Skip to content
Georgia Commons
Menu

Braselton · Zoning Ordinance

Article 8 - SUBDIVISION AND DEVELOPMENT REQUIREMENTS

8.21. Acceptance of Public Improvements

About this text

  • As posted on the city's website, retrieved 2026-11-11

A. If construction of any required public improvements was deferred at the time of final plat approval, said work must be

completed during the maintenance period for the subdivision while bonding instruments are still in effect.

B. Prior to end of the maintenance period, a final acceptance inspection of the public

improvements must be conducted by the Town.

C. The owner must correct all defects or deficiencies in materials or workmanship and make such repairs as necessary to

approximate the as-built condition of the improvements. All deficiencies must be

corrected during the performance and maintenance bond period.

D. Upon certification by the Town Engineer that the public improvements depicted on the asbuilt surveys are in conformance with the specifications of this Development Code and are in good repair, the Town Council must accept the public improvements into

perpetual maintenance. This certification and final acceptance can occur after a minimum one year after final plat, or final infrastructure is installed, whichever occurs last.

Read this code where it is posted (city website (Revize)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:braselton/zoning/8.21@2026-11-11-51eb4d8617

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.