of the award of RFP 26-107 for Alpha Loop Trail Design-Build from Encore Pkwy to Morrison Lake to Reeves Young with a contract term of 18.5-month, in an amount not to exceed $15,991,962.00, and approve the Agreement with True North 400, and to authorize the Mayor to execute all necessary documents.

o Council Member Hipes seconded the motion.

o The motion was approved unanimously (7-0).

B. Request For Proposal 26-115: On-Call Storm Pipe Lining Services Contract Approval and FY 27 Task Order 1 Funding

Consideration and approval of the award of RFP 26-115 for On-Call Storm Pipe Lining Services to NGI Trenchless Pipe and Sewer Repair, Inc. for CIPP and Utility Asset Management (UAM) for Spincast for a one year contract with the option of four one year renewals; approval of funding to NGI for FY 2027 CIPP Task Order No. 1 in an amount not to exceed $1,927,089.92; and authorization for the Mayor to execute all necessary documents.

• Director of Public Works, Peter Sewczwicz, came forward to present this item.

• The life expectancy for corrugated metal pipes (CMP) is approximately 25 years. Due to the age of much of the City's stormwater infrastructure, many of our pipes have met or exceeded their life expectancy and are in need of repair.

• During routine inspections of the City's stormwater pipe conveyance infrastructure, pipe condition is evaluated and ranked, and work orders are entered into the Public Works Asset Management System for repairs. Currently, there are 528 total work orders in the work order system for pipe lining. This is a total of 44,440 linear feet of pipe that has been identified to be trenchless rehabilitated. Current funding requested in this agenda item will cured in place pipeline approximately 8,360 linear feet of pipe.

• Pipe maintenance falls into two categories; full replacement and repairs in place. When pipes are in need of repair but are not to the point of complete failure or replacement, the City has a unique opportunity of extending pipe life expectancy through trenchless lining of the pipe. The trenchless system of lining pipes has been recognized as being the most efficient and cost-effective way of making repairs while minimizing the impacts on our roads, parking lots, and residents.

• Pipe lining is done by a variety of methods. Two that the city has had the most success with are Cured-in-Place Pipe (CIPP) and Spincast. The city has just completed one 5- year contract on each of these pipe lining methods.

• 1. CIPP — This process involves the installation of a resin-impregnated flexible tube that is either inverted or pulled into the original pipe and expanded to fit tightly against the existing pipe using water or air pressure. The resin system is hardened in place. This method is preferable for applications up to 42 or 48" pipes.

• 2. Spincast — This process involves spraying a cementitious mortar along the inside surface of the existing pipe. This method is often preferred for larger pipes as access is needed for the spraying.

• Current funding has been budgeted and allocated to the stormwater maintenance and repair account for pipe lining services throughout the City. The requested funding will go to NGI for CIPP lining of approximately 8,360 linear feet of stormpipe throughout the City.

• The Department of Public Works, with guidance from the Finance Department, prepared RFP 26–115, which was issued on April 30th 2026. RFP 26-115 was advertised through the City’s e-procurement site (Bonfire) as well as the Georgia Procurement Registry and resulted in over 390 vendor invites and 33 document takers. RFP 26–115 responses were received on May, 28th, 2026 and included proposals from 10 firms.

• The resulting scores were as follows:

CIPP Total Score NGI Trenchless Pipe & Repair, INC 81.540 Utility Asset Managment, Inc. 81.490 Southern Premier Contractors, Inc. 80.860 Atlantic Pipe Services, LLC 76.960 Pateco Services, LLC 45.667 Spincast Total Score Utility Asset Management, Inc. 85.200 Southern Premier Contractors, Inc. 74.940 Atlantic Pipe Services, LLC 73.940 Pateco Services, LLC 36.937

• Staff from Public Works created a rate sheet to obtain costs. The rate sheet is based on a linear foot cost of lining for CIPP and Spincast based on existing pipe size and depth.

In order to obtain a fair cost comparison, staff created a typical task order (sample project) based on current work orders in the work order system queue. Vendors were scored on their example project pricing and overall rate sheet. UAM was the highest scoring firm for spincast with the lowest submitted sample project cost, and NGI was the highest scoring firm for CIPP with the second lowest submitted sample project cost.

Although NGI was not the cheapest submitted cost for the CIPP sample project, their technical submittal and references scored much higher than the cheapest submitting firm who had the overall lowest score.

• Tasks orders will be issued annually for pipe lining based on work order queue and identified emergency situations. Public Works staff anticipates an annual budget of $1.5 million a year for pipe lining if funding allows.

• The Evaluation Committee recommends award of RFP 26-115 On-call Pipe lining CIPP to NGI Trenchless Pipe and Repair, Inc. and 26-115 On Call Pipe Lining Spincast to Utility Asset Management. Inc.

