Butts County · Zoning Ordinance
Butts County Zoning Ordinance
This document is shown whole, as one text: its source does not cut it into sections.
About this text
- As published by Municode, current through 2026-04-13
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
Part 4 of 5. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.
(c) Corner visibility. No sign or sign structure above a height of three feet shall be maintained within 15 feet of the intersection of the right-of-way lines of two streets, or of a street intersection with a railroad right-of-way.
(d) Traffic visibility and safety. No sign shall obstruct the traffic sight line or the view of vehicles entering the roadway (i.e., the view of oncoming traffic by vehicles attempting to enter the road, or vice versa). No sign shall be erected on any traffic island.
(e) Good repair. All signs, together with all their supports, braces, guys, and anchors, shall be kept in good repair and shall be structurally sound.
(f) Removal of signs. The county may remove a sign in violation of this ordinance, without giving notice to any party, if said sign is upon the public right-of-way or upon other public property; or said sign poses an immediate safety threat to the life or health of any members of the public.
Sec. 5.04.05. Prohibited signs.
The following types of signs are prohibited in every zoning district:
(a) Roof signs (which means signs mounted above a roof or projecting above the roof-line of a structure).
(b) Rotating signs (which includes any sign designed to revolve, rotate, or otherwise turn, in whole or in part, by means of electrical power).
(c) Portable signs (which means signs which are attached to vehicles, trailers, movable structures, or attached to sign structures which are not permanently anchored into the ground, or any sign which may be transported or is designed to be transported).
Such signs include, but are not limited to, printed banners or billboards attached to vehicles and trailers; portable signs do not include signs or messages that are painted on or permanently affixed to vehicles that are licensed, tagged and operable.
(d) Moving signs, or signs with moving parts. This includes, but is not limited to, animated signs involving motion or sound; signs with moving words; signs with waiving elements, whether motorized or wind-powered; or similar moving signs.
Sec. 5.04.06. Continuance of nonconforming signs.
Invariably, at the time a sign ordinance is adopted or amended, certain signs which lawfully existed prior to the adoption or amendment will not conform to specified regulations and development standards. These are known as nonconforming signs, and in order to feasibly adopt the ordinance and so as not to cause undue economic hardship on owners of nonconforming signs, these signs are allowed to continue under special conditions as outlined in the following subsections of this section:
(a) Where a nonconforming sign has ceased to be used for more than six months or has changed to a permitted or conforming sign, further use of the sign must be in conformance with the standards and requirements of this ordinance.
(b) A nonconforming sign must not be extended or altered unless the extension or alteration is in conformance with the requirements of this ordinance.
(c) A nonconforming sign which is altered or extended must meet applicable county building codes and development regulations. When an applicant seeks a sign permit for the extension or alteration of a nonconforming sign, the zoning administrator will inspect the sign and determine what (if anything) is needed to bring the sign into conformance with applicable building codes and development regulations. Upon determining that the sign meets applicable building codes and development regulations, he will issue the sign permit for the nonconforming sign.
(d) If a nonconforming sign suffers damage which does not exceed 50 percent of its assessed valuation, the sign may be reconstructed and reused as before if done within 12 months from the time such damage occurred. If such damage is greater than 50 percent of its assessed valuation, such a sign may only be reconstructed and used in conformity with the standards and requirements of this ordinance.
Sec. 5.04.07. Permits, inspections, etc.
(a) Permit required. Except as otherwise provided herein, it shall be unlawful for any person to erect, construct, enlarge, move, or convert any sign in the county or cause the same to be done without first obtaining a sign permit from the zoning administrator. These directives shall not be construed to require any permit for change of copy on any sign, replacement of the sign face, nor for the repainting, cleaning, or other normal maintenance or repair of a sign or sign structure for which a permit has previously been issued, so long as the sign structure is not modified or enlarged in any way. No permit or fee shall be required for signs having no electrical connection and a sign face less than 32 square feet in area.
(b) Application. Sign permits may be applied for by the owner of the property upon which the sign will be located, or by that person or entity's authorized agent. In order to obtain a permit to erect, alter or relocate any sign under the provisions of this ordinance, an applicant therefor shall submit to the zoning administrator a sign permit application which shall set forth in writing a complete description of the proposed sign including:
(1) The name, address, and telephone number of the owner or persons entitled to possession of the sign and of the sign contractor or erector;
(2) The name, address and telephone number of the owner or lessee of the lot on which the sign is located if different from those designated above;
(3) The location by street address and parcel number of the proposed sign structure;
(4) A drawing of the proposed sign showing dimensions and construction specifications, prepared and signed by an architect or engineer licensed by the state of Georgia;
(5) Where the sign construction requires an electrical connection, the electrical contractor shall obtain an electrical permit;
(6) Each applicant shall present to the zoning administrator on request a certificate of liability insurance prior to the issuance of a sign permit; and
(7) Where the application is for a multiple-message sign using electronic lighting as part of the display on the sign face, a copy of the sign manufacturer's specifications for luminosity shall be attached to the application.
(c) Issuance of permit if application in order. It shall be the duty of the zoning administrator, upon receipt of a completed application for a sign permit, to examine such plans and specifications and other data and, if the proposed structure is in compliance with the requirements of this section and all other applicable provisions of this ordinance, to issue, within five working days from date of filing, to the applicant a written permit evidencing the applicant's compliance therewith. Sign permits shall be issued in the name of the property owner upon which the sign is to be located. Issuance of the permit shall in no way prevent the zoning administrator from later declaring said sign to be nonconforming if the permit is obtained based on false information submitted by the applicant.
(d) Permit duration. A sign permit shall become null and void if the construction of the sign for which the permit was issued has not begun within a period of six months after the date of issuance and completed within 12 months after date of issuance.
(e) Work on illegal signs. No person shall erect or assist in the erection, construction, maintenance, alteration, relocation, repair or painting of, or do any work upon any sign for which a permit has not been obtained where required. Any such sign shall be illegal, and the zoning administrator may order the owner to remove the same immediately. If the owner fails to remove the same within 30 days, the zoning administrator shall proceed in accordance with this ordinance.
(f) Inspection. All signs for which a permit is required by this ordinance are subject to inspection by the zoning administrator.
(g) Revocation. The zoning administrator is hereby authorized to revoke any permit upon failure of the holder thereof to comply with the provisions of this section within 30 days after notification in writing.
(h) Permit fees. Before any permit is issued under the provisions of this section, the applicant shall pay a fee in the amount of $50.00.
Sec. 5.04.08. Sign and sign structure maintenance.
(a) Signs and sign structures shall be maintained in good repair, structurally sound, with proper anchorage capable of supporting the imposed loads, so as not to pose a threat to the public health, safety or welfare. All structural members shall be maintained free from deterioration and shall be capable of safely supporting the imposed dead and live loads.
(b) All exterior surfaces shall be maintained in good condition. Exterior wood surfaces, other than decay-resistant woods, shall be protected from the elements and decay by painting or other protective covering or treatment. Peeling, flaking and chipped paint shall be eliminated and surfaces repainted. When required, all exposed surfaces of metal or wood shall be protected from the elements and against decay or rust by periodic application of weather-coating materials, such as paint or similar surface treatment. Sign faces shall be maintained in good repair and shall have neatly painted, posted or otherwise maintained display surfaces, free of defects such as holes, tears, cracks, breaks or missing portions, which are plainly visible from the public right-of-way.
(c) When a sign or sign structure is found to be in need of maintenance, a notice of violation shall be issued to the property owner which shall describe the maintenance issue and provide a reasonable amount of time to repair the violation.
(d) If, after receiving the notice of violation, the property owner fails to remedy the maintenance issue within the time provided, it shall be a violation of this ordinance, subject to citation. The county may also institute the appropriate proceeding at law or in equity to restrain, correct or abate such violation or to require the removal of the sign or sign structure where appropriate. The reasonable cost of any action taken by the county or its agents to remedy the maintenance issue shall be charged against the real estate upon which the structure is located and shall constitute a lien upon such real estate.
Sec. 5.05.00. Telecommunication towers.
Sec. 5.05.01. Requirements.
Towers may be permitted in zoning districts pursuant to those additional restrictions listed herein:
(a) General requirements.
(1) A special land use permit granted by the board of commissioners shall be required for the construction of all new communications towers within the county after the following factors are considered:
a. The proposed height of the tower.
b. Proximity to residential structures and residential district boundaries.
c. Nature of uses on adjacent and nearby properties.
d. Surrounding topography, tree coverage and foliage.
e. Design of the tower, with particular reference to design characteristics which have the effect of reducing or eliminating visual obtrusiveness.
(2) All permit applications submitted to the community development department shall include a complete inventory of the applicant's existing towers and receivers/transmitters located within Butts County including each asset's location, height and collocation usage or capabilities. The community development department shall utilize such information to promote collocation alternatives for other applicants.
(3) All applicants must demonstrate that no existing tower or structure can accommodate the proposed antenna(s). Evidence of an engineering nature shall be documented by the submission of a certification by a qualified engineer. Such evidence may consist of the following:
a. No existing towers or structures are located within the geographic area required to meet the applicant's engineering requirements.
b. No existing structure is of sufficient height to meet the applicant's engineering requirements.
c. No existing tower or structure has sufficient structural strength to support the applicant's proposed antenna(s) and related equipment.
d. The applicant's proposed antenna(s) would cause electromagnetic interference with the antenna(s) on the existing tower or structure.
e. The fees or costs required to share the existing tower or structure or to adapt the existing tower or structure for shared use are unreasonable.
Costs exceeding new tower development are presumed unreasonable.
f. Such other limiting factor(s) as may be demonstrated by the applicant.
(4) At the time of filing the application for a tower, the applicant shall provide the federal statutory provision under which approval is sought, a site plan and information regarding tower location, accessory structures, neighboring uses and proposed landscaping. Documentation must be submitted and certified by a qualified engineer delineating coverage and propagation zones, tower design and collocation capabilities.
(5) All collocation applications shall be ruled upon within 90 days of the filing of a completed application; all other applications shall be ruled upon within 150 days of a completed application. Applications which are not completed at the time of filing shall not be accepted, and county staff shall review the application to verify completeness within 30 days from the filing of the application. In the event that an application is determined to not be complete within the initial 30-day period after filing, county staff shall promptly notify the applicant, and the time for issuance of the decision shall be tolled for the time period between such notification to the applicant and the date the applicant files materials which complete the application. The time periods within this subparagraph may be extended by the mutual consent of the county and the applicant.
(6) In granting a special land use permit, the board of commissioners may impose additional conditions to the extent determined necessary to minimize adverse effects on adjoining property.
(7) In any case where an application is denied, the county shall issue a written decision which lists the reasons and evidence in the record supporting such denial.
(b) Standards.
(1) All towers must be set back a distance of twice the full height of the tower from any residentially-zoned property or structure used for residential purposes.
This condition shall not apply in areas zoned heavy industry district.
(2) All towers shall be separated from each other by a distance of at least 1,000 feet.
(3) All new self-supporting towers which do not incorporate alternative design features must be designed and built in a manner that allows at least one other entity to collocate on the structure.
(4) All towers and their related structures shall maximize the use of building materials, colors, textures, screening and landscaping that effectively blend the tower facilities within the surrounding natural setting and built environment.
Towers shall be painted so as to reduce their visual obtrusiveness, subject to any applicable standards of the Federal Aviation Administration (FAA).
(5) Any tower which directly abuts a residentially-zoned property shall have a minimum 50-foot landscaped buffer with a solid fence or wall no less than six feet in height.
(6) All landscaping plans shall be prepared by a registered landscape architect. For each 30 linear feet of perimeter fencing, no less than two trees and two shrubs shall be installed.
(7) Towers shall be enclosed by security fencing not less than six feet in height and shall be equipped with an appropriate anti-climbing device; provided, however, that such requirements may be waived for alternative design mounting structures.
(8) Lattice and guy-wire supported structures are permitted only within heavy industrial districts.
(9) All towers must meet or exceed current standards and regulations of the Federal Communications Commission (FCC) and FAA.
(10) Subsequent to commission approval, but prior to the issuance of any building permits, compliance with section 106 of the Natural Historic Preservation Act shall be demonstrated.
(11) Tower heights shall be measured from the existing ground base level to the highest point on the tower or other structure, even if said highest point is an antenna, and limited to the following:
Zoning District Single User Two Users* Three Users* AR 75' 125' 150' R-1 50' 90' 120' R-2 50' 90' 120' R-3 50' 90' 120' R-4 50' 90' 120' R-5 50' 90' 120' P-R 50' 90' 120' P-M 50' 90' 120' C-1 50' 90' 120' C-2 50' 90' 120' O-1 50' 90' 120' M-1 75' 125' 150' M-2 75' 125' 150' M-3 75' 125' 200'
* Refers to the number of separate entities collocating on the same structure.
(c) Administrative approval.
