City: Alpharetta
Alpharetta City Council regular meeting, August 24, 2026
6:30 PM · 51 pages
These are the minutes as Alpharetta City Council posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Alpharetta City Council.
Records of this meeting
Each link opens the body's own website or meeting portal.
- Minutes2026-08-24 CC Minutes APPROVED (alpharettaga.api.civicclerk.com) · shown on this page
- Video recordingCity Council Meeting & Public Hearing 8-24-2026 (cpmedia.azureedge.net)
Summary
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Council approved the North Point Sports & Entertainment District rezoning and master plan amendment 4-3, with the rental housing tied to an NHL franchise award by August 24, 2031.
The council held a public hearing on a request from Jamestown to redevelop North Point Mall into a mixed-use sports and entertainment district with a 20,000-seat hockey arena, music hall, hotels, office, retail and 1,385 for-rent apartments. After staff presentations, council questions and public comment (8 in favor, 14 in opposition), the council approved the master plan amendment, rezoning, conditional use and variances 4-3 with 74 conditions, including a revised condition 1 that ties the entitlements to the NHL awarding a franchise to the site on or before August 24, 2031. A proposed added condition on tax allocation district bonds was denied by the mover. Earlier, the council approved the consent agenda including prior minutes, and approved a $2,500 opioid settlement sponsorship for a recovery bus tour event 6-0-1.
Topics taken up: North Point Sports & Entertainment District; North Point Mall redevelopment rezoning; NHL arena and hockey franchise condition; for-rent apartment units and concurrency; North Point stormwater park; event parking and traffic conditions; public safety conditions for arena events; GA Recovery Bus Tour sponsorship; public hearing procedures.
Decisions the minutes record (5)
Each decision is followed by the sentence of the minutes that records it, copied word for word.
Approved master plan amendment, rezoning to mixed use, conditional use and variances for the North Point Sports & Entertainment District with 74 conditions, including an NHL award requirement
4-3
The minutes: “Mayor Pro Tem Merkel offered a motion to approve MP-26-06/Z-26-05/CU-26-04/V-26-08 North Point Sports & Entertainment District, subject to the following conditions:”
Proposed added condition 75 requiring voter-approved general obligation bonds for any tax allocation district incremental financing was not added
The minutes: “Council Member DeRito offered a friend amendment to add Condition 75: That requires any use of incremental financing of the TAD that is in place, that any bonds associated to use of those TAD”
Approved a $2,500 Recovery Partner sponsorship to Vision Warriors for the September 10, 2026 GA Recovery Bus Tour event, funded by opioid settlement funds
6-0-1
The minutes: “Mayor Pro Tem Merkel offered a motion to Item B. Sponsorship Approval: GA Recovery Bus Tour Community Event to be held at Brooke Street Park on September 10, 2026.”
Approved public hearing procedure allowing each speaker 3 minutes and extra time for the applicant
7-0
The minutes: “Council Member DeRito offered a motion to extend the opportunity to allow any member of the public to speak for 3 minutes and to provide additional time to the applicant to present their case, if they need it.”
Approved the consent agenda, including prior meeting minutes, without the sponsorship item
7-0
The minutes: “Mayor Pro Tem Merkel offered a motion to approve the consent agenda without Item B.”
Agenda items (10)
Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.
- 1. CALL TO ORDER
- 2. ROLL CALL
- 4. CONSENT AGENDA
- 4. CONSENT AGENDA
- A. City Council Meeting Minutes (Meeting of 08/17/2026)
- B. Sponsorship Approval: GA Recovery Bus Tour Community Event to be held at Brooke Street Park on September 10, 2026
- 5. PUBLIC HEARING
- 6. PUBLIC COMMENT
- 7. REPORTS
- 8. EXECUTIVE SESSION (IF NECESSARY)
- 9. ADJOURNMENT
The minutes
As posted on alpharettaga.api.civicclerk.com, read November 11, 2026. Nothing below is written by Georgia Commons.
1. CALL TO ORDER
• Mayor Gilvin called the meeting to order at 6:30 p.m.
2. ROLL CALL
• Council Members o Mayor Jim Gilvin o Mayor Pro Tem Dan Merkel o T. Kirk Driskell o Katie Reeves o Douglas J. DeRito o John Hipes o Fergal M. Brady
• Staff o Chris Lagerbloom, City Administrator o John Robison, Assistant City Administrator o David Dove, City Attorney o Lauren Shapiro, City Clerk City Council Meeting & Public Hearing
AUGUST 24, 2026
OFFICIAL MINUTES
Office of the City Clerk
ALPHARETTA CITY HALL
COUNCIL CHAMBERS | 2 PARK PLAZA | 6:30 PM
OFFICIAL MINUTES
The public is advised that the following minutes are not a verbatim transcription of business presented at the Council Meeting of the date shown; but are a synopsis of pertinent information. The public is further advised that the video recording for said meeting is a matter of public record and is available to be viewed at the City Clerk’s office during normal business hours or viewed online at https://www.youtube.com/user/alpharettagov.
o Grace Orehosky, Deputy City Clerk o Adam Montgomery, Director of Information Technology o Brad Dekinger, Chief of Fire o Charlie Jewell, Director of Economic Development o Deanna McKay, Public Communication & Engagement Coordinator o Kathi Cook, Director of Community Development o Morgan Rodgers, Director of Recreation, Parks, and Cultural Services o Pete Sewczwicz, Director of Public Works
o Trent Lindgren, Chief of Police o Tom Harris, Director of Finance o Michael Woodman, Planning & Development Services Manager
3. PLEDGE TO THE FLAG
4. CONSENT AGENDA
• Council Member Driskell requested to remove Item B. Sponsorship Approval: GA Recovery Bus Tour Community Event to be held at Brooke Street Park on September 10, 2026 and shared that he will be recusing himself from this item.
A. City Council Meeting Minutes (Meeting of 08/17/2026)
Approval of the City Council meeting minutes from the meeting of August 17, 2026.
Mayor Pro Tem Merkel offered a motion to approve the consent agenda without Item B.
o Council Member DeRito seconded the motion.
o The motion was approved unanimously (7-0).
B. Sponsorship Approval: GA Recovery Bus Tour Community Event to be held at Brooke Street Park on September 10, 2026
Consideration and approval of a $2,500 Recovery Partner sponsorship to Vision Warriors for the September 10, 2026, #GARECOVERS Bus Tour event at Brooke Street Park, with funding from the City's Opioid Settlement Funds.
PUBLIC COMMENTS:
There were no public comments.
Mayor Pro Tem Merkel offered a motion to Item B. Sponsorship Approval: GA Recovery Bus Tour Community Event to be held at Brooke Street Park on September 10, 2026.
o Council Member D seconded the motion.
o The motion was approved (6-0-1; with Council Member Driskell in abstention).
5. PUBLIC HEARING
A. Announcement of Public Hearing Procedures
• City Attorney, David Dove, announced the public hearing procedures.
Council Member DeRito offered a motion to extend the opportunity to allow any member of the public to speak for 3 minutes and to provide additional time to the applicant to present their case, if they need it.
o Council Member Reeves seconded the motion.
o The motion was approved unanimously (7-0).
B. MP-26-06/Z-26-05/CU-26-04/V-26-08 North Point Sports & Entertainment District Consideration of a master plan amendment, rezoning, conditional use and variances to allow for the redevelopment of North Point Mall with a mixed-use development consisting of approximately a 20,000-seat hockey arena, 4,000-seat music hall and performing arts center, 2,000-seat team practice facility and community hockey rink, movie theater, 30,000 square foot hotel conference center, 350-room full-service hotel, 300-room hybrid hotel, 750,000 square feet of office, 565,000 square feet of retail/restaurant, 1,385 ‘For-Rent’ dwelling units, and 26 acres of public parks, plazas and multi-use trails on 98.58 acres in the North Point Overlay. A master plan amendment is requested to the North Point Mall Master Plan to allow for the proposed mixed-use development.
A rezoning is requested from PSC (Planned Shopping Center) to MU (Mixed Use) and a conditional use is requested to allow ‘Dwelling, ‘For-Rent’ use, to increase residential density, and to increase non-residential building height. Variances are requested to Unified Development Code (UDC) Subsection 2.2.20(B)(4) to reduce the minimum percentage of office, UDC Subsection 2.5.4 to increase the distance requirement for off-site parking, UDC Subsection 2.10.3 to modify streetscape
requirements, UDC Subsection 2.10.4 to modify block and access requirements, UDC Subsection 2.10.3(D) to increase residential building height, and UDC Subsection 3.2.2 to allow an encroachment into the Georgia 400 Tree Buffer. The property is located at 0 North Point Drive, 0 Rock Mill Road, 1000 North Point Parkway, and 2000, 4000, 4500, 5000 & 6000 North Point Circle and is legally described as being located in Land Lots 687, 688, 689, 700, 701, 702, 742, and 743, 1st District, 2nd Section, Fulton County, Georgia.
• Planning & Development Services Manager, Michael Woodman, came forward to present this item.
• Director of Community Development, Kathi Cook, came forward to present this item.
• Brian Bolick, Transportation Engineer with AtkinsRéalis, came forward to present this item.
• The applicant, Jamestown, is requesting a master plan amendment, rezoning, conditional use and variances to allow for the redevelopment of North Point Mall with a mixed-use sports and entertainment district consisting of a 20,000-seat NHL hockey arena, 2,000-seat practice/community ice sheets, 565,000 square feet of commercial uses (includes 342,000 square feet existing anchors), 750,000 square feet of office, 1,385 ‘For-Rent’ dwelling units, 1,139-seat cinema, 4,000-seat music hall, 650 hotel rooms, 30,000 square foot hotel conference center, and
• 26.86 acres of open space on 98.58 acres in the North Point Overlay. The proposed residential density is 14.04 dwelling units per acre. A master plan amendment is requested to the North Point Mall Master Plan to modify the development mix and development regulations, and a rezoning is requested from PSC (Planned Shopping Center) to MU (Mixed Use). A conditional use is requested to allow ‘Dwelling, ‘For-Rent’, increase allowable residential density, and increase non-residential building height. Variances are requested to allow the MARTA ELT and multi-use trail in the Georgia 400 buffer; reduce MU office percentage; modify block, access, and streetscape requirements; allow off-site parking greater than 500’ from the property; and increase residential building height. The property is located at 1000 North Point Parkway, 4500 North Point Place, 0 & 5000 North Point Drive, 2000 & 6000 North Point Circle, and 0 Rock Mill Road.
• The request was considered at the August 6, 2026 Planning Commission meeting. There were eight (8) public comments in favor and one (1) in opposition to the request. Those in favor stated
that the Mall is outdated and is in need of redevelopment, proposal aligned with the comprehensive plan, need entertainment, will add foot traffic to the area, increase tax digest, Alpharetta will be a pass through community with a distressed mall if hockey goes to Forsyth, no concern over retail competition, thoughtful development, proposal is an opportunity for the City, office demand is strong in and around mixed-use developments, will bring jobs, place to make family memories, and creating a destination. The speaker in opposition stated that he was on the fence regarding the proposal, with concerns that the proposal is moving too fast, fears of an empty arena with no hockey team, cannibalize retailers from Avalon and other locations in Alpharetta, why tear down the movie theater, why more office is needed, and too far from the airport. After discussion, the Planning Commission recommended approval subject to the staff recommended conditions and accepting a change to condition #15 from the applicant, as well as additional changes from the Planning Commission. Vote 4-3.
• Staff recommends that Mayor and Council approve MP-26-06/Z-26-05/CU-26-04/V-26-08 North Point Sports & Entertainment District, subject to the following conditions:
1. Approximately 98.58 acres shall be zoned to MU and developed substantially similar to the site plan prepared by Kimley-Horn, dated 8/17/26, except as modified by these conditions.
2. Exterior modifications to existing buildings and new buildings shall be consistent with the submitted renderings, with final approval by DRB. Architectural design shall use high-quality materials such as brick, stone, cementitious panels, metal accents, and glazing systems consistent with the EcoDistrict character. Buildings over 7 stories shall be stepped back a minimum 15’ above the 4th story, as approved by DRB. Buildings shall incorporate façade articulation, step-backs, transparency, pedestrian-scale frontage, and architectural consistency across the district, as approved by DRB.