PUBLIC COMMENTS:

• There were no public comments.

 Council Member Reeves offered a motion to approve the award of RFP 26-115 for On-Call Storm Pipe Lining Services to NGI Trenchless Pipe and Sewer Repair, Inc. for CIPP and Utility Asset Management (UAM) for Spincast for a one year contract with the option of four one year renewals; approval of funding to NGI for FY 2027 CIPP Task Order No. 1 in an amount not to exceed $1,927,089.92, and to authorize the Mayor to execute all necessary documents.

o Council Member Brady seconded the motion.

o The motion was approved unanimously (7-0).

C. Request For Proposal 26-117: On-Call Pipe Cleaning Services Contract Approval and FY 27 Task Order 1 Funding

Consideration and approval of the award of RFP 26-117 for On-Call Storm Pipe Cleaning Services to NGI Trenchless Pipe and Sewer Repair, Inc.; approval of funding for FY 2027 Task Order No. 1 in an amount not to exceed $150,000.00; and authorization for the Mayor to execute all necessary documents.

• Director of Public Works, Peter Sewczwicz, came forward to present this item.

• The City has a continued need for a reliable and responsive stormwater pipe cleaning contractor. Stormwater pipe cleaning services are needed to supplement City resources by providing quick, proactive storm pipe flushing to prevent flooding and possible damage to property in the event of a clogged storm pipe during storm events. The stormwater pipe cleaning contractor will be utilized to flush current pipe clean work orders, and emergency pipe cleaning on an as-needed basis. Currently, there are 134 work orders in the queue with pipes that have been identified that need flushing. This

equates to approximately 9,116 linear feet of pipe in need of cleaning throughout the City. The requested $150,000.00 will clean an estimated 4,057 LF along with annual cleaning of City-owned stormceptors. The requested funding will also provide emergency cleaning/clearing of pipes that clog during storm events to help prevent infrastructure and property damage and maintenance to City of Alpharetta maintained stormwater management facilities.

• The Department of Public Works, with guidance from the Finance Department, prepared RFP 26-117 which was issued on April, 30, 2026. RFP 26-117 was advertised through the City’s e-procurement site (Bonfire) as well as the Georgia Procurement Registry and resulted in over 1245 vendor invites and 35 document takers. RFP26-117 responses were received on May, 28, 2026 and included proposals from 10 firms.

• Evaluation Committee members independently evaluated and scored each proposal for all criteria above, excluding cost. Upon completion of the independent evaluations, cost was added to the overall scoring, resulting in the following rankings:

• Costs evaluated for scoring purposes were based on hourly rates, travel time charges and dump fees. Public Works will issue task orders throughout the year based on need and annual maintenance items such as stormceptors and other proprietary stormwater devices located throughout the City. Annual maintenance of these devices is estimated at $25,000.00-$30,000.00 a year annually. Other requested funding for pipe cleaning will be based on work order queue, emergency work and pond maintenance.

FY 27 task order 1 request will be for 4057 linear feet of pipe cleaned, annual maintenance to proprietary devices as required per the City's MS4 NPDES permit requirements, pond maintenance, and emergency work as needed. The total funding request for FY 27 task order 1 is $150,000.00.

• The Evaluation Committee recommends award of RFP 26-117 to NGI Trenchless Pipe & Repair INC (NGI) as the high-scoring proposal. NGI received great references from the City of Sandy Springs and Johns Creek and provided the evaluation team with a list of great resources available to complete the work outlined. If awarded, the contract with NGI will be for 1 year with the option of four 1-year renewals.

PUBLIC COMMENTS:

• There were no public comments.

 Council Member Reeves offered a motion to award RFP 26-117 for On-Call Storm Pipe Cleaning Services to NGI Trenchless Pipe and Sewer Repair, Inc.; approval of funding for FY 2027 Task Order No. 1 in an amount not to exceed $150,000.00, and to authorize the Mayor to execute all necessary documents.

o Mayor Pro Tem Merkel seconded the motion.

o The motion was approved unanimously (7-0).

D. Invitation To Bid 27-001: Fiscal Year 2027 Milling and Resurfacing Consideration and approval of the award of ITB 27-001 FY 27 Milling and Resurfacing to C.W. Matthews Contractors FY 27 Milling and Resurfacing in an amount totaling $4,093,950.56 and authorize the Mayor to execute all necessary documents.

• Director of Public Works, Peter Sewczwicz, came forward to present this item.

• The City of Alpharetta maintains over 550 lane miles of roadway. Each year the City budgets dollars towards the milling and resurfacing of these roads. Accomplishing this task extends the roads' useful life and increases the roads' ability to handle traffic volumes.