(1) The addition of transmitting and/or receiving whip antennas and panels may be approved administratively by the zoning administrator so long as any such addition does not add more than ten feet in height to an existing structure more than 50 feet in height, or more than five feet in height to an existing structure less than 50 feet in height but greater than 20 feet in height and all necessary building permits are obtained. Such acceptable structures include buildings, signs, light poles, water towers, and other freestanding nonresidential structures.
Antennas attached to existing structures, along with supporting electrical and mechanical equipment, shall be of a color identical to, or closely compatible with, that of the supporting structure.
(2) The zoning administrator may administratively approve alternative mounting structures such as fake trees, clock towers, bell steeples, light standards, and similar alternative mounting structures, provided such alternative structure is determined by the director to satisfy such factors set forth in subsection (a).
These structures shall also be exempt from the additional separation and setback requirements pertaining to towers.
(3) The zoning administrator may administratively approve the shared use of an existing tower or structure by another provider, including the placement of additional accessory buildings or other supporting equipment. The director may administratively waive district setback requirements by up to 50 percent to accommodate the placement of such additional buildings or other supporting equipment in order to encourage the shared use of existing infrastructure.
(4) The addition of antennas to an existing tower structure is exempted from all setback requirements which pertain to residentially-zoned or used properties.
(d) Removal of antennas and/or towers. All towers shall be maintained in compliance with standards contained in applicable building and technical codes so as to ensure the structural integrity of such towers. If upon inspection by the building inspection division of the community development department, such tower is determined not to comply with the code standards and to constitute a danger to persons or property, then upon written notice by certified mail, return receipt requested, or by personal service being provided to the owner of the tower, the owner shall have 30 days to bring such tower into compliance.
(e) Exceptions.
(1) Antennas or towers located on publicly-owned property or owned by governmental bodies shall be exempt from the requirements of this ordinance provided a license or lease authorizing such antenna or tower has been approved by the appropriate governing body.
(2) A tower under 70 feet in height owned and operated by a federally-licensed amateur radio station operator shall be exempted from these requirements.
However, the owner or operator of such tower shall be required to comply with all applicable local, state, and federal codes.
CHAPTER 6
INFRASTRUCTURE IMPROVEMENTS
Sec. 6.00.00. Generally.
The purpose of this chapter is to establish standards and requirements for the provision of infrastructure by all development. This chapter contains requirements for the transportation system, set forth in section 6.01.00, including placement of underground utilities, access, streets, off-street parking and clear visibility at intersections. Butts County Board of Health requirements are set forth in section 6.02.00. Requirements for utilities are set forth in section 6.03.00, including potable water and sanitary sewer. Requirements for drainage and stormwater management are set forth in section 6.04.00.
Sec. 6.01.00. Transportation and parking facilities.
Sec. 6.01.01. Generally.
(a) Acceptance of official county road map. The Butts County Road Classification Map, as now or hereafter amended, is hereby accepted.
(b) No person shall do any paving work, or any other related or similar roadwork, on, or adjacent to, a county road without a permit.
(c) All transportation system design, street design, and construction for non-local roadways shall comply with Georgia Department of Transportation (GDOT) requirements.
The latest edition of the GDOT manual, "Standard Specifications, Construction of Roads and Bridges," shall apply.
(d) Where conflict arises between GDOT standards and this section concerning non-local roadways, the stricter standard shall apply. Design of local roadways shall be governed by the policies as stated within the UDO; however, construction methods/practices of said roadways shall be governed by the stricter of the GDOT standards and the UDO.
(e) All materials, equipment, labor and other matters related to street construction shall be provided by the applicant. The following is a summary of the improvements required:
(1) All streets, roads, and alleys shall be graded to their full width right-of-way by the applicant so that the pavements and sidewalks, when installed in the future, can be constructed on the same level plane. The preparation of the right-of-way before grading is started, and the construction of cuts and fills, shall be accomplished according to the specifications of the county (see subsections 6.01.07(i) and (k)).
(2) Two copies of an as-built subgrade centerline profile shall be submitted to the county.
The profile shall include both proposed and as-built centerline elevations at every even station. No curb and gutter or waterlines shall be installed prior to subgrade approval.
(3) An adequate drainage system, including necessary curbs, pipes, culverts, headwalls, intersectional drains, drop inlets, bridges, swale ditches, and detention areas, shall be provided for the proper drainage of all surface water. The drainage system shall be designed by a registered professional engineer, licensed in the state of Georgia.
(4) After preparation of the subgrade, the roadbed shall have base material and paving applied according to county specifications (see subsections 6.01.07(i) and (k)).
(f) Installation of underground public utility lines. The following minimum specifications shall govern the installation of underground public utility lines on county road rights-of-way.
They are the minimum specifications for installation of underground utilities including lines for electricity, water, natural gas, telephone, cable television, and street lights on county road rights-of-way:
(1) All of the above shall be located a minimum of two feet from the edge of the pavement (with curb and gutter) and shall be located a minimum of four feet below the existing grade and/or edge of pavement, whichever is lower.
(2) Public utility lines shall be located underground along all new roads, and, at the discretion of the public works director, on all existing roads when serving new construction, excluding single-lot residential development.
(3) Paved roads shall be bored rather than cut for the installation of utilities. The cutting of all paved county roads shall require the approval of the public works director prior to the cut being made.
(4) Any paved road which is saw cut to a width of more than 12 inches shall be filled with a compacted base material to within eight inches of the riding surface and with concrete to within two inches of the riding surface. The remaining two inches shall be filled with asphaltic concrete to allow for a smooth riding surface.
(5) Any paved road which is saw cut to a width of 12 inches or less shall be filled with a compacted base material to within two inches of the riding surface. The remaining two inches shall be filled with asphaltic concrete to allow for a smooth riding surface.
(6) Any dirt road which is cut shall be filled with a compacted base material.
(g) Private roads may be allowed only by authorization from the board of commissioners.
Any such roads must be designed and constructed in accordance with all applicable county ordinances and specifications. Verification must be provided by the owner/developer at their own expense to satisfy the county engineer.
Sec. 6.01.02. Naming of public roads.
(a) New roads. Prior to new roads being accepted into the county road system by the board of commissioners, the proposed road name shall be reviewed and approved by the county's technical review committee, which shall be a standing committee of the county department heads or their representative and be chaired by the director of the Butts County EMA-911, to ensure that the road name will not cause confusion with other roads. Roads that are obviously in alignment with roads within the same subdivision development should be given the same name. The names of new roads should not duplicate or closely approximate those of the existing roads in the county.
(b) Name changes. Before the name of any county road may be changed from the current official name, the request shall be presented to the county's technical review committee to ensure that the proposed name will not cause confusion with other roads. If the proposed name is approved by the technical review committee, then the board of commissioners shall hold a public hearing for determination of whether to change the road name. A notice shall be published in the legal organ of the county once a week for three weeks stating the name of the road to be changed, the general location of the road, the proposed new name and the date, time and location of the hearing. The cost of the advertising shall be paid by the proponents of the name change.
Sec. 6.01.03. Utility facilities and equipment.
(a) Purpose. This section is enacted to more efficiently provide for the safety of persons and vehicles traveling on the county roads of Butts County, as allowed under O.C.G.A.
§ 32-4-42(6).
(b) Basis for ordering removal, relocation of facilities; failure to comply, removal by county:
(1) When the board of commissioners reasonably determines that any pipe, main, conduit, cable, wire, pole, tower or other signal and equipment, facilities or appliances of any utility in, on, along, over or under the public roads of the county should be removed or relocated because it has become an obstruction or interference with the use and safe operation of a county road, or will become an obstruction or interference with the use and safe operation of a contemplated county road or project, a written notice shall be directed to the utility company, giving at least 60 days notice in which to make such change as is necessary for removal or relocation as may be necessary.
(2) If the utility does not thereafter begin removal within a reasonable time sufficient to allow for engineering and other procedures reasonably necessary to the removal and relocation of the utility facility, the board of commissioners may give the utility a final notice directing that such removal shall commence not later than ten days from receipt of such final notice.
(3) If such removal has not begun, or if such removal has begun and the relocation has not been completed within a reasonable time, the county may remove or relocate the same with its own employees, or by contracted labor, tools, equipment, supervision or other necessary services or materials and whatever else is necessary to accomplish the removal or relocation, and the expense thereof shall be charged to the utility.
(4) Such expense shall be certified to the county attorney, who shall have the authority to proceed with suit against the utility for same if payment or arrangements to make payment are not made within 60 days.
(c) Compensation of utility upon relocation. Nothing in this section shall be construed so as to deprive any utility, relocated from a location in which it owned a property interest, of compensation for such property interest.
Sec. 6.01.04. Right-of-way protection.
(a) Purpose and intent. The purpose of this section is to provide procedures, rules and regulations governing persons, firms, businesses, companies, municipalities, utilities and corporations engaged in any activity involving the utilization of county road rights-of-way in Butts County and to provide for the issuance of permits to protect the citizens, the environment, county infrastructure, and to assure the public's safety.
(b) Permits. No person shall engage in any activity upon, across, or through the rights-of-way of roads in Butts County without first securing a permit to conduct such operations in Butts County.
(1) Exception. The placement of mailboxes for the delivery of items from the U.S. Postal Service shall be exempt from the requirement for a permit, subject to the following standards:
a. Said mailboxes shall be constructed or designed in such a way that the design allows for the unit to break away upon impact.
b. It shall be the responsibility of the owner of the mailbox to maintain and repair those portions of the public rights-of-way impacted or damaged through the delivery of mail by vehicular traffic.
(2) Any person seeking a permit shall apply in person or through an authorized agent at the Butts County Public Works Department and shall provide the following information for each permit requested in subsections a. and b. below.
a. Timber operations.
1. No timber operation shall commence in Butts County, whether or not over, upon, across, or through county rights-of-way, without first having obtained Georgia Department of Revenue form PT 283T, completing sections A, B, C, and G of said form, and submitting "Sellers Copy for Tax Assessor" to the Butts County Public Works Department as an accompaniment to the permit application.
2. Timber operations that do not access or utilize county roads or rights-ofway shall be exempt from the requirements of subsection a.10. of this section only. All other provisions of this section shall be applicable.
3. The name and address of the owner of the property on which the timber operator will engage in timber operations.
4. The location of the property on which the timber operator will engage in timber operations.
5. The roads in Butts County upon which timber trucks will travel.
6. The date cutting operations are expected to commence and end.
7. The name and address of all persons in a supervisory capacity engaged in the timber operation at the location for which the permit is requested.
8. If the timber operator intends to engage independent contractors to haul the timber, then the name, address, SSN or E.I.N. of each independent contractor.
9. If the timber operator is engaged in hauling only, then the name, address, SSN or E.I.N. of the timber operator for whom he will be hauling.
10. A surety bond made payable to Butts County indemnifying the county for any damage caused by the timber operator from its timber operations in Butts County.
11. In addition to the provisions of this section, the applicant for a permit will comply with all state and federal regulations pertaining to timber operations.
12. Timber operations occurring on two acres or less and being done primarily for the purpose of building construction or lot maintenance may be exempted from the requirements of subsections a.1. and 10. upon the inspection and approval of the public works director.
b. Utility providers.
1. The location of the property on which the utility provider will engage in operations.
2. The date utility operations are expected to commence and end.
3. The name and address of all persons in a supervisory capacity engaged in the utility operation at the location for which the permit is requested.
(c) Issuance of permit.
(1) A permit will be issued to the applicant without charge when all required information and surety bonds as required for the issuance of the permit have been provided.
(2) Permits will not be issued for signage, advertisements, or notices of any kind upon the rights-of-way of county roads, and the unauthorized placement of such shall be unlawful. Any unauthorized items placed upon the rights-of-way in Butts County shall be considered littering, and Butts County, its officers and employees shall be empowered to remove and destroy such items.
(3) All permits shall be conspicuously posted, clearly visible, and located upon the public right-of-way abutting the property upon which the permitted activity is taking place.
(d) Public nuisance.
(1) No person shall allow dirt, mud, gravel or other debris from adjoining land or resulting from any activity to accumulate upon the rights-of-way of any public road to such an extent that it becomes a nuisance or a hazard to persons traveling upon said roads, or that it creates an unsightly condition upon the public rights-of-way.
(2) No person shall allow dirt, mud or other debris resulting from any activity to accumulate in ditches and drainage areas on public rights-of-way to such an extent that the usual flow of water or run-off is stopped, disturbed, changed or interrupted.
(3) No person shall create any other type of public nuisance that interferes with or in any way damages the public rights-of-way in Butts County.
(4) No person shall park or leave unattended a truck or other motor vehicle or trailer upon the rights-of-way of any county road.
(5) No activity, whether permitted by this section or any other section, shall commence operation or continue to operate without first installing and maintaining, when necessary, a temporary drive cut and culvert to access property and installing and maintaining soil erosion and sedimentation controls sufficient to prevent dirt, mud, gravel or other debris from accumulating in the county drainage ditches or on county roads.