3. Development regulations shall be as follows:
a. Arena & Practice/Community Ice – A minimum 17,500 seat and maximum 20,000 seat arena shall be permitted with a maximum building height of 170’ (as measured from the internal street at the main entrance to the arena). Practice/community ice sheets shall be permitted with a maximum 2,000 seat capacity and maximum building height of 4 stories or 80’, whichever is less.
b. Commercial – Maximum 565,000 square feet of retail/restaurant uses (new and existing) shall be permitted in freestanding and mixed-use buildings. Non-residential uses (retail, restaurant, office, and ‘For-Rent’ amenities) on the ground floor of the ‘For-Rent’ buildings shall not count against the maximum commercial and office entitlements or require additional parking. Freestanding commercial building height shall not exceed 4 stories or 80’, whichever is less. Drive-through restaurants shall not be permitted.
Rooftop and outdoor dining areas shall not count against the maximum commercial entitlement or require additional parking.
c. Office – Maximum 750,000 square feet of office shall be permitted in freestanding buildings no greater than 14 stories or 200’, whichever is less. Additional office shall be permitted when exchanged for commercial, ‘For-Rent’ residential (1,000 SF per unit), or hotel (500 SF per hotel room) entitlements.
d. Hotel – Maximum 650 rooms shall be permitted in two (2) freestanding or mixed-use (limited to retail on the first floor) buildings no greater than 20 stories or 300’ whichever is less. Hotels shall be 4-star (AAA Diamond Program), or higher and similar in quality to a Loews, Curio, or Autograph Collection. Accessory uses shall be limited to restaurant, spa, fitness center and conference space. Minimum 10,000 square feet of conference space shall be provided with a maximum of 35,000 square feet; and shall include a minimum 7,500 square feet of outdoor pavilion space for weddings and other events.
Both hotels shall include on-site full-service restaurants and banquet kitchen capable of serving full-scale events. Hotels shall provide direct pedestrian connectivity to the arena and music hall.
e. ‘For-Rent’ Residential – If the National Hockey League (NHL) awards a franchise team to the North Point site, up to 1,385 ‘For-Rent’ units shall be eligible for an LDP and CO’s based on the available units by year as depicted in the ‘For-Rent’ Request - Recommended CO Year table in this staff report. Up to 2 ‘For-Rent’ buildings may have a building height up to 20 stories or 240’, whichever is less, and all other buildings shall not exceed 7 stories or 90’, whichever is less. ‘For-Rent’ units shall be limited to studio, one (1), two (2), and three (3) bedrooms. A maximum of 65% of units shall be studio or one (1) bedroom and no more than ten percent (10%) shall be three (3) bedroom units. ‘For-Rent’ units shall have first-class amenities, including a pool, fitness
center, secured parking, resident’s lounge, business center, on-site management office and secure elevator access.
Concurrency: 600 ’For-Rent’ units shall be eligible for CO after building permits are issued for a minimum of 300,000 square feet of retail (including retail anchors, new retail, restaurants, and a minimum 3,500 square foot neighborhood grocery) and the cinema. A CO shall not be issued for the remaining ’For-Rent’ units until the arena super structure (foundation, all supporting steel and concrete), 350,000 square feet of office, and internal section of Alpha Loop is constructed and shall be eligible for a CO based on the available units by year as depicted in the ‘For-Rent’ Request – Recommended CO Year table in this staff report.
Reversion: If construction does not commence on the ‘For-Rent’ units by August 24, 2031, or if the NHL does not approve a hockey team at the site before August 24, 2031, then zoning entitlements shall revert to current zoning of the property.
f. Other Uses – A performing arts or music hall with a maximum seating capacity of 4,000 seats shall be permitted in a building with a maximum height of 80’. A cinema with a maximum seating capacity of 1,139 seats shall be permitted in a building with a maximum height of 80’.
g. Parking Decks – Maximum height shall not exceed 7 stories or 95’, whichever is less.
Parking decks visible from North Point Circle or Georgia 400 shall be treated with comparable materials and finishes as the building they serve and/or screened from view with evergreen landscaping. Suitability of parking deck elevation, visibility and landscape screening shall be approved by the DRB.
4. Active uses, including retail, restaurant, office and ‘For-Rent’ amenities, shall be required in all ‘For-Rent’ buildings and located on the ground-floor space along storefront streets and shall have a minimum first floor height of 14’ and depth of 30’, as approved by Staff.
Ground-floor residential units shall have individual walkouts connecting to the sidewalk system.
5. The Master Plan area shall be limited to the following uses and further restricted by conditions of zoning:
a. Arena and Indoor Practice/Community Ice Sheets
b. Retail
c. Restaurant
d. Office (professional, medical and research and development)
e. Hotel (boutique hotel and hotel)
f. Residential (‘For-Rent’ and ‘For-Sale’)
g. Performing Arts/Music Hall
6. Uses shall be customarily accessory to or amenities for residential, office, and sports and entrainment uses, limited to the following:
a. Amphitheater
b. Animal Hospital, Small Animal
c. Art Gallery
d. Athletic Facility
e. Auditorium
f. Automotive Sales Showroom (limited to one (1) not to exceed 5,000 SF and outside car storage display limited to no more than 5 vehicles)
g. Bakery
h. Bank
i. Barber Shop
j. Beauty Shop
k. Book Store
l. Bowling Alley
m. Brewery or Distillery
n. Dance and Fitness Studio
o. Day Care Facility
p. Drug Store (Pharmacy)
q. Dry Cleaning, Pick-up Station
r. Florist, Retail without Greenhouse
s. Golf, Miniature and Driving Range
t. Grocery Store
u. Hardware and Garden Supply Store
v. Home Improvement Store
w. Museum and Libraries
x. Nail Salon
y. Park and Playground
z. Pet Grooming and Pet Day Care aa. Public Building bb. Recreational Facilities, Indoor and Outdoor cc. Restaurant (no drive-thru) dd. Retail Sales and Services Establishment ee. School, Academic and Commercial ff. Shop or Studio, Craftsman/Artist gg. Spa Services (conditional use) hh. Special Event Facility (conditional use) ii. Theater, Cinema jj. Vertiport
7. Minimum 26.86 acres of open space (21.24 acres of civic space and 5.62 acres of amenity space), consisting of squares, plazas, multi-use trails, park, yards and lawns, patios and balconies, outdoor dining, sports court, pocket parks, and pool courtyards and amenity areas shall be provided as depicted on the submitted renderings and site plan prepared by Kimley-Horn, dated 8/17/26.
Design Conditions:
8. Developer shall provide a detailed street planting plan for North Point Circle and new private streets, including landscape theme with overstory shade trees, mid-story shade trees, ornamental trees, evergreen trees and shrubs to be planted throughout the District. The theme shall include flowering trees and shrubs of similar color with varying bloom times, as approved by DRB. Landscape plan shall be approved prior to issuance of an LDP.
9. Minimum 10’ landscape strip shall be required along North Point Circle adjacent to the proposed development.
10.Minimum size of tree planter pits shall be 100 SF and planted with shrubs and/or groundcover, as approved by Staff. The edge of planting pits for overstory shade trees shall be a minimum of 15’ off the face of the building and or any architectural features such as balconies or overhangs. The edge of planting pits for mid-story shade trees shall be a minimum of 10’ off the face of the building and or any architectural features such as balconies or overhangs. The edge of planting pits for ornamental trees shall be a minimum of 5’ off the face of the building and or any architectural features such as balconies or overhangs. Tree planters shall be delineated with physical barriers. Planters located within pedestrian gathering and activation areas shall be designed to contribute to the activation of the spaces through the incorporation of seating, standing tables, ledges, or similar amenities.
11.Developer shall provide EcoDistrict measures with each phase of development in compliance with the North Point Overlay. Detailed information shall be provided at LDP and building permit showing compliance with the requested EcoDistrict measures. Total EcoDistrict points to be confirmed by Staff.
12.Developer shall improve the stormwater park on its property, including trails, landscaping and overlook, as depicted on Page 20 of the staff report. The northern half of the stormwater park shall be improved prior to a CO for the 1st ‘For-Rent’ building and remaining portion of the stormwater park is improved prior to a CO for the 2nd ‘For-Rent’ building, as approved by Staff. Upon completion of each of the northern half and the remaining portion, the tract shall be dedicated to the City, other than the detention ponds themselves and waterways which feed it. The City shall be responsible for the structural repairs upon dedication, and the developer shall be responsible for daily maintenance. Developer and
other pond owner shall remain solely and exclusively responsible for maintenance of the detention ponds and waterways which feed it. The cost of the construction of such improvements shall be eligible for park impact fee credits.
13.Minimum 8 public art installations shall be provided at prominent locations throughout the development, with unique murals and sculptures approved by Cultural Arts Commission (CAC). Public art shall include sculptures, murals, water features, EcoDistrict monuments and District Thresholds, and other similar improvements approved by Staff. Approval and construction of at least 1 public art installation shall be required concurrent with the 1st CO for a ‘For-Rent’ building. A minimum of 1 additional public art installation shall be required concurrent with the issuance of each CO. All sculptures shall be required prior to final CO issued for the last building constructed. Public art installations shall be privately maintained.
14.Minimum 2,500 square feet civic space shall be developed at the corner of North Point Circle and North Point Drive and North Point Circle and North Point Center East. Civic space shall include decorative hardscape, landscape, and public art. Open space, including improvements, shall be privately maintained.
15.Developer shall provide an interactive water feature in a location, as approved by Staff.
This improvement shall count toward the required public art installations.
16.Per the developer, the North Point Mall carousel shall be saved and incorporated into the development.
17.Retaining walls shall receive architectural façade treatment and be heavily landscaped.
Retaining walls visible from developed areas exceeding 16’ in height shall be terraced with landscaping to break up large expanse of retaining wall.
18.Applicant shall provide a dedicated space within the North Point Sports & Entertainment District for a Georgia Tourism visitor kiosk to be operated in coordination with the Georgia Department of Economic Development, Explore Georgia, or their authorized partner. The visitor kiosk shall be located in a high-visibility, publicly accessible area of the development, such as the primary plaza, event promenade, or other location approved by the City and Developer and shall be integrated into the pedestrian circulation network. The kiosk easement area shall be a minimum of 150 square feet and shall include connections for electrical service, lighting, and data/communications, as well as necessary weather
protection if located outdoors. Alternatively, the developer can provide Georgia Tourism space within the arena structure to be operated by Explore Georgia.
19.Developer shall provide bicycle racks, benches, trash receptacles, decorative crosswalks, planters, kiosks and other street furniture, where appropriate, throughout the development.
20.Prior to LDP, developer shall submit for DRB approval a document titled, ‘North Point Sports & Entertainment District Design Standards’. This document shall include elevations or architectural themes, street amenities and furnishings consistent with the North Point Design Guidelines, streetscape and alleyway standards, entrance treatments at the intersections of North Point Circle and North Point Drive and North Point Center East, signage, storefronts, and landscaping which shall be substantially similar to the information contained in the 2026 public hearing application. This condition shall be satisfied upon approval by DRB.
21.Signage visible from the public right-of-way or from neighboring properties shall comply with a DRB-approved Master Sign Package defining sign styles, illumination, materials, and placement. Signage not visible from the public right-of-way or from neighboring properties shall not be subject to the City’s sign regulations but shall be considered in the Master Sign Package. Signs mounted or affixed to a building shall appear integral to building design.
Off-premises signage shall be prohibited, except in areas of the district that are not subject to the City’s sign regulations and in existing off-premises sign easements in existence at the time of this master plan amendment. Off-premises signage in an existing sign easement shall comply with the North Point Creative Placemaking Monuments and District Thresholds, as approved by Staff.
22.Awnings, or similar overhead structures, shall be provided at the ground level in commercial areas where reasonably appropriate in order to protect pedestrians from inclement weather.
23.Development shall include at least 2 rooftop amenities within the non-residential portion of the development.
24.Developer shall prioritize the orientation of ‘back of house’ functions, such as delivery service areas, loading areas, and refuse enclosures away from view from the right-of-way, as approved by DRB. Service areas and loading areas shall be screened from public areas and separated from the primary vehicular and pedestrian circulation areas, as approved by DRB.