• Public Works utilizes the services of a third party to drive city-maintained streets to evaluate roadway conditions. Each road is inspected for various criteria: patching, rutting, longitudinal cracks, etc. The objective was to collect accurate data and information about the City’s road inventory and surface conditions that would allow the City’s staff to optimize their plan for road network repair and rehabilitation under budget constraints. After entering last year's milling and resurfacing, data was put into the system and our current average Pavement Condition Index (P.C.I.) score is 78.5. This score places the City in the good classification. A score below 75 would place the City in the fair classification. The information collected during past inspections, in conjunction with historical repair, rehabilitation information, and traffic information, helps the City make consistent and cost-effective decisions for roadway preservation. Based on these ratings, 45 locations adding up to 28 lane miles were included in the annual offering.

Two roads due to insufficient/failing subgrade will be treated with soil cement. Soil cement is a process in which the asphalt, subgrade, and soil are pulverized on-site and mixed with cement to create a new subgrade. The new subgrade is extremely rigid,

durable, and strong. Then a new asphalt surface is placed over the new subgrade. This process takes less time than conventional roadway construction.

• The Department of Public Works, with guidance from the Finance Department, prepared ITB 27-001, which was issued on June 18th, 2026. ITB 27-001 was advertised through the City’s e-procurement site (Bonfire) as well as the Georgia Procurement Registry and resulted in over # vendor (firm) invites and # document takers. ITB 27–001 responses were received on July 16th, 2026 and included bids from seven firms.

• Staff recommends award of ITB 27-001 to C.W. Matthews Contractors as the low-cost, responsive and responsible bidder.

PUBLIC COMMENTS:

• There were no public comments.

 Council Member Reeves offered a motion to award ITB 27-001 FY 27 Milling and Resurfacing to C.W. Matthews Contractors FY 27 Milling and Resurfacing in an amount totaling $4,093,950.56, and to authorize the Mayor to execute all necessary documents.

o Council Member DeRito seconded the motion.

o The motion was approved unanimously (7-0).

E. Microsoft Enterprise Agreement for Software Services with Dell Marketing LP Consideration of approval of the procurement of the Microsoft Enterprise Agreement from Dell Marketing LP for one year, plus two renewal periods that are renewed annually for the amount of $372,391.27 using state contract number 9999-SPD-SPD0000060-0006, and authorize the Mayor to execute all necessary documents.

• Director of Information Technology, Adam Montgomery, came forward to present this item.

• This agreement allows the City to deploy Windows Desktop and Server operating systems, Office 365 applications and systems, SQL Server licenses for database management, mobile device management, and other Microsoft applications and services. This agreement is essential to the operations of the City as it supports all major

systems and departmental functions. This is the first year of an agreement that is renewed annually at a fixed cost for two more years.

• This Microsoft Enterprise Agreement is funded in the fiscal year 2027 budget. A single quote using Georgia statewide contract 99999-SPD-SPD0000060-0006 is provided.

The previous three-year agreement was $290,479.78. This is an increase of $81,911.49. This increase is the result of additional licenses purchased during the current agreement ($21,153.05), announced price increases by Microsoft ($29,849.74), additional Microsoft 365 Copilot licenses ($28,125.00), and a correction of CAL licenses for our G1 users ($2,783.70). These increases were budgeted into the fiscal year 2027 operating budget and are within budget.

PUBLIC COMMENTS:

• There were no public comments.

 Council Member DeRito offered a motion to approve the procurement of the Microsoft Enterprise Agreement from Dell Marketing LP for one year, plus two renewal periods that are renewed annually for the amount of $372,391.27 using state contract number 9999-SPD-SPD0000060-0006, and to authorize the Mayor to execute all necessary documents.

o Council Member Brady seconded the motion.

o The motion was approved unanimously (7-0).

7. PUBLIC COMMENT

• There were no public comments.

8. REPORTS

• There were no reports.

9. EXECUTIVE SESSION (IF NECESSARY)

 Council Member Reeves offered a motion to recess the meeting.

o Council Member Merkel seconded the motion.

o The motion was approved unanimously (7-0).

• Mayor Gilvin recessed the meeting at 8:31 p.m. for the purposes of litigation.

 Council Member Driskell offered a motion to reconvene the meeting.

o Council Member Reeves seconded the motion.

o The motion was approved unanimously (7-0).

• Mayor Gilvin reconvened the meeting at 9:11 p.m.

10.ADJOURNMENT

 Council Member DeRito offered a motion to adjourn the meeting.

o Mayor Pro Tem Merkel seconded the motion.

o The motion was approved unanimously (7-0).

• With there being no further items to consider or discuss, Mayor Gilvin adjourned the meeting at 9:11 p.m.

Respectfully submitted, Lauren Shapiro, City Clerk