Acworth · Zoning Ordinance
Appendix B - ZONING ORDINANCE
73-13.12. Storm Drainage.
About this text
- As published by Municode, current through 2026-02-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. The subdivider shall pay the cost of, or guarantee payment for, the cost of the storm drainage system in a manner suitable to the City of Acworth, prior to said installation.
B. The storm drainage system may be included in the sanitary sewer plan for subdivision required in section 30, provided the two systems are kept separate.
C. The size, location, and length of all surface drainage pipe or structures shall be shown on final plans and shall be subject to approval. Storm drain pipes 42 inches and smaller carrying stormwater from the street of adjacent property between or through lots shall be extended at least 60 feet behind the building line and in no cases shall be allowed to be discharged at a point where the water would cause damage to any existing or future structure. All cross drain pipes and pipes under the roadway and shoulder shall be reinforced concrete pipe of such gauge and strength according to the height of fill as specified by the state highway specifications.
D. Installation, backfilling and compaction shall be in accordance with the state highway specifications. All pipes shall have minimum cover of one foot and headwalls or inlet basins constructed at end of pipes. No concrete block headwalls shall be permitted.
E. The design of drainage structures shall be based on Talbot's Formula, a minimum constant of 0.8 shall be used, the design drainage area and constant shall be shown on the final plat for each pipe or culvert opening.
F. Any lots within the subdivision which, are undesirable for building due to bad drainage conditions shall be excluded and no building shall be permitted thereon until such conditions have been corrected.
G. In special cases where it is the desire of the subdivision developer or owner to leave running streams open for aesthetic purposes, this may be permitted upon approval. Whenever open streams are permitted, such streams shall retain their natural design characteristics and be so designed that they do not present a maintenance problem to the city and that they do not present a hazard to life and safety.
H. Storm drainage system plans shall be submitted, checked and are subject to final approval prior to installation. Said system shall be designed in accordance with the State of Georgia 1983 State Highway Department Specifications, volumes I and II.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.