Butts County · Zoning Ordinance

Butts County Zoning Ordinance

This document is shown whole, as one text: its source does not cut it into sections.

About this text

  • As published by Municode, current through 2026-04-13
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Part 2 of 5. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.

Nationally, a considerable number of these important natural resources have been lost or impaired by draining, dredging, filling, excavating, building, pollution and other acts.

Piecemeal or cumulative losses will, over time, destroy additional wetlands. Damaging or destroying wetlands threatens public safety and the general welfare.

The Georgia Department of Natural Resources and the Georgia Department of Community Affairs have determined that each local government with classified wetlands located in its jurisdiction must adopt a wetlands protection ordinance under the requirements of House Bill 215, Georgia's 1989 Growth Strategies Legislation and the rules promulgated thereunder.

It is therefore necessary for Butts County, Georgia, to ensure maximum protection for wetlands by discouraging development activities in wetlands that may adversely affect wetlands.

The purpose of this ordinance is to promote wetlands protection while taking into account varying ecological, economic development and recreational and aesthetic values. Activities that may damage wetlands should be located on upland sites to the greatest degree practicable as determined through a permitting process. The objective of this article is to protect wetlands from alterations which will significantly affect or reduce their primary functions for water quality, flood plain and erosion control, ground water recharge, aesthetic nature, and wildlife areas and to comply with the requirements of state law related to wetland protection.

Sec. 3.06.02. Establishment of the Wetlands Protection District.

The Wetlands Protection (WP) District is hereby established which shall correspond to all lands within the jurisdiction of Butts County, Georgia, that are mapped as wetland areas by the U.S. Fish and Wildlife Service National Wetlands Inventory Map. This map shall be referred to as the Generalized Wetlands Map and is hereby adopted by reference and declared to be a part of this ordinance, together with all explanatory matter thereon and attached thereto.

The Generalized Wetlands Map does not necessarily represent the boundaries of jurisdictional wetlands within Butts County and cannot serve as a substitute for a delineation of wetland boundaries by the U.S. Army Corps of Engineers, as required by Section 404 of the Clean Water Act, as amended. Any local government action under this ordinance does not relieve the landowner from federal or state permitting requirements.

Sec. 3.06.03. Protection criteria.

Requirement for local permit or permission. No regulated activity will be permitted within the Wetlands Protection District without written permission or a permit from Butts County.

If the area proposed for development is located within 50 feet of a Wetlands Protection District boundary, as determined by the zoning administrator using the Generalized Wetlands Map, a U.S. Army Corps of Engineers' determination shall be required. If the Corps determines that wetlands are present on the proposed development site, the local permit or permission will not be granted until a Section 404 permit or letter of permission is issued. For purposes of this section, regulated activity means any activity which will, or which may reasonably be expected to, result in the discharge of dredged or fill material into waters of the United States excepting those activities exempted in section 3.06.04 of this article and exempted in Section 404 of the Federal Clean Water Act.

Sec. 3.06.04. Permitted uses.

The following uses shall be allowed as of right within the Wetlands Protection District to the extent that they are not prohibited by any other ordinance or law, including laws of trespass, and provided they do not require structures, grading, fill, draining, or dredging except as provided herein. [The activities listed in this section are exempted from Section 404 regulations provided they do not have impacts on a navigable waterway that would necessitate acquisition of an individual 404 permit. However, under Section 10 of the Rivers and Harbors Act, a permit may be required in some circumstances.]

(a) Operations conducted during normal silvicultural activities, including minor dredge and fill associated with road construction, harvesting, and reforestation practices provided they meet the performance standards and road construction best management practices required under Section 404 of the Clean Water Act.

(b) Conservation or preservation of soil, water, vegetation, fish and other wildlife, provided it does not affect waters of Georgia or of the United States in such a way that would require an individual 404 permit.

(c) Outdoor passive recreational activities, including fishing, bird watching, hiking, boating, horseback riding, and canoeing.

(d) Forestry practices applied in accordance with best management practices approved by the Georgia Forestry Commission and as specified in Section 404 of the Clean Water Act.

(e) The cultivation of agricultural crops. Agricultural activities shall be subject to best management practices approved by the Georgia Department of Agriculture.

(f) The pasturing of livestock, provided that riparian wetlands are protected, that soil profiles are not disturbed, and that approved agricultural best management practices are followed.

(g) Education, scientific research, and nature trails.

(h) Temporary emergency permit. A temporary emergency permit can be issued by the county or its designee for the following reasons:

(1) Maintenance or repair of lawfully located roads or structures and of facilities used in the service of the public to provide transportation, electric, gas, water, telephone, telegraph, telecommunication or other services, provided that such roads, structures, or facilities are not materially changed or enlarged and that, prior to the commencement of work, written notice has been given to the county or its designee and provided that the work is conducted using best management practices to ensure that flow and circulation patterns and chemical and biological characteristics of the wetland are not impaired and that any adverse effect on the aquatic environment will be minimized.

(2) Temporary water level stabilization measures associated with silvicultural operations, provided that they are necessary to alleviate abnormally wet or dry conditions that would have an adverse impact on the conduct of silvicultural activities if not corrected.

(3) Limited ditching, tilling, dredging, excavating, or filling done solely for the purpose of maintaining or repairing existing drainage systems necessary for the cultivation of agricultural crops, provided that the maintenance or repair activity does not result in the impairment, alteration, or loss of wetlands not previously subject to agricultural and silvicultural use under the terms and provisions of this section.

(4) Limited excavating and filling necessary for the repair and maintenance of piers, walkways, nature trails, observation decks, wildlife management shelters, boathouses, or other similar water-related structures, provided that they are built on pilings to allow unobstructed flow of water and preserve the natural contour of the wetland.

Sec. 3.06.05. Prohibited uses.

The following uses are not permitted within the Wetlands Protection District:

(a) Receiving areas for toxic or hazardous waste or other contaminants; or

(b) Hazardous or sanitary waste landfills.

Sec. 3.06.06. Permit requirements and enforcement procedures.

(a) Site plans. Application for a local development permit within Butts County shall include a site plan, drawn at a scale of one inch equals 50 feet, with the following information:

(1) A map of all planned excavation and fill, including calculations of the volume of cut and fill involved, and cross-sectional drawings showing existing and proposed grades. Elevations, horizontal scale, and vertical scale must be shown on the cross-sectional drawings.

(2) A map of any wetland boundaries occurring within the site must be provided. This boundary may be included on other maps provided by the applicant.

(3) Location, dimensions, and area of all impervious surfaces, both existing and proposed, on the site and adjacent to the site for a distance of 200 feet.

(4) The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body.

(5) Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than two feet and no greater than one foot for slopes less than or equal to two percent.

(6) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials.

(7) All proposed temporary disruptions or diversions of local hydrology.

(b) Activities to comply with site plan. All development activities or site work conducted after approval of the site plan shall conform to the specifications of said site plan. Significant changes to the site plan that would alter the amount and velocity of stormwater runoff from the site, increase the amount of impervious surface within the development, alter the overall density of the development, or result in a considerable increase in the amount of excavation, fill, or removal of the overall appearance of the development as proposed can be amended only with the approval of the zoning administrator. Minor changes, such as the realignment of streets or minor alterations to drainage structures and other infrastructure to meet unexpected conditions, are exempted from this requirement.

(c) Exemptions to site plan requirements. The following activities and developments are exempt from the requirement for detailed site plans:

(1) Single-family detached homes constructed within a subdivision of fewer than five parcels.

(2) Repairs to a facility that is part of a previously approved and permitted development.

(3) Construction of minor structures, such as sheds or additions to single-family residences.

(d) Review procedures. The application shall be made to the zoning administrator and will be reviewed within 30 days. At the time of the application, the applicant shall pay a filing fee as specified by the Butts County fee schedule. This fee may be used to retain expert consultants who will provide services pertaining to functional assessment, mitigation, and wetland boundary determinations, as deemed necessary by the zoning administrator. The review period shall include the preparation of findings (approval, approval with conditions, or disapproval) by the zoning administrator. The applicant will receive written notification of the findings of the zoning administrator. Decisions of the zoning administrator may be appealed to the Butts County board of appeals.

(e) Duration of permit validity.

(1) If construction described in the development permit has not commenced within 12 months from the date of issuance, the permit shall expire.

(2) If construction described in the development permit is suspended or abandoned after work has commenced, the permit shall expire 12 months after the date that work ceased.

(3) Written notice of pending expiration of the development permit shall be issued by the zoning administrator.

(f) Suspension, revocation. The zoning administrator may suspend or revoke a permit if s/he finds that the applicant has not complied with the conditions or limitations set forth in the permit or has exceeded the scope of the work set forth in the permit.

Sec. 3.06.07. Amendments.

These regulations, and maps incorporated herein, may from time to time be amended in accordance with procedures and requirements in the general statutes and as new information becomes available.

Sec. 3.06.08. Assessment relief.

Assessors and boards of assessors shall consider requirements of these regulations in determining the fair market value of land.

Sec. 3.07.00. Aquifer recharge area protection.

Sec. 3.07.01. Title of the article, findings, and objectives.

(a) Title of article. This article shall be known as the Aquifer Recharge Area Protection Ordinance of Butts County, Georgia.

(b) Findings of fact. In order to provide for the health, safety, and welfare of the public and a healthy economic climate within the county and surrounding communities, it is essential that the quality of public drinking water be ensured. For this reason, it is necessary to protect the subsurface water resources that Butts County, Georgia, and surrounding communities rely on as sources of public water. Groundwater resources are contained within aquifers, which are permeable, rock strata occupying vast subsurface regions. These aquifers are replenished by infiltration of stormwater runoff in zones of the surface known as aquifer recharge areas.

Aquifers are susceptible to contamination when unrestricted development occurs within significant aquifer recharge areas. It is, therefore, necessary to manage land use within aquifer recharge zones in order to ensure that pollution threats are minimized.

(c) Adoption of aquifer recharge protection ordinance. The Georgia Department of Natural Resources and the Georgia Department of Community Affairs have determined that each local government with "significant groundwater recharge areas" (identified on the Ground Water Pollution Susceptibility Map of Georgia Hydrologic Atlas #20) must adopt an aquifer recharge protection ordinance under the requirements of House Bill 215, Georgia's 1989 Growth Strategies Legislation and the rules promulgated thereunder.

(d) Objectives. The objectives of this article are to:

(1) Protect groundwater by prohibiting land uses that generate dangerous pollutants in recharge areas;

(2) Protect groundwater by limiting density of development;

(3) Protect groundwater by reducing adverse effects on groundwater from the development that occurs within the recharge area; and

(4) Comply with the requirements of the Georgia 1989 Growth Strategies Legislation.

Sec. 3.07.02. Establishment of an aquifer recharge area district.

An aquifer recharge area district is hereby established which shall correspond to all lands within the jurisdiction of Butts County, Georgia, that are mapped as significant recharge areas by the Georgia Department of Natural Resources in Hydrologic Atlas 18 (1989 Edition) and are indicated as "most significant groundwater recharge areas" on the Groundwater Pollution Susceptibility Map of Georgia.

Sec. 3.07.03. Determination of pollution susceptibility.

Each recharge area shall be determined to have a pollution susceptibility of high, medium, or low based on the Groundwater Pollution Susceptibility Map of Georgia. Said map is hereby adopted and made a part of this article.

Sec. 3.07.04. Permit requirements and enforcement.

No building permit, rezoning request, or subdivision plan may be approved by Butts County or its designee unless the permit, request or plan is in compliance with the aquifer protection standards listed in section 3.07.05.

(a) Enforcement. Butts County or its designee, its agent, officers, and employees shall have authority to enter upon privately-owned land for the purpose of performing their duties under this article and may take or cause to be made such examination, surveys, or sampling as Butts County or its designee deems necessary.

(1) The Butts County zoning and planning department and the Butts County building inspector are hereby designated respectively as the administrator and enforcement officer for this article.

(2) The County building inspector shall have authority to enforce this article; issue permits thereunder; and address violations or threatened violations thereof by issuance of violation notices, administrative orders, and civil and criminal actions. All costs, fees, and expenses in connection with such actions may be recovered as damages against the violator.

(3) Law enforcement officials or other officials having police powers shall have authority to assist the county building inspector in enforcement.

(4) Any person who commits, takes part in, or assists in any violation of any provision of this article shall be guilty of a misdemeanor and, upon conviction thereof, shall be punished as provided by law. Each violation of this act shall be a separate offense, and, in the case of a continuing violation, each day's continuance shall be deemed to be a separate and distinct offense.

(5) The county building inspector shall have the authority to issue cease and desist orders in the event of any violation of this article. Cease and desist orders may be appealed to a court of competent jurisdiction, as identified in section 3.07.06.

(6) When a building or other structure has been constructed in violation of this article, the violator shall be required to remove the structure or bring said structure into compliance with this article.

(7) When removal of vegetative cover, excavation or fill has taken place in violation of this article, the violator shall be required to restore the affected land to its original contours and to restore vegetation, as far as practicable.

(b) Permit review and site plan requirement. Applications for a development permit within the aquifer recharge area district shall include a site plan, with the exception of certain exempted activities identified in subsection (c) of this section. The following information is required for all site plans:

(1) A map shall be drawn to a scale of one inch equals 50 feet or other appropriate scale as determined by the county, showing all planned improvements including the width, depth, and length of all existing and proposed structures, roads, water courses, and drainage ways; water, waste water, and storm water facilities; and utility installations.

(2) Location, dimensions and area of all impervious surfaces, both existing and proposed, on the site.

(3) The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body.

(4) Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than five feet.

(5) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials.

(6) Calculations of the amount of cut and fill proposed and cross-section drawings showing existing and proposed grades in areas of fill or excavation. Elevations, horizontal scale, and vertical scale must be shown on cross-sectional drawings.

(7) Activities to comply with site plan. All development activities or site work conducted after approval of the site plan shall conform with the specifications of said site plan. Significant changes to the site plan, that would alter the amount and velocity of stormwater runoff from the site, increase the amount of impervious surface within the development, alter the overall density of development, result in a considerable increase in the amount of excavation, fill, or removal of vegetation during construction, or otherwise result in an alteration of the overall appearance of the development proposed, can be amended only with the approval of the county. Minor changes, such as realignment of other infrastructure to meet unexpected conditions, are exempted from this requirement.

(c) Exemptions to site plan requirements. The following activities and developments are exempt from the requirement for detailed site plans:

(1) Single-family detached homes constructed within a subdivision of fewer than five parcels.

(2) Repairs to a facility that is part of a previously approved and permitted development.

(3) Construction of minor structures, such as sheds, or additions to single-family residences.

(d) Review procedures. The application shall be made to the county zoning administrator and will be reviewed within 60 days or in accordance with established review procedures for the type of development being constructed, whichever is greater. The review period shall include the preparation of findings (approval or disapproval) by the county zoning administrator. The applicant may request written notification of the findings of the county zoning administrator. If the review process is not completed within 60 days or in accordance with established review procedures for the type of development being considered, whichever is greater, the application is considered to be approved for the purposes of this article. Decisions of the county zoning administrator may be appealed to the Butts County board of appeals.

(e) Duration of permit validity.

(1) If construction described in the development permit has not commenced within 12 months from the date of issuance, the permit shall expire.

(2) If construction described in the development permit is suspended or abandoned after work has commenced, the permit shall expire 12 months after the date that work ceased.

(3) Written notice of pending expiration of the development permit shall be issued by the zoning administrator or designee.

Sec. 3.07.05. Aquifer protection standards.

(a) For all pollution susceptibility areas, new solid waste disposal facilities must have synthetic liners and leachate collection systems.

(b) New agricultural waste impoundments shall meet the following requirement: For areas of low susceptibility, a SCS approved liner shall be provided if the site exceeds 50 acre-feet.

(c) No land disposal of hazardous waste shall be permitted within any significant aquifer recharge area.

(d) For all significant aquifer recharge areas, the handling, storage, and disposal of hazardous materials must take place on an impermeable surface having spill and leak protection approved by the Georgia Department of Natural Resources, Environmental Protection Division (EPD).

(e) For all significant aquifer recharge areas, new aboveground chemical or petroleum storage tanks larger than 650 gallons must have secondary containment for 110 percent of tank volume or 110 percent of the largest tanks in a cluster of tanks.

Sec. 3.07.06. Judicial review.

(a) Jurisdiction. All final decisions of the county board of appeals concerning denial, approval, or conditional approval of a permit shall be reviewable in the Butts County Superior Court pursuant to chapter 10.

(b) Alternative actions. Based on these proceedings and the decision of the court, the county may, within the time specified by the court, elect to:

(1) Institute negotiated purchase or condemnation proceedings to acquire an easement or fee interest in the applicant's land; or

(2) Institute other appropriate actions ordered by the court that fall within the jurisdiction of the county.

Sec. 3.07.07. Amendments.

These regulations may, from time to time, be amended in accordance with procedures and requirements in the general statutes and as new information becomes available.

Sec. 3.07.08. Assessment relief.

Assessors and boards of assessors shall consider the requirements of these regulations in determining the fair market value of land.

Sec. 3.08.00. Soil erosion, sedimentation and pollution control.

Sec. 3.08.01. Title.

This article will be known as "The Butts County Soil Erosion, Sedimentation and Pollution Control Ordinance."

Sec. 3.08.02. Definitions.

The following definitions shall apply in the interpretation and enforcement of this article, unless otherwise specifically stated:

Best management practices (BMPs) means sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the commission as of January 1 of the year in which the land-disturbing activity was permitted.

Buffer means, for purposes of this chapter, the area of land immediately adjacent to the banks of state waters in its natural state of vegetation, which facilitates the protection of water quality and aquatic habitat.

Certified personnel means a person who has successfully completed the appropriate certification course approved by the Georgia Soil and Water Conservation Commission.