25.Developer shall install all utilities and transformer systems underground, except that transformers shall be permitted at-grade if screened, as approved by Staff. To the maximum extent possible, all water/sewer utilities and grease traps shall be installed within service alleyways. All mechanical systems must be screened in a manner that is architecturally comparable to the buildings they are associated with. Any necessary above-ground utility systems shall be screened, as approved by Staff.
Transportation:
26.The arena shall be designed with a pick-up and drop-off area, with final approval by Staff.
27.New streets and alleys shall be private and shall be consistent with the streetscape exhibits prepared by Kimely-Horn, dated 7/29/26, with modifications in final design and permitting, as approved by Staff. Developer shall coordinate with the City and County on any necessary intergovernmental and development agreements for new or existing utilities within streets and alleyways.
28.Enhanced pedestrian crossings and bicycle connections shall be provided throughout the site, including between buildings and open space within the development; and across North Point Circle. Enhanced pedestrian crossings within the development and across the development shall be designed and constructed of materials, such as brick pavers, cobblestones, or architecturally treated concrete products, as approved by DRB. Off-site pedestrian and bicycle connection improvements shall be eligible for impact fee credits.
29.Pedestrian bridges, stairs, elevators and escalators within the site may encroach over and into public spaces provided that they do not impede pedestrian circulation or safety, as approved by Staff.
30.Developer shall construct the Alpha Loop through the site and located within the Loop Road as depicted on the site plan prepared by Kimley Horn, dated 8/17/26. Design shall include landscape separation from storefronts sidewalks with curb, trees, and/or landscaping. The design and construction of the portion of the Alpha Loop to provide connectivity to a pedestrian bridge/ELT stop will be conducted in coordination and after the pedestrian bridge/ELT stop are constructed. A bike share station shall be required along the Alpha Loop with final location and design approved by Staff. Alpha Loop improvements shall be eligible for impact fee credits. Alpha Loop width shall be 15’ through the site.
31.In coordination with MARTA, developer shall upgrade 2 existing bus stops with MARTA bus shelters and will work with MARTA to explore any bus stop consolidations along property frontages. Applicant shall apply for the True North 400 CID bus shelter program.
Expenditures not reimbursed by the CID shall be eligible for impact fee credits.
32.Minimum parking requirements shall be as outlined in the parking study prepared by Kimley-Horn, dated 7/21/26.
33.Prior to the issuance of an LDP, preliminary on-site and off-site Parking Agreements shall be submitted, reviewed, and approved by Staff. Final recorded Parking Agreements shall be provided prior to a CO for the arena. Developer shall coordinate to have submitted Parking Agreements incorporate off-duty officer presence during special event programs to help manage traffic demands, as approved by Staff. Parking Agreements approved by Staff may require additional privately paid licensed security professionals or traffic control professionals, as determined by Alpharetta Police.
34.Developer shall work with the City, MARTA and GDOT to collaboratively explore, design, and create an Express Lane Transit (ELT) station and mobility hub along GA-400 and within the site, as well as pedestrian bridge accessibility options from the ELT station to the site.
Factors to be explored and designed include dedicated space for future micromobility options and universal accessibility capabilities that will assist with improving future transportation mobility services for employees, citizens, and visitors alike.
35.Prior to LDP, special/major event transportation management plans shall be coordinated with City Staff and submitted for review and approval. Developer shall submit a comprehensive traffic and access management plan—coordinated with City Police, Fire, Public Works & Community Development Departments—detailing phased road closures, reroutes, and dedicated emergency lanes for events.
36.Developer shall construct an exclusive southbound right-turn lane along Mall Access B Driveway at the intersection with North Point Parkway, creating one exclusive through lane and one exclusive right-turn lane, as approved by Staff.
37.Developer shall increase the eastbound left-turn storage length at North Point Parkway and Encore Parkway/Private Driveway (Intersection 8). Work with city staff to determine the
length of additional storage required and at which phase of development it must be completed.
38.Developer shall channelize the southbound right-turn movement to create free flow at Haynes Bridge Road and North Point Drive.
39.Developer shall upgrade signal heads on the northbound and southbound approaches to Flashing Yellow Arrow (FYA) to allow protected-permissive phasing by time of day at Mansell Road and North Point Parkway/Resurgens Park Place. Restripe the southbound shared through/left-turn lane to be an exclusive through lane and remove split phasing and provide dual entry for the northbound and southbound approaches.
40.Developer shall construct and/or install traffic control measures as identified in the event Traffic Management Plan. These may include dynamic lane assignment signs used to change lane rules during events, informational signage to guide motorists or pedestrians during events, or other traffic control measures, as approved by Staff.
Fire & Police Departments:
41.Emergency access shall be maintained at lane and including during large-scale events, temporary street closures, and traffic control operations through approved operational planning and coordination with Fire and Police Department.
42.Any proposed street closures, event operations, or traffic control measures affecting fire apparatus access shall be subject to Fire Department review and approval.
43.Evacuation & Emergency Plans: Developer/operator shall develop an event evacuation program, including interior occupant load analysis, egress signage and drills. Incorporate protocols for fire, medical emergencies, severe weather, and crowd surges. Event operations shall include provisions for fire department access, staging, and incident command. Plans shall be reviewed and approved by the Fire Department prior to occupancy and updated periodically.
44.The Fire Department may require Fire Safety Officers (FSOs) for events based upon occupancy load, event type, operational complexity, temporary structures, special effects, pyrotechnics, fire and life safety system impairments, impaired fire access, crowd
characteristics, or other life safety considerations. Fire Safety Officer staffing levels shall be determined by the Fire Department and shall be funded by the developer/operator.
45.Developer shall design and dedicate emergency access easements for critical fire apparatus access routes and emergency operational areas throughout the development to preserve long-term emergency access capabilities and unobstructed routes for first responders.
46.Developer shall conduct a Standards of Coverage study that evaluates anticipated emergency response times and public safety service levels for both Fire and Police Departments. Assessment findings to be used to inform coordination between the project team and the Fire and Police Departments. Information from the findings may also require additional dedicated fire access lanes and a minimum of 7,500 square feet within a planned building for one-bay fire truck/station.
47.Removable or retractable bollards utilized within pedestrian or event-controlled areas shall be required and approved by the Fire Department and equipped with Knox locking systems or other approved emergency access controls.
48.A Public Safety Substation designed to support multi-agency emergency operations during planned events and emergency incidents shall be required within the arena structure.
Minimum 650 square feet shall be provided. The Public Safety Substation can be shared with onsite property security operations center. Consideration should be given to inclusion of restroom facilities, communications infrastructure, building system interfaces, and direct access to life safety system controls necessary to support extended operational periods.
Additionally, 2 holding cells shall be provided on site for Alpharetta Police access.
49.All systems identified as Special Inspections, including but not limited to smoke control, smoke evacuation, and stair pressurization systems, shall require third-party review, testing, and certification in accordance with the International Building Code and applicable NFPA standards. Documentation of certification shall be provided to the Authority Having Jurisdiction (AHJ) prior to final acceptance. Third-party inspections and texting may supplement but shall not replace Fire Department review, witness testing, operational approval authority, or final acceptance responsibilities of the AHJ.
50.A third-party fire protection and life safety engineering review shall be conducted prior to formal plan submittal to the AHJ for the arena. This review shall evaluate life safety systems,
egress design, smoke control strategy, and overall code compliance, and documentation shall be provided as part of the plan review process. All other structures on the site may be handled by AHJ unless otherwise dictated.
51.Site design shall support incident command operations, staging areas, and emergency vehicle circulation.
52.Prior to issuance of a CO for the arena, Developer/Operator shall enter into a Private EMS Operations Agreement with the City, approved by the Fire and Police Departments, establishing minimum staffing levels, certification requirements, equipment standards, and coordination protocols for private EMS coverage at all arena events. The terms of such agreement shall be enforceable by the City through the development agreement and shall not be subject to automatic expiration.
53.Developer/Operator shall create a Public Safety Liaison Committee comprising developer, APD, fire, EMS, and Traffic staff to meet quarterly during design/construction and continue once the arena is operational.
54.Developer/Operator shall provide quarterly incident reports summarizing public safety incidents, emergency responses, and lessons learned. Implement improvement actions required by public safety staff within 60 days; document progress for City review.
55.Developer/Operator shall implement a shared mobility strategy to reduce surface lot density and traffic congestion on adjacent arterials, as approved by Staff.
56.Developer/Operator shall install a network of HD CCTV cameras covering reasonable public entry points, plazas, parking and loading zones, with at least 30-day image retention and integration into the Public Safety Services network.
57. Developer/Operator shall provide a security plan specifying a minimum number of one (1) licensed security professionals per 1,250 attendees covering ingress, egress and potential crowd hot spots, subject to approval by the Police Department. Security professionals shall be paid by private developer/operator.
58.Developer/Operator shall enter into a first-responder partnership agreement mandating event-level coordination with APD, including pre-event briefings, real-time radio access, and on-site staging for response teams during Arena events. A coordinated Public Safety &
Emergency Operations Plan must be approved prior to opening the arena and updated annually thereafter and include:
a. Police staffing and traffic enforcement
b. Fire/EMS staging and medical response
c. Crowd control and evacuation planning
d. Monitoring protocols for pre-, during-, and post-event activity Other Conditions:
59.Developer shall dedicate a 20’ utility easement to Fulton County Government for an existing 16” water main within the North Point Circle right-of-way.
60.Developer’s on-site construction trailer(s) shall provide office space for a minimum 2 City employees (1 land development inspector and 1 building inspector) for the duration of construction.
61.Developer shall be responsible for planting and maintenance of any medians within the development and for medians located on North Point Circle or the Access Roads.
62.Developer’s financial responsibility for offsite and stormwater park improvements shall not exceed its impact fees, nor shall credits be given for meeting minimum EcoDistrict and open space requirements.
63.It is acknowledged that the approved site plan may be subdivided into separately platted parcels with individual tax numbers, that the separate development parcels are to be developed by separate owners/developers, and that the public amenities are to be platted and owned by the Developer. Zoning compliance for conditions uniquely applicable to an individual owner’s parcel will be the responsibility of that owner and that non-compliance by such an owner does not render, by itself, the remaining parcels “non-conforming” uses under the Zoning Code.
General Conditions of Approval to GTEA Development of Regional Impact Notice of Decision, dated 7/31/26:
Bicycle, Pedestrian & Transit Facilities:
64.Ensure multimodal connections between all uses and work with the City of Alpharetta to determine safety mitigations for the internal road network.
65.Provide on-site pedestrian routes that are clearly delineated and appropriately marked to alert both drivers and pedestrians.
66.Provide pedestrian connections to the Alpha Loop trail system, as noted on the DRI site plan.
67.Consider best practices that allow for the prioritization of transportation alternatives; at a minimum the following should be included: pedestrian and bicycle facilities, transit accommodations, traffic calming, and green infrastructure.
68.Coordinate with MARTA, GDOT, and the City of Alpharetta to connect the GA 400 Rapid Transit to the DRI site via the proposed pedestrian bridge and ensure all stakeholders are involved in the design and implementation of the project.
69.The proposed pedestrian bridge for the GA 400 rapid transit station shall provide a direct site connection that ensures adequate and safe access to the DRI site, as noted on the site plan. Coordinate with MARTA during design and construction to identify preferred site access.
70.Evaluate the feasibility and consider implementing a bus stop that is internal to the site.
Consideration shall require coordination with MARTA to identify location accessibility, design, and accommodations within the internal circulation and network.
General Georgia Department of Transportation (GDOT) Conditions:
71.GDOT reserves the right to determine driveway access based on compliance with GDOT standards, safety analysis, neighboring conflicts, and any other circumstance needing consideration on all state routes based on GDOT’s most up-to-date regulations.
72.Any access to GDOT right of way will be determined at the time of permitting when submitted with a design.
Encore Parkway at North Point Center/Private Driveway (Intersection 9):
73.Construct an exclusive northbound right-turn lane along Encore Parkway, creating one exclusive through lane and one exclusive right-turn lane.
74.Construct an exclusive westbound left-turn lane along North Point Center, creating one exclusive through lane and one exclusive left-turn lane.