(6) No timber operator shall commence timber operations until he has first posted or caused to be posted along the public road onto which the timber operator will enter from his timber operations at least the following signs: One sign in each direction located 500 feet from the entrance which states "Slow, Trucks Entering Highway," one sign in each direction located 1,000 feet from the entrance stating "Warning:
Logging Operation Ahead." Each such sign shall be in accordance with the MUTCD and not less than 36 inches by 36 inches, orange in color and posted at least three feet from the edge of the surface of said road.
(7) No permitted activity shall continue in operation if the permittee fails to keep county roads free from dirt, mud, gravel or other debris resulting from the activity being performed.
(8) Immediately upon the completion of the permitted activity, an inspection shall take place by the public works director to ensure that all county rights-of-way have been restored to their original condition. Failure to ensure restoration shall result in the forfeiture of the surety bond.
(9) In addition to any other penalty provided for under the provisions of this section, or under the provisions of any state or federal law, any person in violation of this section shall reimburse the county for any and all costs and expenses incurred in abating said nuisance.
Sec. 6.01.05. Access.
(a) Except where expressly permitted, access to every subdivision shall be provided over a public street. All proposed streets shall be continuous and in alignment with existing, planned or platted streets.
(b) Emergency vehicle access shall be provided to all lots within a subdivision. All subdivisions resulting in the creation of 75 or more lots shall be provided with a minimum of two points of ingress/egress from the existing street system. Where the property configura-tion prohibits or makes impractical the installation of two entrances, this provision may be waived by the board of commissioners after review and recommendation by the planning and zoning commission. In such cases, a widened entrance to provide additional public access for public safety purposes shall be designed and constructed subject to approval by the county engineer. The requirement for access shall not be satisfied by a stub-out to a future, planned, or platted street that has not been constructed unless approved by the board of commissioners.
(c) Access points, whether private commercial/industrial drives or county roadways, shall line up directly across from one another when possible. For driveways/roadways that require an offset, the spacing between driveways/roadways, whether on the same or opposite side of the intersecting roadway, shall be required to have the minimum centerline to centerline spacing as follows, based on the speed limit of the main road:
(1) Thirty miles per hour (or less)—125 feet.
(2) Thirty-five miles per hour—150 feet.
(3) Forty miles per hour—185 feet.
(4) Forty-five miles per hour—230 feet.
(5) Fifty miles per hour—275 feet.
(6) Fifty-five miles per hour—350 feet.
For intersecting roadways that are not classified as collector or above and have posted speed limits of 30 miles per hour or less, private commercial/industrial driveways may be allowed to have a reduced offset requirement if approved by the county engineer.
(d) Where access to a subdivision is on a state route, the Georgia DOT shall approve all access and egress locations and designs.
(e) For subdivisions located on a state route or local arterial road, all residential lots shall take direct access only from within the subdivision.
(f) Limitations on residential curb cuts. Within any residential zoning district (see section 6.01.05(c) for other driveway spacing requirements) where the lowering or cutting away of any curbs for purposes of ingress and egress is required, such curb cut shall be subject to the following provisions:
(1) Any parcel of property with frontage of less than 100 feet on any one street shall be allowed only one combined entrance and exit.
(2) Any parcel of property with frontage of 100 feet to 200 feet on any one street shall be allowed no more than two combined entrances and exits.
(3) Any parcel of property with frontage of more than 200 feet on any one street shall be permitted additional entrances or exits after showing of actual requirements of convenience and necessity and upon approval of the county engineer.
(4) At street intersections, no curb cut/driveway shall be located within 50 feet of the intersections of two curb lines or such lines extended, or within 15 feet of the intersection of two property lines extended. When a culvert is required, it shall receive approval from the county engineer.
(5) The distance between any two curb cuts on the same side of the street and located on one property shall not be less than ten feet. Curb cut distance shall be measured between the points of tangency of the curb return radii and the established curb line of the abutting street.
(6) All driveways shall be constructed so as to be at least two feet from any property line.
(7) The maximum width of any driveway shall not exceed 40 feet measured at the right-of-way line.
(8) The maximum width of any curb cut including curb returns shall not exceed 50 feet.
(9) The sum of the two curb return radii for any one curb cut shall not exceed 15 feet.
(g) Interparcel access. New development in commercial, office, institutional and mixed use zoning districts that contains or is intended to contain more than one building or use on site shall provide access so that automobile trips between and among such buildings or uses can be accomplished without using the highway or major street. New developments and substantial improvements to existing developments shall provide for pedestrian and automobile access connections between adjacent properties under different ownership when the uses of the properties are of such compatibility that patrons may frequent both buildings and/or uses in the same vehicle trip, unless the zoning administrator determines otherwise.
Sec. 6.01.06. Design and construction standards for streets.
(a) Location.
(1) The location, arrangement, extent, width, and grade of all streets shall conform to the comprehensive plan and the transportation system plan, and shall be considered in relation to existing and planned streets, topographical conditions, public safety and convenience, and proposed use of land to be served by the streets. The layout of a subdivision shall conform to the requirements and design principles described in this UDO.
(2) The location of all streets and roads shall conform to the comprehensive plan and the transportation system plan. Provision shall be made in developments for the construction of streets at locations shown in the comprehensive plan and transportation system plan.
(3) Whenever a tract to be subdivided includes any part of a major arterial, minor arterial, major collector, or minor collector street designated on the comprehensive plan or transportation system plan, such part of said street shall be installed by the applicant in the location and at the full width indicated by the functional classification for right-of-way and pavement widths indicated in this UDO.
(b) Design and construction standards for curb and gutter.
(1) Curbs shall be required in all residential subdivisions, except for those located in A-R zoning. If curb and gutter is not constructed pursuant to this provision, then the road base shall be extended one foot beyond the edge of pavement and the shoulders shall extend eight feet from the edge of pavement to a standard ditch or swale section on each side of the road.
(2) Curbs shall be required for streets in commercial and industrial subdivisions.
(3) Curbs in all subdivisions shall be L-back curbs 24 inches in overall width, six inches thick, and shall have an 18-inch gutter. Rollback curbs may be installed in the R-5 or P-R zoning districts with county engineer approval.
(4) Curbs and gutters immediately adjacent to the major travel lane along roadways with a posted speed limit of 45 miles per hour or greater shall be L-back curbs 30 inches in overall width, six inches thick, and shall have a 24-inch gutter. Curbs and gutters shall be per GDOT Standard 9032B.
(5) All curbs shall be constructed of Portland cement concrete.
(6) Curbs shall be designed to provide handicapped access at street intersections wherever sidewalks are constructed.
(c) Street grade standards.
(1) Grades on major and minor arterials shall not exceed five percent, and grades on local residential streets shall not exceed 12 percent.
(2) All changes in grade shall be connected by vertical curves which adhere to the design criteria as set forth by the latest edition of AASHTO Guide, A Policy on Geometric Design of Highways and Streets.
(d) Radius of horizontal curves. The radius of horizontal curves on local residential streets within a subdivision shall be no less than 200 feet. The horizontal radius for collector and arterial streets or any streets with a design speed of more than 25 miles per hour shall comply with the latest edition of the American Association of State Highway and Transportation Officials (AASHTO) standards. The radius of horizontal curves on local commercial and industrial streets within a subdivision shall be no less than 300 feet.
(e) Street intersection standards.
(1) Street intersections shall be as nearly at right angles as possible.
(2) In residential subdivisions, no intersection shall be at an angle of less than 80 degrees or more than 100 degrees.
(3) Street intersections in commercial and industrial subdivisions shall be at an angle of not less than 90 degrees, if at all possible. At the county engineer's discretion, street intersection angle may be allowed to be between 80 degrees and 100 degrees.
(4) The minimum curb radius at street intersections shall not be less than 25 feet in residential subdivisions. For streets/roadways to have a dual lane exit, the exit curb radius shall not be less than 75 feet. Where a county collector or an arterial roadway intersects with another county collector or arterial roadway, the minimum radii at the intersection shall be 50 feet.
(5) The minimum curb radius of street intersections for industrial and commercial subdivisions shall be 50 feet. For commercial/industrial streets/roadways to have a dual lane exit, the exit curb radius shall not be less than 75 feet.
(6) Pedestrian ramps shall be designed for all intersections in accordance with standard drawings for subdivisions and residential developments designed to include sidewalks and shall meet the minimum standards of the Georgia Accessibility Code, Chapter 120-3-20 of The Rules and Regulations of The Georgia Safety Fire Commissioner.
The curb shall be de-pressed to accommodate future installations at the same time as the curb.
(7) Interior subdivision street intersections shall have a minimum centerline offset of at least 125 feet when not aligned directly across from one another. See subsection 6.01.05(c) for requirements of intersection offsets on roadways with posted speed limits over 30 miles per hour.
(f) Minimum tangent lengths. The minimum tangent lengths on roadways with superelevation shall be governed by the minimum runoff and runout lengths necessary to adequately transition the superelevation rates required for the curvature based on the design speed and maximum allowable superelevation rate of the roadway. Design speeds, typical sections of roadway, maximum superelevation rates, and other roadway design items are to be set by the county engineer on an individual roadway basis. The minimum tangent length on commercial and industrial subdivision streets is 100 feet.
(g) Dead end street. Local streets designed to have one end permanently closed and not connected with any existing street, proposed future street, or not intended to extend to the property line of an adjacent tract shall be no longer than 1,000 feet unless necessary due to the topographic or other physical conditions of the property.
(1) Permanent dead-end streets shall be joined by a cul-de-sac with a paved turnaround having an outside diameter of 80 feet (40-foot radius) and a right-of-way of at least 110 feet diameter.
(2) Stub streets which are intended to provide access for future development within a tract of land or adjacent tracts shall be required to have a temporary turnaround area having a diameter of at least 80 feet, consisting of six inches of graded aggregate base.
(3) For subdivisions with a temporary turnaround, it shall be required of the applicant to provide a letter of credit equal to the cost of permanent cul-de-sac construction, in accordance with the standards of section 10.02.12.
(h) Alleys. Alleys may be provided at the rear of lots in residential, commercial, and industrial subdivisions.
(i) Right-of-way and pavement width standards.
Table 6.01.06(i). Right-of-way and Pavement Width Standards Street Type Minimum Required Right-of-Way (feet) Required Pavement Width (feet) With Curbs Without Curbs Major arterial 100* 52-53† 48* Minor arterial 80* 28-29† 24* Collector 80* 28-29† 24* Local street Residential 50 26 Prohibited Industrial 60 30 Prohibited Commercial 60 28 Prohibited Cul-de-sac Residential 80 80 Prohibited Commercial/ industrial 110 110 Prohibited Alleys 0 20 20
* The county may require additional right-of-way and pavement widths in specific situations.
Roadways with medians and/or additional laneage will require extra right-of-way and pavement widths.
† Roadways with posted speed limits of 40 miles per hour or 45 miles per hour will require 30-inch curb and gutter.
(j) Additional street system requirements for major subdivisions or commercial/industrial development.
(1) Private streets are permissible with board of commissioner approval and shall meet and adhere to all county standards. Every subdivision with private streets shall have a mandatory homeowners' association.
(2) Subdivisions that adjoin existing streets shall dedicate additional right-of-way if needed to meet the minimum street right-of-way requirements.
(3) Any subdivision or development which has an entrance onto a state highway, major arterial, minor arterial, or collector county road shall provide lanes for deceleration, ingress, and egress. Design requirements of the GDOT shall be met on state roads, and design requirements of the county engineer shall be met on county roads.
(4) Any subdivision or development which has an entrance onto a major arterial, minor arterial, or collector roadway shall be required to design and construct a left turn lane improvement if the criteria is met as stipulated in Chapter 4 of the GDOT Regulation for Driveway and Encroachment Control. The developer will also be responsible for acquisition of right-of-way as well as for the relocation of utilities.
(5) The names of proposed streets shall not duplicate existing street names, irrespective of the use of the word "street," "avenue," "boulevard," "drive," "place," "court," etc., in the naming of the street.
Sec. 6.01.07. Construction requirements for residential and nonresidential subdivision streets.
The grading, base, and pavement for street construction shall be as follows:
(a) Grading. All streets shall be graded to the elevations shown on the approved construction plans.
(1) The contractor may begin clearing and grubbing the project after:
a. A development permit has been issued by the county;
b. A pre-construction conference has been held, the public works director or designee duly notified; and
c. All required erosion control measures have been installed and approved.
(2) Clearing and grubbing.
a. All trees, stumps, logs, roots, grass, weeds, poles, and other objectionable matter shall be cleared and grubbed from within the construction limits of the project.
b. A 30-foot undisturbed buffer shall be maintained on all property lines prior to submission of construction plans.
c. No rubbish or other material resulting from the clearing and grubbing of the roadway shall be buried at the site.
d. If burning is permitted, all burn pits shall be located outside of the roadway construction limits. After burning, the pit shall be cleared out. A county inspection is required prior to backfilling and must be shown on the final plat.