Commission means, for purposes of this chapter, the Georgia Soil and Water Conservation Commission (GSWCC).

Design professional means a professional licensed by the State of Georgia in the field of:

Engineering, architecture, landscape architecture, forestry, geology, or land surveying; or a person that is a certified professional in erosion and sediment control (CPESC) with a current certification by EnviroCert, Inc. Design professionals shall practice in a manner that complies with applicable Georgia law governing professional licensure.

Director means, for purposes of this chapter, the director of the Environmental Protection Division or an authorized representative.

District means, for purposes of this chapter, the Towaliga Soil and Water Conservation District.

Division means, for purposes of this chapter, the Environmental Protection Division (EPD) of the Department of Natural Resources.

Erosion, sedimentation and pollution control plan means a plan required by the Erosion and Sedimentation Act, O.C.G.A. Ch. 12-7, that includes, at a minimum, protections at least as stringent as the state general permit, best management practices, and requirements in section 3.08.04(c).

Final stabilization means all soil-disturbing activities at the site have been completed and for unpaved areas and areas not covered by permanent structures and areas located outside the waste disposal limits of a landfill cell that has been certified by EPD for waste disposal, 100 percent of the soil surface is uniformly covered in permanent vegetation with a density of 70 percent or greater, or landscaped according to the plan (uniformly covered with landscaping materials in planned landscape areas), or equivalent permanent stabilization measures as defined in the manual (excluding a crop of annual vegetation and seeding of target crop perennials appropriate for the region). Final stabilization applies to each phase of construction.

Local issuing authority means the governing authority of any county or municipality which is certified pursuant to subsection O.C.G.A. § 12-7-8(a).

Nephelometric turbidity units (NTU) means numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed or suspended particles are present.

Operator means, for purposes of this chapter, the party or parties that have:

(1) Operational control of construction project plans and specifications, including the ability to make modifications to those plans and specifications; or

(2) Day-to-day operational control of those activities that are necessary to ensure compliance with an erosion, sedimentation and pollution control plan for the site or other permit conditions, such as a person authorized to direct workers at a site to carry out activities required by the erosion, sedimentation and pollution control plan or to comply with other permit conditions.

Properly designed means designed in accordance with the design requirements and specifications contained in the Manual for Erosion and Sediment Control in Georgia (manual) published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted and amendments to the manual as approved by the commission up until the date of notice of intent submittal.

Roadway drainage structure means a device such as a bridge, culvert, or ditch, composed of a virtually nonerodible material such as concrete, steel, plastic, or other such material that conveys water under a roadway by intercepting the flow on one side of a traveled roadway consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side.

State general permit means the National Pollution Discharge Elimination System (NPDES) general permit or permits for stormwater runoff from construction activities as is now in effect or as may be amended or reissued in the future pursuant to the state's authority to implement the same through federal delegation under the Federal Water Pollution Control Act, as amended, 33 U.S.C. 1251 et seq., O.C.G.A. § 12-5-30(f).

Trout streams means all streams or portions of streams within the watershed as designated by the Wildlife Resources Division of the Georgia Department of Natural Resources under the provisions of the Georgia Water Quality Control Act, O.C.G.A.

§ 12-5-20, in the rules and regulations for Water Quality Control, Chapter 391-3-6 at www.gaepd.org. Streams designated as primary trout waters are defined as water supporting a self-sustaining population of rainbow, brown or brook trout. Streams designated as secondary trout waters are those in which there is no evidence of natural trout reproduction but are capable of supporting trout throughout the year. First order trout waters are streams into which no other streams flow except springs.

Sec. 3.08.03. Exemptions.

This article shall apply to any land-disturbing activity undertaken by any person on any land except for the following:

(a) Surface mining, as the same is defined in O.C.G.A. § 12-4-72, "The Georgia Surface Mining Act of 1968";

(b) Granite quarrying and land clearing for such quarrying;

(c) Such minor land-disturbing activities as home gardens and individual home landscaping, repairs, maintenance work, fences, and other related activities which result in minor soil erosion;

(d) The construction of single-family residences, when such construction disturbs less than one acre and is not a part of a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre and not otherwise exempted under this paragraph; provided, however, that construction of any such residence shall conform to the minimum requirements as set forth in O.C.G.A.

§ 12-7-6 and this paragraph. For single-family residence construction covered by the provisions of this paragraph, there shall be a buffer zone between the residence and any state waters classified as trout streams pursuant to Article 2 of Chapter 5 of the Georgia Water Quality Control Act. In any such buffer zone, no land-disturbing activity shall be constructed between the residence and the point where vegetation has been wrested by normal stream flow or wave action from the banks of the trout waters. For primary trout waters, the buffer zone shall be at least 50 horizontal feet, and no variance to a smaller buffer shall be granted. For secondary trout waters, the buffer zone shall be at least 50 horizontal feet, but the director may grant variances to no less than 25 feet. Regardless of whether a trout stream is primary or secondary, for first order trout waters, which are streams into which no other streams flow except for springs, the buffer shall be at least 25 horizontal feet, and no variance to a smaller buffer shall be granted. The minimum requirements of O.C.G.A. § 12-7- 6(b) and the buffer zones provided by this paragraph shall be enforced by the local issuing authority;

(e) Agricultural operations as defined in O.C.G.A. § 1-3-3, "definitions," to include raising, harvesting or storing of products of the field or orchard; feeding, breeding or managing livestock or poultry; producing or storing feed for use in the production of livestock, including, but not limited to, cattle, calves, swine, hogs, goats, sheep, and rabbits or for use in the production of poultry, including, but not limited to, chickens, hens and turkeys; producing plants, trees, fowl, or animals; the production of aquaculture, horticultural, dairy, livestock, poultry, eggs and apiarian products; farm buildings and farm ponds;

(f) Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause or result in land-disturbing or other activities otherwise prohibited in a buffer, as established in paragraphs (15) and (16) of section 3.08.04(c), no other land-disturbing activities, except for normal forest management practices, shall be allowed on the entire property upon which the forestry practices were conducted for a period of three years after completion of such forestry practices;

(g) Any project carried out under the technical supervision of the Natural Resources Conservation Service (NRCS) of the United States Department of Agriculture;

(h) Any project involving less than one acre of disturbed area; provided, however, that this exemption shall not apply to any land-disturbing activity within a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre or within 200 feet of the bank of any state waters, and for purposes of this paragraph, "state waters" excludes channels and drainage ways which have water in them only during and immediately after rainfall events and intermittent streams which do not have water in them year-round; provided, however, that any person responsible for a project which involves less than one acre, which involves land-disturbing activity, and which is within 200 feet of any such excluded channel or drainage way, must prevent sediment from moving beyond the boundaries of the property on which such project is located and provided, further, that nothing contained herein shall prevent the local issuing authority from regulating any such project which is not specifically exempted by paragraphs (a), (b), (c), (d), (e), (f), (g), (i) or (j) of this section;

(i) Construction or maintenance projects, or both, undertaken or financed in whole or in part, or both, by the Department of Transportation, the Georgia Highway Authority, or the state road and tollway authority; or any road construction or maintenance project, or both, undertaken by any county or municipality; provided, however, that construction or maintenance projects of the Department of Transportation or the state road and tollway authority which disturb one or more contiguous acres of land shall be subject to provisions of O.C.G.A. § 12-7-7.1; except where the Department of Transportation, the Georgia Highway Authority, or the state road and tollway authority is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case a copy of a notice of intent under the state general permit shall be submitted to the local issuing authority, the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders;

(j) Any land-disturbing activities conducted by any electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power; except where an electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders; and

(k) Any public water system reservoir.

Sec. 3.08.04. Minimum requirements for erosion, sedimentation and pollution control using best management practices.

(a) General provisions. Excessive soil erosion and resulting sedimentation can take place during land-disturbing activities if requirements of this article and the NPDES general permit are not met. Therefore, plans for those land-disturbing activities which are not exempted by this article shall contain provisions for application of soil erosion, sedimentation and pollution control measures and practices. The provisions shall be incorporated into the erosion, sedimentation and pollution control plans. Soil erosion, sedimentation and pollution control measures and practices shall conform to the minimum requirements of section 3.08.04(b) and (c). The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed to prevent or control erosion, sedimentation and pollution during all stages of any land-disturbing activity in accordance with requirements of this ordinance and the NPDES general permit.

(b) Minimum requirements/BMPs.

(1) Best management practices as set forth in section 3.08.04(b) and (c) shall be required for all land-disturbing activities. Proper design, installation, and maintenance of best management practices shall constitute a complete defense to any action by the director or to any other allegation of noncompliance with paragraph (2) of this subsection or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to O.C.G.A. § 12-5-30(f), the "Georgia Water Quality Control Act." As used in this subsection, the terms "proper design" and "properly designed" mean designed in accordance with the hydraulic design specifications contained in the Manual for Erosion and Sediment Control in Georgia specified in O.C.G.A. § 12-7-6(b).

(2) A discharge of stormwater runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained shall constitute a separate violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A.

§ 12-5-30(f), the "Georgia Water Quality Control Act," for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters.

The turbidity of the receiving waters shall be measured in accordance with guidelines to be issued by the director. This paragraph shall not apply to any land disturbance associated with the construction of single-family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres.

(3) Failure to properly design, install, or maintain best management practices shall constitute a violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A.

§ 12-5-30(f), the "Georgia Water Quality Control Act," for each day on which such failure occurs.

(4) The director may require, in accordance with regulations adopted by the board of natural resources, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land-disturbing activities occur.

(5) The local issuing authority may set more stringent buffer requirements than stated in section 3.08.04(c)(15) and (16), in light of O.C.G.A. § 12-7-6(c).

(c) The rules and regulations, ordinances, or resolutions adopted pursuant to O.C.G.A.

§ 12-7-1 et seq. for the purpose of governing land-disturbing activities shall require, as a minimum, protections at least as stringent as the state general permit and best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, as well as the following:

(1) Stripping of vegetation, regrading and other development activities shall be conducted in a manner so as to minimize erosion;

(2) Cut-fill operations must be kept to a minimum;

(3) Development plans must conform to topography and soil type so as to create the lowest practicable erosion potential;

(4) Whenever feasible, natural vegetation shall be retained, protected and supplemented;

(5) The disturbed area and the duration of exposure to erosive elements shall be kept to a practicable minimum;

(6) Disturbed soil shall be stabilized as quickly as practicable;

(7) Temporary vegetation or mulching shall be employed to protect exposed critical areas during development;

(8) Permanent vegetation and structural erosion control practices shall be installed as soon as practicable;

(9) To the extent necessary, sediment in run-off water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A.

§ 12-7-1 et seq.;

(10) Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping of fills;

(11) Cuts and fills may not endanger adjoining property;

(12) Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners;

(13) Grading equipment must cross flowing streams by means of bridges or culverts except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum;

(14) Land-disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on site or preclude sedimentation of adjacent waters beyond the levels specified in section 3.08.04(b)(2);

(15) Except as provided in paragraph (16) of this subsection, there is established a 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the director pursuant to O.C.G.A. § 12-2-8, where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or along any ephemeral stream. As used in this provision, the term "ephemeral stream" means a stream that under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the ground-water table year round; for which ground water is not a source of water; and for which runoff from precipitation is the primary source of water flow. Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to Part 6 of Article 5, Chapter 5 of Title 12, the "Georgia Water Quality Control Act," shall remain in force unless a variance is granted by the director as provided in this paragraph.

The following requirements shall apply to any such buffer:

a. No land-disturbing activities shall be conducted within a buffer, and a buffer shall remain in its natural, undisturbed state of vegetation until all landdisturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and

b. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented:

1. Stream crossings for water lines; or

2. Stream crossings for sewer lines; and

(16) There is established a 50-foot buffer as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action along the banks of any state waters classified as trout streams pursuant to Article 2 of Chapter 5 of Title 12, the "Georgia Water Quality Control Act," except where a roadway drainage structure must be constructed; provided, however, that small springs and streams classified as trout streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25-foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the Board of Natural Resources, so long as any such pipe stops short of the downstream landowner's property and the landowner complies with the buffer requirement for any adjacent trout streams. The director may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented.

The following requirements shall apply to such buffer:

a. No land-disturbing activities shall be conducted within a buffer, and a buffer shall remain in its natural, undisturbed, state of vegetation until all landdisturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed: provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and

b. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented:

1. Stream crossings for water lines; or

2. Stream crossings for sewer lines.

(d) Nothing contained in O.C.G.A. § 12-7-1 et seq. shall prevent any local issuing authority from adopting rules and regulations, ordinances, or resolutions which contain stream buffer requirements that exceed the minimum requirements in section 3.08.04(b) and (c).

(e) The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit.

Sec. 3.08.05. Application/permit process.

(a) General. The property owner, developer and designated planners and engineers shall design and review before submittal the general development plans. The local issuing authority shall review the tract to be developed and the area surrounding it. They shall consult the zoning ordinance, stormwater management ordinance, subdivision ordinance, flood damage prevention ordinance, this article, and any other ordinances, rules, regulations or permits which regulate the development of land within the jurisdictional boundaries of the local issuing authority. However, the owner and/or operator are the only parties who may obtain a permit.

(b) Application requirements.

(1) No person shall conduct any land-disturbing activity within the jurisdictional boundaries of the county without first obtaining a permit from the Butts County community development department to perform such activity and providing a copy of notice of intent submitted to EPD if applicable.

(2) The application for a permit shall be submitted to the Butts County community development department and must include the applicant's erosion, sedimentation and pollution control plan with supporting data, as necessary. Said plans shall include, as a minimum, the data specified in section 3.08.05(c). Erosion, sedimentation and pollution control plans, together with supporting data, must demonstrate affirmatively that the land-disturbing activity proposed will be carried out in such a manner that the provisions of section 3.08.04(b) and (c) will be met. Applications for a permit will not be accepted unless accompanied by two copies of the applicant's erosion, sedimentation and pollution control plans. All applications shall contain a certification stating that the plan preparer or the designee thereof visited the site prior to creation of the plan in accordance with EPD Rule 391-3-7-.10.

(3) In addition to the local permitting fees, fees will also be assessed pursuant to paragraph (5) subsection (a) of O.C.G.A. § 12-5-23, provided that such fees shall not exceed $80.00 per acre of land-disturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the state general permit for each acre of land-disturbing activity included in the planned development or each phase of development. All applicable fees shall be paid prior to issuance of the landdisturbance permit. In a jurisdiction that is certified pursuant to O.C.G.A. § 12-7- 8(a), half of such fees levied shall be submitted to the division; except that any and all fees due from an entity which is required to give notice pursuant to O.C.G.A.

§ 12-7-17(9) or (10) shall be submitted in full to the division, regardless of the existence of a local issuing authority in the jurisdiction.

(4) Immediately upon receipt of an application and plan for a permit, the local issuing authority shall refer the application and plan to the district for its review and approval or disapproval concerning the adequacy of the erosion, sedimentation and pollution control plan. The district shall approve or disapprove a plan within 35 days of receipt. Failure of the district to act within 35 days shall be considered an approval of the pending plan. The results of the district review shall be forwarded to the local issuing authority. No permit will be issued unless the plan has been approved by the district and any variances required by section 3.08.04(c)(15) and (16) have been obtained, all fees have been paid, and bonding, if required as per section 3.08.05(b)(6), has been obtained. Such review will not be required if the local issuing authority and the district have entered into an agreement which allows the local issuing authority to conduct such review and approval of the plan without referring the application and plan to the district. The local issuing authority with plan review authority shall approve or disapprove a revised plan submittal within 35 days of receipt. Failure of the local issuing authority with plan review authority to act within 35 days shall be considered an approval of the revised plan submittal.

(5) If a permit applicant has had two or more violations of previous permits, this section, or the Erosion and Sedimentation Act, as amended, within three years prior to the date of filing the application under consideration, the local issuing authority may deny the permit application.

(6) The local issuing authority may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction thereof of the proposed land-disturbing activity, prior to issuing the permit. If the applicant does not comply with this section or with the conditions of the permit after issuance, the local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance. These provisions shall not apply unless there is in effect an ordinance or statute specifically providing for hearing and judicial review of any determination or order of the local issuing authority with respect to alleged permit violations.

(c) Plan requirements.

(1) Plans must be prepared to meet the minimum requirements as contained in section 3.08.04(b) and (c), or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. The Manual for Erosion and Sediment Control in Georgia is hereby incorporated by reference into this article. The plan for the land-disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and storm water management facilities, local ordinances and state laws. Maps, drawings and supportive computations shall bear the signature and seal of the certified design professional. Persons involved in land development design, review, permitting, construction, monitoring, or inspections or any land-disturbing activity shall meet the education and training certification requirements, dependent on his or her level of involvement with the process, as developed by the commission and in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20.

(2) Data required for site plan shall include all the information required from the appropriate erosion, sedimentation and pollution control plan review checklist established by the commission as of January 1 of the year in which the landdisturbing activity was permitted.

(d) Permits.

(1) Permits shall be issued or denied as soon as practicable but in any event not later than 45 days after receipt by the local issuing authority of a completed application, providing variances and bonding are obtained, where necessary, and all applicable fees have been paid prior to permit issuance. The permit shall include conditions under which the activity may be undertaken.

(2) No permit shall be issued by the local issuing authority unless the erosion, sedimentation and pollution control plan has been approved by the district and the local issuing authority has affirmatively determined that the plan is in compliance with this article, any variances required by section 3.08.04(c)(15) and (16) are obtained, bonding requirements, if necessary, as per section 3.08.05(b)(6) are met, and all ordinances and rules and regulations in effect within the jurisdictional boundaries of the local issuing authority are met. If the permit is denied, the reason for denial shall be furnished to the applicant.