• The property is zoned PSC and MU, subject to the North Point Mall Master Plan. Surrounding properties are zoned PSC, with properties to the south and west subject to the North Point Mall Master Plan and properties to the north and east subject to the North Point Business Center Master Plan. Surrounding properties include Sonesta ES Suites to the northeast, a regional stormwater facility to the east, various commercial outparcels to the south, Encore Commons office buildings to the west and Georgia 400 to the north. The comprehensive land use plan designation of the property is ‘Mixed Use’, which supports the applicant’s proposed mixed-use development.
• The North Point Mall Master Plan (MP-90-04) was approved on March 19, 1990, allowing a 1,392,132 square foot regional shopping mall and commercial outparcels on 100 acres. As shown in the table below, the Master Plan has been amended on a few occasions, including amendments to allow creative office space (SPACES) inside the Mall and redevelopment of the Sears anchor with a new mixed-use development. The later approval allowed 300 ‘For-Rent’ units, freestanding commercial and open space, of which the units reverted to 300 ‘For-Sale’ units in 2022. The current master plan amendment, if approved, would significantly expand the redevelopment efforts at North Point Mall and would result in the removal of nearly all of the Mall and/or repositioning of existing retail. The Dillard’s and Von Maur buildings will remain, as will the parking deck.
• A rezoning is requested for 98.58 acres from PSC to MU and a conditional use is requested to allow ‘Dwelling, ‘For-Rent’ Residential’ use and to increase residential density. The subject property is located within Priority Area 1 on the North Point LCI Density Priority Map, which is designated in the North Point Overlay as an appropriate area for higher densities. The North Point Overlay allows City Council to authorize residential densities over the maximum density permitted in the underlying zoning district, of which the MU district has a maximum density of eight (8) dwelling units per acre. The applicant requests a residential density of 14.04 dwelling units per acre. Criteria to be considered with the conditional use include conformance with the North Point LCI, Comprehensive Plan, and other relevant planning studies; Alpharetta rental housing study; EcoDistrict measures; impact on public health, safety, and welfare; and other considerations deemed material to the application by City Council. In addition, a conditional use is requested to increase the maximum non-residential building height from four (4) stories and 60’, whichever is less, to twenty (20) stories. Adjacent properties to the east and west are
subject to the North Point Business Center Master Plan, which allows building heights up to 20 and 30 stories. The applicant is requesting the following building heights:
• The applicant’s requested variances to the Unified Development Code (UDC) are outlined in the table below. The applicant points to the exceptional conditions pertaining to the property due to its size, shape, and topography, as well as peculiar conditions which require redevelopment of a regional mall and shorter building heights than the building heights allowed on adjacent properties.
• The applicant’s mixed-use sports and entertainment proposal represents a reduction in retail combined with the introduction of residential, office, hotel, sports and entertainment uses, and open space.
• There are many examples across the country, as well as in the Atlanta metro, of major league sports developments. The Battery, home to Truist Park and The Braves, is considered a significant financial and operational success, serving as the standard for sports-anchored, mixed-use developments. The Battery draws roughly ten (10) million visitors annually and generates near-capacity leasing. Truist Park has a seating capacity of approximately 41,500, which is considered a mid-sized stadium in Major League Baseball. For comparison, the applicant’s NHL hockey arena would have a maximum seating capacity of 20,000 seats. The Battery consists of 74 acres developed with two (2) hotels with 656 hotel rooms, approximately 500,000 square feet of retail and entertainment uses, 1.6 million square feet of office, and 1,033 ‘For-Rent’ units. The Gathering proposal in Forsyth County was approved with 500 hotel rooms, 600,000 square feet of retail and entertainment uses, one (1) million square feet of office, and 1,800 ‘For-Rent’ units. Every mixed-use development with a major league arena included a hotel or future hotel, and most included retail, entertainment, office, and ‘For-Rent’ units. The sports-anchored mixed-use developments listed below had an average of 1,822 ‘For-Rent’ units.
• Staff researched mall redevelopments across the country to find comparisons to the applicant’s proposal, as shown in the table below. Mall redevelopments had an average size of 61.8 acres and included an average of 1,600 ’For-Rent’ units with an average density of 29.9 dwelling units per acre (du/ac). The nearest developments to the applicant’s proposal are Gwinnett Place Mall with 3,800 ’For-Rent’ units, North Dekalb Mall with 1,700 ‘For-Rent’ units, Lakeshore Mall (Gainesville, GA) with
652 ‘For-Rent’ units, and Georgia Square Mall (Bogart, GA) with 1,138 ‘For-Rent’ units. The applicant’s ‘For-Rent’ request is less than the average at the mall redevelopments and the proposed residential density (14 du/ac) is significantly less than the average in the table.
• The submitted site plan depicts redevelopment of the 98.58-acre property with a mixed-use sports and entertainment district. A 20,000-seat NHL hockey arena, 4,000-seat music hall, 350-room full-service hotel with 30,000 square foot conference center, and structured parking deck are depicted in the northeast quadrant of the site. A 2,000-seat practice and community ice facility, 1,139-seat cinema, 300-room hybrid hotel, retail uses, vertiport and structured parking decks are depicted in the northwest quadrant of the site. The Von Maur, Dillard’s, structured parking deck and surface parking are depicted to remain in the southwest quadrant with the addition of an office building over retail uses. The southeast quadrant includes five (5) ‘For-Rent’ residential buildings with retail uses on the ground floor, as well as an office building over retail, and parking decks. Retail uses amount to 565,000 square feet, of which 342,000 square feet is located in existing anchor buildings to remain. The two (2) office buildings will consist of approximately 750,000 square feet. Access to the property will continue by way of the existing street network (North Point Circle, North Point Drive, and North Point Center East) and the driveways currently serving the Mall. North Point Circle is proposed to remain in its current configuration. A future MARTA ELT (express lane transit) stop is proposed at the Mall property with an elevated connection, or pedestrian bridge, provided from the center of Georgia 400 over to the property. The pedestrian bridge would function as a future alignment of the Alpha Loop, which is depicted traversing the site to the south and west connecting to North Point Parkway, as well as to Encore Parkway by way of the primary storefront street and North Point Center East.
• The sports and entertainment district is situated along a primary east-west storefront street, which bisects the property from north to south and provides a direct connection between North Point Drive and North Point Center East. The tallest buildings, consisting of two (2), maximum twenty (20) story residential towers, two (2), maximum twenty (20) story hotels are situated in the middle of the development along the primary storefront street. Building heights reduce as the development spreads outward toward North Point Circle. Several secondary streets are proposed throughout the development providing a network of connections between the primary storefront street and North Point Circle. Sidewalks are depicted throughout the development along both sides of the primary storefront street and along secondary streets. The Alpha Loop multi-use trail is depicted connecting to the district by way of the future MARTA ELT connection on Georgia 400 in the northeast corner of the site, as well as from North Point Center
East on the west side of the site. The Alpha Loop runs along the north side of the primary storefront street providing a connection between the ELT station and Encore Parkway. Another Alpha Loop connection is depicted between the ELT station and running south through the property along a secondary street to North Point Parkway. If approved, the connection to North Point Parkway should run along the frontage of the future Stormwater Park.
• The site plan depicts 26.86 acres, or 27.2% open space, of which 21.24 acres (21.55%) is civic space and 5.62 acres (5.70%) is amenity space. Civic space includes squares, plazas, pocket parks, park, and multi-use trails. Amenity space includes outdoor dining, rooftop decks, yards and lawns, enhanced hardscape, balconies, and pool areas. The North Point Overlay requires a minimum five percent (5%) of the site acreage as amenity space and a minimum ten percent (10%), plus one percent (1%) for each one (1) unit/acre over eight (8) units/acre of the site acreage as civic space. A conditional use is requested to increase density to 14.04 units/acre. Therefore, the minimum civic space requirement is 16.05%, of which the applicant’s proposal exceeds the minimum requirement. Because the mixed-use sports & entertainment district is so large, it is difficult to visualize the size and functionality of the open spaces that will be open to the general public. The table below compares the most notable open spaces on the applicant’s site plan to similar open spaces at local or known locations. In particular, the three
(3) acre main Event Plaza is over double the size of the same open space at The Battery and approximately 25% larger than the same open space at Mercedes Benz Stadium.
• Impacts to trees will be minimal given that the proposal represents redevelopment of an existing regional shopping mall and surface parking lot. Stormwater facilities are not depicted on the applicant’s site plan; however, a regional stormwater facility exists to the east of the property and is proposed to be improved as a multipurpose stormwater park.
• The MU zoning district development regulations require a minimum 25% residential use, minimum ten percent (10%) commercial use, minimum 25% office-institutional use, and a minimum open space. The applicant provided the table below, reflecting the percentage of each use in their proposal. The applicant is requesting a variance to reduce the office percentage given that the adjacent properties to the west are developed with approximately 562,000 square feet of office buildings.
• The site plan depicts approximately seven (7) parking decks, which includes the existing parking deck adjacent to Dillard’s. In addition, the existing surface parking lot surrounding Von Muar and Dillard’s will remain. A total of 8,752 parking spaces are proposed on-site for the development, which does not
include off-site parking agreements associated with the arena. The UDC requires 14,450 parking spaces for all uses in the proposed mixed-use development, which includes the required twenty percent (20%) parking reduction in the North Point Overlay. When events are not occurring at the arena, the required parking drops to 8,850. The applicant is requesting a shared parking reduction of approximately one percent (1%) in order to comply with the minimum parking requirements during typical mixed-use operations.
• The applicant submitted a shared parking study prepared by Kimley-Horn. The study concludes that under typical mixed-use operations (no arena events), parking demand is estimated to peak at approximately 7,375 spaces during the recurring peak condition when the arena is not in use. The study appropriately assumes that residential and hotel parking will be accommodated in dedicated or nested parking areas. During arena events, total parking demand will be higher and will be managed through a combination of on- and off-site parking agreements, employee parking management, and shuttle operations. According to the City’s sports and entertainment consultant, CAA ICON, it is estimated that the arena would be utilized for approximately 96 events/year, which includes 41 NHL home games during the regular season. The study notes that there are approximately 10,000 additional parking spaces located within a fifteen (15) minute walk of the arena, which provides a substantial off-site parking resource during major events.
• For a comparison, staff looked at the parking operations at Ameris Amphitheater. Ameris has a capacity of 12,000 seats, requiring a total of 4,200 parking spaces (parking ratio: 1 space/4 seats + 1 employee space/10 seats). A total of 2,674 parking spaces, or 63%, are provided on-site with the remaining parking provided at off-site locations on surrounding or nearby properties.
• The applicant provided a phasing plan, which contemplates renovation and an addition to the Von Maur building before demolition of the Mall, except for Dillard’s and the parking deck. AMC would be the last building to be demolished. Phase 1 construction activities are depicted to include buildings along the primary storefront street, including an office building over ground floor retail, hybrid hotel over ground floor retail, cinema, two (2) residential buildings, and parking decks. Phase 2 is depicted to include the full-service hotel, a residential building, arena, practice/community ice, and parking decks. The music hall, parking deck with vertiport, office building over ground floor retail, two (2) residential buildings, and parking decks will complete the mixed-use sports and entertainment development in Phase 3.
• Careful consideration should be given to maintaining a balance between ‘For-Rent’ versus ‘For-Sale’ product in the City. The Horizon 2040 Comprehensive Plan identifies the following policy as it relates to maintaining a balance of ‘Owner-Occupied’ versus ‘Renter-Occupied’ housing in the City:
o Housing Policy 2: Maintain a balance between ‘owner-occupied’ and ‘renter-occupied’ in Alpharetta such that at least 68% of the housing stock is ‘owner-occupied’.
• There are several factors that should be considered with requests for apartments, such as mix of uses, design, long-term viability, impacts to City facilities and services, as well as traffic and school impacts. Office space already exists, or is proposed, within the LCI and high-density housing should be tied to office space where jobs exist and are created, and service uses are available to limit vehicular trips. The 561,575 square feet of existing office (Encore Commons) and 750,000 square feet of new office would generate approximately 5,246 employees (1 employee per 250 square feet) to support the proposed mixed-use development.
• The City’s Rental Housing Study (updated May 2025) recommends an annual target entitlement of approximately 149 ‘For-Rent’ units per year in order to achieve Housing Policy 2, as stated above. While the minimum 68% ‘owner-occupied’ housing policy is included in the Horizon 2040 Comprehensive Plan, the annual target recommendation is not an approved City policy.