(3) Excavation.
a. All grading operations shall be planned and executed by the contractor in such a manner as to provide suitable subgrade material for the roadway with the top 12 inches compacted to 100 percent maximum dry density, 95 percent below the top.
b. In areas where the material in place is not suitable for subgrades, these areas shall be undercut a minimum of 12 inches and backfilled with suitable material.
c. All rock and boulders in the roadbed shall be excavated and the space backfilled to the correct grade with suitable material.
d. Any stones, broken rock, or boulders resulting from the grading of the roadway may not be placed in any roadway fill area except when approved by the division director or designee and then under his supervision.
e. During the construction of the roadway on a day-to-day basis, the roadbed edges shall be kept lower than the center, and the grading shall be done so that the surfaces of the excavated areas and fill shall be kept reasonably smooth and well drained. Adequate surface ditches shall be cut at the tops of cut slopes, extending to each end of the cuts in order to carry the water from the side hill. Side ditches or gutters emptying from cuts to fill areas shall be turned outward so as to prevent erosion of the fill slopes.
(4) Placement of fill.
a. Fill construction shall not begin until all clearing and grubbing of the fill area has been completed.
b. All depressions in the ground shall be filled level with the adjacent surface using suitable material and compacted to the approximate density of the surrounding soil before placement of the fill begins.
c. The entire area upon which fill is to be placed shall be plowed, scarified, and finely broken up to a depth of a minimum of six inches.
d. Before the placement of fill material begins, all loosened soil shall be compacted the approximate density of the underlying soil.
e. Where a depth of fill and surfacing is three feet or less, the original ground shall be compacted a minimum 12 inches deep to at least 95 percent of the maximum laboratory dry density as determined from representative
samples of the material being compacted.
f. In areas where layers of organic or other unstable materials exist, the existing ground shall be excavated, for the full width of the fill area, to an underlying stable material. The subgrade thus created shall then be compacted to the approximate density of the underlying material.
g. All fill material shall be deposited and spread in uniform horizontal layers, not more than six inches thick, for the full width of the fill area, and these layers shall be kept uniform by the use of graders, bulldozers or other approved equipment.
h. Each layer shall be compacted within the range of optimum moisture content necessary to achieve the compaction required. Material containing too much water shall be dried to the correct moisture content. If the material is too dry, water shall be added and uniformly mixed with the soil before it is compacted.
i. Fills shall be compacted to at least 95 percent of the maximum dry density to within the top 12 inches of the fill. The top 12 inches of the fill shall be compacted to at least 100 percent of the maximum dry density.
j. The entire roadbed shall be scarified and compacted with a sheep's foot or other approved rollers.
k. While the work is in progress, contractor shall maintain the surface in a manner so that the excavation, fills, subgrade, base course, and ditches always present a smooth and even surface.
l. The contractor shall have available on the job at all times at least one motor patrol grader with adequate power to blade and maintain the
roadbed. Suitable scarifiers shall also be available for use whenever necessary.
(5) Final finishing of roadway.
a. After all excavation has been completed and all fills have been placed, the entire road bed surface shall be finally shaped with a grading machine, supplemented with hand work whenever required, to secure a smooth
surface and uniform cross-section.
b. Slopes of cuts and fills shall also be carefully shaped to the true section specified.
c. When final shaping is finished, the road surface shall conform accurately to the line, grade and cross section shown on the plans, and no roots, sod, grass, stones, or other unsuitable material shall remain in the top 12 inches of the finished roadbed.
d. All ditches and drains shall be opened to effectively drain the roadway.
(b) Placement of curb and gutter.
(1) After sanitary sewer lines have been installed, all storm drainage in place, and the final finishing of the roadway has been approved by the division director or designee, and the centerline profile has been approved, the installation of the concrete curb and gutter may begin.
(2) All concrete curb and gutter shall be in accordance with section 6.01.06(b).
(3) Any curb and gutter which does not conform to a true section, texture, line, and grade shall be removed and replaced as directed by the division director or designee.
(4) Water lines shall be installed after installation of the curb and gutter.
(c) Subgrade.
(1) Before placing any pavement base, the entire surface of the subgrade shall be plowed, harrowed, and mixed to a depth of at least six inches. If a subgrade stabilization material is required, it shall be incorporated into the subgrade at this time.
(2) After the material has been thoroughly mixed, the subgrade shall be brought into a proper line and grade and compacted to 100 percent of maximum dry density just prior to placing the base material.
(3) The centerline profile shall conform to the established elevations with an acceptable tolerance of one-half inch.
(4) The acceptance crown tolerance shall be one-half inch.
(d) Base construction.
(1) The division director or designee shall be notified 24 hours prior to the placing of any base material.
(2) The division director or designee may authorize the placing of the base material after all equipment necessary for the proper construction of the road base is on the project and the subgrade has been brought to the proper line, grade and crown, and compacted to the required density.
(3) The division director or designee shall check the completed base course after the base material has been placed and compacted to the required density. All areas found to be deficient shall be marked and corrected before any asphalt pavement is placed. Areas where the crown is found to exceed that which is specified, or the exposed edge of the concrete gutter is less than the minimum depth required, shall be reshaped and rolled to obtain the required crosssection.
(4) After the compacted material has been approved, field tests shall be taken by the field contractor and development inspector, or by a professional engineer as directed by the public works director or designee to determine the thickness of the constructed base course. Tests shall be taken at 400 feet intervals alternating between each lane and center of roadway. Measurements shall be taken per GDOT-42, Method of Test for Measurement of Thickness of Bases and Subbases. Areas found to be deficient in thickness shall be corrected as directed by the division director or designee. No asphalt course shall be placed until deficiencies in base have been adequately addressed.
(5) A copy of all delivery tickets for the graded aggregate base material shall be furnished prior to placing any asphaltic concrete paving material. A shortage in the base material used shall require that the asphaltic concrete surface course thickness be increased.
(6) All work and materials shall be in accordance with the pertinent Graded Aggregate Construction sections of the Georgia Department of Transportation "Standard Specifications," latest edition.
(e) Soil cement. A soil cement base may be used to improve the subgrade with approval by the county engineer but shall not be used as a substitute for base construction.
Soil testing and mix design must be performed by the developer and approved by the county engineer.
(f) Paving.
(1) The contractor shall begin the construction of the asphaltic concrete pavement upon approval of the road base by the division director or designee.
(2) All asphaltic concrete material and construction shall be in accordance with the "hot mix asphaltic concrete construction" sections of the Georgia Department of Transportation "Standard Specifications," latest edition.
(3) The public works director or designee shall check the cross section of the finished pavement. Any area found to be deficient shall be marked and a record of deficiencies made by the division director or designee.
(4) If, in the opinion of the public works director or designee, the extent of deficiencies will impair the performance of the pavement, he shall direct that an overlay of a minimum thickness of one inch be placed before the roadway is opened to traffic.
(5) A copy of the delivery tickets for the asphaltic concrete material used shall be furnished to the division director or designee at the time of completion of the work. If the delivery tickets indicate a shortage in the material used from the quantity estimated, the division director or designee may require a minimum one-inch overlay of the streets.
(6) As mentioned in subsection 6.01.07(d)(4), the GAB (base) thickness is to be measured and accepted by the county prior to placement of any asphalt course.
The applicant shall have core tests made to verify the thickness and compaction of the asphalt pavement course. The minimum core diameter shall be such that compaction of the sample can be determined in the lab and subsequent data supplied to the division director or designee. The compaction of the course shall be required to meet GDOT specifications per the asphalt mix placed. If a two-course asphalt section is required, the cores for the binder layer shall be cut, reviewed, and approved by the division director or designee prior to placement of the topping lift. Also, in the event that a two-course asphalt section is required, the cores for the topping lift, if between one and one-half inch and one and one-quarter inch in thickness, shall be made to determine the thickness only. All cores shall be made on 400 feet intervals, alternating between each lane and center of roadway. If these cores indicate a deficiency in thickness or compaction of the asphalt pavement, an overlay shall be required when the following deficiencies occur:
a. When the number of cores deficient in thickness within the allowable one-quarter of an inch tolerance, or deficient in compaction, exceeds 35 percent of the total cores taken on one street.
b. When two or more consecutive tests show a deficiency of more than one-quarter of an inch allowable tolerance or a deficiency in compaction.
When a core shows a deficiency in excess of the allowable tolerance or compaction, additional cores shall be taken to delineate the area of the deficient thickness/compaction.
(7) The applicant shall correct any deficiency with an overlay extending a minimum of 150 feet beyond the outer limits of the deficient area for the full width of the street. Smooth, neat joints shall be saw cut normal to the roadway for full depth of asphalt pavement, removing the original pavement for a minimum of ten feet at each end of the overlay. The thickness of the overlay shall be determined by the depth of the deficient area and shall not be less than one and one-quarter inch in compacted thickness. The type of material used in the overlay shall be specified by the division director or designee.
G. Shoulder and drainage improvements. After the paving has been inspected and approved, the pavement edges or behind the curb and gutter shall be backfilled and compacted and the ditches and back slopes properly graded, shaped, seeded and mulched. An 80 percent stand of grass shall be obtained. All swales and ditches excavated below required depth shall be backfilled and compacted to 95 percent of maximum dry density.
(h) Compliance with minimum standards. Road design and construction for residential subdivisions shall comply with the minimum standards shown below in subsection 6.01.07(i). Acceleration and deceleration lane construction shall comply with the standards set forth in subsection 6.01.07(k). For roadways with more than 150 lots of contributing traffic, a pavement design is to be done and submitted to the county engineer for review. The GDOT Asphalt Pavement Design program is an accepted method for the pavement design submittal for roadways with more than 150 lots of contributing traffic.
(i) Table of residential subdivision street roadway standards.
Table 6.01.07(i). Residential Subdivision Street Roadway Standards Roadway Standards Specifications
Surface topping (plant mix) for roadways with 0 to 75 lots contributing traffic 2-inch 12.5 mm superpave mix with hydrated lime (Level 1), 220 pounds per square yard Surface topping (plant mix) for roadways with more than 75 lots contributing traffic 1-inch 12.5 mm superpave mix with hydrated lime (Level 1), 165 pounds per square yard Tack coat 0.04—0.06 GAL/square yard Asphalt (binder course) for roadways with more than 75 lots contributing traffic 2-inch 12.5 mm superpave mix or 19 mm superpave mix with hydrated lime (Level 1), 220 pounds per square yard Prime application to base course 0.20—0.25 GAL/square yard Curbs/shoulder and ditch construction 24-inch x 6-inch concrete "L" back curb 18-inch gutter; 6 inches high, 6-inch curb width Base construction 6-inch base (graded aggregate); 100 percent dry density compaction
Roadway Standards Specifications Subgrade Top 12-inch subgrade compacted to 100 percent dry density Street width 26 feet back of curb to back of curb Asphalt pavement width 22 feet Street grade 12 percent maximum on subdivision streets;
4 percent maximum grade at intersections—100 feet from curb line Turnaround area 40 feet radius cul-de-sac pavement; 80 feet diameter Intersections 25 feet pavement radius at intersection within subdivision;
25 feet pavement radius required where intersecting existing county or state roads.
75 feet exit curb radius when designing a dual lane exit.
Right-of-way 50 feet right-of-way minimum for local streets (additional right-of-way and/or slope easements may be required for
cut and fill areas); 110 feet diameter right-of-way for culde-sac. A 5-foot utility easement is required along all street rights-of-way.
Fill areas and back slopes 2:1 maximum slope allowed (2:1 or flatter) Storm sewers and cross
drains See section 6.04.03 and 6.04.04 for pipe specifications and minimum requirements for pipe types listed. Pipe location and size approved by development plan review and stormwater management.
Grassed areas See Soil Erosion, Sedimentation and Pollution Control Ordinance
Core testing Core samples shall be taken as directed (at applicant's expense) to determine thickness of base and pavement.
See sections 6.01.07(d)(4) and 6.01.07(f)(6).
Letter of credit or bond 2-year maintenance letter of credit or bond on all improvements within public right-of-way (streets, sidewalks, storm sewer, catch basins, cross drains) and stormwater detention facilities; on phased developments, certain sections may require a renewed letter of credit or bond if used for
construction access to newer phases (see section 10.02.12).
(j) Design and construction requirements. The design and construction requirements for subdivision developments for industrial, commercial, or office use and urban streets which are to be county arterial roads shall:
(1) Be required to have concrete curb and gutter along each side in accordance with section 6.01.06(b).
(2) Comply with the minimum standards shown below in subsection 6.01.07(k).
(k) Table of industrial, commercial, and office subdivision street construction standards.