(3) Any land-disturbing activities by a local issuing authority shall be subject to the same requirements of this ordinance, and any other ordinances relating to land development, as are applied to private persons, and the division shall enforce such requirements upon the local issuing authority.

(4) If the tract is to be developed in phases, then a separate permit shall be required for each phase.

(5) The permit may be suspended, revoked, or modified by the local issuing authority, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in the title is not in compliance with the approved erosion and sedimentation control plan or that the holder or his successor in title is in violation of this article. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the conditions contained in the permit.

(6) The local issuing authority may reject a permit application if the applicant has had two or more violations of previous permits or the Erosion and Sedimentation Act permit requirements within three years prior to the date of the application, in light of O.C.G.A. § 12-7-7(f)(1).

(7) No permit shall be issued unless the applicant provides a statement by the tax commissioner's office certifying that all ad valorem taxes levied against the property and due and owing have been paid.

Sec. 3.08.06. Inspection and enforcement.

(a) The Butts County community development department will periodically inspect the sites of land-disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation. Also, the local issuing authority shall regulate primary, secondary and tertiary permittees as such terms are defined in the state general permit. Primary permittees shall be responsible for installation and maintenance of best management practices where the primary permittee is conducting land-disturbing activities. Secondary permittees shall be responsible for installation and maintenance of best management practices where the secondary permittee is conducting land-disturbing activities. Tertiary permittees shall be responsible for installation and maintenance where the tertiary permittee is conducting land-disturbing activities. If, through inspection, it is deemed that a person engaged in land-disturbing activities as defined herein has failed to comply with the approved plan, with permit conditions, or with the provisions of this article, a written notice to comply shall be served upon that person.

The notice shall set forth the measures necessary to achieve compliance and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article.

(b) The local issuing authority must amend its ordinances to the extent appropriate within 12 months of any amendments to the Erosion and Sedimentation Act of 1975.

(c) The Butts County community development department shall have the power to conduct such investigations as it may reasonably deem necessary to carry out duties as prescribed in this article, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land-disturbing activities.

(d) No person shall refuse entry or access to any authorized representative or agent of the local issuing authority, the commission, the district, or division who requests entry for the purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties.

(e) The district or the commission or both shall semi-annually review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7-8(a). The district or the commission or both may provide technical assistance to any county or municipality for the purpose of improving the effectiveness of the county's or municipality's erosion, sedimentation and pollution control program. The district or the commission shall notify the division and request investigation by the division if any deficient or ineffective local program is found.

(f) The division may periodically review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7-8(a). Such review may include, but shall not be limited to, review of the administration and enforcement of a governing authority's ordinance and review of conformance with an agreement, if any, between the district and the governing authority. If such review indicates that the governing authority of any county or municipality certified pursuant to O.C.G.A. § 12-7-8(a) has not administered or enforced its ordinances or has not conducted the program in accordance with any agreement entered into pursuant to O.C.G.A. § 12-7-7(e), the division shall notify the governing authority of the county or municipality in writing. The governing authority of any county or municipality so notified shall have 90 days within which to take the necessary corrective action to retain certification as a local issuing authority. If the county or municipality does not take necessary corrective action within 90 days after notification by the division, the division shall revoke the certification of the county or municipality as a local issuing authority.

Sec. 3.08.07. Penalties and incentives.

(a) Failure to obtain a permit for land-disturbing activity. If any person commences any land-disturbing activity requiring a land-disturbing permit as prescribed in this article without first obtaining said permit, the person shall be subject to revocation of his business license, work permit or other authorization for the conduct of a business and associated work activities within the jurisdictional boundaries of the local issuing authority.

(b) Stop-work orders.

(1) For the first and second violations of the provisions of this article, the director or the local issuing authority shall issue a written warning to the violator. The violator shall have five days to correct the violation. If the violation is not corrected within five days, the director or the local issuing authority shall issue a stop-work order requiring that land-disturbing activities be stopped until necessary corrective action or mitigation has occurred; provided, however, that if the violation presents an imminent threat to public health or waters of the state or if the land-disturbing activities are conducted without obtaining the necessary permit, the director or the local issuing authority shall issue an immediate stop-work order in lieu of a warning;

(2) For a third and each subsequent violation, the director or the local issuing authority shall issue an immediate stop-work order; and

(3) All stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred;

(4) When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or significant amounts of sediment, as determined by the local issuing authority or by the director or his or her designee, have been or are being discharged into state waters and where best management practices have not been properly designed, installed, and maintained, a stop-work order shall be issued by the local issuing authority or by the director or his or her designee. All such stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. Such stop-work orders shall apply to all land-disturbing activity on the site with the exception of the installation and maintenance of temporary or permanent erosion and sediment controls.

(c) Bond forfeiture. If, through inspection, it is determined that a person engaged in land-disturbing activities has failed to comply with the approved plan, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance with the plan and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this ordinance and, in addition to other penalties, shall be deemed to have forfeited his performance bond, if required to post one under the provisions of section 3.08.05(b)(6). The local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance.

(d) Monetary penalties. Any person who violates any provisions of this article, or any permit condition or limitation established pursuant to this article, or who negligently or intentionally fails or refuses to comply with any final or emergency order of the director issued as provided in this article shall be liable for a civil penalty not to exceed $2,500.00 per day. For the purpose of enforcing the provisions of this article, notwithstanding any provisions in any city charter to the contrary, municipal courts shall be authorized to impose a penalty not to exceed $2,500.00 for each violation. Notwithstanding any limitation of law as to penalties which can be assessed for violations of county ordinances, any magistrate court or any other court of competent jurisdiction trying cases brought as violations of this article under county ordinances approved under this article shall be authorized to impose penalties for such violations not to exceed $2,500.00 for each violation. Each day during which violation or failure or refusal to comply continues shall be a separate violation.

Sec. 3.08.08. Education and certification.

(a) Persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the commission in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20.

(b) For each site on which land-disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the state general permit, shall have as a minimum one person who is in charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the commission present on site whenever landdisturbing activities are conducted on that site. A project site shall herein be defined as any land-disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit.

(c) Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on site may contract with certified persons to meet the requirements of this ordinance.

(d) If a state general permittee who has operational control of land-disturbing activities for a site has met the certification requirements of O.C.G.A. § 12-7-19(b)(1), then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in O.C.G.A § 12-7-19(b)(4) and shall not be required to meet any educational requirements that exceed those specified in said paragraph.

Sec. 3.08.09. Administrative appeal judicial review.

(a) Administrative remedies. The suspension, revocation, modification or grant with condition of a permit by the local issuing authority upon finding that the holder is not in compliance with the approved erosion, sediment and pollution control plan; that the holder is in violation of permit conditions; or that the holder is in violation of any ordinance shall entitle the person submitting the plan or holding the permit to a hearing before the board of appeals within 30 days after receipt by the local issuing authority of written notice of appeal.

(b) Judicial review. Any person, aggrieved by a decision or order of the local issuing authority, after exhausting his administrative remedies, shall have the right to appeal to the Superior Court of Butts County.

Sec. 3.08.10. Validity and liability.

(a) Validity. If any section, paragraph, clause, phrase, or provision of this article shall be adjudged invalid or held unconstitutional, such decisions shall not affect the remaining portions of this article.

(b) Liability.

(1) Neither the approval of a plan under the provisions of this article nor the compliance with provisions of this article shall relieve any person from the responsibility for damage to any person or property otherwise imposed by law nor impose any liability upon the local issuing authority or district for damage to any person or property.

(2) The fact that a land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this ordinance or the terms of the permit.

(3) No provision of this article shall permit any persons to violate the Georgia Erosion and Sedimentation Act of 1975, the Georgia Water Quality Control Act or the rules and regulations promulgated and approved thereunder or pollute any waters of the state as defined thereby.

Sec. 3.09.00. Tree and vegetation protection.

Sec. 3.09.01. Purpose.

The purpose of this section is to provide for the protection, conservation, and replacement of trees and landscaping in order to improve the urbanized and natural environment of Butts County. It is the policy of Butts County to minimize the removal of trees on development sites and, upon proper site completion, achieve replacement of trees by uniform standards set forth in this section.

Sec. 3.09.02. Applicability.

(a) The terms and provisions of this section and the standards set forth shall apply to:

(1) Individuals engaged in any activity, private and/or governmental, on real property which requires the issuance of a land disturbance permit within the county.

(2) Individuals engaged in the building and/or development of single-family homes or subdivisions, multifamily and manufactured home developments, and all nonresidential uses.

(3) Owners of individual properties more than five acres in size and which are not part of a platted subdivision.

(b) Nothing in this section shall be construed to allow the removal of any tree or vegetation in a required stream buffer, watershed buffer, buffer adjacent to waters of the state, or other undisturbed or planted buffer located for protection of natural resources, except where such removal has been specifically authorized as set forth in this UDO.

Sec. 3.09.03. Specific requirements for timber lands.

(a) Land that is used for silviculture shall comply with the requirements of subsection 3.09.03(b) or subsection 3.09.03(c), below.

(b) Land that is declared silviculture shall be exempt from the requirements for tree protection provided that the following conditions are met:

(1) A certificate from the tax assessor indicating agricultural preference;

(2) A forest management plan, demonstrating compliance with the erosion control standards set forth in section 3.08.00; and

(3) A commitment to follow the Georgia Forestry Commission's "Best Management Practices" as set forth in paragraph (e), below.

(c) Land that has been designated silviculture may subsequently be developed, provided that a development plan has been prepared and approved by the zoning administrator prior to any clearing, grading, clear-cutting, or other land disturbance. The purpose of the development plan is to ensure that cutting or harvesting of trees occurs in such a manner as to avoid the practice called "clear-cutting" prior to any subsequent development.

(d) Prior to clearing, harvesting, or cutting trees, or any grading or land disturbance, a combined timbering and logging permit shall be obtained from the county. The development plan shall include a forest management plan for the timberlands site. The management plan shall demonstrate compliance with erosion control standards set forth in section 3.08.00, protection of soil and water resources, and compliance with best management practices.

(e) Georgia Forestry Commission's "Best Management Practices" (BMPs) include, but are not limited to:

(1) Analyze and plan site preparation, taking into account all aspects of streamside management zones.

(2) Avoid the cutting of roads or trails unless absolutely necessary. If roads/trails are necessary, do not locate them on ridge-tops and avoid use of soft roads/trails during wet ground conditions.

(3) Avoid harrowing, root raking, or bulldozing.

(4) When forestry activities are completed for a particular period of time, temporary access roads shall be retired. This includes reshaping, mulching, and seeding, in combination with water bars.

(5) Leave logging debris on exposed soil, dry washes, and at points of concentrated drainage from skid trails and road. Do not pile debris in live or wet-weather streams.

(6) Do not service logging equipment where it will have an impact on soil or water quality.

(7) Skidding on steep slopes shall be done on a gradual grade rather than straight up the slope, and skidding shall be alternated between several skidding trails to minimize soil exposure and disturbance.

(f) In addition to the BMPs set forth above and by the Georgia Forestry Commission, the property owner shall not conduct any other land-disturbing activities for a period of three years after the completion of such forestry practices.

Sec. 3.09.04. Exemptions.

The following situations are exempt from the provisions of section 3.09.00:

(a) Individual homeowners within platted subdivisions. The exemption does not include an exemption from requirements for protective buffers along streams, creeks, and reservoirs.

(b) All properties for which a covenant has been established with the Butts County board of tax assessors, pursuant to O.C.G.A. §§ 48-5-7.1 and 48-5-7.4, shall be exempt from the terms of this section so long as such covenant has not been breached and/or remains in effect.

(c) The following situations within all residential districts shall also be exempted:

(1) Where the addition to a principal structure will constitute structural and exterior changes to the home.

(2) Where the construction of an accessory structure(s) and/or uses including, but not limited to, swimming pools and tennis courts, is permitted, including an accessory residential living facility (a.k.a. guest quarters).

(3) The removal of diseased, deceased, infested or dying trees, or living pine trees or other trees which may pose a danger to an existing or proposed home, or other structure.

(4) Mass grading is allowed for lots 10,890 square feet or smaller.

Sec. 3.09.05. Requirements in all zoning districts.

(a) The mass grading and/or clear-cutting of properties and/or parcels of land which are five acres in size or greater for residential development is strictly prohibited, except as noted in subsection 3.09.04(c). As to each such development, only so much land area shall be cleared as is necessary for the development and construction of roadways, utilities, and amenity areas (i.e., parking lots for clubhouses, pool areas, tennis courts, etc.).

(b) Mass grading and clear-cutting of any lot in a residential subdivision are prohibited, except as noted in subsection 3.09.04(c). On such lots, land area shall be cleared only as is necessary for purposes of the proper development of said lot. Clearing shall be limited to the specific development and an area not to exceed ten feet from the specific development, including areas for:

(1) The placement of the individual home;

(2) The placement of driveways and sidewalks;

(3) The placement of utilities and detention ponds;

(4) The placement of septic systems;

(5) The placement of roads;

(6) The placement of decks and patios; and

(7) Proper drainage as required by the county.

(c) Developers and builders shall coordinate the location of all utilities with all utility companies in order to prevent root damage within the critical root zones of protected trees, so as to minimize damage to trees in the protected zones.

(d) Topographical difficulties and/or the installation of utilities shall be considered at the time of the development of a residential subdivision or parcel. Each parcel of land shall be considered on a case-by-case basis as to the removal of trees where topography and/or utility installation is a factor. Special consideration should be given to maintaining the natural topography of the land when possible, and to applying existing trees to the development of a site. The zoning administrator shall have final approval of the site. Failure to follow the approved development plan shall result in denial of the issuance of a certificate of occupancy.

(e) Unnecessary removal of trees or other vegetation shall be prohibited. The planting of grass or other ground covers shall not supersede the requirement for trees as indicated by each zoning district.

(f) Efforts should be taken to preserve existing trees, especially those trees which are eight inches dbh or larger and which are of a considerable age but not dying or diseased. The preservation of large specimen trees is encouraged.

(g) It is desirable that planted trees be ecologically compatible with the site and neighborhood.

(h) Replacement trees shall be planted in a manner that will provide adequate space for nourishment, light, and maturation.

Sec. 3.09.06. Protection of trees during construction.

Methods and standards for tree protection shall be required as follows:

(a) Trees identified to be preserved and/or planted, and being counted as credit for meeting the requirements of section 3.09.00, shall have a valid, recognizable method of tree-protection (tree-save) marking or delineation installed at the critical root zones.

(b) No person engaged in the construction of any structure(s) or improvement(s) shall encroach on a designated tree-save/critical root zone area with heavy machinery or the storage of heavy building materials.

(c) During construction, a tree-save area must be designated around any trees that are to remain at the end of construction. Desirable trees should be identified and a physical barrier set up around the tree or group of trees. This barrier can consist of a four-foot high orange safety fence, wide plastic caution tape, a simple fence made of lumber, or other appropriate methods that can identify the noninvasive drip line area.

(d) The barrier should be placed beyond the drip zone (critical root zone) and should prevent the stockpiling of soil or building materials, dumping cleaning solvents, or parking vehicles or equipment within this barricaded area.

CHAPTER 4

SITE DESIGN STANDARDS

Sec. 4.00.00. Generally.

Sec. 4.00.01. Purpose.

The purpose of this chapter is to provide design standards applicable to all development activity within the county. This chapter also provides design standards applicable in specific situations, such as development within overlay districts or development of specific uses that require additional standards to address potential impacts.

Sec. 4.00.02. Development standards in general.

(a) Suitability of land. Land on which there is a danger to health, safety, or property should not be platted for residential use or other use that will continue or increase such danger when practicable, unless such hazards can be and are corrected. Examples of such conditions are as follows:

(1) Land subject to flooding, improper drainage, or erosion.

(2) Land with excessive slope or other physical constraints which make it unsuitable for development.

(b) Name of subdivision. The name of the subdivision must have the approval of the planning and zoning commission. The name must not duplicate or closely approximate the name of an existing subdivision.

(c) Access. Except where expressly provided herein, access to every subdivision must be provided over a public street, and every lot within a subdivision must be served by a publicly dedicated street or a private street approved by the planning and zoning commission.

(d) Conformance with adopted land use plan. Proposed subdivisions should conform with the adopted Butts County land use plan and development policies in effect at the time of submission to the planning and zoning commission. When features of the Butts County land use plan such as sites for schools, public buildings, parks, major streets, or other public uses are located in whole or in part in a proposed subdivision, such features should be either dedicated or reserved by the subdivider for acquisition within a reasonable time by the appropriate public agency.

(e) Reservation or dedication of public use areas.

(1) Reservation of plan features. Where the features of the Butts County land use plan such as sites for schools, public buildings, parks, major streets, or other public uses are located in whole or in part in a proposed subdivision, such features must be reserved by the subdivider. However, no more than ten percent of the total area of the subdivision will be required for reservation to fulfill this requirement. Whenever the land required for such plan features is not purchased, acquired, optioned, or condemned by the appropriate public agency within a two-year period from the date of recording of the subdivision or by the time that at least 75 percent of the lots are built on and occupied, whichever is sooner, the subdivider may claim the original reservation and subdivide it in a manner that meets the requirements of this ordinance. Whenever a public body responsible for land acquisition executes a written release stating that the reserved land is not to be acquired, the planning and zoning commission will waive the reservation requirements.

(2) Reservation omissions. The planning and zoning commission will not approve a subdivision plat when features specified in the Butts County land use plan are not incorporated into the subdivision plat and the reservation requirements for such features have not been waived.

(3) Unsuitable reservations. Whenever the planning and zoning commission finds that a proposed reservation or dedication of land for public use is not suitable for such public use, it may require the rearrangement of lots to provide suitable land for public use.