The latest US Census American Community Survey 5-year estimate (2019 – 2023) reflects that the City is at 68% owner-occupied housing units, which complies with Housing Policy 2. As shown in the table below, 915 ‘For-Rent’ units have been approved since 2021.
• The applicant proposes 1,385 ‘For-Rent’ units over five (5) buildings. As shown in the table below, Certificate of Occupancy’s (CO’s) for the applicant’s ‘For-Rent’ units could be recommended through 2034. Two (2) ‘For-Rent’ buildings are proposed to be up to twenty (20) stories with the remaining ‘For-Rent’ buildings proposed to be up to seven (7) stories. All ‘For-Rent’ buildings will have attached, structured parking decks and on-site amenities. Ground-floor active uses (retail, office, and amenities) are required along storefront streets and ground-floor dwellings are limited to non-storefront streets. Residents will have access to dedicated covered parking and amenities, such as a pool and private outdoor amenity areas. The applicant proposes a mix of studio, one (1), two (2), and three (3) bedroom units. If the City decides to allow future ‘For-Rent’ approvals, a condition is recommended limiting CO’s to be in line with the recommended CO year in the table below.
• The applicant is requesting 750,000 square feet of office within the mixed-use development.
Alpharetta has approximately 21 million square feet of office space across 250 buildings with a citywide vacancy rate of 22.1%. Vacancy is not evenly distributed. Lower‑vacancy districts (Table 12 below) such as Downtown Alpharetta (9.2%), Avalon (10.9%), and Northwinds/Lakeview Park/GA‑400 Center (14%) consistently demonstrate strong performance, reflecting modern tenant preference for walkable, mixed‑use environments with dining, hospitality, and entertainment nearby. Higher vacancy is concentrated in older, auto‑oriented suburban office parks, including Brookside (36%), Great Oaks Way (38.1%), and legacy North Point office inventory (25.5%). These buildings were largely constructed in the late 1980’s and early 1990’s and have reached ages where substantial reinvestment is needed to maintain competitiveness.
• The Horizon 2045 Comprehensive Plan identifies North Point as the single-most important redevelopment opportunity in Alpharetta. Public engagement confirmed strong alignment: 77% of survey responses directed future investment toward North Point, and community input emphasized the need for entertainment, placemaking, public spaces, and mixed‑use development within the district. The Plan states that North Point should be repositioned as a regional center differentiated from Avalon and Downtown, supported by walkability, connectivity, mixed‑use employment, and regional‑draw uses including entertainment.
• The Comprehensive Plan further notes that visits to North Point have declined by 38% since 2019 and that a substantial share of the district’s office buildings—many now more than 30 years old—are approaching reinvestment or repositioning thresholds. The proposed office program at North Point does not compete with these older districts. Instead, it aligns with Plan directives to support appropriately located mixed‑use employment centers, retrofit suburban office areas with amenities, and designate major GA‑400 entranceways—including North Point Parkway—for office growth. Mixed‑use office integrated with hotel, conference, entertainment, trails, and transit responds directly to the plan’s finding that tenants prefer amenity‑rich environments and that new office supply in such districts attracts net‑new demand.
• The Plan’s Economic Resilience & Office policies reinforce Alpharetta’s 21‑million‑square‑foot office inventory as a defining competitive strength. It calls for maintaining high‑quality office supply, selectively reinvesting in aging properties, and enhancing the connection between office districts and walkable mixed‑use amenities that attract today’s workforce. It further notes that
post‑COVID office demand has been strongest in mixed‑use areas such as Avalon and Downtown—areas that pair office with lodging, retail, restaurants, and activated public spaces.
• The entertainment district should improve performance in nearby legacy office areas, including older North Point office buildings and the Great Oaks Way area. Horizon 2045 acknowledges both districts as aging environments with increasing vacancy, emphasizing that strategic redevelopment at the Mall site could serve as a catalyst across the full 670‑acre North Point area to invest in older buildings. As entertainment, hospitality, public realm improvements, and walkable amenities are introduced, surrounding office buildings benefit from increased visibility, improved tenant perceptions, greater workforce presence, and new reinvestment interest. This trend mirrors national outcomes at The Battery Atlanta, ICE District, and District Detroit, where adjacent aging office assets experienced improved occupancy and modernization following activation of entertainment‑anchored mixed‑use districts.
• In summary, staff finds that the proposed 750,000 square feet of office space is appropriate and consistent with the Horizon 2045 Comprehensive Plan. The applicant’s proposal advances adopted goals for North Point and supports reinvestment in aging office submarkets and enhances regional competitiveness.
• The applicant is requesting approval of 650 hotel rooms within the North Point Sports & Entertainment District. This includes a 350‑room full‑service hotel designed to serve as a primary convention‑capable property, a 30,000‑square‑foot indoor and outdoor conference center, and a 300‑room hybrid hotel modeled after the applicant’s Scout Living concept at Ponce City Market. Alpharetta currently has a total of 4,105 hotel rooms, with 1,013 of those rooms located within four (4) full‑service hotels. Citywide average annual occupancy is approximately 65%, demonstrating sustained demand from corporate travel, conferences, events, and leisure visitation.
• Hotel supply adjacent to North Point consists of three (3) limited‑service properties built between 1997 and 1999, totaling 352 rooms, with no meeting facilities or full‑service amenities and serving a different, value‑oriented customer segment. These properties are not capable of accommodating corporate groups, conferences, or production‑related travel associated with an arena and sports & entertainment district.
• Avalon remains Alpharetta’s primary full‑service conference destination with a 44,000‑square‑foot indoor facility. That conference center regularly produces 300 to 1,200
nightly room blocks for major corporate, financial, medical, and association events. Avalon’s only outdoor event space—a small terrace with a capacity for twenty (20) to 100 guests—limits the ability to host hybrid indoor-outdoor receptions, activations, trade show functions, or sports-related banquets. North Point’s proposed indoor-outdoor conference center could address unmet demand for outdoor-capable and arena-adjacent events. Both districts serve different event profiles and could strengthen Alpharetta’s position as a dual-anchor hospitality market.
• The indoor arena will host concerts similar to State Farm Arena and drive lodging demand from touring performers, technical crews, production teams, managers, media staff, and regional overnight visitors. Concert activity generates multi‑night stays and higher weekend room rates, adding year‑round demand that complements the seasonal programming of Ameris Bank Amphitheatre. Promoters regularly use both indoor and outdoor venues within a single metropolitan area, increasing total visitation rather than splitting audiences.
• Alpharetta’s 20‑million‑square‑foot office market requires additional full‑service hotels to support corporate travel, multi‑day training programs, vendor meetings, offsite planning sessions, and client events. Many large employers operate within Alpharetta’s technology, finance, cybersecurity, and professional services sectors and regularly require flexible lodging options proximate to their campuses. Full‑service hotels with banquet space and breakout rooms contribute to retaining and attracting corporate tenants by offering meeting facilities within close proximity to workplaces.
• Peer markets with similar suburban office inventory demonstrate the importance of full-service hotel supply. Tysons Corner, VA maintains approximately 2,485 full‑service rooms and Bellevue, WA maintains approximately 1,614 full‑service rooms. Alpharetta currently offers 1,013 full‑service rooms despite hosting a 21 million‑square‑foot employment base. Both peer markets accommodate high volumes of conferences, corporate travel, and entertainment programming, strengthening the case for expanded full-service supply at North Point.
• Relative to peer districts, 650 full-service hotel rooms versus a split between full-service and hybrid hotel would bring Alpharetta’s full‑service hotel inventory closer to ratios found in markets that successfully accommodate corporate travel, arena events, conferences, and music‑driven visitation. The Staff recommended 650 full‑service rooms ensure the North Point district is properly scaled to the City’s 21 million‑square‑foot employment base, reducing existing
compression and positioning Alpharetta to compete with peer mixed‑use entertainment and employment centers.
• The North Point Overlay requires that EcoDistrict measures be incorporated into all new developments. The applicant’s proposal represents a significant redevelopment with a conditional use to increase density. Therefore, the proposed mixed-use development must achieve at least ten (10) EcoDistrict points. The applicant intends to implement the following EcoDistrict measures throughout the district: Building Energy Efficiency, Building Water Efficiency, Heat Island Reduction, Connected Open Space, Sustainable Landscaping, Enhanced Bicycle Amenities, Alternative Transportation, and Additional Landscaped Civic Space. The applicant’s proposed EcoDistrict measures will be confirmed by Staff at LDP and building permit.
• The EcoDistrict encourages incorporating water into civic and amenity areas. An eleven (11) acre regional stormwater facility with a permanent pool is located in a wooded area at the southeast corner of North Point Drive and North Point Circle. The applicant proposes to improve a portion of the stormwater pond under their control as a multipurpose stormwater and public park facility, including an overlook deck and multi-use trail, as shown in the design below.
North Point Stormwater Park would be similar in concept to the Old Fourth Ward Stormwater Park in downtown Atlanta.
• The proposed mixed-use development is expected to generate 1,666 new AM Peak Hour trips, 3,487 new PM Peak Hour trips, and 50,298 new daily trips. The trip generation results for the proposed development are presented in the table below.
• Based on the scope of the project, the applicant was required to go through the Development of Regional Impact (DRI) process. The DRI Process solicits additional review of the project from regional partners, including the Atlanta Regional Commission (ARC), Georgia Department of Transportation (GDOT), Georgia Transportation Efficiency Agency (GTEA), as well as adjacent communities. Following the DRI requirements, a traffic study was commissioned to assess traffic impacts anticipated from the proposed project. The study reviewed existing, future no-build, and future build conditions at fourteen (14) key intersections in the area, five (5) of which provide direct site access, as shown in the below figure.
• The traffic impact study identified geometric improvements needed at the signalized intersection of Encore Parkway and North Point Center (Study Intersection 9 of 14) to accommodate new site trips entering and exiting this intersection that include a new right turn deceleration lane
along Encore Parkway for entering site trips, a new left turn lane along North Point Center East for exiting site trips, and signal head improvements to accompany these geometric improvements. Additional recommendations identified within the traffic study include signal timing updates at eight (8) of the fourteen (14) study intersections to improve level of service (LOS) operations that will better serve the roadway users and proposed development traffic.
• These recommended conclusions were subsequently agreed to as conditions of approval by GTEA in the resultant Notice of Decision, dated July 31, 2026, to yield acceptable level of service (LOS) operations at all studied intersections in the future scenario with the development of the project. The Notice of Decision recommendations are included as conditions of zoning in this staff report and general address bicycle, pedestrian, and transit facilities, as well as intersection improvements at Encore Parkway and North Point Center East.
• Facilities & Event Operations: The proposed mixed-use sports and entertainment district includes multiple large-scale assembly venues including a 20,000-seat NHL arena, 2,000-seat practice/community ice sheets, and 4,000-seat music hall. The concentration of major entertainment uses within a walkable grid will result in substantial event-related pedestrian and vehicular volumes. Staff find that comprehensive event management plans, crowd evacuation protocols, and multi-agency coordination for ingress/egress during high-attendance conditions will be required.
• As part of the original regional mall approval in 1990 the developer deeded 2 acres along Westside Parkway for a fire station due to the regional impacts. However, the programing for the Sports and Entertainment District draws larger crowds for events which may require onsite substations. If approved, the Developer should also be conditioned to conduct a comprehensive Standards of Coverage Study to analyze several elements including but not limited to:
o Projected fire and police emergency response times o Travel distance and access modeling within the new street network o Staffing and apparatus needs under full build-out o Special event and multi-venue concurrent-use scenarios o Adequacy of existing City facilities to support the district
• The Study would be required prior to a land disturbance permit with coordination between the Developer, the Alpharetta Fire Department, and the Alpharetta Police Department. If the Study
finds deficiencies affecting response-time reliability or apparatus access the City may require one or more of the following mitigation measures:
o Additional dedicated fire access lanes, and/or o A minimum of 7,500 square feet within a planned building or structured parking deck to accommodate a one-bay fire truck station, including apparatus space, operational clearances, utility connections, and ingress/egress routes designed for fire apparatus movement.