Table 6.01.07(k). Industrial, Commercial, and Office Subdivision Street Construction Standards Roadway Standards Specifications
Surface topping plant mix 1-inch 12.5 mm superpave mix with hydrated lime (Level 1) asphalt topping, 165 pounds per square yard
Tack coat 0.04—-0.06 GAL/YD Binder (office and commercial) 3-inch 19 mm superpave mix with hydrated lime (Level 1), 330 pounds per square yard Binder (industrial) 4-inch 25 mm superpave mix with hydrated lime (Level 1), 440 pounds per square yard or 2 2-inch lifts of 19 mm
superpave mix with hydrated lime (Level 1), 220 pounds per square yard, per lift Curb and gutter required 24 x 6-inch concrete "L" back curb; 18-inch gutter; 6-inch high; 6-inch curb width
Base construction (office and commercial) 8-inch base (graded aggregate), compacted to 100 percent maximum dry density Base construction (industrial) 10-inch base (graded aggregate), compacted to 100 percent maximum dry density. To be on decel/accel also for industrial.
Street width (office and commercial) 28 feet back of curb to back of curb Street width (industrial) 30 feet back of curb to back of curb Asphalt pavement width (office and commercial) 24 feet Asphalt pavement width (industrial) 26 feet Street grade 8 percent maximum on industrial/commercial streets; 2 percent maximum grade at intersections; 100 feet from
curb line Turnaround area 55 feet radius cul-de-sac pavement; 110 feet diameter Intersections 50 feet pavement radius at intersections; 50 feet straight section from curved streets required; 75 feet exit curb
radius when designing a dual lane exit Driveway entrances GDOT specifications Right-of-way 60 feet right-of-way minimum; additional right-of-way or slope easement may be required for cut and fill areas; 150
feet diameter right-of-way for cul-de-sac. A 5-foot utility easement is required along all street rights-of-way.
Fill areas and back slopes 2:1 maximum slope allowed Roadway Standards Specifications Storm sewers and cross drains See sections 6.04.03 and 6.04.04 for pipe specifications and minimum requirements for pipe types listed. Pipe location and size approved by development plan review and stormwater management.
Grassed areas Shall comply with the Soil Erosion, Sedimentation and Pollution Control Ordinance
Core testing Core samples shall be taken as directed (at applicant's expense) to determine thickness of base and pavement.
See subsections 6.01.07(d)(4) and 6.01.07(f)(6).
Maintenance letter of credit or bond 3-year maintenance letter of credit or bond on all improvements within public right-of-way (streets, sidewalks, storm sewer, catch basins, cross drains) and stormwater detention facilities. On phased developments, certain sections may require a renewed letter of credit or bond if used for
construction access to newer phases (see section 10.02.12).
Sec. 6.01.08. Improvements to existing streets and rights-of-way for residential, commercial and/or industrial developments.
(a) Existing unpaved road. Any unpaved road upon which a development has frontage and access shall be widened and paved, according to the functional class of the road, as set forth in subsection 6.01.07(i) along the frontage* of the development to the nearest intersection with a paved county road. The minimum right-of-way required according to subsection 6.01.06(i) shall be dedicated along the entire frontage of the development back to the nearest intersection in which the roadway is to be improved. In addition to the design, construction, and right-of-way acquisition, the developer shall also be responsible for relocation of utilities. Where a development has frontage, but does not provide access to an unpaved road, the developer shall preserve right-of-way along the development's frontage for future improvements to the roadway.
(b) Existing paved road. Any existing paved county road upon which a development has frontage and access and which is deficient relative to county specifications (see Tables 6.01.07(i) and (k)) shall be widened and resurfaced from the limit of the frontage back to the nearest roadway meeting Butts County standards as determined by the county engineer for the entire frontage of the development. The minimum right-of-way required according to subsection 6.01.06(i) shall be dedicated along the entire frontage of the development.
* In instances where improving a roadway to the limits of the frontage causes for an undesirable termination point for the improved roadway (i.e., alignment issues, topographic issues, etc.), the improvement shall be required to be further extended in order to provide for an acceptable tie-in to the existing roadway.
Sec. 6.01.09. Visibility at intersections.
(a) Corner lots. On corner lots within all zoning districts, no fence, shrubbery or other obstruction shall be placed within the sight line triangles that blocks or disrupts the line of sight based on a driver eye height of three and one-half feet located 14 feet from edge of travel lane (when there is a deceleration lane, the driver eye height shall be located 14 feet from edge of decel lane) and an object height of three and one-half feet located in the center of each respective lane. The minimum distances required are shown in Table 6.01.09(b).
However, street signs, streetlights, mailboxes, or similar shall be permitted within the sight line triangles.
(b) Intersection sight distance for all streets.
(1) Curb cuts shall be placed so as to provide for the minimum intersection sight distance based on the intersecting road's posted speed limit. The intersection sight distance is measured using a driver eye height of three and one-half feet and an object height of three and one-half feet with the driver eye height being located 14 feet beyond the edge of the travel lane (when there is a deceleration lane, the driver eye height shall be located 14 feet from edge of decel lane) and an object height of three and one-half feet located in the center of each respective oncoming lane.
(2) Table of minimum intersection sight distances relative to design speed posted on streets are:
Table 6.01.09(b). Intersection Sight Distance for Two-Lane Roadway Speed (mph) 25 30 35 40 45 50 55
Stopping sight distance 280 335 390 445 500 555 610
(c) Stopping sight distance for all streets.
(1) Minimum street centerline stopping sight distance shall be designed relative to the design speed of the street and shall be measured above the street centerline using a driver eye height of three and one-half feet and an object height of six inches.
(2) Table of minimum centerline stopping sight distances relative to design speed posted on streets are:
Table 6.01.09(c). Stopping Sight Distance Speed (mph) 0-25 30 35 40 45 50 55 Centerline sight distance (stopping distance in feet) 150 200 225 275 325 400 450 Minimum crest curve "k" value 20 30 40 60 80 110 150 Minimum sag curve "k" value 26 37 49 64 79 96 115 Note: As info concerning the above minimum crest "k" values, where there is an intersecting street on or near the vertical curve, the minimum "k" value may not provide for the minimum intersection sight distance requirement. If this is the case, the "k" value for the crest curve will need to be increased in order to obtain the minimum intersection sight distance required.
Sec. 6.01.10. Street names and signs requirements.
(a) Street names.
(1) All proposed street names within the county for new roads or roads within commercial, industrial, or residential subdivisions shall be approved by the county's technical review committee during the preliminary plat review process or prior to recording of the road and its right-of-way deed.
(2) Any request to change the name of an existing road shall be submitted to the division director or designee for review and approval, with the board of commissioners having final approval of the change.
(b) Street signs.
(1) All required street name signs, traffic control signs and other traffic control devices shall be installed at the developer's expense.
(2) The design and placement of all traffic control devices shall meet the requirements of the Manual On Uniform Traffic Control Devices (MUTCD), latest edition. The design professional shall show the placement of all required traffic control signs and features on the plans for review and approval by the county engineer.
(3) If nonstandard signposts, holders, etc. are installed, they will not be maintained by Butts County. Either the developer or a legally established homeowners association will be responsible for the maintenance of these posts, holders, etc. All nonstandard posts, holders, etc. must be approved by the county prior to installation.
Sec. 6.01.11. Off-street parking and service facilities standards.
(a) General standards for parking space design.
(1) The required number of off-street parking spaces must not be reduced below the minimum required number for the use or facility to which they are assigned.
(2) Drainage, construction and maintenance. All off-street parking, loading and service areas must be drained so as to prevent damage to abutting properties and/or public streets and must be paved with asphalt or concrete subject to county paving standards and inspection and service by the county engineer; provided however that, in the A-R zoning district, required parking may be gravel or other pervious surface material approved by the county engineer, so long as all required parking and access for disable persons is paved with asphalt or concrete. All such areas must be at all times maintained at the expense of the owners in a clean and orderly condition to not create a nuisance. Outdoor storage yards and interior drives intended for employees only and located in the rear yard that are contained in industrial zoned areas may be surfaced with gravel, with approval by the zoning administrator and county engineer.
(3) Separation from walkways, sidewalks and streets. All off-street parking, loading and service areas must be separated from walkways, sidewalks and streets by curbing or other suitable protective device.
(4) Parking area design. Automobile parking stalls must have a minimum width of nine feet and length of 18 feet. There must be provided adequate interior driveways to connect each parking space with a public right-of-way. Interior drives must be at least 24 feet wide (two-way traffic) where used with 90-degree angle parking, and at least 14 feet wide (one-way traffic) where used with 45-degree angle parking, and at least 12 feet wide (one-way traffic) where used with one-way-traffic parallel parking.
Unless otherwise stated, interior driveways must be at least 12 feet wide for one-way traffic movement and at least 24 feet wide for two-way traffic.
(5) Joint parking facilities. Two or more neighboring uses of the same or different types may provide joint parking facilities as long as the number of off-street parking spaces are not less than the sum of the requirements for each individual use.
(6) Pavement markings and signs. Each off-street parking space must be clearly marked, and directional arrows or signs must be provided wherever necessary.
Markers, striping, directional arrows and signs must be properly maintained so as to ensure their maximum efficiency.
(7) Outdoor lighting of off-street parking areas shall be downcast and directed away and shielded from abutting residential districts and all rights-of-way. All free standing outdoor lighting fixtures erected on private property having a non-residential use shall have a maximum height of 45 feet. All free standing outdoor lighting fixtures erected on private property having a residential use shall have a maximum height of 35 feet.
(b) Number of parking spaces required. Off-street parking space must be provided and maintained as specified in the following tables. For uses not specifically listed in this section, the parking requirements for the listed use most similar to the unlisted use in question, as determined by the zoning administrator, will apply. Parking requirements by use are as follows:
Table 6.01.11(a). Parking Space Requirements Off-Street Parking Requirements by Land Use
USE STD USE STD
RESIDENTIAL INSTITUTIONAL
Dwelling, Single-Family P-1 Child Care—Home and Facility P-4 Dwelling, Two-Family P-1 Church, Synagogue, Place of Worship P-16 Dwelling, Multi-Family P-2 Club P-9 Accessory Apartment P-2 Community Care Home P-6 Housing for the Elderly P-3 Hospital P-5 Family Care—Home P-4 Nursing Home P-5 Child Care—Home P-4 Public Assembly Hall or Area P-16 Dormitory P-6 Elementary or Middle School P-20 Boarding/Rooming House P-7 High School P-21 Other Residential Uses P-1 Academic Institution P-22 Other Institutional Uses P-17
LODGING
Bed and Breakfast P-7 TRANSPORTATION/UTILITIES Hotel, Motel P-7 All Transportation/Utility Uses P-15 Inn, Tourist Home P-7
INDUSTRIAL USES
COMMERCIAL USES All Industrial Uses P-15 Business Services in C-1 P-11 Business Services Outside C-1 P-12 RECREATIONAL USES Doctor's Office P-18 Theater P-9 Eating and Drinking Establishment P-13 All other Recreational Uses P-8 Funeral Home P-14 Medical Clinic in C-1 P-18 OTHER Medical Clinic Outside C-1 P-19 Agricultural or Forestry Use P-15 Office in C-1 P-11 Agricultural or Forestry Sales P-11 Office Outside C-1 P-12 Animal Care/Veterinarian P-11 Personal Services in C-1 P-11 Animal Exhibit P-17 Personal Services Outside C-1 P-12 Animal Rehabilitation Center P-11 Retail Sales in C-1 P-11 Quarry P-15
Retail Sales Outside C-1 P-12 Stable, Public P-8 Retail Furniture/Carpet P-23 Storage of Quarry, Sand or Gravel Pit Products P-15 Theater P-9 Any other use not otherwise named P-17 Off-Street Parking Requirements by Land Use
USE STD USE STD
Warehouse P-15 Other Commercial Use P-17 Table 6.01.11(b). Parking Space Requirements Off-Street Parking Standards
STD
Number of Required Parking Spaces STD Number of Required Parking Spaces P-1 1.5 per dwelling unit P-11 1 per each 400 sq. ft. of net floor area P-2 (a) 1 per dwelling unit for spaces with unobstructed access P-12 1 per each 250 sq. ft. of net floor area P-13 1 per every 3 seats (including bar stool)
(b) 2 per dwelling unit for spaces with obstructed access (See Note 2) P-14 1 per each 75 sq. ft. of floor area open to the public in the conduct of business P-3 1 per each 3 dwelling units P-15 1 per each 1.2 employees (See Note 3) P-4 1 per 8 children at peak hour plus 1 per employee (See Note 3) P-16 1 per 4 persons at maximum occupancy capacity of principal P-5 1 per every 2 nonresident employees P-17 1 per 250 sq. ft. floor area plus 2 P-6 1 per 3 beds and 1 per employee (See Note 3) P-18 4 per practitioner at peak hour P-7 1 per lodging unit, hotel/ motel room P-19 5 per practitioner at peak hour P-8 1 per 8 persons (See Note 4) P-20 1.5 per staff at peak hour P-9 1 per 4 seats P-21 1 per 4 students at max.
capacity P-10 1 per each 250 sq. ft. of floor area P-22 1 per 2.5 students at max.
capacity P-23 3 per 1,000 sq. ft. plus 2 Notes to Table (b):
1. Calculations will be rounded up to the next whole number.
2. The first space of each unit has unobstructed access and the second for each unit is accessed through the first space for that unit.