(4) Unnecessary reservations. Whenever the planning and zoning commission finds that a proposed reservation or dedication of land for public use is not necessary, it may permit the rearrangement of lots to eliminate the area proposed for such public use.

(f) Planned developments. A planned development, including large-scale construction of housing units, streets, and off-street parking facilities, may be approved in accordance with the requirements for planned developments set forth in this ordinance. If the design of the project does not include standard streets, lots, or subdivision arrangements, departure from the normal requirements of this ordinance may be permitted if such deviations are consistent with the intent of this ordinance or are permitted in the requirements for planned developments set forth in this ordinance. If a planned development is to be phased, then each phase shall require a separate application and approval. The developer of such a proposal is urged to consult early with the planning and zoning commission to coordinate, plan, and plat properly.

(g) Community assets. In all subdivisions, due regard must be shown for all natural features such as large trees, watercourses, historical sites, and similar community assets which will add attractiveness and value to the property if preserved.

Sec. 4.00.03. Principles of site design and development.

Development design shall first take into account the protection of environmental and natural resources as set forth in chapter 3. All development shall be designed to avoid unnecessary impervious surface cover; to provide adequate access to lots and sites; and to avoid adverse effects of shadow, glare, noise, odor, traffic, drainage, and utilities on surrounding properties.

Sec. 4.00.04. Applicability.

The design standards set forth in this chapter apply to all development in unincorporated Butts County.

Sec. 4.01.00. Site design standards for base zoning districts.

Sec. 4.01.01. Development standards for subdivision lots.

All subdivision lots established in Butts County must comply with the development standards contained in this ordinance. However, where provisions of the zoning ordinance apply and are stricter, those provisions take precedence. Development standards for lots are as follows:

(a) Lot lines. As far as practical, side lot lines must be perpendicular or radial to street lines.

(b) Jurisdictional limits and lot lines. Subdivision lots must not be divided by city or county boundary lines.

(c) Lot frontage arrangements. Land must be subdivided in a manner that provides each lot in the subdivision with direct abutting access to an existing public street or to an approved private street contained within the proposed subdivision. Each lot must front for at least 60 feet upon an approved street or road. Flag lots are prohibited in subdivisions unless topographic conditions or the shape and orientation of the property to be subdivided make the inclusion of some flag lots necessary. Flag lots are not intended to provide access to other properties so as to circumvent the street and right-of-way requirements of this ordinance. When such a lot is allowed, the street frontage of each panhandle access must be at least 60 feet wide and no more than 500 feet long. No more than two such panhandle access points may abut each other or be closer than 1,000 feet apart. A flag lot is intended only to provide a means of using the rear portion of an extremely deep tract of land for residential purposes.

(d) Adequate building sites. Each subdivision lot must contain an adequate building site not subject to flooding and outside the limits of existing easements or building setback lines required by this ordinance or any existing ordinance as is appropriate.

(e) Double or reverse frontage lots. Double and reverse frontage lots, unless required by the planning and zoning commission, are prohibited except where essential to provide separation of residential development from traffic arteries or to overcome specific disadvantages of slope, orientation, or property size. A reserve strip planted with a vegetative screen across which there is no right of access may be required along the line of lots abutting a traffic artery or other such incompatible use.

(f) Commercial and industrial lots. Size, shape, and arrangement of commercial and industrial lots, where platted and classified as a subdivision, are subject to the approval of the planning and zoning commission.

(g) Lot remnants. Lot remnants are prohibited. Such remnant areas must be added to adjacent lots, rather than remain as unusable parcels.

(h) Monuments. Solid steel rods at least one-half inch in diameter or square and two feet long must be set at all street corners, at all points where street lines intersect the exterior boundaries of the subdivision, at angle points in streets, at points of curve in streets, and at points of change of direction in the exterior boundaries of the subdivision. The top of the monument must have an indented cross to identify the finished grade. All other lot corners must be marked with solid steel rods no less than one-half inch in diameter, and at least two feet long, driven so as to be flush with the finished grade.

Sec. 4.01.02. Design standards for lots.

The following regulations apply to properties in all zoning districts, unless the regulations of a particular zoning district expressly provide otherwise.

(a) Sight distance. In order to ensure maintenance of adequate sight distances at intersections, no fence, wall, shrubbery, or other obstruction to vision between the heights of three feet and 15 feet above the ground is permitted within 20 feet of the intersection of the rights-of-way of streets or of streets and railroads.

(b) Applicability to land, buildings, and open space. No building, structure, land, or open space may be used or occupied—and no building or structure or part of a building or structure may be erected, constructed, reconstructed, moved, or structurally altered — unless in conformity with all of the regulations specified for the district in which it is located.

(c) Every use must be on a lot. No building or structure may be erected or use established unless upon a lot.

(d) Only one principal building per lot. Only one principal building and its accessory buildings may be erected on any lot, except for planned developments or as otherwise provided.

(e) Open space not to be encroached upon. No open space may be encroached upon or reduced in any manner except in conformity with the setback, off-street parking spaces, and other such required development standards contained in this ordinance.

Shrubbery, driveways, retaining walls, fences, curbs, and buffers are not considered to be encroachments of setbacks. Open space areas as required by this ordinance must be permanently maintained as open space in accordance with the requirements of this ordinance.

(f) Reduction of setbacks or lot area. Except as otherwise provided in this ordinance, a lot existing at the time of passage of this ordinance may not be reduced, divided, or changed as to produce a tract of land which does not comply with the minimum dimension or area requirements of this ordinance for the district in which it is located unless that reduction or division is necessary to provide land which is needed and accepted for public use.

(g) Lots with multiple frontage. In the case of a corner lot or double frontage lot, front setback requirements apply to all lot lines abutting a street.

(h) Landlocked lots. In the case of a landlocked lot (a lot without direct access to a public street or road) lawfully existing as of the effective date of this ordinance, the property owner is entitled to one building permit, as long as all of the following requirements are met:

(1) No other principal building exists or is being constructed on the property.

(2) No other valid building permit has been issued prior to the effective date of this ordinance and is currently valid.

(3) The property was and continues to be under single ownership since the effective date of this ordinance.

(4) The property owner has acquired a 60-foot easement to a city-maintained, county-maintained, or state-maintained street or road, and the easement has been duly recorded and made a part of the property deed.

(5) In the event the property is divided, no additional permits will be issued.

Within the A-R district only, tracts of land which are accessible only by recorded easement may be divided one time only into no more than three lots when each new lot will be accessible by the recorded easement and shall in all other aspects comply with the requirements of this UDO. Any lot so created shall not be eligible for further division until such time as the lot has the required amount of road frontage except by approval of the planning commission.

(i) Street frontage. Except where expressly provided herein, no principal building may be erected on any lot which has less than 60 feet of immediate frontage on at least one public street.

(j) Setbacks and other spaces. No part of a setback, other open space, off-street parking, or loading space required for another building may be included as a part of the setback, off-street parking, or loading space required for another building, except as specifically provided for in this ordinance.

(k) Substandard lots. Any lot existing at the time of the adoption of this ordinance which has an area or a width which is less than required by this ordinance is subject to the following exceptions and modifications:

(1) Adjoining lots in same ownership. When two or more adjoining and vacant lots are within a non-approved development with continuous frontage and are in single ownership at the time of application and such lots have a frontage or lot area less than is required by the district in which they are located, such lots must be replatted so as to create one or more lots which conform to the minimum frontage and area requirements of the district.

(2) Single lots. When a lot has an area or frontage which does not conform with the requirements of the district in which it is located, but was a lot at the effective date of this ordinance, such a lot may be used for any use allowed in the zoning district in which it is located as long as all other requirements of this ordinance are met.

(l) Encroachment on public rights-of-way. No building, structure, service area, required off-street parking, or loading/unloading facility is permitted to encroach on public rights-of-way.

(m) Physical design standards. Minimum design standards for driveways, loading areas, and other such physical site improvements are contained in applicable development regulations of Butts County. Consult that document for specific requirements.

(n) Off-street parking and service requirements. Minimum standards for off-street parking and service requirements are contained in the Butts County standard for off-street parking and service facilities [See chapter 6].

(o) Other applicable development regulations. Information concerning any other applicable development regulations may be obtained by consulting the zoning administrator.

(p) Signs. Signs are permitted on all lots, subject to the regulations contained in the Butts County sign regulations.

Sec. 4.01.03. Design standards for structures in rural zoning districts and residential zoning districts.

(a) The following additional regulations shall apply in the R-1 district:

(1) Minimum roof pitch: 5:12 (five feet of rise for each 12 feet of run).

(2) Maximum density: One dwelling per 1.5 gross acres. A minimum of 30 percent of the gross site area shall be preserved as greenspace.

(b) The following additional regulations shall apply in the R-2 district:

Maximum density: One dwelling per 1.5 gross acres.

(c) The following additional regulations shall apply in the R-4 and R-M districts:

(1) Maximum density: Eight dwelling units per net acre.

(2) Length of townhouse row: More than four attached dwelling units must be arranged in adjacent sets of dwellings, each set having a front foundation line offset by at least ten feet from the foundation line of the adjacent set of dwelling units.

(3) Firewalls: All side and rear walls of attached dwelling units which are less than ten feet from the lot line must be firewalls. (See Georgia Building Code for construction standards.)

(d) Nonresidential primary use structures in residential zoning districts. In order to ensure that nonresidential uses allowed in residential districts are consistent with the residential nature of the district, where a nonresidential primary use is permitted by this ordinance on a lot zoned R-1, R-2, R-3, R-4 or R-5, such building shall be no larger than 10,000 square feet in area.

Sec. 4.01.04. Design standards for structures in commercial, office, and institutional zoning districts.

(a) The following additional regulations shall apply in the O-1 district:

Side setbacks and rear setbacks are not required adjacent to railroad rights-of-way.

(b) The following additional regulations shall apply in the M-1 and M-2 districts:

(1) Side setbacks and rear setbacks are not required adjacent to railroad rights-of-way.

(2) Outside storage: Outside storage of building materials is the only outside storage permitted and must be completely screened from view from adjacent properties and streets. No other outside storage is permitted.

(c) The following additional regulations shall apply in the M-3 district:

(1) Side setbacks and rear setbacks are not required adjacent to railroad rights-of-way.

(2) Outside storage must be completely screened from view from adjacent properties and streets.

(3) Loading docks must be located to the side or rear of the building, unless the loading area is completely screened from the street.

(4) The site must be designed to permit onsite maneuvering of all vehicles. No backing in from the street is permitted.

(5) All applications for rezoning to M-3 must include the following information:

a. Copies of a written description of the proposal designed to provide detailed information about all aspects of the proposed operation and its anticipated impact on the community. The description must include copies of any reports required by the U.S. Environmental Protection Agency or state environmental protection division. The description must also include information regarding minerals, processes (including steps to minimize adverse community impact), products, byproducts, wastes, and any additional information necessary to understand the proposal. Further, this report must address the immediate and anticipated future impacts, if any, of the proposed use on each of the following specific concerns:

1. Noise.

2. Odor.

3. Water quality (surface and sewer).

4. Smoke and particulate matter.

5. Vibrations.

6. Hazardous materials (ignitable, corrosive, explosive, toxic).

7. Radiation.

8. Lighting and glare.

9. Fire hazards.

10. Water usage.

11. Any other concerns identified by the zoning administrator or applicant as pertinent to the proposed use.

b. A listing of all federal, state, and local approvals and permits, if any, that will be required by the proposed use and the status of all requests for such approvals or permits.

c. Project name.

d. Project owner.

e. Location of all proposed structures.

f. Proposed buffers and/or screening.

Sec. 4.01.05. Structure numbering.

(a) Designation of street names and numbers. Streets now being maintained by the county and other public agencies within the unincorporated county shall in the future be named and numbered as now designated on the official map and official index of the county as amended by each implementing resolution. Every other street within the unincorporated county shown on the official index shall hereafter be referred to as designated on the official index for structure numbering purposes.

(b) Designation of structure numbers. The emergency management director shall keep a record of all numbers assigned under this section. Such records may be maintained in data processing storage systems if so desired. Structure numbers for dwelling units, places of business, industrial locations and all other structures and uses requiring same shall be assigned by:

(1) The emergency management director in conjunction with the United States Postal Service during the implementation stage of the system; and

(2) The emergency management director following the implementation phase of the system.

(c) Posting of designated structure numbers. The owner, occupant or person in charge of any dwelling unit, structure or use to which a number has been assigned shall be notified in writing by the implementing agency of the number assigned to the same. Within 60 days after receipt of such written notification, the owner, occupant or person in charge of any dwelling unit, structure or use to which a number has been assigned shall cause the same to be posted in either one or two locations depending on the following conditions:

(1) If the mailbox is located on the same side of the street and adjacent to the driveway or curb cut, the number shall be affixed to the mailbox in letters two inches in height or larger and of a color contrasting with the color of the mailbox. This section does not preclude an individual from also numbering the front entrance of the structure if so desired.

(2) If the mailbox is not on the same side of the street and adjacent to the driveway or curb cut, the number shall be posted at two locations:

a. On the mailbox as prescribed by U.S. Postal Service regulations; and

b. Either on the structure front if visible from the street or on an aboveground sign attached to a post or other object at the driveway or curb cut. The numbers shall be two inches in height or larger and of a color contrasting with the color of the background. This section does not preclude an individual from also numbering the front entrance of his structure if so desired.

(3) In the case that a building is served by two or more driveways or curb cuts, the number shall be assigned and posted to the front entrance or driveway.

(4) It shall be the duty of the owner, occupant or person in charge of the dwelling unit, structure or use, upon affixing the new number, to remove any different number which might be mistaken for or confused with the number assigned to the structure.

(5) In such cases where the assigned number cannot be posted as required above, the number shall be posted as prescribed by the emergency management director after consultation with the owner.

(d) Types of numbers. Two types of numbers are used under this section:

(1) A primary number to be assigned to each street frontage of each parcel of land, whether or not the parcel is occupied. The primary number is required to be posted only if the parcel is occupied by a dwelling unit, structure or active use and the owner, occupant or person in charge is notified under section 4.01.05(c). Other primary numbers are reserved for future development of the numbered parcels and will be assigned at the time of development.

(2) Secondary numbers may be used when a number of units, structures and uses coexist on the same parcel of land. Examples of parcels requiring secondary numbers include apartment projects, condominium projects, manufactured home developments, office parks, recreational vehicle parks, recreational areas, shopping centers and other uses where the use of secondary numbers would clarify the location of a unit or use for public safety purposes. To provide secondary numbers, the emergency management director shall work with the owner, manager, or person in charge of the project to determine a logical numbering system under the following guidelines:

a. Existing numbered units and uses shall retain the present set of addresses with only the primary number being changed if the primary number is not in sequence with the overall system.

b. Buildings on a single parcel with more than one and less than five units may be given a number designation as requested by the owner.

c. A single building on a single parcel of land and with five or more units may be given numerical designations such as Suite 5, Apartment 5, etc., if so desired.

d. Multiple buildings on the same parcel of land may be given secondary numbers consisting of number designations if the buildings are accessed from a main entrance to the project. Generally, the number designations should increase in a clockwise direction from the main entrance.

e. Manufactured home developments, recreational vehicle parks, and similar uses shall be given number designations for lots or sections and number designations for individual lots or sites.

(e) Implementation in stages. Because of the large and complex nature of the county and the existing numbering system now in place in some portions of the unincorporated county, this section shall be implemented in stages covering small sections of the entire area by the adoption of implementation resolutions for each section of the county. It shall be the policy of the county not to change existing numbered addresses if the existing system follows a logical and expandable order.

(f) Exempt and excluded structures. Those structures that do not present a significant danger to human life if destroyed by fire or other events shall be excluded from the provisions of this section. The following structures shall be excluded from the provisions of this section:

(1) Agricultural buildings not requiring a separate mailing address such as a barn, poultry house, outbuilding or equipment storage buildings. Buildings used as dwelling units, offices, or the normal work station of an employee shall not be exempt from the provisions of this section.

(2) Storage and accessory buildings for the use of the occupant of another building on the property. Buildings used as dwelling units, offices, or the normal work station of an employee, or requiring a separate mailing address, shall not be exempt.

(g) New structure and lots.

(1) Structure numbers will be assigned to each new lot, tract or building site on the original drawings of a final subdivision plat or other plan requiring the approval of the building inspector or by the planning and development department.

(2) No building, electrical, plumbing or mechanical permit for any new, remodeled or repaired structure will be issued by the building inspector following the implementation of this section in the affected area of the county until the owner, developer or builder has procured from the emergency management director the official structure number or numbers. Final approval for a certificate of occupancy of any principal building erected or repaired, or use requiring such number, shall be withheld until permanent and proper numbers have been displayed in accordance with the standards of this section.

(h) Utility company compliance. Following the implementation of this section in any area of the county, all utility services regulated by the Georgia Public Service Commission or any utility cooperative service organization shall withhold service from any building until the owner or other requesting party has furnished the utility with a valid structure number.

Sec. 4.02.00. Site design standards for I-75 Corridor Overlay District.

Sec. 4.02.01. Purpose and intent.

(a) Attractive and integrated architectural and site design features tend to improve an area's image, raise overall property values, attract new businesses and residents, and improve the quality of life. There is a positive return on investment for providing attractive design features, for both government and property owners, and can provide similar enhancements to public safety, community health, and well-being.

(b) This article establishes an overlay district for a defined area in the Interstate 75 corridor for the purposes of controlling land uses, setting standards and requirements for development, and providing for improved architecture and site design.

(c) This article also identifies future road corridors in the overlay district. In addition, the overlay reserves land needed for future roads to provide a basis for provisioning of transportation facilities along with new development by designating corridors where the construction and improvement of transportation facilities are expected. Moreover, the overlay restricts the construction or expansion of permanent structures in the intended right-of-way of planned roads and protects the rights of landowners whose land is reserved.