• This facility would ensure that long-term emergency coverage remains sufficient as the district reaches full build-out and event-related demands increase.
• Emergency Access, Street Grid, and Vertical Circulation: The site includes elevated pedestrian bridges, structured parking decks, private streets and Alpha Loop connections that shape the emergency circulation network. If approved, the applicant will be required to design and dedicate emergency access easements for critical fire apparatus routes and emergency operational areas, preserving long-term emergency access and ensuring that future redevelopment phases cannot obstruct fire lanes or staging areas.
• Structured parking placement and block configuration reinforce the need for integrated emergency pathways between decks, loading zones, and public spaces, as well as district-wide surveillance and secure access control.
• Public Safety Substation and Multi-Agency Coordination: City staff have met several times with public safety professionals at The Battery in Cobb County to discuss their operations and recommendations based on their Battery operations experience. The Battery stadium is over twice the size, 45,000 seats of the proposed 20,000 seat arena at North Point. The Cobb County staff recommended 650 sf of space be provided to accommodate a Public Safety Substation within the arena structure to support Police, Fire, EMS, and event-level emergency coordination. They also recommended 2 holding cells on site for Alpharetta Police access.
• Staff also find that the district’s proposed uses and event load justify continued requirements for:
o A Public Safety Liaison Committee o Quarterly incident reporting o A coordinated Public Safety & Emergency Operations Plan updated annually
• Vertiport Emergency Planning: The site plan identifies a Vertiport within the district’s land-use mix. Staff find that EVTOL aircraft operations require:
o Dedicated emergency access routes that do not conflict with arena or event ingress/egress o EVTOL-specific fire suppression strategies, including battery fire response protocols o Coordination with MARTA and regional aviation safety agencies due to proximity to the ELT corridor
o Integration of Vertiport monitoring into district-wide CCTV and communication systems o Specialized procedures for airborne emergencies, hazardous materials, and landing incidents
• Requirements should be incorporated into the district’s Public Safety & Emergency Operations Plan.
• Residential development is known to increase school enrollment. Fulton County Schools calculated the potential number of children who may live on the property by using their standard calculation to distinguish the number of children that a residential development will generate.
• Based on the total for all three school levels, it can be assumed that the proposed development could house approximately 4 – 234 school age children. All three (3) schools are shown to be under capacity.
• The Citizen Participation Plan Report submitted by the applicant states that a meeting was held with Ecco Park residents in April. Questions included traffic, parking, rental rate range, concern over gameday overflow parking into neighborhood, and Alpha Loop extension. The applicant noted the following questions and concerns voiced at the CZIM meetings: traffic, parking, will mall remain or be demolished, NHL questions, need for height and density, impact to taxpayers, will office hurt other office, why not condos, greenspace, and how event parking will function.
The applicant indicated that they have spoken with non-residential property owners, as well as Mall tenants and employees.
• The City also received public feedback including comments of support, as well as concern over the impact of apartments on infrastructure and schools, too much office, development could bring crime, negative impact on other mixed-use developments, and impact to taxpayers.
• The Community Zoning Information Meeting was held on June 10, 2026 and July 8, 2026.
There were public comments in support and in opposition to the proposal. Comments and concerns raised at the meetings included whether or not the NHL was onboard with the North Point location, a desire to bring hockey back to Georgia, need affordable housing, greenspace, keep the carousel, looking forward to the revitalization of the area, remove surface parking to avoid heat islands, whether the redevelopment will move forward with or without the NHL, property should be developed with something unique, when will development begin, bicycle facilities around loop road, limit where e-bikes are permitted, ensure sufficient parking and road capacity, keep the mall and diversify tenant mix, consider condos instead of apartments, is there a financial ask of the City, impact to taxpayers, traffic, building height, and whether there is a backup plan.
• Staff has reviewed the applicant’s proposal against the established review criteria for a master plan amendment, rezoning, conditional use and variances. The proposed mixed-use sports and entertainment district is consistent with the vision in the North Point LCI and Comprehensive Plan and would benefit surrounding properties. The proposal specifically addresses objectives in the North Point LCI, such as 1) Create a “park once walk everywhere” walkable environment, 2) Induce redevelopment of large areas of surface parking, and 3) Improve the area’s retail balance. Open space and connectivity between various modes of transportation are key components in the applicant’s proposal and are supported by the LCI. The proposed mixed-use sports and entertainment district is ideally located at the North Point Mall property which is situated adjacent to and between two (2) Georgia 400 interchanges and was developed with the appropriate infrastructure to support a regional development of this magnitude. The Horizon 2045 Comprehensive Plan identifies North Point as the single-most important redevelopment opportunity in Alpharetta. Public engagement confirmed strong alignment with 77% of survey responses directing future investment toward North Point, and community input emphasized the need for entertainment, placemaking, public spaces, and mixed‑use development within the district.
• The conditional use to allow ‘For-Rent’ use, increased density, and increased non-residential building height is proposed in association with a mixed-use development, which is consistent with the comprehensive land use plan designation of the property. The property is located in the North Point Overlay Priority Area, which is appropriate for higher residential densities. The increased building height is compatible with surrounding properties which allow building
heights up to twenty (20) and 30 stories in the North Point Business Center Master Plan. Finally, the project site was developed as a regional mall, which is supported by existing transportation infrastructure with the capacity to support the mall’s peak demand during the winter holiday season. The site is ideally located between the Haynes Bridge Road and Mansell Road interchanges on Georgia 400 with a future MARTA ELT stop planned at the subject property.
• The property has exceptional and peculiar conditions related to its size, shape, and topography, as well as being developed with a distressed regional mall. The variance to allow an encroachment into the Georgia 400 buffer is for the purpose of accommodating the future MARTA ELT stop at the property. The request to increase the maximum residential building height is supported by adjacent properties being approved for building heights up to twenty (20) and 30 stories. Two (2) ‘For-Rent’ buildings would be up to twenty (20) stories and the remaining buildings would be up to seven (7) stories. The MU office percentage reduction can be supported based on there being approx. 562,000 square feet of office in four (4) adjacent office buildings. Parking demand will be met on-site during typical mixed-use operations. Major events at the arena will generate higher parking demand for approximately 96 events per year, or less than 30% of the year. Therefore, arena parking will be managed through a combination of on- and off-site parking agreements, employee parking management, and shuttle operations.
There are approximately 10,000 parking spaces available within a fifteen (15) minute walk of the site which would support the district during arena events.
• The following individuals came forward to present on behalf of the application and offered a rebuttal:
o Julie Sellers, attorney with Dillard Sellers, 1776 Peachtree Street, NW, Suite 415-South, Atlanta, Georgia, 30309
o Tim Perry, Jamestown o David Carlock, Machete Group o Frances Bohn, Jamestown o Tyler Vosser, Kimley Horn
CITY COUNCIL DISCUSSION
• Council Member Reeves asked about bikes along the AlphaLoop, pedestrian sidewalks around the current mall loop, definition of an NHL award per the proposed conditions, offsite parking, bike and scooter use areas, and the stormwater park.
• Council Member Brady asked about parking, intersection improvements, design layout and height of buildings on the site plan, and the stormwater park.
• Council Member DeRito asked about the traffic study, parking demands, and traffic impacts to the City, apartments and proposed condition regarding concurrency, the stormwater park and impact fee credits, density, MARTA bus platform, offsite parking, timeline for NHL award and current progress, decline of the mall, and financing needed.
• Council Member Hipes asked about stormwater park impact fee credits, proposed changes to Condition 1, performing arts center/music venue and community ice and how they will benefit our community, and department stores.
• Mayor Gilvin asked about previous MARTA train plans for this property, and specialty fire trucks and fire truck access.
• Mayor Pro Tem Merkel asked about access to rooftop amenities.
• Council Member Driskell asked about permanent jobs, green space, and potential grocery anchor.
PUBLIC COMMENTS:
In Favor:
• Parker Welton, 1115 Howell Mill Road, Atlanta, GA 30318
• Cameron Hood, 225 Saddlebrook Terrace, Roswell, GA 30075
• Rich Johnson, 10000 Avalon Boulevard, Alpharetta, GA 30009
• Dale Sizemore, 6130 Pin Oak Lane, Alpharetta, GA 30005
• Noel Baber, 4045 Deverell Street, Johns Creek, GA 30022
• Adam Schwegman, 12722 Ruths Farm Way, Alpharetta, GA 30004
• Margaret Culver, 1125 Chasewood Trail, Alpharetta, GA 30005
• Davis Myers, 130 Cedar Trace, Roswell, GA 30075
In Opposition:
• Belinda Kasminsky
• Amy Whittall, 131 Mayfield Circle, Alpharetta, GA 30009
• Tom Miller, 4025 Walnut Creek Trail, Alpharetta, GA 30005
• Martine Zurinskas, 8070 Willow Tree Way, Alpharetta, GA 30005
• Ron Rhodes, 1635 Spinnaker Drive, Alpharetta, GA 30005
• Buddy Stovall, 175 Manning Drive, Alpharetta, GA 30009
• Donna Shaw Murphy, 2001 Commerce Street, Alpharetta, GA 30009
• Judy Lyon, 620 Flying Scot Way, Alpharetta, GA 30005
• Nan Bodeep, 6385 Spinnaker Lane, Alpharetta, GA 30005
• Craig Johnson, 1120 Muirfield Court, Alpharetta, GA 30005
• Birdel Jackson, 1055 Chasewood Trail, Alpharetta, GA 30005
• Robert Buczek, 2060 Winthrope Commons, Alpharetta, GA 30009
• Sarika Bokil, 735 Barnesley Lane, Alpharetta, GA 30022
• Tammy Lucas, 435 Fieldstone Landing, Alpharetta, GA 30005 Mayor Pro Tem Merkel offered a motion to approve MP-26-06/Z-26-05/CU-26-04/V-26-08 North Point Sports & Entertainment District, subject to the following conditions:
1. Approximately 98.58 acres shall be zoned to MU and developed as follows:
1. If the property owner provides satisfactory written evidence to the City that the National Hockey League (NHL) awarded a franchise team to the North Point site on or before August 24, 2031, the property shall be developed substantially similar to the site plan prepared by Kimley-Horn, dated 8/17/26, and in accordance with the conditions listed as 2 through 74, which conditions shall be subject to the condition set forth herein; or
2. If no written notice is provided to the City as required by 1(a) above, the property may be developed in accordance with the current entitlements for the property as of August 23, 2026.
2. Exterior modifications to existing buildings and new buildings shall be consistent with the submitted renderings, with final approval by DRB. Architectural design shall use high-quality materials such as brick, stone, cementitious panels, metal accents, and glazing systems consistent with the EcoDistrict character. Buildings over 7 stories shall be stepped back a minimum 15’ above the 4th story, as approved by DRB. Buildings shall incorporate façade articulation, step-backs, transparency, pedestrian-scale frontage, and architectural consistency across the district, as approved by DRB.
3. Development regulations shall be as follows:
a. Arena & Practice/Community Ice – A minimum 17,500 seat and maximum 20,000 seat arena shall be permitted with a maximum building height of 170’ (as measured from the internal street at the main entrance to the arena). Practice/community ice sheets shall be permitted with a maximum 2,000 seat capacity and maximum building height of 4 stories or 80’, whichever is less.
b. Commercial – Maximum 565,000 square feet of retail/restaurant uses (new and existing) shall be permitted in freestanding and mixed-use buildings. Non-residential uses (retail, restaurant, office, and ‘For-Rent’ amenities) on the ground floor of the ‘For-Rent’ buildings shall not count against the maximum commercial and office entitlements or require additional parking.
Freestanding commercial building height shall not exceed 4 stories or 80’, whichever is less.