3. The number of employees is based on the highest average employee occupancy.
4. The number of persons is based on maximum capacity.
(c) Number of loading spaces required. Manufacturing, industrial, wholesale and retail operations must provide loading space as follows:
(1) Spaces appropriate to functions. Off-street loading spaces must be provided as appropriate to the functions and scope of operation or individual or groups of buildings and uses. The following must be provided as a minimum:
a. Retail business: One space, ten feet by 25 feet, for each 3,000 square feet of floor area or any part thereof.
b. Manufacturing, wholesale and industry: One space, ten feet by 50 feet, for each 10,000 square feet of floor area or any part thereof.
(2) Design of loading spaces. Off-street loading spaces must be designed and constructed so that all maneuvering to park vehicles for loading and unloading can take place entirely within the property lines of the premises. Loading spaces must be provided so as not to interfere with the free, normal movement of vehicles and pedestrians on public rights-of-way. Such space shall have at least 14 feet of vertical clearance.
(3) Ingress and egress. Ingress and egress to off-street loading spaces must conform to curb cut requirements specified in this article.
(Ord. of 6-14-2021(2), § 2; Ord. of 6-14-2021(4), § 2) Sec. 6.02.00. Board of health requirements.
Sec. 6.02.01. General.
Reserved.
Sec. 6.02.02. Onsite sewage management systems.
The rules and regulations of the state Department of Public Health entitled and published as Chapter 511-3-1 Onsite Sewage Management Systems are hereby adopted as written in revised form of January 1, 2014, and as may be hereafter amended.
Sec. 6.02.03. Additional requirements for onsite sewage management systems.
(a) No building permit shall be issued by the county without the approval of the Butts County Board of Health for a proposed private septic tank or onsite sewage disposal system.
(b) Community or shared sewage disposal systems may be approved at the discretion of the board of health.
(c) In addition to section 6.02.03(b) above, community or shared sewage disposal systems with a capacity greater than 10,000 gallons per day shall require approval of Georgia EPD.
Sec. 6.03.00. Requirements regarding sanitary sewer, potable water, fire protection and other utilities.
Sec. 6.03.01. Sanitary sewer.
(a) The developer shall be responsible for installing adequate public sanitary sewer facilities when such sewerage lines are available for connection to serve all existing and proposed buildings in the subdivision.
(b) Any residential dwelling, commercial establishment or industrial establishment shall be connected to public sewer when sewerage lines are available within 200 feet for connection. Connection shall be at the cost of the property owner and in accordance with the policies and procedures of the applicable water and sewer utility provider.
(c) Where public sanitary sewer systems are not available, onsite sewage disposal systems (i.e., septic tank) shall be installed, subject to approval by the board of health and provided that the lots conform to all requirements of this UDO.
Sec. 6.03.02. Potable water.
(a) If a public water supply is available to a proposed subdivision and connection to it is permitted, water mains, fire hydrants, and stub connections to each lot within the subdivision must be provided as shown on approved construction plans before any building permits shall be issued.
(b) All public water facilities shall be installed subject to the policies and procedures of the applicable water and sewer utility provider.
(c) If a public water supply is not available, the owner/developer may install a community water system developed according to plans and specifications shown on the approved construction plans and approved by the Environmental Protection Division of the Georgia Department of Natural Resources.
(d) No building permit shall be issued by the building inspector without the approval of Butts County Health Department for a proposed private well, if applicable.
Sec. 6.03.03. Fire protection.
(a) Fire protection. The placement of fire hydrants within a subdivision or parcel of land deemed necessary for the protection of buildings, homes, facilities, or other property types shall be required, with hydrant placement at locations such that each structure is not further than 500 feet from such hydrant. When six-inch public water lines are available within 1,000 feet from any portion of the subdivision, the developer/property owner shall assume all costs of extending such lines to the subdivision such that no structure within the subdivision is more than 500 feet from a hydrant. Refer to the current edition of the International Fire Code, Appendix B, for minimum fire-flow requirements.
(b) Location of hydrants.
(1) Subdivisions. All fire hydrants will be placed within 500 feet of each structure, as determined by the fire inspector, at the time of plan review for the construction plat.
(2) Industry and business. The location, number and distribution of fire hydrants will be determined by the fire inspector, referencing the current edition of the International Fire Code, Appendix C.
(c) Water line size. All fire hydrants will be installed on water lines no less than six inches in diameter, unless approved by the fire chief. Fire-flow requirements will dictate the actual water line to be installed.
(d) Fire hydrant type. All fire hydrants shall be Mueller brand, Super-Centurion 250, Number A423, three-way hydrants. All shall include two two and one-half inch hose outlets and one pumper hose connection.
(e) Inspection. Notification shall be made by the developer to the fire inspector after installation of fire hydrants has been completed. All installations shall meet N.F.P.A. 24 and 25 requirements, with completed inspection and test reports provided to the fire inspector before the final plat is submitted. The fire inspector will inspect the hydrants to ensure proper bury depth, location, and usability.
Sec. 6.04.00. Requirements regarding drainage and stormwater management.
Sec. 6.04.01. Generally.
(a) Intent. The intent of section 6.04.00 is to provide standards and criteria to protect, maintain, and enhance the public health, safety, environment, and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-development stormwater runoff and nonpoint source pollution associated with new development and redevelopment. Proper management of post-development stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment, and general welfare of the public, and protect water and aquatic resources.
(b) Purpose.
(1) Require that new developments and redevelopments maintain the pre-development hydrologic response in their post-development state as nearly as practicable in order to reduce flooding, stream bank erosion, nonpoint source pollution, increases in stream temperature, and maintain the integrity of stream channels and aquatic habitats;
(2) Establish minimum post-development stormwater management standards and design criteria for the regulation and control of stormwater runoff quantity and quality;
(3) Establish design and application criteria for the construction and use of structural stormwater control facilities that can be used to meet the minimum postdevelopment stormwater management standards;
(4) Encourage the use of nonstructural stormwater management and stormwater better site design practices, such as the preservation of green space, conservation areas and floodplain to the maximum extent practicable;
(5) Coordinate site design plans with other standards in the UDO that address resource protection, erosion control and the connectivity of open space; and
(6) Establish provisions for the long-term responsibility for and maintenance of structural stormwater control facilities and nonstructural stormwater management practices to ensure that they continue to function as designed, are maintained, and pose no threat to public safety.
(c) Applicability. No owner or developer shall perform any land development activities without first meeting the requirements of this ordinance prior to commencing the proposed activity. The standards and requirements of section 6.04.00 shall be applicable to all land development meeting the standards in subsection 6.04.01(c)(1) through (5), where a development plan, subdivision plat, or an application for a grading or land disturbance permit is required, unless specifically exempt pursuant to paragraph (d), below.
(1) New development that involves the creation of 5,000 square feet or more of impervious cover;
(2) New development that involves one acre or more;
(3) Redevelopment that includes the creation or addition of 5,000 square feet or more of impervious cover;
(4) Redevelopment that involves one acre or more; and
(5) Land development activities that are smaller than the minimum applicability criteria set forth in paragraphs (c)(1) through (4), above if such activities are part of a larger common plan of development, even though multiple, separate, and distinct land development activities may take place at different times on different schedules.
(d) Exempt activities. The following activities are exempt from the requirements of section 6.04.00:
(1) An individual single-family residential dwelling unit on a legal lot of record;
(2) Additions or modifications to existing single-family or duplex residential structures;
and
(3) Agricultural or silvicultural land management activities within the A-R zoning districts.
Sec. 6.04.02. Stormwater management plan requirements.
(a) An application for development activity as defined in subsection 6.04.01(c), above shall be accompanied by a stormwater management plan and an inspection and maintenance agreement regarding ongoing maintenance of the stormwater management facilities.
Stormwater management plans should authorize, but not obligate, the county to perform maintenance when the board of commissioners determines that doing so is in the best interest of the public welfare of the county. Where the county is required to maintain stormwater management facilities, it shall be entitled to assess the reasonable cost of such maintenance against the owner of the facility.
(b) The stormwater management plan shall detail how post-development stormwater runoff will be controlled or managed and how the proposed project will meet the requirements of section 6.04.00.
(c) The stormwater management plan shall be in accordance with the criteria established in section 6.04.00. The plan shall contain the stamp and signature of a professional engineer licensed in the state of Georgia, who must verify that the design of all stormwater management facilities and practices meet/exceed the level of standard practice.
(d) The plan shall consist of maps, narrative, and supporting design calculations (hydrologic and hydraulic) for the proposed stormwater management system.
(e) The following information is required, at a minimum:
(1) Existing conditions hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include:
a. A topographic map of existing site conditions with the drainage basin boundaries indicated;
b. Acreage, soil types and land cover of areas for each subbasin affected by the project;
c. All perennial and intermittent streams and other surface water features;
d. All existing stormwater conveyances and structural control facilities;
e. Direction of flow and exits from the site;
f. Analysis of runoff provided by off-site areas upstream of the project site; and
g. Methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology.
(2) For redevelopment sites, predevelopment conditions shall be modeled using the established guidelines for the portion of the site undergoing land development activities.
(3) A post-development hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include:
a. A topographic map of developed site conditions with the post-development drainage basin boundaries indicated;
b. Total area of post-development impervious surfaces and other land cover areas for each subbasin affected by the project;
c. Calculations for determining the runoff volumes that need to be addressed for each subbasin for the development project to meet post-development stormwater management performance criteria;
d. Location and boundaries of proposed natural feature protection and conservation areas (see chapter 3);
e. Documentation and calculations for any applicable site design credits that are being utilized; and
f. Methodologies, assumptions, site parameters, and supporting design calculations used in analyzing the existing conditions site hydrology.
g. If the land development activity on a redevelopment site constitutes more than 50 percent of the site area for the entire site, then the performance criteria shall be met for the stormwater runoff from the entire site.
(4) The description, scaled drawings, and design calculations for the proposed postdevelopment stormwater management system, which shall include:
a. A map and/or drawing of the stormwater management facilities, including the location of nonstructural site design features and the placement of existing and proposed structural stormwater controls, including design water surface elevations, storage volumes available from zero to maximum head, location of inlet and outlets, location of bypass and discharge systems, and all orifice/restrictor sizes;
b. A narrative describing how the selected structural stormwater controls will be appropriate and effective;
c. Cross-section and profile drawings and design details for each of the structural stormwater controls in the system, including supporting calculations to show that the facility is designed according to the applicable design criteria;
d. A hydrologic and hydraulic analysis of the stormwater management system for all applicable design storms (two 100-year design storm events);
e. Documentation and supporting calculations to show that the stormwater management system adequately meets the post-development stormwater management performance criteria. Note: The outlet structure and outfall discharge pipe for any detention/retention pond shall include an emergency overflow provision that is designed to safely pass the 100-year storm event without overtopping the dam;
f. Drawings, design calculations, elevations and hydraulic grade lines for all existing and proposed stormwater conveyance elements including stormwater drains, pipes, culverts, catch basins, channels, swales and areas of overland flow.
(5) A downstream peak flow analysis is required, which includes the assumptions, results and supporting calculations to show safe passage of post-development design flows downstream. The analysis of downstream conditions in the report shall address each and every point or area along the project site's boundaries at which runoff will exit the property. The analysis shall focus on the portion of the drainage channel or watercourse immediately downstream from the project. This area shall extend downstream from the project to a point in the drainage basin where the project area is ten percent of the total basin area. In calculating runoff volumes and discharge rates, consideration may need to be given to any planned future upstream land use changes. The analysis shall be in accordance with the stormwater design manual.
(6) An erosion and sedimentation control plan that meets the requirements of section 3.08.05(c).
(7) The landscaping plan, as required, shall describe how vegetation will be placed within and adjacent to stormwater management facilities.
(8) Detailed description of ongoing operations and maintenance procedures for stormwater management facilities and practices to ensure their continued function as designed and constructed or preserved. These plans shall identify the parts or components of a stormwater management facility or practice that need to be regularly or periodically inspected and maintained, and the equipment and skills or training necessary. The plan shall include an inspection and maintenance schedule, maintenance tasks, and responsible parties for maintenance, funding, access, and safety issues. Provisions for the periodic review and evaluation of the effectiveness of the maintenance program and the need for revisions or additional maintenance procedures shall be included in the plan.
(9) A minimum 20-foot easement shall be provided to ensure access from a public right-of-way to the stormwater management facilities. Such access shall be sufficient for all necessary equipment for maintenance activities. Depending on the depth of pipe, the drainage easement width may be required to be increased. Upon final inspection and approval, a plat or document indicating that such easements exist shall be recorded and shall remain in effect even with the transfer of title of the property.