(d) This article helps to ensure road and highway access to foster economic development by predetermining appropriate routes of access to state routes and the county road system for properties within and near the corridor in a manner that protects private property rights, ensures public safety, and provides reasonable access and connectivity according to locally-determined standards.

Sec. 4.02.02. Map of overlay district boundaries.

The map entitled "Interstate 75 Corridor Overlay District, Butts County, Georgia," which is hereby made a part of this ordinance, is hereby adopted.

Sec. 4.02.03. Relationship to zoning districts.

This article establishes regulations that are in addition to the regulations of the underlying zoning district. Zoning districts listed in chapter 2, established in this ordinance, and as applied by the official zoning map, shall continue to apply, except as specifically modified by this article. This article imposes more restrictions on land uses than the rights conferred by underlying zoning and more land development standards than are applied outside the overlay district.

Sec. 4.02.04. Relationship to environmental and watershed overlay districts.

Overlay districts listed in chapter 3, established in this ordinance, shall continue to apply, to the extent they involve property in this overlay district, unless specifically stated otherwise in this article.

Sec. 4.02.05. Establishment of subareas.

(a) Character of subareas. Within the overlay, there are distinct subareas that have different aims and requirements. The three subareas are:

(1) Industry/commerce. Focuses on light industrial uses and supporting commercial uses adjacent to the I-75 highway.

(2) Mixed-use. Focuses on walkable commercial, retail, and some residential as a local and regional destination.

(3) Rural neighborhood. Similar to traditional neighborhood design, rural neighborhood focuses on walkable smaller neighborhoods but does not include a mix of uses.

(4) Refer to the map "Interstate 75 Corridor Overlay District, Butts County, Georgia" for a determination of the applicable subarea.

(b) Definitions. The phrase "non-industrial areas" as it is used in this article refers to mixed-use and rural neighborhood areas within the overlay. "Industrial areas" refers to those designated as part of the industry-commerce area as used in this article.

Sec. 4.02.06. Regulation of uses.

(a) Restrictions. Notwithstanding the permitted uses and special uses sections of the zoning districts established in this zoning ordinance, the following uses as defined shall not be permitted within the overlay district boundaries:

(1) Adult entertainment establishments regulated by the county's adult entertainment ordinance.

(2) Bars, taverns, or nightclubs, as defined in section 1.10.00, are prohibited except when located within the same structure of a hotel, motel or restaurant.

(3) Reserved.

(4) Bulk storage.

(5) Composting facilities.

(6) Crematories.

(7) Extraction activities larger than five acres.

(8) Food processing plants.

(9) Gas tank sales.

(10) Hazardous waste materials handling and storage facilities.

(11) Incinerators.

(12) Junkyards.

(13) Landfill, construction and demolition.

(14) Landfill, inert waste.

(15) Landfill, sanitary.

(16) Materials recovery facilities.

(17) Motor vehicle impound lot.

(18) Motorized race tracks.

(19) Pawn shops.

(20) Power plants, private.

(21) Recovered materials processing facilities.

(22) Recreational vehicle parks, except those that existed on the effective date of this article, which shall not be deemed nonconforming (notwithstanding other provisions of this section).

(23) Salvage yards.

(24) Slaughterhouses.

(25) Solid waste handling facilities.

(26) Truck stops; except that a facility with no more than 30 percent of the developed area being committed to the fueling of commercial trucks with diesel fuel will be permitted in the overlay district, on the west side of I-75 only, when it is within a mixed use development (P-M zoning district) of 20 acres of more.

(27) Truck, utility trailer, and recreational vehicle rental and leasing (does not prohibit sales) and other similar uses including, but not limited to, those classified under 2007 NAICS Code 532120.

(b) Additional permitted uses. Within each of the areas as defined in section 4.02.05, the specified uses are permitted by right in addition to the uses permitted by the underlying zoning. Refer to section 2.02.02 for a table of permitted uses.

(1) Industry/commerce area:

a. Any permitted use in the M-1 zoning district.

b. Hotel.

c. Hospital.

(2) Mixed-use area:

a. Any permitted use in the C-1 zoning district except: Drive-in theater.

b. Hospital.

c. Hotel.

d. Dwelling, apartment.

e. Dwelling, condominium.

f. Dwelling, garden apartment.

g. Dwelling, multiple-family.

h. Dwelling, single-family attached.

i. Dwelling, townhouse.

(3) Rural neighborhood area:

a. Dwelling, single-family detached.

(c) Land uses that are not permitted by this section, but which lawfully existed at the time this overlay district was first made effective, may continue to exist but shall be considered nonconforming uses. Continuance of such nonconforming uses shall be as regulated in section 9.01.01 of this UDO.

(d) Places of worship. Churches, synagogues, and similar places of worship shall not be located within a storefront where other leased spaces may be available for office, retail, and commercial service. Places of worship, where permitted, must have all principal buildings devoted for such uses located at least 300 feet from any property line. The purpose of this regulation is to prevent the location of churches in a way that would hinder the reasonable accommodation of alcoholic beverage service and alcoholic beverage sales within the overlay district.

(e) Communication towers. Communication towers, including wireless telecommunications facilities and equipment, shall be set back a minimum of twice the tower's height from the right-of-way of Interstate 75 or other arterial, collector, or local county road.

Sec. 4.02.07. General procedures.

(a) Rezoning, special uses, and variances processes. If a property must be rezoned, or the development requires a special use or a variance in order to allow the proposed use or development proposal, such rezoning, special use, and variance processes remain independent of the special procedures of this article.

(b) Rezoning, special uses, and variances standards for review. When an application for rezoning, special use, or variance is proposed in the overlay district, said application shall be reviewed for compliance with the requirements of this article, and failure to meet the regulations of this article shall be cause to deny such applications. When an application for rezoning, special use, or variance is proposed in the overlay district, said application shall be reviewed for consistency with the site design guidelines or adopted by reference in design guidelines for the overlay district, as applicable. An application for rezoning, special use, or variance pertaining to property within this overlay district should demonstrate compliance with the site design guidelines established in this article. Conditions of approval may be placed on the application to ensure compliance with the requirements or design guidelines of this article.

(c) When an application for rezoning, special use, or variance is proposed in the overlay district, and such application requires the submission of architectural renderings or elevations of representative building types, the applicant should demonstrate that the proposed architecture of structures is consistent with the architectural guidelines of this article in addition to any other requirements and guidelines of the underlying zoning district. Inconsistency with such regulations or guidelines can be as a basis for disapproving such a rezoning, special use, or variance.

(d) Preliminary plats. Development in this overlay district is subject to the preliminary and final plat requirements of chapter 10 of this UDO, when applicable. The additional requirements, standards, and guidelines for site design established in this article shall be considered during the process of reviewing and approving a preliminary plat. Inconsistency with site design requirements or design guidelines is a basis for the refusal to process the application and to deny the application.

(e) Construction plans and land disturbance permits. The county engineer shall review construction plans to ensure that the applicant meets all development-related requirements of this article as a condition of the issuance of a land-disturbance permit. Furthermore, the zoning administrator and development review staff shall ensure that the site design provisions of this article are reflected in construction plans and will be followed. The zoning administrator and development review staff may cite inconsistency with the site design requirements of this article as a basis for disapproving the construction plans and land-disturbance permits. The zoning administrator and development review staff may place conditions of approval on the permit to ensure compliance with the requirements or design requirements of this article.

(f) Site plan submittal and review. In order to demonstrate compliance with the standards of this overlay, detailed site plans must be submitted for review.

(1) Concept plans shall include the following, as applicable:

a. Use and phases of development;

b. Lot lines and setbacks;

c. Location, shape, size, and height of proposed buildings, common areas, plazas, and other amenities;

d. Gross acreage and density;

e. Lot sizes, dimensions and square footage;

f. Building heights and stories;

g. For large residential developments, the floor plan identifier (e.g., name or number);

h. Amount of open space;

i. Lakes, ponds, streams, floodplains and wetlands;

j. Stormwater facilities;

k. Recreation facilities;

1. Proposed landscaping, tree save areas;

m. Location of off-street or on-street parking;

n. Location of streets, widths of rights-of-way, location of stop signs and other traffic control devices;

o. Pedestrian circulation plan and illustrations of pedestrian amenities;

p. Any other architectural and engineering data as may be required to evaluate the project.

(2) In addition to site plans, architectural materials may be required. All application materials for architectural review are outlined in section 4.02.09(d).

Sec. 4.02.08. Architectural review.

(a) Required. This section outlines an administrative architectural review process. The applicant shall pay for all required fees involved within the architectural review process.

The following activities and processes, when proposed within the area that is subject to this article, shall require architectural review:

(1) Any principal building which is used or intended to be used for industry, commerce, office, institution, or multi-family residence.

(2) Any addition to a principal building of more than 2,000 square feet or ten percent of the base square footage, whichever is lower, to a principal building which is used or intended to be used for industry, commerce, office, institution, or multi-family residence.

(3) Entrance monument signs or displays to office parks, commercial and industrial uses, all subdivisions, and planned or condominium developments, including those for detached, single-family dwellings and manufactured homes.

(b) Not required. The following accessory and principal buildings, when proposed within the area that is subject to this article, shall not require architectural review as established by this article:

(1) Individual, detached single-family dwellings and manufactured homes when located on their own fee-simple lot are specifically exempt from architectural review, as are any customary accessory buildings and structures on the same lot.

(2) Buildings related to agriculture or forestry.

(3) Any principal building, addition thereto, or accessory building or addition thereto, which is found by the zoning administrator to be consistent with private covenants establishing architectural controls that have been reviewed and accepted by Butts County.

(4) Nonconforming land uses that are not permitted by this article to be established in the overlay district, but which existed at the time this overlay district is made effective, may continue to exist without the requirement for an architectural review.

(c) Relationship of architectural review to other permit processes.

(1) The process of subdivision, as established and regulated by chapter 10 of this UDO, shall remain independent of and unaffected by the architectural review process which shall only occur after approval of a preliminary plat when required.

(2) The process of construction plan approval and issuance of land disturbance permits, as established and required by chapter 10 of this UDO, may be concurrent with architectural review.

(3) Where no land disturbance permit is required, the process of architectural review shall take place prior to the issuance of a building permit.

(4) The process of architectural review shall take place concurrently with site plan review. All application materials required for architectural review are referenced in section 4.02.09(d).

Sec. 4.02.09. Process for architectural review.

(a) Generally. The county zoning administrator is authorized to distribute application forms and more specific procedures for architectural review which shall be consistent with the requirements of this section. The county architect shall hereafter refer to either an architect employed directly by the county or an architect serving as a consultant to the county for the purpose of architectural review.

(b) Pre-application conference. All applicants for architectural review and approval may schedule a free pre-application conference with the county zoning administrator. A pre-application conference is a time where applicants can familiarize themselves with the application requirements and processes and gain preliminary input from staff as to the suitability of the proposed material change in appearance. Upon showing that there is an approved site plan for the property, the applicant may initiate an application for architectural review if architectural review is required.

(c) Fee. At the time an application is submitted, the applicant shall submit, and the zoning administrator shall collect on behalf of the county, a fee for architectural review. The fee for architectural review shall be as set forth in a fee schedule adopted by the board of commissioners, as may be amended from time to time. At the discretion of the board, the fee schedule may vary based on the type of building or size of the building as to whether the architectural review is for a single, principal building or for multiple principal buildings, or the complexity of review. Said fee shall be used to offset the administrative costs to the county of processing such applications and shall be set at a level that compensates the services of an architect hired by the county for purposes of architectural review.

(d) Application materials for architectural review. All applications for architectural review shall be made as required by the zoning administrator and shall at minimum contain the following information:

(1) Elevation drawings. Three color copies of exterior elevation drawings of all four facades of all buildings, drawn to scale and signed by an architect, engineer or other appropriate professional, and one electronic file copy in PDF format. Exterior elevation drawings shall clearly show in sufficient detail the exterior appearance and architectural design of buildings or proposed change(s) to buildings or structures.

Each application shall also indicate proposed materials, textures and colors. The zoning administrator may require that the applicant provide samples of materials and colors.

(2) Surrounding area. Photographs of all adjacent parcels that clearly show any structures and the character of the land are required to see the character of the site.

Photographs shall be submitted in printed copy and in digital form unless otherwise specified by the zoning administrator.

(3) Existing structures. All applications involving existing buildings or structures or alteration thereof shall be accompanied by photographs of all sides of the existing building(s) or structure(s) affected and of adjoining properties. Photographs shall be submitted in printed copy and in digital form unless otherwise specified by the zoning administrator.

(4) Site plan and landscaping plan. A copy of the proposed site plan and landscape plan shall be included with the submission of elevation drawings.

(e) Completeness check. Upon submission of an application for architectural review and payment of the required fee, the zoning administrator shall review the application for completeness. Incomplete applications shall be refused and will not be processed until complete.

(f) Authority, review and disposition. The county architect shall have final authority to review and approve, conditionally approve, or disapprove applications for architectural review. Depending on the nature of the application and its complexity, the zoning administrator shall determine whether review is by a consulting architect. The process of architectural review shall not exceed 30 days from the date such application was deemed complete, except by mutual agreement of the zoning administrator and the applicant.

(g) Applications for architectural review. The zoning administrator shall consider the appropriateness of the application in the context of the following criteria:

(1) Consistency with any adopted design guidelines.

(2) Consistency and compatibility of the proposed application with the nature and character of the surrounding area.

(3) The general design, character and appropriateness of design, scale of buildings, arrangement, texture, materials, and colors of the structure and the relation of such elements to similar features of structures in the immediate surrounding area, site, and landscaping.

(h) Approved applications for architectural review shall bear the signature of the zoning administrator and the county architect, and one copy of the approved and signed plans shall be returned to the applicant; at least one copy of said approved plans shall be maintained in the office of the zoning administrator. If the plans are approved, the signature on the plans by the zoning administrator and the county architect as well as notice, verbal or written, that the plans have been approved and are ready for pick up by the applicant shall be the only notice required. Any applications that are conditionally approved shall require the applicant to submit three copies of the final, as approved plans and elevation drawings.

(i) If the application for architectural review is not approved, the zoning administrator shall at the conclusion of the review period submit in writing to the applicant the reasons for disapproval with specific reference to code sections not met, design guidelines not complied with, or inconsistency with the criteria for architectural review for applications specified in this article. In addition, the zoning administrator may submit to the applicant a marked up copy of the plans and elevations submitted, conveying comments on said plans where revisions are needed.

(j) Revision and resubmission. At any time after receiving the disapproval of an architectural review application, the applicant may revise and resubmit the application. A resubmittal fee shall be required, and the process shall follow the same time limits and procedures specified in this section for first-time applications. Any applications that are conditionally approved shall require the applicant to submit three copies of the final, as approved plans and elevation drawings.

(k) Appeal. The decisions of the zoning administrator shall be final unless an appeal is made by the property owner subject to the provisions set forth in section 10.03.00.

(l) Records. The zoning administrator shall keep records of all applications for architectural review, and the zoning administrator shall keep records of the disposition of all applications for architectural review. Such records shall be open to public inspection.

(m) Building permit plans for single-family uses shall include:

(1) A site plan;

(2) Architectural elevations of all four sides of the proposed building indicating exterior treatments;

(3) Samples of materials and colors used.

(n) Building permits. No building permit shall be issued for a building that would be inconsistent with the requirements of this article. No building permit application required to undergo architectural review as required by this article shall be approved until architectural review has been completed in accordance with the requirements of this article. The chief building official may place conditions of approval on a building permit to ensure compliance with the requirements or design guidelines of this article.

Sec. 4.02.10. Future roads.

(a) All future roads.

(1) In the event that a subdivision or land development proposes to access a substandard road, improvements shall be considered through a development agreement.

Substandard roads are defined here as roads that do not meet right-of-way pavement width and/or county road standards. If the abutting substandard road provides the access to the subdivision or land development, the substandard road shall be upgraded to county standards for a local roadway from the subdivision or land development along the route of primary access to the nearest standard paved road.

(2) The zoning administrator may require a traffic impact study for land developments or subdivisions that are anticipated to increase traffic volumes by more than ten percent. The study will determine the most appropriate road improvements, including driveway locations, and used as a basis for determining improvements required to the road system.

(b) Future roads west of I-75. Due to the industry-commerce land uses programmed for areas west of I-75 in the overlay district, the road network must be laid out to maximize access to both State Highways 16 and 36. All new roads in the overlay district must meet the applicable Butts County or Georgia DOT standards for roadway construction.

(c) Parcels adjacent to the eastern side of the I-75 right-of-way.

(1) Frontage road east of I-75. In order to maximize visibility of and provide access to the mixed uses planned for areas east of I-75, a frontage road located parallel to I-75 must be constructed when developing properties adjacent to I-75. The minimum required right-of-way for the frontage road shall be 90 feet. The frontage road shall have two lanes plus a center turn lane with low level landscaping on either side and adequate space for a six-foot wide sidewalk on the developed side of the road. The frontage road shall be developed according to the applicable Butts County or Georgia Department of Transportation standards. Intersections with State Highways 16 and 36 must meet minimum Georgia DOT standards for distance from interstate highway interchanges. The exact placement of the frontage road right-of-way will be determined on a parcel by parcel basis as development occurs and funding is available.

(2) Land adjacent to the eastern side of the I-75 right-of-way is hereby considered reserved for future intended use as a county frontage road right-of-way. The county shall not issue a subdivision plat, land disturbance, development, building or any other permit for development or building within a frontage road reserve area until the frontage road serving the development is under construction.

(3) Each applicant for a permit to develop a parcel existing on the date of adoption of this section, within the area "reserved" for the frontage road, shall design the development proposal or subdivision plat in a manner that will not encroach upon the land designated to accommodate the frontage road.