Drive-through restaurants shall not be permitted. Rooftop and outdoor dining areas shall not count against the maximum commercial entitlement or require additional parking.
c. Office – Maximum 750,000 square feet of office shall be permitted in freestanding buildings no greater than 14 stories or 200’, whichever is less. Additional office shall be permitted when exchanged for commercial, ‘For-Rent’ residential (1,000 SF per unit), or hotel (500 SF per hotel room) entitlements.
d. Hotel – Maximum 650 rooms shall be permitted in two (2) freestanding or mixed-use (limited to retail on the first floor) buildings no greater than 20 stories or 300’ whichever is less. One hotel shall be 4- diamond (AAA Diamond Program), or higher and similar in quality to a Loews, Curio, or Autograph Collection, with accessory uses shall be limited to restaurant, spa, fitness center and conference space. Minimum 10,000 square feet of conference space shall be provided with a maximum of 35,000 square feet; and shall include a minimum 7,500 square feet of outdoor pavilion space for weddings and other events. One hotel may be a 3-diamond
(AAA Diamond Program) or higher. Both hotels shall include on-site full-service restaurants (order from a menu) and 4-diamond hotel shall include banquet kitchen capable of serving full-scale events. Hotels shall provide pedestrian connectivity to the arena and music hall.
e. ‘For-Rent’ Residential – Subject to Condition 1 above, if the National Hockey League (NHL) awards a franchise team to the North Point site, up to 1,385 ‘For-Rent’ units shall be eligible for an LDP and CO’s based on the available units by year as depicted in the ‘For-Rent’ Request
- Recommended CO Year table in this staff report. Up to 2 ‘For-Rent’ buildings may have a building height up to 20 stories or 240’, whichever is less, and all other buildings shall not exceed 7 stories or 90’, whichever is less. ‘For-Rent’ units shall be limited to studio, one (1), two (2), and three (3) bedrooms. A maximum of 65% of units shall be studio or one (1) bedroom and no more than ten percent (10%) shall be three (3) bedroom units. ‘For-Rent’ units shall have first-class amenities, including a pool, fitness center, secured parking, resident’s lounge, business center, on-site management office and secure elevator access.
Concurrency: Subject to Condition 1 above, 600 ’For-Rent’ units shall be eligible for CO after building permits are issued for a minimum of 300,000 square feet of retail (including retail anchors, new retail, restaurants, and a minimum 3,500 square foot neighborhood grocery) and the cinema.
A CO shall not be issued for the remaining ’For-Rent’ units until the arena super structure (foundation, all supporting steel and concrete), 350,000 square feet of office, and internal section of Alpha Loop is constructed and shall be eligible for a CO based on the available units by year as depicted in the ‘For-Rent’ Request – Recommended CO Year table in this staff report.
f. Other Uses – A performing arts or music hall with a maximum seating capacity of 4,000 seats shall be permitted in a building with a maximum height of 80’. A cinema with a maximum seating capacity of 1,139 seats shall be permitted in a building with a maximum height of 80’.
g. Parking Decks – Maximum height shall not exceed 7 stories or 95’, whichever is less. Parking decks visible from North Point Circle or Georgia 400 shall be treated with comparable materials and finishes as the building they serve and/or screened from view with evergreen landscaping.
Suitability of parking deck elevation, visibility and landscape screening shall be approved by the
DRB.
4. Active uses, including retail, restaurant, office and ‘For-Rent’ amenities, shall be required in all ‘For-Rent’ buildings and located on the ground-floor space along storefront streets and shall have a
minimum first floor height of 14’ and depth of 30’, as approved by Staff. Ground-floor residential units shall have individual walkouts connecting to the sidewalk system.
5. The Master Plan area shall be limited to the following uses and further restricted by conditions of zoning:
a. Arena and Indoor Practice/Community Ice Sheets
b. Retail
c. Restaurant
d. Office (professional, medical and research and development)
e. Hotel (boutique hotel and hotel)
f. Residential (‘For-Rent’ and ‘For-Sale’)
g. Performing Arts/Music Hall
6. Uses shall be customarily accessory to or amenities for residential, office, and sports and entrainment uses, limited to the following:
a. Amphitheater
b. Animal Hospital, Small Animal
c. Art Gallery
d. Athletic Facility
e. Auditorium
f. Automotive Sales Showroom (limited to one (1) not to exceed 5,000 SF and outside car storage display limited to no more than 5 vehicles)
g. Bakery
h. Bank
i. Barber Shop
j. Beauty Shop
k. Book Store
l. Bowling Alley
m. Brewery or Distillery
n. Dance and Fitness Studio
o. Day Care Facility
p. Drug Store (Pharmacy)
q. Dry Cleaning, Pick-up Station
r. Florist, Retail without Greenhouse
s. Golf, Miniature and Driving Range
t. Grocery Store
u. Hardware and Garden Supply Store
v. Home Improvement Store
w. Museum and Libraries
x. Nail Salon
y. Park and Playground
z. Pet Grooming and Pet Day Care aa. Public Building bb. Recreational Facilities, Indoor and Outdoor cc. Restaurant (no drive-thru)
dd. Retail Sales and Services Establishment ee. School, Academic and Commercial ff. Shop or Studio, Craftsman/Artist gg. Spa Services (conditional use) hh. Special Event Facility (conditional use) ii. Theater, Cinema
jj. Vertiport
7. Minimum 26.86 acres of open space (21.24 acres of civic space and 5.62 acres of amenity space), consisting of squares, plazas, multi-use trails, park, yards and lawns, patios and balconies,
outdoor dining, sports court, pocket parks, and pool courtyards and amenity areas shall be provided as depicted on the submitted renderings and site plan prepared by Kimley-Horn, dated 8/17/26.
Design Conditions:
8. Developer shall provide a detailed street planting plan for North Point Circle and new private streets, including landscape theme with overstory shade trees, mid-story shade trees, ornamental trees, evergreen trees and shrubs to be planted throughout the District. The theme shall include flowering trees and shrubs of similar color with varying bloom times, as approved by DRB.
Landscape plan shall be approved prior to issuance of an LDP.
9. Minimum 10’ landscape strip shall be required along North Point Circle adjacent to the proposed development.
10.Minimum size of tree planter pits shall be 100 SF and planted with shrubs and/or groundcover, as approved by Staff. The edge of planting pits for overstory shade trees shall be a minimum of 15’ off the face of the building and or any architectural features such as balconies or overhangs. The edge of planting pits for mid-story shade trees shall be a minimum of 10’ off the face of the building and or any architectural features such as balconies or overhangs. The edge of planting pits for ornamental trees shall be a minimum of 5’ off the face of the building and or any architectural features such as balconies or overhangs. Tree planters shall be delineated with physical barriers.
Planters located within pedestrian gathering and activation areas shall be designed to contribute to the activation of the spaces through the incorporation of seating, standing tables, ledges, or similar amenities.
11.Developer shall provide EcoDistrict measures with each phase of development in compliance with the North Point Overlay. Detailed information shall be provided at LDP and building permit showing compliance with the requested EcoDistrict measures. Total EcoDistrict points to be confirmed by Staff.
12.Developer shall improve the stormwater park on its property, including trails, landscaping and overlook, as depicted on Page 20 of the staff report. The northern half of the stormwater park shall be improved prior to a CO for the 1st ‘For-Rent’ building and remaining portion of the stormwater park is improved prior to a CO for the 2nd ‘For-Rent’ building, as approved by Staff. Upon completion of each of the northern half and the remaining portion, the tract shall be dedicated to the City, other than the detention ponds themselves and waterways which feed it. The City shall be
responsible for the structural repairs upon dedication. The developer shall be responsible for maintenance until the earlier of (1) five years after the northern half of the stormwater park improvements are completed or (2) the completion of the park features on the adjacent parcel shown as “Property Owned By Others” on page 20 of the staff report and located between the north and south detension park areas. Developer and other pond owner shall remain solely and exclusively responsible for maintenance of the detention ponds and waterways which feed it. The cost of the construction of such improvements shall be eligible for park impact fee credits.
13.Minimum 8 public art installations shall be provided at prominent locations throughout the development, with unique murals and sculptures approved by Cultural Arts Commission (CAC).
Public art shall include sculptures, murals, water features, EcoDistrict monuments and District Thresholds, and other similar improvements approved by Staff. Approval and construction of at least 1 public art installation shall be required concurrent with the 1st CO for a ‘For-Rent’ building.
A minimum of 1 additional public art installation shall be required concurrent with the issuance of each CO. All sculptures shall be required prior to final CO issued for the last building constructed.
Public art installations shall be privately maintained.
14.Minimum 2,500 square feet civic space shall be developed at the corner of North Point Circle and North Point Drive and North Point Circle and North Point Center East. Civic space shall include decorative hardscape, landscape, and public art. Open space, including improvements, shall be privately maintained.
15.Developer shall provide an interactive water feature in a location, as approved by Staff. This improvement shall count toward the required public art installations.
16.Per the developer, the North Point Mall carousel shall be saved and incorporated into the development.
17.Retaining walls shall receive architectural façade treatment and be heavily landscaped. Retaining walls visible from developed areas exceeding 16’ in height shall be terraced with landscaping to break up large expanse of retaining wall.
18.Applicant shall provide a dedicated space within the North Point Sports & Entertainment District for a Georgia Tourism visitor kiosk to be operated in coordination with the Georgia Department of Economic Development, Explore Georgia, or their authorized partner. The visitor kiosk shall be located in a high-visibility, publicly accessible area of the development, such as the primary plaza, event promenade, or other location approved by the City and Developer and shall be integrated
into the pedestrian circulation network. The kiosk easement area shall be a minimum of 150 square feet and shall include connections for electrical service, lighting, and data/communications, as well as necessary weather protection if located outdoors. Alternatively, the developer can provide Georgia Tourism space within the arena structure to be operated by Explore Georgia.
19.Developer shall provide bicycle racks, benches, trash receptacles, decorative crosswalks, planters, kiosks and other street furniture, where appropriate, throughout the development.
20.Prior to LDP, developer shall submit for DRB approval a document titled, ‘North Point Sports & Entertainment District Design Standards’. This document shall include elevations or architectural themes, street amenities and furnishings consistent with the North Point Design Guidelines, streetscape and alleyway standards, entrance treatments at the intersections of North Point Circle and North Point Drive and North Point Center East, signage, storefronts, and landscaping which shall be substantially similar to the information contained in the 2026 public hearing application.
This condition shall be satisfied upon approval by DRB.
21.Signage visible from the public right-of-way or from neighboring properties shall comply with a DRB-approved Master Sign Package defining sign styles, illumination, materials, and placement.
Signage not visible from the public right-of-way or from neighboring properties shall not be subject to the City’s sign regulations but shall be considered in the Master Sign Package. Signs mounted or affixed to a building shall appear integral to building design. Off-premises signage shall be prohibited, except in areas of the district that are not subject to the City’s sign regulations and in existing off-premises sign easements in existence at the time of this master plan amendment. Off-premises signage in an existing sign easement shall comply with the North Point Creative Placemaking Monuments and District Thresholds, as approved by Staff.
22.Awnings, or similar overhead structures, shall be provided at the ground level in commercial areas where reasonably appropriate in order to protect pedestrians from inclement weather.
23.Development shall include at least 2 rooftop amenities within the non-residential portion of the development.
24.Developer shall prioritize the orientation of ‘back of house’ functions, such as delivery service areas, loading areas, and refuse enclosures away from view from the right-of-way, as approved by DRB.
Service areas and loading areas shall be screened from public areas and separated from the primary vehicular and pedestrian circulation areas, as approved by DRB.
25.Developer shall install all utilities and transformer systems underground, except that transformers shall be permitted at-grade if screened, as approved by Staff. To the maximum extent possible, all water/sewer utilities and grease traps shall be installed within service alleyways. All mechanical systems must be screened in a manner that is architecturally comparable to the buildings they are associated with. Any necessary above-ground utility systems shall be screened, as approved by Staff.
Transportation:
26.The arena shall be designed with a pick-up and drop-off area, with final approval by Staff.
27.New streets and alleys shall be private and shall be consistent with the streetscape exhibits prepared by Kimely-Horn, dated 7/29/26, with modifications in final design and permitting, as approved by Staff. Developer shall coordinate with the City and County on any necessary intergovernmental and development agreements for new or existing utilities within streets and alleyways.
28.Enhanced pedestrian crossings and bicycle connections shall be provided throughout the site, including between buildings and open space within the development; and across North Point Circle.
Enhanced pedestrian crossings within the development and across the development shall be designed and constructed of materials, such as brick pavers, cobblestones, or architecturally treated concrete products, as approved by DRB. Off-site pedestrian and bicycle connection improvements shall be eligible for impact fee credits.