(10) Fences a minimum of four feet in height will be required around all detention ponds where the depth of water in the pond is greater than three feet. This fencing shall be chain-link or provided alternative material. The fence shall be designed, installed and maintained to allow the free flow of runoff and sediment into the facility. The fence shall include a gate of sufficient size (minimum ten-foot width) to permit entrance of equipment necessary to allow periodic maintenance activities. All fences and gates shall be located within the easement required by section 6.04.02(e)(9).
Sec. 6.04.03. Drainage standards for streets—Placement, location and design.
(a) The size, length, and location of all surface drainage pipes or structures shall be shown on all preliminary plats. All storm drain pipes or culverts carrying stormwater from the street and adjacent property or through lots in the subdivision shall be extended a minimum of ten feet beyond the rear of the house or structure. Stormwater shall be released into a channel or swale without causing scouring, erosion, or resulting in sedimentation of the receiving channel. The outlet channel shall include structural and vegetative measures to assure nonerosive velocities of stormwater.
(b) Installations, backfilling, and compaction around drainage pipes shall be in accordance with GDOT specifications. All pipes shall have a minimum cover of 18 inches from the bottom of the road base, and head walls or inlet basins constructed at the ends of the pipes.
(c) The design of drainage structures shall be based on recognized hydrological formulae.
Minimum pipe size shall be 18 inches for use within the public right-of-way.
(d) Piped collection systems for public streets (catch basins, inlets, cross drains, longitudinal piping) shall be designed for the 50-year storm.
(e) Road culverts, which carry live streams and off-site drainage, shall be designed for the 100-year storm.
(f) Cross drain pipes within the public rights-of-way shall be designed and constructed at or near a 90-degree angle with the roadway centerline. Where a slight skew is necessary, the pipe shall be placed within an 80- to 100-degree angle with the roadway centerline.
(g) Longitudinal pipes along a curved section of roadway shall be located on the inside of the curve to avoid pipe beneath the roadway footprint. In the event that the longitudinal pipe needs to be along the outside of the curve, the pipe shall be wholly located outside the limits of the curb and gutter by use of additional junction boxes. For pipes at a cul-de-sac location, all pipes shall be wholly located outside of the footprint of the curb and gutter that encircles the cul-de-sac.
Sec. 6.04.04. Drainage standard for streets—Materials and installation.
(a) Standard specifications.
(1) All of the materials, methods of the construction, and workmanship for the work covered in reference to stormwater conveyance facility construction shall conform to the most recent Standard Specifications of the Georgia Department of Transportation (Georgia DOT).
(2) Allowable pipe material for all applications in drainage easements and public street rights-of-way, except as specified below, are aluminum-coated (Type 2) corrugated steel pipe (ASP), corrugated aluminum alloy pipe, smooth-lined corrugated polyethylene pipe (HDPE), or reinforced concrete pipe (RCP). Allowable pipe materials are indicated by an "X" in Table 6.04.01.
(3) For roads constructed with public funds, either wholly or in part, or roads classified as major thoroughfares, materials which meet the Georgia DOT design standards shall be used unless an alternative is specifically approved by Butts County Public Works.
(4) Reinforced concrete pipe (RCP) shall be used under non-local roads when the ADT is greater than 15,000 vehicles per day (vpd). Reinforced concrete pipe (RCP) or smooth-lined corrugated high density polyethylene (HDPE) pipe shall be used under non-local roads when the ADT is less than 15,000 vpd.
The public works division may approve an alternative pipe material.
(b) Minimum pipe and pipe coating requirements. The type of pipe material used shall be in accordance with subsection 6.04.04(a), standard specifications.
(1) Reinforced concrete pipe shall be in minimum eight-foot joint lengths. All joints shall be bell and spigot type, with a rubber gasket conforming to ASTM C-443. Pipe shall be manufactured in accordance with AASHTO M-170 and/or ASTM C-76. Class of pipe and wall thickness shall be in accordance with 1030-D, Georgia DOT specification, Table No. 1.
(2) Aluminum-coated (Type 2) steel pipe shall comply with AASHTO M-274 for the coating and AASHTO M-36 for the pipe fabrication. Aluminum alloy pipe shall comply with AASHTO M-196 for material and fabrication.
(3) Each end of each corrugated metal pipe section, to be joined by a coupling band, shall have a minimum of two annular corrugations. Coupling bands shall be so constructed to lap on an equal portion of each of the pipe sections to be joined. The connecting bands shall have a minimum of two annular corrugations and fully engage, over the entire pipe periphery, one corrugation on each pipe. Bands shall be fabricated from the same material as the pipe. The minimum band gauges for aluminum pipe and aluminized pipe shall be as specified in AASHTO M-196, Section 19, and AASHTO M-36, Section 9, respectively.
(4) Gaskets may be required as determined by the county in the field, and shall be either sleeve type or O-ring type and shall meet the requirements for gaskets as specified in AASHTO M-36, Section 9.3.
(c) Smooth interior corrugated polyethylene pipe.
(1) This specification applies to high density polyethylene corrugated pipe with an integrally formed smooth interior (HDPE). HDPE pipe manufacturers shall be approved by the public works division.
(2) This pipe shall conform to the requirements of AASHTO M-294, Type S.
(3) Joints shall be as recommended by the manufacturer and approved by the county.
Connections shall create a soil tight joint at a minimum and shall use a rubber gasket, which conforms to ASTM F-477.
(4) Installation shall be in accordance with ASTM Recommended Practice D2321, AASHTO Section 30, or as specified by the county.
Certification from the manufacturer that the product was manufactured, tested, and supplied in accordance with this specification shall be furnished to the county upon request.
Table 6.04.01. Allowable Pipe Use Metal Pipe Plastic Pipe Smoothed Lined High Density Reinforced | Aluminized Corrugated Poly- Concrete Type 2 Aluminum Poly- ethylene Pipe Type Pipe Steel Alloy ethylene Type "S" Specifications (See note 1) | ASTM C76, | ASTM A760, | ASTM B744,| AASHTO ASTM
AASHTO A929; B745; M252 F-2306;
M170 AASHTO AASHTO AASHTO
M36, M274 | M196, M197, M294 (see GDT17 note 2) Minimum thickness/class Per GDOT Per GDOT Per GDOT AASHTO AASHTO Std 1030D | Std 1030D | Std 1030D M252 M294 Type Installation Longitudinal X X X xX Cross drains|Cross drain Xx on road|<10 percent w/over 15,000] slope ADT Cross drain Check w/county engineer concerning pipe type to be used when >10 percent x-drain > 10 percent and ADT > 15,000
slope Cross drains|Cross drain Xx X on nonlocal|}<10 percent road_ w/less|slope than 15,000 Cross drain X >10 percent slope Cross drains|Cross drain Xx Xx X on local road|<10 percent (sid road) slope w/less than F Cross drain Xx X 15,000 ADT >10 percent slope Lateral systems Xx Xx Xx Xx Slope drain Xx Xx Xx Perforated underdrain Xx Xx X X Dams H > 9 feet and V > 20 Xx Ac-Ft Perennial streams Xx x Metal Pipe Plastic Pipe Smoothed Lined High Density Reinforced | Aluminized Corrugated Poly- Concrete Type 2 Aluminum Poly- ethylene Pipe Type Pipe Steel Alloy ethylene Type "S" Minimum allowable design 2.5 fps 2.5 fps 2.5 fps — 2.5 fps velocity Maximum allowable design 15 fps 5 fps 15 fps — 15 fps velocity Minimum soil pH/resistiv- — 6/1500 — — — ity ohm/cm Notes:
1) All pipe materials shall meet the minimum requirements of the Georgia Department of Transportation's Standard Specifications Construction of Transportation Systems, most current edition.
2) Allow smoothed-lined HDPE, Type S (AASHTO M294) pipe for storm (longitudinal and cross) and side drain applications through 48-inch diameter so long as roadway's ADT is less than 15,000 vehicles per day.
(d) Backfilling. Backfill for CSP, CAP, and HDPE pipe installations shall be constructed using graded aggregate base or crusher run six inches below the bottom of pipe to 12 inches above the pipe crown. Backfill for RCP pipe installations shall be constructed using graded aggregate base or crusher run six inches below the pipe invert to one-quarter of the pipe diameter. Foundation backfill material shall be used for RCP above one-quarter of the pipe diameter (if graded aggregate base is not used above one-quarter of the pipe diameter) as per Type I or Type II, as specified in sections 812.01 and 812.02 respectively, in Georgia DOT Standard Specifications. These materials shall be placed in layers of not more than six inches loose. Compaction of these materials shall be accomplished by hand tamping or machine tamping. Required compaction levels are as follows:
(1) Within street right-of-way. Backfill within all street rights-of-way shall be compacted to 95 percent maximum density, tested using the AASHTO Method T-99.
(2) In other areas. Backfill in all other areas shall be compacted to 90 percent maximum density, tested using the AASHTO Method T-99.
(3) Construction loads and minimum covers. If drainage pipe is installed prior to the completion of grading, a minimum of four feet of fill should be provided where needed to adequately protect the drainage structure during the land development phase, unless the structure itself is designed to withstand the anticipated live load during construction.
(e) End finish.
(1) Headwalls or other end treatments are required on all culverts and at the outlet of all piped collection systems. Where ends of pipe are located within, or near, the right-of-way and are parallel, or nearly parallel, with the roadway, safety end sections shall be required when the posted speed limit is 35 miles per hour and over.
(2) Headwalls are to be precast concrete, stone masonry with reinforced concrete footings, or poured in place, reinforced concrete with reinforced concrete footings.
Precast concrete headwalls for corrugated aluminum coated steel pipe or aluminum alloy pipe shall be made with aluminum coated steel or aluminum alloy pipe stubs.
(3) End treatments that conform to the slope may be pre-cast concrete end sections, aluminum coated steel or aluminum alloy end sections, masonry, PE end sections, reinforced poured-in-place slope collars, or grouted rip-rap. Concrete and metal flared end sections shall conform to applicable Georgia DOT Standard Drawing 1120, 1122, or Detail D-39.
(f) Junction boxes and catch basins. Junction boxes and catch basins shall have metal manhole frames and lids for access.
(g) Other structures. Natural bottom arches and box culverts may be used in accordance with the latest standard specifications of the Georgia Department of Transportation.
Bottomless culverts shall require that a scour analysis be done by a registered professional engineer in that field to Georgia Department of Transportation Specifications and Standards to ensure the soundness of the proposed structure.
Sec. 6.04.05. Driveway culverts.
(a) Each site requiring a driveway pipe/culvert for access shall be analyzed for stormwater runoff flow patterns and sized for a minimum 25-year storm event by the design professional.
(b) Where a driveway pipe will be used in a stream crossing, the pipe shall be sized for a 100-year storm event by the design professional.
(c) The construction plans and the final plat shall show the minimum driveway pipe size required for each lot.
(d) Driveway culvert material shall conform to section 6.04.04 above.
CHAPTER 7
DEVELOPMENT IMPACT FEE
Sec. 7.01.01. Legislative findings.
The board of commissioners of Butts County, Georgia, has considered the feasibility of imposing development impact fees and finds, determines and declares that:
(a) The Georgia Legislature, through the enactment of the Georgia Development Impact Fee Act, O.C.G.A. §§ 36-71-1 through 36-71-13, has authorized the county to enact development impact fees.
(b) The county established a development impact fee advisory committee pursuant to the Georgia Development Impact Fee Act, O.C.G.A. § 36-71-5, and that committee has served in an advisory capacity and assisted and advised the county with regard to the development and adoption of this development impact fee ordinance.
(c) The Butts County Comprehensive Plan contains within it Land Use Assumptions, a Capital Improvements Element, and the establishment of level of service standards for capital facilities for the planning horizon to 2027; and the Butts County Comprehensive Plan, including the Amendment to Include a Capital Improvement Element, has been submitted to the McIntosh Trail Regional Development Center and has been determined by the Georgia Department of Community Affairs to be in compliance with the rules of the Georgia Department of Community Affairs, Chapter 110-12-2, Development Impact Fee Compliance Requirements.
(d) Butts County must expand its capital facilities in order to maintain level of service standards established in the Butts County Comprehensive Plan if new development is to be accommodated without decreasing current standards. This must be done in order to promote and protect the health, safety, morals, convenience, order, prosperity, and the general welfare of Butts County, Georgia.
(e) The imposition of development impact fees is a preferred method of ensuring the availability of capital facilities necessary to accommodate new development.
(f) Each of the types of land development described in this ordinance will create a need for the construction, equipping, or expansion of Butts County's capital facilities.
(g) The fees established by this ordinance are derived from, are based upon, and do not exceed a proportionate share of the costs of providing additional facilities necessitated by the new land developments for which the fees are levied.
Sec. 7.01.02. Short title and applicability.
(a) This ordinance shall be known and may be cited as the "The Butts County Development Impact Fee Ordinance."
(b) This ordinance shall apply throughout the unincorporated area of Butts County. Butts County may also collect a development impact fee in one or more municipalities in Butts County if agreed to by an intergovernmental agreement between Butts County and a municipality as provided by law.