(4) Curb cut distance. A minimum distance of 500 feet shall be established between curb cuts onto the frontage road. New development along the frontage road shall be designed to provide inter-parcel access with adjoining tracts.

(5) The frontage road shall be constructed from property line to property line according to applicable county and Georgia Department of Transportation standards. When a development is constructed in phases, only that portion of the frontage road serving the development phase may be required to be constructed concurrent with that phase of development.

(6) Temporary turnarounds. Where the end of the frontage road will not connect with the existing road or driveway network, a temporary paved turnaround shall be provided by the developer and in compliance with applicable county and Georgia Department of Transportation standards.

(7) Alternative routes. In cases where the applicant determines that such a reservation or right-of-way dedication is not practical or possible, the applicant shall determine and propose an alternative route for the frontage road corridor on the same lot, or on adjacent land owned by the permit applicant if applicable, so that the public purpose of providing a road connection through the lot is met while accommodating the development proposal.

(8) Permit required. It shall be unlawful to initiate or carry out development upon land reserved for the frontage road without first securing a permit as required by this section.

(9) Hearing on permit. Upon receiving an application for a permit involving reserved land, the zoning administrator shall arrange for the application to be scheduled for public hearing before the Butts County board of commissioners. The applicant shall be notified in writing of the date, time, and place of the hearing, by registered mail at least 15 days prior to the public hearing. The public shall be given notice by publication in a newspaper of general circulation in the county at least 15 days prior to the public hearing of the date, time, place, and nature of the hearing. At the hearing, the applicant or official representative shall have an opportunity to present evidence and argument in support of his or her application, as shall any government or individual that has an interest in the application.

(10) Action on permit. Following the public hearing, the board of commissioners may take one of the following actions:

a. Approve the permit as proposed, with or without conditions;

b. Remove all or part of the reserved land and issue, with or without conditions, the permit authorizing development on the land removed from the corridor;

c. Allow the applicant to relocate the reserved land to another part of the same parcel of land for which a permit is requested and issue, with or without conditions, the permit authorizing development on the land outside the reserved land;

d. Modify the proposed permit application and issue it for development as modified, with or without conditions, if the development can reasonably be accomplished on the subject parcel without encroaching on the reserved land; or

e. Delay action on the permit for a defined period of time not to exceed six months for the purpose of any of the following:

1. Negotiating with the property owner for the purchase of all or a part of the reserved land by the county or other governmental agency;

2. Acquiring the reserved land voluntarily;

3. Acquiring a negative easement over the reserved land that prevents the property owner from building on the reserved land; or

4. Taking the reserved land through eminent domain and the payment of just compensation to the property owner.

f. Authority to acquire land for public use. After delaying action on the permit, the county may, but shall not be obligated to, negotiate for the voluntary dedication of the land, enter into an option to purchase, or use its powers of eminent domain and initiate condemnation proceedings subject to applicable state law and the payment of just compensation to the property owner.

(11) Final action on permit. If the county delays action on the permit as provided by this section, and the county or other responsible governmental agency fails to arrange for the legal acquisition of all or a part of the reserved land within the specified time period which shall not exceed six months, then the county may approve the permit, with or without conditions, or in the absence of such approval, the permit can be deemed approved as submitted.

(12) Inapplicability of reservation provision of development ordinance. In cases where this section applies, the procedures established in this section shall supersede the requirements of section 4.00.02(e), with respect to future major streets.

Sec. 4.02.11. Grading and construction of roads.

(a) Intent. Land adjacent to the eastern side of the I-75 right-of-way is reserved for the construction of frontage road with 90 feet right-of-way. Such a road is intended to be constructed without cost to the county to access the mixed use properties to be developed in the area. The Butts County subdivision regulations generally prescribe new road standards for the construction of new roads within land that is subdivided for the purpose of accessing property to be developed. The subdivision regulations do not prescribe exact locations for roads. In prescribing the approximate location of the frontage road, the county seeks to maximize the visibility of businesses that will locate in the I-75 corridor to ensure their success. The developers of these properties will thereby benefit from the installation of said frontage road.

(b) Development agreement. The board of commissioners may negotiate a development agreement with any development applicant with regard to fire, parks and recreation, police, library services, and the grading and/or installation of road improvements.

(c) Negotiating the development agreement. The applicant for development proposal may propose, and the county may agree to, any of the following as appropriate to the specific context:

(1) The development applicant may voluntarily agree to pay for the entire cost of grading and provide all of the road improvements;

(2) In cases where the full costs of road improvements are not proportional to the amount, type, or intensity of development proposed by the applicant, the applicant may submit a study prepared by a traffic engineer or transportation planner documenting the probable trips generated by the development. The results of the study will be compared to the total capacity of the road improvement, as accepted by the county, in order to arrive at a proportionate share the development would benefit from the proposed road improvement. In such cases, the applicant for development proposal may voluntarily agree to pay the pro-rated share of said road improvements attributed to the subject development as indicated in said study. The county shall reserve the right to require a traffic study completed by the applicant by a traffic engineer;

(3) In cases where a developer agrees to provide a proportionate share of the cost of funding the proposed road, and the county has not or cannot secure funding for the remaining share of the costs of improving the proposed road, either through the participation of other developers or through public funds, the board of commissioners is authorized to escrow the funds contributed by the developer as a proportionate share of the total costs of such proposed road improvements in an interest-bearing account to be expended at the discretion of the county. If the county does not encumber for the specific purpose said escrowed funds submitted by the particular land developer within six years of the date such funds are escrowed, the contributor shall be entitled to, and upon written request the county will reimburse to the land developer, the escrowed funds plus that portion of interest in such account attributed to the developer's escrowed funds;

(4) In cases where the timing of the road improvement cannot be assured to coincide with the development, and the developer has agreed to provide a proportionate share of the cost of funding the proposed road, the development applicant and the county may agree for the developer to conduct all or a negotiated part of the grading activities necessary for the road improvement, in lieu of escrowed funds for improvement of the proposed road itself; or

(5) Any other written arrangement mutually agreed to by the development applicant and the board of commissioners.

Sec. 4.02.12. Minimum access and connectivity requirements.

(a) Connection to planned road system. It is intended that frontage roads and other local roads in the I-75 overlay district, and connections from development to such frontage roads and local roads, will be planned and coordinated with the road system of the surrounding area and with the plans for future roads in the overlay district. Accordingly, a lot owner may be required, as part of the land development approval process, to connect to an existing or planned frontage road or other part of the public or private street or road access system.

(b) Connection to state routes. All commercial driveways onto state routes in the I-75 overlay district are subject to the Georgia Department of Transportation Regulations for Driveway and Encroachment Control or any official revisions thereto. No development permit or land-disturbance permit shall be issued that involves a driveway or other access onto a state route unless a commercial driveway permit or access approval from the Georgia Department of Transportation has been submitted to the zoning administrator.

(c) Inter-parcel access. Inter-parcel site access shall be provided to adjacent properties where the board of commissioners has determined that the land uses so connected are compatible. The following figure provides a basic guide for compatible uses, though the ultimate determination is up to the board of commissioners. Where inter-parcel access is required, property owners will be required to grant an access easement across the lot or development site to facilitate the movement of motor vehicles across the lot or development site.

Inter-parcel Access Matrix Residential School Retail Office Restaurant Hotel Industrial Uses Residential Yes Yes Yes Yes No No No School Yes Yes Yes No No No No Retail Yes Yes Yes Yes Yes Yes No Office Yes No Yes Yes Yes Yes No Restaurant No No Yes Yes Yes Yes Yes Hotel No No Yes Yes Yes Yes Yes Industrial Uses No No No No Yes Yes Yes

(d) Right-of-ways and easements. Prior to development approval, an additional road right-of-way for a county road or private road or an access easement may be required to be dedicated. The location, type, and amount of right-of-way or easement to be dedicated may also be needed at intersections or at other locations fronting the property where turning lanes or road intersection realignments are required for traffic safety and the right-of-way is inadequate to accommodate the road, drainage, and utility, and other improvements are necessitated by the development or called for in the future road plan for the overlay district.

(e) Separation of directions of travel. On any two-lane, two-way directional travel road, or other access way, whether public or private, the directions of travel may be separated if necessary to minimize grading requirements, subject to the county's approval.

(f) Crossing of streams with road, bridge or driveway access. Where roads, bridges, and driveways must cross streams and tributaries, they shall cross such streams and tributaries at the least sensitive places and while providing the shortest feasible bridge.

Sec. 4.02.13. Standards for pedestrian and bicycle infrastructure.

Land development or subdivision within the overlay district will be reviewed for conformity with the following standards and adherence to the following principles, which are articulated to ensure safe and convenient pedestrian access within and to/from the land development or subdivision:

(a) Pedestrians are a part of everyday roadway environment, and attention must be paid to their presence in rural as well as urban areas.

(b) As a general practice, sidewalks should not be constructed along any county road or state highway in the overlay district where future residential development density is expected to be lower than two dwelling units per acre or where industrial development is planned.

(c) Sidewalks used for pedestrian access to schools, parks, and shopping areas, and placed along all streets in office, institutional and commercial areas, should be provided along both sides of the road. In residential areas, sidewalks are desirable on both sides of the street but need to be provided on at least one side of all local streets.

(d) Sidewalks along streets with curbs and gutters should be separated from the curb by a planting strip of at least two feet along local residential streets and five feet along local collector and commercial streets. Sidewalks along streets without curbs and gutters should be separated by a drainage swale.

(e) At street intersections with traffic signalization, crosswalks shall be provided including curb ramps. Crosswalks within the overlay shall be the highly visible "piano key" style with five-inch parallel band pairs two feet apart. All curb ramps in the overlay are required to meet applicable requirements of the Americans with Disabilities Act.

(f) Land developers are required to provide pedestrian connections on private properties to sidewalks on public or private roads.

(g) Bicycle facilities may be provided by the private developer via incorporation of bicycle paths and/or bicycle lanes internal to the development. Subject to the approval of the zoning administrator, a bicycle lane may be incorporated within the right-of-way of a public road abutting the proposed development. Bicycle paths may be provided within their own dedicated right-of-way.

(h) When a bicycle lane, bicycle path, or multi-use trail crosses a road intersection or a railroad, then ramps and adequate warning and safety signing and or striping must be provided subject to the approval of the county engineer utilizing applicable requirements of the Americans with Disabilities Act and county standards.

(i) Bicycle lanes on county roads shall be a minimum of four feet in width. On rural roads without curbs and gutters, the shoulders of roads may be paved, designated, and maintained for bicycle travel.

(j) Bicycle paths are separate paved trails not attached to the adjacent road. The minimum width for a bicycle path shall be ten feet. The county engineer may reduce this required width to eight feet in instances where he or she finds bicycle traffic and pedestrian use will be light and where the path presents a satisfactory and safe alignment vertically and horizontally. The county engineer may also authorize a reduction of the minimum width for short sections of the bicycle path where necessary to preserve trees, move the bicycle path alignment to avoid hazards, at narrow bridge crossings, or at other places as may be appropriate. When a bicycle path is incorporated into a multiuse trail, the multi-use trail should either be constructed to a width of 12 feet or provided with pullouts or passing areas in frequent places along the length of the multi-use trail to accommodate passing situations for different users traveling at different speeds.

(k) Bicycle paths shall have a minimum two-foot wide graded shoulder area on at least one side of the bicycle path in addition to the width requirements mentioned above.

Vertical clearance shall be eight feet minimum with ten feet desirable.

Sec. 4.02.14. General site design requirements.

(a) Buffer along Interstate 75.

(1) Properties abutting the west right-of-way of Interstate 75 shall maintain a natural undisturbed buffer not less than 100 feet in width to serve as a visual and acoustical barrier to noise from the I-75 corridor. If 100 feet of undisturbed buffer is unavailable, 50 feet of planted buffer should be used to achieve opacity.

(2) Properties abutting the east right-of-way of Interstate 75 shall maintain a landscaped area not less than 30 feet in width that allows view of the businesses located on the frontage road.

(b) Buffers standards. Buffers shall contain a minimum of seventy-five percent of evergreen plant materials comprised of diverse array of plant species, and no plant species may account for more than 15 percent of the plant material for the particular categories of canopy shade tree, understory tree, shrub, or ground cover. One tree shall be planted for every 50 linear feet of buffer area. Turf grass shall not be considered as an appropriate buffer material.

(c) Supplementing buffers. In those instances where the existing natural vegetation and topography are insufficient to achieve the desired level of screening as required by this section, a planted buffer shall be provided and shall consist of plant material of such growth characteristics as will provide a visual screen having a height of not less than six feet in two years and planted in a minimum of two rows with staggered spacing such that a continuous opaque screen is created within two years of planting.

(d) Buffer maintenance. Required buffer strips shall be established and maintained in perpetuity by the owner(s) of the nonresidential land use. The required buffer strip shall not be disturbed by grading, property improvements, or construction activities except where necessary to prevent a nuisance, to remove diseased, misshapen, or dangerous and decayed timbers, or any similar county approved enhancement. Any contemplated disturbance shall first be brought to the attention of the Butts County community development department and formal approval of a permit secured prior to initiating activity within the required buffer areas.

(e) Certificate of occupancy. Buffers shall be provided in accordance with the approved plan prior to issuance of a certificate of occupancy.

(f) No parking. Buffers shall be prohibited from being used for temporary or permanent parking or loading.

(g) Buffers between uses. Refer to the table below for the buffer requirements between different uses within the overlay.

Butts I-75 Overlay Required Buffer Chart Industry/ Commerce Industrial Industry/ Commerce Commercial Mixed-Use Commercial Mixed-Use Residential Rural Neighborhood NonOverlay Residential Use Industry/Commerce Industrial — 75 100 100 100 100 Industry/Commerce Commercial — 50 50 75 75 Mixed-Use Commercial — 15 75 75 Mixed-Use Residential — 50 75 Rural Neighborhood — 75 Non-Overlay Residential Use — All distances are measured in feet

(h) Development standards. Refer to the table below for the relevant development standards for each subarea within the overlay.

Development Standards Industry/ Commerce Mixed-Use Rural Neighborhood Open Space (min % of lot area)* Meet landscaping standards 10% 10% Impervious Surface (% of lot area max) 60% 70% 60% Single-Family Density (units per net site acreage)**

N/A N/A 4

Townhouse Density (units per net site acreage)** N/A 8 stand alone 10 mixed use N/A Multi-Family Density (units per net site acreage)** N/A 10 stand alone 12 mixed use N/A Development Standards Industry/ Commerce Mixed-Use Rural Neighborhood Nonresidential or Mixed-Use Density (units per acre) Meet parking ratio Meet parking ratio Meet parking ratio

* Open space requirements only apply to developments over 3 acres.

** Net site acreage is defined here as gross area of the site less the areas of the 100-year floodplain, wetlands, road rights-of-way, and open space.

(i) Site standards. Refer to the table below for some of the basic building standards for structures within the overlay.

Site Standards Industry/ Commerce Mixed-Use Rural Neighborhood Minimum Lot Size Commerce 1 acre Industry 1 acre Townhouse 1/10 acre MultiFamily 1/2 acre Nonresidential 1/2 acre SingleFamily Residential 1/4 acre Minimum Floor Area Per Dwelling Unit (in square feet) — — 750 750 - 1,600 Minimum Lot Width (in feet) 30' 100' 25' 30' — 40' Minimum Front Yard Setback from Right-of-Way of Street for:

A: Arterial Streets 100 100 75 75 75 75 B: Collector Streets 80 80 50 50 50 50 C: Other Streets 55 55 50 50 50 50 Minimum Distance between Building and Property Line (in feet) 35 75 10 20 0 20 Minimum Side Setback (in feet) 15' 15' 0' 5' 5' 10' Maximum Building Height (in feet) 35'2 35'1 40'2 40'2 40'2 40'2 Minimum Rear Setback (in feet) 30' 30' 10' 10' 10' 10' 1 This height limit does not apply to projections not intended for human habitation. For buildings and structures with such projections, the minimum required setbacks must be increased one foot for every two feet (or part of two feet) of height greater than 35 feet.

2 This height limit does not apply to projections not intended for human habitation, except for satellite, television, and radio antennas, to which this limit does apply. For buildings and structures with such projections, the minimum required setbacks must be increased one foot for every two feet (or part of two feet) of height greater than the height limit.

(j) Nonresidential landscaping standards. Each lot or development shall contain a minimum of 60 tree density units per acre proportional to the lot size. Each item listed below is inclusive to the 60 tree density units per acre.

(1) Each lot or development must contain a minimum of one 2.5 inch caliper hardwood tree per 50 feet of roadway, located adjacent to the ROW, and not closer than 15 feet from any structure.

(2) The required tree density shall be accomplished with the preservation of trees, tree planting, or a combination of preservation and planting.

(k) Residential landscaping standard. Required tree density for residential property development or redevelopment is subject to this section in the R-1, R-2, R-3, and A-R zoning districts and the rural neighborhood overlay subarea. The required tree density shall be accomplished with the preservation of trees, tree planting, or a combination of preservation and planting.

(1) Each residential lot one acre or less shall contain a minimum of three one and one-half inch caliper hardwood trees. Each residential lot greater than one acre shall contain a minimum of seven one and one-half inch caliper hardwood trees. No tree shall be planted closer than 15 feet from any structure. Remaining hardwood trees on each lot with a diameter breast height (DBH) of three inches or greater shall be credited as replacement trees.

(2) Each residential lot shall contain a minimum of 20 gallons of shrubs per house. Of the 20 gallons, there shall be a minimum of two three-gallon shrubs per house.

(3) Balance of lot area is to be seeded, sodded, hydro-seeded or stabilized with other landscape materials.