29.Pedestrian bridges, stairs, elevators and escalators within the site may encroach over and into public spaces provided that they do not impede pedestrian circulation or safety, as approved by Staff.
30.Developer shall construct the Alpha Loop through the site and located within the Loop Road as depicted on the site plan prepared by Kimley Horn, dated 8/17/26. Design shall include landscape separation from storefronts sidewalks with curb, trees, and/or landscaping. The design and construction of the portion of the Alpha Loop to provide connectivity to a pedestrian bridge/ELT stop will be conducted in coordination and after the pedestrian bridge/ELT stop are constructed. A bike share station shall be required along the Alpha Loop with final location and design approved by Staff. Alpha Loop improvements shall be eligible for impact fee credits. Alpha Loop width shall be 15’ through the site.
31.In coordination with MARTA, developer shall upgrade 2 existing bus stops with MARTA bus shelters and will work with MARTA to explore any bus stop consolidations along property frontages.
Applicant shall apply for the True North 400 CID bus shelter program. Expenditures not reimbursed by the CID shall be eligible for impact fee credits.
32.Minimum parking requirements shall be as outlined in the parking study prepared by Kimley-Horn, dated 7/21/26.
33.Prior to the issuance of an LDP, preliminary on-site and off-site Parking Agreements shall be submitted, reviewed, and approved by Staff. Final recorded Parking Agreements shall be provided prior to a CO for the arena. Developer shall coordinate to have submitted Parking Agreements incorporate off-duty officer presence during special event programs to help manage traffic demands, as approved by Staff. Parking Agreements approved by Staff may require additional privately paid licensed security professionals or traffic control professionals, as determined by Alpharetta Police.
34.Developer shall work with the City, MARTA and GDOT to collaboratively explore, design, and create an Express Lane Transit (ELT) station and mobility hub along GA-400 and within the site, as well as pedestrian bridge accessibility options from the ELT station to the site. Factors to be explored and designed include dedicated space for future micromobility options and universal accessibility capabilities that will assist with improving future transportation mobility services for employees, citizens, and visitors alike.
35.Prior to LDP, special/major event transportation management plans shall be coordinated with City Staff and submitted for review and approval. Developer shall submit a comprehensive traffic and access management plan—coordinated with City Police, Fire, Public Works & Community Development Departments—detailing phased road closures, reroutes, and dedicated emergency lanes for events.
36.Developer shall construct an exclusive southbound right-turn lane along Mall Access B Driveway at the intersection with North Point Parkway, creating one exclusive through lane and one exclusive right-turn lane, as approved by Staff.
37.Developer shall increase the eastbound left-turn storage length at North Point Parkway and Encore Parkway/Private Driveway (Intersection 8). Work with city staff to determine the length of additional storage required and at which phase of development it must be completed.
38.Developer shall channelize the southbound right-turn movement to create free flow at Haynes Bridge Road and North Point Drive.
39.Developer shall upgrade signal heads on the northbound and southbound approaches to Flashing Yellow Arrow (FYA) to allow protected-permissive phasing by time of day at Mansell Road and North Point Parkway/Resurgens Park Place. Restripe the southbound shared through/left-turn lane to be an exclusive through lane and remove split phasing and provide dual entry for the northbound and southbound approaches.
40.Developer shall construct and/or install traffic control measures as identified in the event Traffic Management Plan. These may include dynamic lane assignment signs used to change lane rules during events, informational signage to guide motorists or pedestrians during events, or other traffic control measures, as approved by Staff.
Fire & Police Departments:
41.Emergency access shall be maintained at lane and including during large-scale events, temporary street closures, and traffic control operations through approved operational planning and coordination with Fire and Police Department.
42.Any proposed street closures, event operations, or traffic control measures affecting fire apparatus access shall be subject to Fire Department review and approval.
43.Evacuation & Emergency Plans: Developer/operator shall develop an event evacuation program, including interior occupant load analysis, egress signage and drills. Incorporate protocols for fire, medical emergencies, severe weather, and crowd surges. Event operations shall include provisions for fire department access, staging, and incident command. Plans shall be reviewed and approved by the Fire Department prior to occupancy and updated periodically.
44.The Fire Department may require Fire Safety Officers (FSOs) for events based upon occupancy load, event type, operational complexity, temporary structures, special effects, pyrotechnics, fire and life safety system impairments, impaired fire access, crowd characteristics, or other life safety considerations. Fire Safety Officer staffing levels shall be determined by the Fire Department and shall be funded by the developer/operator.
45.Developer shall design and dedicate emergency access easements for critical fire apparatus access routes and emergency operational areas throughout the development to preserve long-term emergency access capabilities and unobstructed routes for first responders.
46.Developer shall conduct a Standards of Coverage study that evaluates anticipated emergency response times and public safety service levels for both Fire and Police Departments. Assessment findings to be used to inform coordination between the project team and the Fire and Police Departments. Information from the findings may also require additional dedicated fire access lanes and a minimum of 7,500 square feet within a planned building for one-bay fire truck/station.
47.Removable or retractable bollards utilized within pedestrian or event-controlled areas shall be required and approved by the Fire Department and equipped with Knox locking systems or other approved emergency access controls.
48.A Public Safety Substation designed to support multi-agency emergency operations during planned events and emergency incidents shall be required within the arena structure. Minimum 650 square feet shall be provided. The Public Safety Substation can be shared with onsite property security operations center. Consideration should be given to inclusion of restroom facilities, communications infrastructure, building system interfaces, and direct access to life safety system controls necessary to support extended operational periods. Additionally, 2 holding cells shall be provided on site for Alpharetta Police access.
49.All systems identified as Special Inspections, including but not limited to smoke control, smoke evacuation, and stair pressurization systems, shall require third-party review, testing, and certification in accordance with the International Building Code and applicable NFPA standards.
Documentation of certification shall be provided to the Authority Having Jurisdiction (AHJ) prior to final acceptance. Third-party inspections and texting may supplement but shall not replace Fire Department review, witness testing, operational approval authority, or final acceptance responsibilities of the AHJ.
50.A third-party fire protection and life safety engineering review shall be conducted prior to formal plan submittal to the AHJ for the arena. This review shall evaluate life safety systems, egress design, smoke control strategy, and overall code compliance, and documentation shall be provided as part of the plan review process. All other structures on the site may be handled by AHJ unless otherwise dictated.
51.Site design shall support incident command operations, staging areas, and emergency vehicle circulation.
52.Prior to issuance of a CO for the arena, Developer/Operator shall enter into a Private EMS Operations Agreement with the City, approved by the Fire and Police Departments, establishing
minimum staffing levels, certification requirements, equipment standards, and coordination protocols for private EMS coverage at all arena events. The terms of such agreement shall be enforceable by the City through the development agreement and shall not be subject to automatic expiration.
53.Developer/Operator shall create a Public Safety Liaison Committee comprising developer, APD, fire, EMS, and Traffic staff to meet quarterly during design/construction and continue once the arena is operational.
54.Developer/Operator shall provide quarterly incident reports summarizing public safety incidents, emergency responses, and lessons learned. Implement improvement actions required by public safety staff within 60 days; document progress for City review.
55.Developer/Operator shall implement a shared mobility strategy to reduce surface lot density and traffic congestion on adjacent arterials, as approved by Staff.
56.Developer/Operator shall install a network of HD CCTV cameras covering reasonable public entry points, plazas, parking and loading zones, with at least 30-day image retention and integration into the Public Safety Services network.
57. Developer/Operator shall provide a security plan specifying a minimum number of one (1) licensed security professionals per 1,250 attendees covering ingress, egress and potential crowd hot spots, subject to approval by the Police Department. Security professionals shall be paid by private developer/operator.
58.Developer/Operator shall enter into a first-responder partnership agreement mandating event-level coordination with APD, including pre-event briefings, real-time radio access, and on-site staging for response teams during Arena events. A coordinated Public Safety & Emergency Operations Plan must be approved prior to opening the arena and updated annually thereafter and include:
a. Police staffing and traffic enforcement
b. Fire/EMS staging and medical response
c. Crowd control and evacuation planning
d. Monitoring protocols for pre-, during-, and post-event activity
Other Conditions:
59.Developer shall dedicate a 20’ utility easement to Fulton County Government for an existing 16” water main within the North Point Circle right-of-way.
60.Developer’s on-site construction trailer(s) shall provide office space for a minimum 2 City employees (1 land development inspector and 1 building inspector) for the duration of construction.
61.Developer shall be responsible for planting and maintenance of any medians within the development and for medians located on North Point Circle or the Access Roads.
62.Developer’s financial responsibility for offsite and stormwater park improvements shall not exceed its impact fees, nor shall credits be given for meeting minimum EcoDistrict and open space requirements.
63.It is acknowledged that the approved site plan may be subdivided into separately platted parcels with individual tax numbers, that the separate development parcels are to be developed by separate owners/developers, and that the public amenities are to be platted and owned by the Developer.
Zoning compliance for conditions uniquely applicable to an individual owner’s parcel will be the responsibility of that owner and that non-compliance by such an owner does not render, by itself, the remaining parcels “non-conforming” uses under the Zoning Code.
General Conditions of Approval to GTEA Development of Regional Impact Notice of Decision, dated 7/31/26:
Bicycle, Pedestrian & Transit Facilities:
64.Ensure multimodal connections between all uses and work with the City of Alpharetta to determine safety mitigations for the internal road network.
65.Provide on-site pedestrian routes that are clearly delineated and appropriately marked to alert both drivers and pedestrians.
66.Provide pedestrian connections to the Alpha Loop trail system, as noted on the DRI site plan.
67.Consider best practices that allow for the prioritization of transportation alternatives; at a minimum the following should be included: pedestrian and bicycle facilities, transit accommodations, traffic calming, and green infrastructure.
68.Coordinate with MARTA, GDOT, and the City of Alpharetta to connect the GA 400 Rapid Transit to the DRI site via the proposed pedestrian bridge and ensure all stakeholders are involved in the design and implementation of the project.
69.The proposed pedestrian bridge for the GA 400 rapid transit station shall provide a direct site connection that ensures adequate and safe access to the DRI site, as noted on the site plan.
Coordinate with MARTA during design and construction to identify preferred site access.
70.Evaluate the feasibility and consider implementing a bus stop that is internal to the site.
Consideration shall require coordination with MARTA to identify location accessibility, design, and accommodations within the internal circulation and network.
General Georgia Department of Transportation (GDOT) Conditions:
71.GDOT reserves the right to determine driveway access based on compliance with GDOT standards, safety analysis, neighboring conflicts, and any other circumstance needing consideration on all state routes based on GDOT’s most up-to-date regulations.
72.Any access to GDOT right of way will be determined at the time of permitting when submitted with a design.
Encore Parkway at North Point Center/Private Driveway (Intersection 9):
73.Construct an exclusive northbound right-turn lane along Encore Parkway, creating one exclusive through lane and one exclusive right-turn lane.
74.Construct an exclusive westbound left-turn lane along North Point Center, creating one exclusive through lane and one exclusive left-turn lane.
o Council Member Hipes seconded the motion.
o Council Member Hipes offered a friendly amendment to the above motion to add clarity that all of condition 1, including its subparts 1 and 2, and all of condition 3(e) that was presented to Council and made part of the record in lieu of what is in the staff report, as Mayor Pro Tem Merkel only announced the red-lined version in his motion, but it is the entirety of Condition 1 that has been re-written.
o Council Member DeRito offered a friend amendment to add Condition 75: That requires any use of incremental financing of the TAD that is in place, that any bonds associated to use of those TAD
revenues are General Obligation Bonds that require a referendum to the voters of the City of Alpharetta to approve.
o Mayor Pro Tem Merkel denies the friendly amendment.
o The motion was approved (4-3; with Council Members Brady, DeRito, and Reeves in opposition).
6. PUBLIC COMMENT
• There were no public comments.
7. REPORTS
• There were no reports.
8. EXECUTIVE SESSION (IF NECESSARY)
• There was not an executive session.
9. ADJOURNMENT
Council Member DeRito offered a motion to adjourn the meeting.
o Council Member Reeves seconded the motion.
o The motion was approved unanimously (7-0).
• With there being no further items to consider or discuss, Mayor Gilvin adjourned the meeting at 1:03 a.m.
Respectfully submitted, Lauren Shapiro, City Clerk