(4) Recommended areas for additional tree preservation and planting include subdivision entrances, contiguous rear/side setbacks outside required drainage easements, external road frontage, stream-side buffers, and stormwater detention facilities.

(l) Utilities. All utility lines serving uses proposed or developed within the overlay district, including water, sewer, gas, electric, telephone, data and cable television, shall be installed underground (this excludes high voltage transmission power lines within easements of 100 feet or more). Underground utility trenches must be re-vegetated. Utility boxes and cabinets that are located above ground must be shielded from view with a continual ring of evergreen shrubs expected to reach maturity one foot higher than the height of the box.

Any aboveground boxes that cannot be buried shall, in addition to being screened by vegetation, be painted a neutral or earth tone color or otherwise made to blend in with their surroundings.

(m) Outdoor lighting. All outdoor lighting hereafter installed shall be full cut-off luminaires, or another luminaire which does not emit any direct light above a horizontal plane through the lowest direct-light-emitting part of the luminaire. Cut-off fixtures are not required for incandescent lighting with an intensity of 160 watts or less. Full cut-off luminaire is defined as outdoor light fixtures shielded or constructed so that no direct light rays are emitted by the installed fixture at angles above the horizontal plane. The following outdoor lighting practices are prohibited:

(1) Glass tubes filled with neon, argon, or other gas and used for outdoor lighting, or for the purpose of outlining windows, doors or any other part of a building.

(2) Metal halide, and/or quartz lighting, except when the designing engineer deems that color rendering is critical, as may be specifically approved by the zoning administrator as a part of an approved lighting plan for development within a commercial or industrial zoning district.

(3) The outdoor use of laser source light, search lights or any similar high intensity light, when used for purposes of advertising, attraction, or entertainment, may be authorized by permit from the zoning administrator for a limited duration only upon a finding that the lighting will not be a nuisance or an unreasonable burden upon the community or the surrounding properties.

(4) Lighting underneath the ceiling of a freestanding canopy or accessory structure such as a gasoline pump island that is not recessed into the ceiling of the canopy.

Sec. 4.02.15. Industry/commerce site design requirements.

The following criteria are required for new construction in the Industry/Commerce area of the overlay:

(a) Truck access. Separate entrances must be provided for trucks and all other vehicles to prevent conflicts and accidents. Site access for trucks shall be provided as a separate, well-signed point of ingress and egress. Typically, truck/semi-truck access to the site should be designed with a minimum 30-foot wide driveway and a minimum 45-foot turning radii to allow for sufficient maneuverability (based on Georgia DOT Design Policy Manual for minimum design vehicle with a 62-foot wheelbase). Truck access shall be located with sufficient separation to other vehicle points of access so as to avoid conflicts and congestion on the public right-of-way and on interior drive aisles. Curb cuts are encouraged to be minimized through shared access between neighboring industrial properties.

(b) General vehicle access. Site access for general vehicles, including employees and visitors, shall be provided as a separate, well-signed, landscaped point of ingress and egress. Typically, access to the site should be designed with a minimum 20-foot wide driveway. General vehicle access shall be located with sufficient separation from truck points of access to avoid conflicts and congestion on the public right-of-way and on interior drive aisles. The number of curb cuts for each site shall be minimized, and shared access between neighboring industrial properties is encouraged.

(c) Internal circulation. Internal circulation should promote safety, efficiency, convenience, and minimize conflict between visitor/employee vehicles and large trucks. Appropriate maneuvering and stacking areas for trucks should be a primary consideration in the overall design of the circulation system.

(d) Employee parking. Employee parking shall be located on the side or rear of the site to reduce visual exposure to the public right-of-way. Parking areas shall be located near other vehicle access points to avoid conflicts with trucks and service areas.

(e) Visitor parking. A small number of visitor parking spaces may be located toward the front of the site, with convenient access to the primary building. These parking spaces shall be located near general vehicle access points to avoid conflicts with trucks and service areas. Pedestrian walkways shall be clearly identified and connect parking areas to the primary building entrance.

(f) Truck parking. Truck parking shall be located at the rear of the site, behind the primary building and not within the required landscaped buffer areas. The dimensional requirements for delivery truck parking spaces shall be 12 feet by 20 feet and 12 feet by 60 feet for semi-trucks.

(g) Loading/service areas. Truck drive aisles and service areas shall be separate from visitor and employee drive aisles and be located on the side and/or rear of the site.

(h) Fencing. Acceptable fencing materials include painted or coated metal (aluminum, wrought iron, or steel), masonry, or stone. The use of razor or barbed wire is not permitted in areas visible from the public right-of-way. Security fencing when required adjacent to public rights-of-way shall consist of wrought iron, tubular steel, or similar materials. The use of chain-link fence material is not permitted in the front yard of a site but may be used on the sides and rear if it's coated chain-link.

Fences shall not exceed a height of six feet along the front and shall be no less than six feet and no more than eight feet on the side and rear.

(i) Walls. Walls over three feet in height should include design elements such as textured concrete block, interlocking "diamond" blocks, formed concrete with reveals, or similar effect.

(j) Landscaped buffer yard. A minimum landscape strip 20 feet wide is required adjacent to the public ROW. These areas shall incorporate a mix of trees, shrubs, and flowers to provide a multi-layered attractive element that softens the otherwise hard industrial appearance.

(k) Foundation planting. A minimum five-foot foundation planting strip adjacent to the base of the main structures facing a public street shall be required.

(l) Detention/retention areas. Detention areas may be located within the required landscaped buffer yards as long as the required amount of planting material provided meets the standards for both buffer yards and detention/retention areas.

(m) [Street trees.] Street trees shall be required to be planted at no less than 60-foot intervals along the entire property fronting all streets. Street trees may be placed in the right-of-way or at a maximum of ten feet outside the street right-of-way if necessary given available right-of-way and visibility considerations including clear zone requirements.

(n) Screening of working areas. Storage areas, trash and recycling dumpsters, mechanical equipment, loading areas, and other work areas should be screened with fencing materials and landscaping where appropriate.

(o) Entrance and ground signs. As a matter of safety, entrance and ground signs must respect GDOT clear-zone restrictions. Entrance and ground signs shall be constructed of similar materials and color to that of the primary building and shall be landscaped around the sign base with low-lying shrubs and plants. Lighting of entrance and ground signs shall be external illumination; internally illuminated signs and/or lettering shall be prohibited.

(p) Directional signs. Directional signs shall be provided at one per vehicular access point, with a maximum sign area of six square feet and a maximum height of three feet. These signs shall not count against the maximum number of ground signs allowed under the sign regulations of this UDO.

Sec. 4.02.16. Industrial architectural requirements.

(a) Building materials. The following materials are prohibited on an industrial building facade fronting a county road or state highway: corrugated and/or sheet metal siding;

prefabricated steel panels; smooth-face concrete block; untextured tilt-up concrete panels;

plywood; vinyl siding; and synthetic stucco.

(b) Entrances. Primary building entries shall be oriented toward the predominant public view, readily identifiable, and well defined through the use of projections, recesses, columns, roof structures, or other design elements.

(c) Horizontal articulation. Street-facing building facades shall be horizontally divided at least every 20 feet using architectural means such as string courses, recesses, cornice lines, reveals or the like. There must be at least one horizontal division on every building facade.

(d) Vertical articulation. Street-facing building facades shall also be vertically divided utilizing major and minor articulations to create visual interest and avoid monotony. Major articulations shall occur at least every 120 feet of horizontal facade length. Major articulations may be accomplished through: a change of facade materials extending from grade through the cornice; physical offsets; and/or similar means intended to convey the impression of separate buildings. Minor articulations shall occur approximately every 60 feet of horizontal facade length and may be accomplished by: the use of pilasters; the use of smaller offsets; or similar means intended to create the appearance of structural bays.

(e) Windows. All public street-fronting first stories shall have windows that shall be of clear, unpainted or similarly treated glass to allow views of building interior.

(f) Rooftop mechanical equipment. Any mechanical equipment located on the roof of a building shall be as inconspicuous as possible from the right-of-way of the public road or state highway by the building roof, a parapet wall, or by other screen approved by the zoning administrator. In the case of flat roofs, equipment may be located within a roof depression to comply with this requirement. If the elevation of the road or state highway is higher than the building and such screening cannot be accomplished, or in other cases where such screening is not feasible in the zoning administrator's opinion, equipment shall be painted to minimize its visibility.

(g) Accessory buildings. Buildings accessory to the primary structure shall be designed to resemble that of the primary building with respect to architecture, materials, color, mass, and scale.

Sec. 4.02.17. Mixed-use site design standards.

(a) Block size. Mixed-use areas are encouraged to be divided into blocks with a grid street pattern to allow multiple alternative routes for transportation. The maximum block size fronting on State Highways 16 and 36 and the I-75 frontage road, measured from road center line to road center line, shall be 1,000 feet. The maximum block size fronting on collector and local roads, measured from road center line to road center line, shall be 500 feet.

(b) Service functions. Service functions such as deliveries or maintenance activities shall be integrated into the circulation pattern in a manner which minimizes conflicts with vehicles and pedestrians. On development sites of 15 acres or more, office and commercial developments shall have service and loading areas separate from main circulation and parking areas.

(c) Interconnection. To promote interconnection, cul-de-sacs and other dead-end roads are prohibited; instead, developers are encouraged to create blocks as referenced above. In cases where life safety is concerned, a dead-end may be granted by written approval from the zoning administrator.

(d) Sidewalks. Sidewalks at least ten feet in width shall be provided on both sides of the street in Mixed-Use areas, except along the frontage road. In addition, a five foot planting strip shall be provided from the back edge of the curb to the sidewalk. This area shall be landscaped with a mixture of ground cover and street trees.

(e) Street trees shall be required to be planted at no less than 50-foot intervals along the entire property fronting all streets. Street trees may be placed in the right-of-way or at a maximum of ten feet outside the street right-of-way if necessary given available right-of-way and visibility considerations including clear zone requirements.

(f) Open space. For mixed-use subdivisions of more than three acres, the developer shall set aside ten percent of the land to be used as an amenity area or green space open to the public. This area shall be centrally located to maximize accessibility and shall include pedestrian accommodations such as lighting, benches, and trash and recycling receptacles as appropriate.

(g) Off-street parking. Off-street parking shall be provided on every lot on which any permitted or special use is established in accordance with section 6.01.11.

(1) One row of angled parking may be located between the street and the primary building. The remaining required parking spaces shall be located to the side and rear of the building.

(2) Parking screening. Any parking adjacent to the right-of-way must be screened by opaque shrubbery at least three feet in height when planted or by a masonry wall or fence measuring 36 inches high. Parking lots over 50 spaces must provide pedestrian paths at least five feet wide towards the main entrance of the primary building and pedestrian crossing areas where such paths intersect with vehicular roads.

(h) Shared parking. The zoning administrator may approve a reduction in the number of parking spaces required for a specific use where inter-parcel access is provided and a shared parking analysis, which is approved by the zoning administrator, demonstrates that adequate parking will be provided.

(1) Per the table below, a shared parking calculation projection shall be provided that demonstrates that each use will have adequate parking provisions at all times. The process for determining the minimum parking requirements for a mixed use development or for contiguous properties containing multiple uses is:

a. Determine the minimum number of parking spaces required for each use category. See parking space requirements tables in chapter 6. If the use is undetermined at the time of construction, one space shall be provided for each 300 square feet of floor space.

b. Multiply each parking requirement by the corresponding percentage for each of the time periods shown on the table below.

Shared Parking Chart

WEEKDAYS WEEKENDS

Use Daytime 6:00 a.m. - 5:00 p.m.

Evening 5:00 p.m. - 6:00 a.m.

Daytime 6:00 a.m. - 5:00 p.m.

Evening 5:00 p.m. - 6:00 a.m.

Residential 0.8 1 0.8 1 Office 1 0.1 0.2 0.05 Retail 0.95 0.85 1 0.7 Hotel 0.6 1 0.6 1 Restaurant 0.75 1 0.6 1 Entertainment 0.5 0.85 0.7 1 Church 0.5 0.5 1 0.6

c. Total the number of parking spaces for each of the time periods (add together the numbers in each column).

d. The largest column total is the minimum shared parking requirement for the development or collectively for the contiguous properties.

(2) In no case shall parking spaces that are farther than 1,000 feet from a building entrance be counted towards shared parking requirements.

(i) Bicycle parking. All nonresidential uses that are required to provide off-street parking spaces for motorized vehicles shall also provide bicycle parking spaces. Uses that require up to 50 off-street parking spaces for motorized vehicles shall provide at least one bicycle rack (two spaces), plus one more bicycle rack for each additional 50 parking spaces required for motorized vehicles.

(1) Multi-family residential developments shall provide a minimum of one bicycle rack (two spaces) for up to ten dwelling units and one additional rack per each additional ten dwelling units.

(2) Bicycle spaces shall consist of one or more inverted U-racks parallel to one another anchored into concrete 30 inches apart and 30 inches away from nearby walls or obstacles, providing a clear length of at least 83 inches for easy access in and out.

Each rack shall count as two bicycle spaces.

(3) The zoning administrator may permit other styles of bicycle racks provided they meet similar criteria of durability and security.

(4) No single bicycle parking area should exceed ten racks or 20 spaces or impede normal pedestrian flow.

(5) It is recommended that the bicycle parking area be located within 100 feet of the facility entrance, preferably visible from that entrance. In no case shall the bicycle parking be further than 200 feet from the entrance.

(j) Paths. Surface parking shall provide safe pedestrian passage by incorporating an efficient system of pedestrian paths at least five feet wide. Buildings that locate their parking in front must provide a crosswalk to connect the public sidewalk to the sidewalks adjacent to the building entrance.

(k) Parking illumination. Parking lots and structures shall follow basic Illuminating Engineering Society (IES) guidelines by providing even lighting of at least 0.2 foot-candles of horizontal intensity, but no more than four foot-candles (one foot-candle average). Full cutoff luminaires shall be used to prevent wasted light and keep glare from reaching neighboring areas. Parking lot and street light posts shall not exceed a height of 32 feet from finished grade.

(l) Location of loading areas. Loading areas shall be located to the rear of the building unless site design precludes a rear location, in which case loading shall be to the side of a building. Loading areas, at the determination of the zoning administrator, shall be permitted within front yards only if undue hardship can be shown.

(m) Trash enclosures. Enclosures shall be constructed of sturdy, durable, opaque materials making it so trash receptacles are completely screened from view. These enclosures should be similar to or designed to be compatible with the surrounding architecture. Trash enclosures should include adequate, accessible, and convenient areas for collecting and loading recyclable materials. Space should be provided within enclosures for pallets, skids, cartons, etc., and no overflow of these or other debris shall be allowed in public view.

Sec. 4.02.18. Mixed-use architectural requirements.

(a) Building materials. The following materials are prohibited from fronting a county road or state highway: corrugated and/or sheet metal siding; prefabricated steel panels;

smooth-face, split or ground face concrete block; tilt-up concrete panels; and synthetic stucco.

Steel or other metals shall not be used on building exteriors, except as may be necessary for roofing, window trim, gutters, and downspouts.

(b) [Entrances.] Primary entrances, and individual tenant space entries, shall be designed to express greater architectural detail through the use of awnings, recessed areas, a change in material, variations of the material patterning, or other similar techniques.

(c) Horizontal articulation. Street-facing building facades shall be horizontally divided at least every third floor using architectural means such as string courses, recesses, cornice lines, reveals or the like. There must be at least one horizontal division on every building facade.

(d) Vertical articulation. Street-facing building facades shall also be vertically divided utilizing major and minor articulations to create visual interest and avoid monotony. Major articulations shall occur at least every 60 feet of horizontal facade length or at changes between tenants. Major articulations may be accomplished through: A change of facade materials extending from grade through the cornice; physical offsets; and/or similar means intended to convey the impression of separate buildings. Minor articulations shall occur approximately every 30 feet of horizontal facade length and may be accomplished by: the use of pilasters; the use of smaller offsets; or similar means intended to create the appearance of structural bays.

(e) Windows.

(1) All street-fronting first stories shall have windows that meet the following requirements along the portion of the building fronting a public street or public sidewalk.

a. Windows shall be of clear, unpainted or similarly treated glass to allow views of store interior or display windows.

b. Windows shall be located along a minimum of 60 percent of the linear measure of street frontage. Windows shall start a maximum of three feet above the sidewalk.

c. The maximum facade length without windows shall be 20 feet.

d. Glass doors and display cases may count towards window requirements.

e. Hospitals, hotels, townhouses, and multi-family residences first stories rewire windows for a minimum 20 percent of first floor facade area, primarily arranged in a grid.

(2) All building stories above the first story shall have windows that equal a minimum of 20 percent of the total facade area, with each story being calculated independently.

Additionally, all street-facing upper story windows shall be predominately arranged in a grid, subject to individual window variation.

(f) Rooftop mechanical equipment. Any mechanical equipment located on the roof of a building shall be as inconspicuous as possible from the right-of-way of the public road or state highway by the building roof, a parapet wall, or by other screen approved by the zoning administrator. In the case of flat roofs, cooling and air handling equipment may be located within a roof depression to comply with this requirement. If the elevation of the road or state highway is higher than the building and such screening cannot be accomplished, or in other cases where such screening is not feasible in the zoning administrator's opinion, equipment shall be painted to minimize its visibility.

(g) Entrances. All first story uses shall have a primary pedestrian entrance which faces, is visible from, and is directly accessible from the sidewalk.

Sec. 4.02.19. Rural neighborhood site design standards.

(a) Block size. Rural neighborhood areas are encouraged to be divided into blocks to allow multiple alternative routes for transportation. The maximum block size, measured from road center line to road center line, shall be 500 feet.

(b) Interconnection. To promote interconnection, cul-de-sacs and other dead-end roads are prohibited; instead, developers are encouraged to create blocks as referenced above. In cases where life safety is concerned or undue hardship from crossing a wetland or stream, a dead-end may be granted by written approval from the zoning administrator.

(c) Lot size. The rural neighborhood area allows a minimum lot size of 10,890 square feet for single-family houses.

(d) Sidewalks. Sidewalks at least five feet in width shall be provided on both sides of the street in rural neighborhood areas. In addition, a four-foot planting strip shall be provided from the back edge of the curb to the sidewalk. This area shall be landscaped with a mixture of ground cover and street trees.

(e) Street trees. Appropriate street trees shall be provided within the planting strip every 40 feet on center.

(f) Open space. For rural neighborhood subdivisions of more than three acres, the developer shall set aside ten percent of the area in a common area as a park or other public amenity that is located to maximize accessibility by as many residences as possible. Said public amenity shall include pedestrian accommodations such as lighting, benches, and trash and recycling receptacles as appropriate.

Sec. 4.02.20. Rural neighborhood architectural standards.

(a) Building materials. The following materials are prohibited: Corrugated and/or sheet metal siding; prefabricated steel panels; smooth-face, split or ground face concrete block;

tilt-up concrete panels; vinyl siding; exterior insulated finishing systems (EIFS); and synthetic stucco. The following materials are encouraged: brick, stone, and cement board siding.

(b) Entry ways. All residential entry ways shall be covered. The actual style of covering (e.g., porch, awning, etc.) can be determined by the architectural style.

(c) Chimneys. Chimneys shall be veneered in stone, brick, or stucco.

(d) Garages. Garages whether attached or detached shall not face the street; instead, garages shall face the side or rear of the lot.

(e) Mechanical equipment. All mechanical equipment, including HVAC and similar systems, shall be screened from street view on three sides by an opaque wall or fence constructed of brick, stucco, split-face block or wood. A vegetative screen is permissible if the screen uses 100 percent evergreen materials at least two plants deep.

Sec. 4.02.21. Sign regulations.

(a) Interstate signs. Properties within this overlay district that are directly adjacent to the Interstate 75 right-of-way shall be entitled to erect interstate signs, subject to the provisions for interstate signs in the sign regulations of this ordinance. Otherwise, signs within the overlay district are permitted in a manner consistent with the underlying zoning classification, as provided by the sign regulations of this ordinance, and shall also be subject to the following requirements.

(b) Monument-style ground signs. For purposes of this section, "monument sign" shall mean a free standing sign permanently secured to the ground with a structural base below the sign face. In residential areas, monument signs may be composed of brick, stone, or other material approved by the zoning administrator. Nonresidential signs shall be consistent with the primary building on the applicable site, where applicable. Monument signs are subject to architectural review in the overlay.

(c) Master uniform sign plan. For properties that contain more than two uses, buildings, or tenants constructed or managed as a single development, a master uniform sign plan for the entire property shall be required to be submitted for approval by the zoning administrator. Such plan shall demonstrate the size, location, design, and color of signs on the property.

Master uniform sign plans are subject to architectural review and shall at minimum consist of the following:

(1) Drawings and specifications to clearly illustrate the location, materials, size, letter style, and color of all signs to be placed as freestanding and building signs within the development.

(2) Design standards such that signs of a similar type and function within the development shall have a consistency of size, lettering style, color scheme, and construction materials so as to present a unified design concept while also allowing some differences between tenant types and occupancies. Following approval by the zoning administrator, the requirements of the master uniform sign plan shall be referenced in documents involving the sale, lease, or other transfer of right of occupancy affecting any part of the development. Upon such approval, said master uniform sign plan shall be binding on the owner and any lessees, subtenants, purchasers, or other occupants, until or unless the uniform sign plan is replaced with another approved uniform sign plan.

Sec. 4.02.22. Butts County I-75 overlay design guidelines.

The design guidelines which shall apply to the use and development of all properties within the Butts County I-75 overlay district is attached as appendix A and incorporated herein.

Sec. 4.03.00. Supplemental standards for specific uses.

Sec. 4.03.01. Bed and breakfast inn.

A structure which is used primarily as an owner-operated business for providing overnight accommodations to the public, even though the owner or manager may live on the premises. The number of guest rooms shall be ten or fewer. The establishment shall not contain restaurant facilities, but may provide food service for transient guests only. The inn may host events such as weddings, small business meetings, etc.

Sec. 4.03.02. Campground/recreational vehicle park.

(a) In general.

(1) All RV parks and campgrounds, as defined in section 4.03.02(b), whether the camp spaces or lots are offered for ownership or rental, are subject to the requirements of this section.

(2) Permanent occupancy prohibited.

a. No recreational vehicle or tent shall be used as a permanent place of abode, dwelling or business. Continuous occupancy for a combined period of 120 days or more during any calendar year of a recreational vehicle or tent, or of a camp space by the same recreational vehicle or tent, shall constitute permanent place of abode.

b. Removing the wheels of a recreational vehicle except for temporary purposes of repair or to attach the recreational vehicle to the ground for permanent stabilizing purposes is prohibited.

(3) Development of an RV park or campground shall be based on a site plan meeting all requirements of this section and other relevant requirements of the Unified Development Ordinance, and shall subject to issuance of a development permit in accordance with the provisions and requirements for such permits found in the Unified Development Ordinance.

(4) Predevelopment review and approval by the health department must be obtained prior to site plan approval and the issuance of a development permit.

(5) Internal roadways and camp spaces within an RV park or campground shall be located outside of any flood hazard area (i.e., the 100-year flood plain).

(b) Definitions related to recreational parks and campgrounds.

Camp space means a specific and designated portion of the land in an RV park or campground intended for the placement of a single recreational vehicle or tent for the use of its occupants.

Campground. See "RV park or campground."

Motor vehicle means every vehicle which is self-propelled by a motor or engine and is authorized to operate on public streets and highways.

Recreational vehicle means a vehicular type unit primarily designed as temporary living quarters for recreational, camping or travel use which either has its own motive power or is mounted on or towed by another vehicle. Any of the following and similar vehicles are "recreational vehicles":

(1) Travel trailer means a vehicular, self-propelled or portable structure built on a chassis, so designed or constructed as to permit occupancy for dwelling or sleeping purposes.

a. Dependent trailer means a travel trailer that is dependent upon a service building housing toilet facilities.

b. Independent trailer means a travel trailer that has its own holding tank for waste and/or can be connected directly to a sewer connection.

(2) House trailer means a trailer or semitrailer that is designed, constructed and equipped as a temporary dwelling and is equipped to be towed as a conveyance on streets and highways.

(3) Motor home means every motor vehicle designed, used or maintained primarily for temporary or transient occupancy for travel, recreation and vacation.

(4) Truck camper means any structure designed, used or maintained primarily to be loaded on or affixed to a motor vehicle for temporary or transient occupancy for travel, recreation and vacation.

(5) Camping trailer means a canvas or folding structure mounted on wheels and designed for travel, recreation and vacation.

RV means recreational vehicle.

RV park or campground means any privately owned parcel of land that is accessible by motor vehicles and designed, maintained, intended or used for the purpose of supplying temporary accommodations to transients for overnight use by recreational vehicles and/or tents, and permanently designated as a developed camp area set aside for temporary camping purposes for two or more recreational vehicles or tents.

Tent means a portable shelter of material stretched and sustained by poles or ropes or other support device, whether placed directly on the ground or elevated above the ground.

Trailer, dependent. See under "Recreation vehicle."

Trailer, independent. See under "Recreation vehicle."

Transient means a temporary occupant of living quarters (such as a motel room, recreational vehicle or tent) while away from their permanent place of residence.

(c) Area, density and other park standards.

(1) The minimum land area of any RV park or campground shall be five contiguous acres. The maximum land area that can be devoted to an RV park or campground is 20 contiguous acres.

(2) An RV park or campground must have at least 100 feet of frontage along a major thoroughfare designated as an arterial or collector road.

(3) The overall density of an RV park or campground shall not exceed eight camp spaces per acre outside of any flood hazard area or required buffers. Camp spaces may be clustered within the RV park or campground in order to create open space, natural areas or buffers.

(4) Grounds. The unpaved areas of an RV park or campground shall be maintained with grass, trees and/or shrubs to enhance the appearance of the park and to prevent soil erosion or the creation of dust during dry weather.

(5) No individual camp space in any RV park or campground may be sold as an individual lot.

(6) Lighting. All park roadways, pedestrian walkways and areas around park service buildings shall be illuminated to at least 0.3 foot candles.

a. The park street system shall be adequately maintained and lighted by the owner of the RV park or campground. The lighting units shall be so spaced and equipped to provide for the safe movement of pedestrians and vehicle traffic at night.

b. Lighting shall be located, aimed and shielded so that it is focused away from adjoining properties and public rights-of-way. Lighting should be focused downward in order to avoid light trespass, glare and light pollution. Levels of illumination must be appropriate for the security of the area without having an adverse impact on adjacent properties.

c. No flashing, moving, neon or animated lights shall be allowed.

d. Lighting requirements shall apply to all individual camp spaces as well as to the common areas, parking lots, park service buildings and recreation areas.

e. Some or all of the lights may be extinguished after the RV park or campground is closed at night.

(7) Park boundary treatment.

a. An RV park or campground shall be bounded with buffer strip along all of the exterior lot lines of the park. The buffer strip shall meet the buffer standards of the Landscaping, Buffers and Tree Protection [section] of the Unified Development Ordinance.

b. The buffer strip along the exterior side and rear lot lines shall be no less than 25 feet wide.

c. A buffer of at least 25 feet in width, across which there shall be no right of access other than the approved entrance/exit roadway, shall be provided along the frontage of the RV park or campground.

(8) Recreation areas.

a. The RV park or campground shall provide at least one residential area. The number of residential areas shall be no less than one per 25 camp spaces or fraction thereof. Each recreation area provided shall contain at least 2,500 square feet and be improved with such recreation facilities as children's play equipment, outdoor cooking facilities, picnic tables or picnic shelters, as appropriate to the nature or operation of the RV park or campground.

b. Recreation areas shall be so located as to be free of traffic hazards and shall be equally accessible by all occupants of the park.

(d) Minimum setbacks and separations. The size of individual camp spaces shall be adequate to meet all setback and separation requirements of this subsection. The minimum size of a camp space may vary depending on the type and size of the vehicle or tent occupying or intended to occupy such space.

(1) All camp spaces and all principal or accessory buildings within the park shall be located no closer than 40 feet to adjoining property lines.

(2) Recreational vehicles and other vehicles shall be parked so that the vehicle is no less than ten feet and no more than 20 feet from the edge of any internal roadway giving access to the camp space.

(3) Camp spaces shall be so arranged that RVs and tents shall be separated from each other and from other buildings and structures by at least 20 feet, provided further that:

a. Any accessory structures or extensions (such as awnings, tie-down lines, and individual storage facilities) and any separate vehicles (such as automobiles, trucks, motorcycles or towing vehicles) shall be considered part of the recreational vehicle or tent for the purpose of measuring separation from other RVs or tents;

and

b. Separation between RVs and tents and an individual storage structure located on the camp space for use by the occupant of the RV or tent shall be at least eight feet.

(e) Access and circulation.

(1) Entrances and exits. The entrances and exits to the RV park or campground shall be only from the major thoroughfare on which it fronts. Internal roadways connecting to the major thoroughfare must be designed and constructed to public street standards within the thoroughfare's right-of-way, but shall be maintained as private roadways.

(2) Internal streets.

a. Access to all camp spaces and all park service buildings shall be from internal roadways within the park and in no case directly from any public road, street or highway.

b. All internal roadways shall be private drives and shall be of adequate width to accommodate anticipated traffic. Internal roadways shall meet the following minimum requirements: One-way drive—minimum 12 feet in width; two-way drive—minimum 24 feet in width.

(3) Surfacing. All roadways and parking areas within the RV park or campground shall be surfaced with concrete or asphalt, or an equivalent all-weather surfacing approved by the public works director and/or county engineer.

(4) Off-street parking. Every RV park and campground shall provide sufficient parking and maneuvering space so that the parking, loading or maneuvering of recreational vehicles shall not necessitate the use of any public street or right-of-way.

(5) All road signs and lot identification numbers must be sufficient for and meet the requirements of the county's E-911 system.

(f) Park service buildings. Accessory structures and community service facilities may include the following uses:

(1) Park manager's permanent residence.

(2) Park management office and storage.

(3) Community sanitary and laundry facilities.

(4) Indoor community recreation center, not exceeding 1,800 square feet of gross floor area.

(5) Commercial uses supplying essential goods or services for the use of park occupants, not exceeding 800 square feet of gross floor area.

(6) An individual storage structure located on a camp space for use by the occupant of the camp space, not exceeding 320 square feet of gross floor area. Such storage structures shall not be used for temporary or permanent habitation.

(7) Such other structures or facilities directly related to and necessary for the proper management, operation or maintenance of the RV park or campground as determined in writing by the zoning administrator prior to installation.

(g) Health department requirements. Any RV park or campground must comply with all currently adopted rules and regulations of the Georgia Department of Human Resources regarding "tourist accommodations" and sewage disposal requirements of the Department of Human Resources or Department of Natural Resources (as applicable) or the Department of Environmental Health or Butts County Water and Sewage Authority, as applicable. Such rules and regulations, which may be amended from time to time, may include but are not limited to the following:

(1) Water supply.

a. The water supply shall comply with all federal, state and local laws and/or ordinances related to safe drinking water.

b. Hose used for filling travel trailer water tanks shall be stored under sanitary conditions, used for no other purposes and be so handled that back siphonage cannot occur and that contaminants will not be introduced into the travel trailer's water tank.

(2) Toilet facilities.

a. Where dependent trailers are located, central toilet facilities shall be provided for each ten camp spaces or fraction thereof, with not less than one commode, one lavatory and one tub or shower head for each sex and separated from the other sex. In addition, at least one urinal shall be provided in each central toilet designated for men. It is not required for independent trailer sites to have access to central toilet facilities.

b. Central toilets shall be plainly marked, separate for each sex, lighted at night and located within 200 feet of the camp spaces served.

c. Anti-slip tubs, slip strips, appliqués or slip-proof mats shall be provided in each bathing facility and shall be kept clean and in good repair.

(3) Sanitary sewage and disposal facilities.

a. Connection shall be made to a public sewer whenever possible and feasible as determined by the health department and Butts County Water and Sewage Authority, as applicable.

b. Each independent trailer camp space shall be provided with a sewer connection not less than three inches in diameter. Suitable fittings shall be provided at each sewer connection to permit a watertight junction to be made with the travel trailer outlet. Each sewer connection shall be so constructed that it can be closed and when not in use shall be capped to prevent escape of odors.

c. Where public sewers are not available, sewage disposal shall be provided to effectively dispose of all water carried wastes in a sanitary manner. No sewage, waste water, or other liquid effluent shall be discharged in such manner as to enter surface or subsurface water except following a treatment process approved prior to construction in conformity with existing state and local laws. Such sewage disposal systems shall be constructed and maintained in a manner to prevent the creation of unsanitary conditions. Existing private sewage disposal systems giving satisfactory service as determined by the health department may be approved by said department.

(4) Garbage and refuse disposal.

a. All outside refuse or garbage storage containers shall be constructed of durable metal or other approved types of materials, which do not leak and do not absorb liquids and shall be provided with tight-fitting lids or covers and shall, unless kept in a special vermin proof room or enclosure, be kept covered when stored.

Each container shall be located within 100 feet of the camp spaces it serves or in a location approved by the health department and shall be cleaned at such frequency as to prevent a nuisance or odor.

b. Adequate cleaning facilities shall be provided and each garbage and/or recycling storage room, enclosure or container shall be thoroughly cleaned after the emptying or removal of refuse or garbage. Areas surrounding these rooms, enclosures and containers shall be kept clean and orderly. Liquid waste resulting from the cleaning of containers shall be disposed of as sewage.

c. The RV park or campground shall dispose of the refuse in compliance with all federal, state and local laws and/or ordinances.

(5) Insect and rodent control. Effective measures, approved by the health department, intended to eliminate the presence of rodents and flies, roaches and other insects on the premises shall be utilized. The premises shall be kept in such condition as to prevent the harborage or feeding of insects or rodents.

(6) Laundry rooms. Where laundry facilities are provided, they shall be separate from other facilities, of sound construction and shall be kept clean and in good repair.

Laundry rooms for guest use shall be vented to the exterior and shall be well lighted, ventilated and provided with hot and cold water under pressure. Dryers shall be vented to the outside.

(h) Electrical service requirements.

(1) All utilities, including electrical, shall be underground. Where on-site or offsite conditions require electrical supply lines to be above ground, there shall be no less than 18 feet of vertical clearance and three feet of horizontal clearance in all areas subject to recreational vehicle movement.

(2) Any RV park or campground must comply with all requirements of the National Electrical Code regarding recreational vehicle parks which include, but are not limited to, the following:

a. Every recreational vehicle site with electrical supply shall be equipped with at least one 20-ampere, 125-volt receptacle. A minimum of five percent of all recreational vehicle sites, with electrical supply, shall each be equipped with a 50-ampere, 125/250-volt receptacle. A minimum of 70 percent of all recreational vehicle sites with electrical supply shall each be equipped with a 30-ampere, 125-volt receptacle. Dedicated tent sites with a 15- or 20-ampere electrical supply shall be permitted to be excluded when determining the percentage of recreational vehicle sites with 30- or 50-ampere receptacles.

b. Additional receptacles shall be permitted for the connection of electrical equipment outside the recreational vehicle within the recreational vehicle park.

c. All 125-volt, single-phase, 15- and 20-ampere receptacles shall have listed ground-fault circuit-interrupter protection for personnel.

d. Location.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:butts-county/zoning/whole@2026-04-13-cd344fba4b