Sec. 7.01.03. Intents and purposes.
(a) This ordinance is intended to implement and be consistent with the Butts County Comprehensive Plan last adopted on August 25, 2008, and as it may be amended from time to time, and in accordance with Title 36, Chapter 70 of the Official Code of Georgia annotated and pursuant to the minimum standards and procedures established by the Georgia Department of Community Affairs.
(b) The purpose of this ordinance is to regulate the use and development of land so as to assure that new development bears a proportionate share of the cost of capital expenditures necessary to provide certain specified facilities and services in Butts County.
(c) This ordinance is intended to comply fully with each and every relevant provision of the Georgia Development Impact Fee Act, O.C.G.A. §§ 36-71-1 through 36-71-13, and shall be interpreted and implemented to so comply.
(d) Nothing in this ordinance shall be deemed to prevent or prohibit private development agreements between property owners or developers and Butts County Board of Commissioners.
Sec. 7.01.04. Rules of construction.
(a) The provisions of this ordinance shall be liberally construed so as to effectively carry out its purpose to promote and protect the health, safety, morals, convenience, order, prosperity, and the general welfare of Butts County, Georgia.
(b) For the purposes of administration and enforcement of this ordinance, unless otherwise stated in this ordinance, the following rules of construction shall apply to the text of this ordinance:
(1) In case of any difference of meaning or implication between the text of this ordinance and any caption, illustration, summary table, or illustrative table, the text shall control.
(2) The word "shall" is always mandatory and not discretionary; the word "may" is permissive.
(3) Words used in the present tense shall include the future; and words used in the singular number shall include the plural, and the plural the singular, unless the context clearly indicates the contrary.
(4) The phrase "used for" includes "arranged for," "designed for," "maintained for," or "occupied for."
(5) The word "person" includes an individual, a corporation, a partnership, an incorporated association, or any other similar entity.
(6) Unless the context clearly indicates the contrary, where a regulation involves two or more items, conditions, provisions, or events connected by the conjunction "and," "or," or "either ? or," the conjunction shall be interpreted as follows:
a. "And" indicates that all the connected terms, conditions, provisions or events shall apply.
b. "Or" indicates that the connected items, conditions, provisions or events may apply singly or in any combination.
c. "Either ? or" indicates that the connected items, conditions, provisions or events shall apply singly but not in combination.
(7) The word "includes" shall not limit a term to the specific example but is intended to extend its meaning to all other instances or circumstances of like kind or character.
(8) "Impact fee administrator" means the county official designated by the Butts County Board of Commissioners to carry out the administration of this ordinance, and unless otherwise designated shall be the county administrator of Butts County.
(9) Any road right-of-way used to define the roads impact district boundaries shall be considered to be within any district it bonds for purposes of using impact fee funds.
Sec. 7.01.05. Imposition of development impact fees.
(a) Any person who, after the effective date of this ordinance, seeks to develop land within the unincorporated area of Butts County, Georgia, by applying for a building permit, is hereby required to pay development impact fees in the manner and amount set forth in this ordinance.
(b) No new building permit for any activity requiring payment of a development impact fee pursuant to this ordinance shall be issued unless and until the development impact fee amount as determined by the impact fee administrator has been paid.
Sec. 7.01.06. Computation of the amount of development impact fees.
(a) The amount of the development impact fees shall be determined by the following fee schedule.
Fee Schedule Development Impact Fees, Butts County Land Use Road Library Parks/ Recreation Public Safety Administrative Fee Total Residential (per unit) $ 405.00 $50.00 $240.00 $295.00 $30.00 $1,020.00 Retail/Commercial (per 1,000 sq. ft.)
1,230.00 0 0 420.00 50.00 1,700.00 Hotel/Motel (per room)
690.00 0 0 350.00 30.00 1,070.00 Industrial/ Warehousing (per 1,000 sq. ft.)
850.00 0 0 275.00 35.00 1,160.00 Office/Finance (per 1,000 sq. ft.)
430.00 0 0 350.00 20.00 800.00 Eating/Drinking Establishments (per 1,000 sq. ft.)
835.00 0 0 385.00 30.00 1,250.00 Medical Facilities (per 1,000 sq. ft.)
860.00 0 0 430.00 40.00 1,330.00
(1) If a building permit is requested for mixed uses, then the fee shall be determined through using the above schedules by apportioning the space committed to uses specified on the schedules.
(2) If the type of development activity that a building permit is applied for is not specified on the above fee schedules, the impact fee administrator shall use the fee applicable to the most nearly comparable type of land use on the above fee schedules.
(b) If an applicant opts not to have the development impact fee determined according to paragraph (a) of this section, then the applicant shall prepare and submit to the impact fee administrator an independent fee calculation study for the land development activity for which a building permit is sought. The documentation submitted shall show the basis upon which the independent fee calculation was made. The impact fee administrator shall consider the documentation submitted by the applicant but is not required to accept such documentation as he/she shall reasonably deem to be inaccurate or not reliable and may, in the alternative, require the applicant to submit additional or different documentation for consideration. If an acceptable independent fee calculation study is not presented, the applicant shall pay development impact fees based upon the schedules shown in paragraph
(a) of this section. If an acceptable independent fee calculation study is presented, the impact fee administrator may adjust the fee to that appropriate to the particular development.
Determinations made by the impact fee administrator pursuant to this paragraph may be appealed to the board of commissioners by filing a written request with the county administrator within ten calendar days of the impact fee administrator's determination.
(c) On the request of an applicant, the impact fee administrator shall certify the development impact fee schedules or development impact fees resulting from an individual assessment, whichever is applicable, and said certification shall establish the applicable development impact fee for a period of 180 days from the date thereof.
Sec. 7.01.07. Payment of fee.
(a) The applicant shall pay the development impact fee required by this ordinance to the impact fee administrator or his/her designee prior to the issuance of a building permit.
However, for an industrial building on property zoned for industrial purposes and where such building has no less than 1,000,000 square feet of enclosed, heated and air-conditioned space, the impact fee administrator or his/her designee may accept from the applicant no less than 50 percent of the total required impact fees at the issuance of the building permit for such building and shall collect the balance of the required impact fee due prior to the issuance of a certificate of occupancy for such building or within 12 months from the issuance of the building permit, whichever occurs first.
(b) All funds collected shall be properly identified by and promptly transferred for deposit in the development impact fee trust fund established for each fee charged by this ordinance, to be held in separate accounts as determined in this ordinance and used solely for the purposes specified in this ordinance.
(Ord. of 1-24-2022, § 1) Sec. 7.01.08. Service areas established.
(a) There is hereby established a service area for Butts County road facilities which shall be the entirety of Butts County; provided, however, that Butts County shall not charge and collect impact fees for development inside an incorporated area of Butts County within the services area, except by intergovernmental agreement with the municipality as provided by law.
(b) There is hereby established a service area for Butts County sheriff/court/jail (public safety) facilities which shall be the entirety of Butts County; provided, however, that Butts County shall not charge and collect impact fees for development inside an incorporated area of Butts County within the service area, except by intergovernmental agreement with the municipality as provided by law.
(c) There is hereby established a service area for Butts County fire protection and emergency medical services (public safety) which shall be the unincorporated area of Butts County and the City of Jenkinsburg; provided, however, that Butts County shall not charge and collect impact fees for development inside the incorporated area of the City of Jenkinsburg, except by intergovernmental agreement with the City of Jenkinsburg as provided by law.
(d) There is hereby established a service area for Butts County library facilities which shall be the entirety of Butts County; provided, however, that Butts County shall not charge and collect impact fees for development inside an incorporated area of Butts County within the service area, except by intergovernmental agreement with the municipality as provided by law.
(e) There is hereby established a service area for Butts County parks and recreation which shall be the entirety of Butts County; provided, however, that Butts County shall not charge and collect impact fees for development inside an incorporated area of Butts County within the service area, except by intergovernmental agreement with the municipality as provided by law.
Sec. 7.01.09. Impact fee trust funds established.
(a) There is hereby established one county road development impact trust fund for the county road system service area established in this ordinance.
(b) There is hereby established one sheriff/court/jail (public safety) development impact fee trust fund for the sheriff/court/jail (public safety) service area established in this ordinance.
(c) There is hereby established one fire protection and emergency medical services (public safety) development impact fee trust fund for the fire protection and emergency medical services (public safety) service area established in this ordinance.
(d) There is hereby established one library development impact fee trust fund for the library service area established in this ordinance.
(e) There is hereby established one parks and recreation development impact fee trust fund for the parks and recreation service area established in this ordinance.
(f) Development impact fees placed in these funds shall be maintained in interest bearing accounts.
(g) All impact fees collected shall be promptly deposited in the trust fund established for that purpose and maintained there, including interest thereon, until withdrawn pursuant to this ordinance.
(h) Funds withdrawn from these accounts must be used in accordance with the provisions of section 7.01.10 of this ordinance.
Sec. 7.01.10. Use of funds.
(a) Funds collected from sheriff/court/jail development impact fees shall be used solely for the purpose of acquiring, equipping, and/or making capital improvements to sheriff, court, and jail facilities under the jurisdiction of Butts County, and related expenses as permitted by the Georgia Development Impact Fee Act, and shall not be used for maintenance or operations.
(b) Funds collected from fire department and emergency medical services (public safety) development impact fees shall be used solely for the purpose of acquiring, equipping, and/or making capital improvements to fire department and emergency medical (public safety) facilities under the jurisdiction of Butts County, and related expenses as permitted by the Georgia Development Impact Fee Act, and shall not be used for maintenance or operations.
(c) Funds collected from library development impact fees shall be used solely for the purpose of acquiring, equipping, and/or making capital improvements to library facilities under the jurisdiction of Butts County, and related expenses as permitted by the Georgia Development Impact Fee Act, and shall not be used for maintenance or operations.
(d) Funds collected from parks and recreation development impact fees shall be used solely for the purpose of acquiring, equipping, and/or making capital improvements to parks and recreation facilities under the jurisdiction of Butts County, and related expenses as permitted by the Georgia Development Impact Fee Act, and shall not be used for maintenance or operations.
(e) Funds shall be used exclusively for acquisitions, expansions, or road capital improvements within the development impact fee service area from which the funds were collected.
(f) In the event that bonds or similar debt instruments are issued for advanced provision of capital facilities for which development impact fees may be expended, development impact fees may be used to pay debt service on such bonds or similar debt instruments to the extent that the facilities provided are of the type described in this section.
(g) In the event a developer enters into an agreement with the county to construct, fund or contribute system improvements such that the amount of the credit created by such construction, funding or contribution is in excess of the development impact fee otherwise due, the developer shall be reimbursed for such excess construction funding or contribution from development impact fees paid by other development located in the service area which is benefited by such improvements.
(h) At least once each fiscal period the impact fee administrator shall present to the board of commissioners a report describing the amount of development impact fees collected, encumbered and used, and a proposed capital improvement program for capital facilities that are the subject of this ordinance, assigning funds, including any accrued interest, from the development impact fee trust funds to specific improvement projects and related expenses. Monies, including any accrued interest, not assigned in any fiscal period shall be retained in the appropriate development impact fee trust fund until the next fiscal period except as provided by the refund provisions of this ordinance.
(i) Funds may be used to provide refunds as described in section 7.01.11.
(j) Funds shall be considered expended on a first in, first out basis.
Sec. 7.01.11. Refund of fees paid.
(a) If a building permit expires without commencement of construction, then the feepayor shall be entitled to a refund, without interest, of the development impact fee paid as a condition for its issuance except that the county shall retain three percent of the fee to offset a portion of the costs of collection and refund. The feepayor must submit an application for such a refund to the impact fee administrator within 30 days of the expiration of the permit.
(b) In the event that development impact fees have not been expended or encumbered by six years from the date the development impact fee was paid, the impact fee administrator shall provide written notice of entitlement to a refund to feepayors or their successors in interest.
(c) If funds not expended or encumbered following six years from the date the police protection development impact fee was paid, upon application of the then current landowner, they must be returned to such feepayor with interest that is a pro rata share of the interest earned by the fund, provided that the feepayor submits an application for the refund to the impact fee administrator within one year of the expiration of the six-year period or the publication of the notice of entitlement, whichever is later. Refunds shall be made to the feepayor within 60 days after it is determined that a sufficient proof of claim for a refund has been made.
Sec. 7.01.12. Exemptions and credits.
(a) The following shall be exempted from payment of the development impact fee:
(1) Alterations, repairs or expansion of an existing one or two-family dwelling.
(2) The construction of accessory buildings or structures.
(3) The replacement of a building or structure with a new building or structure of the same size and use.
(4) Upon the expiration of a lawfully issued building permit, the person or entity to whom the permit was issued shall have a period of 30 days, as measured from the date that official written notice of the expiration was provided, within which to renew the building permit without payment of any fees otherwise due under the impact fee ordinance. If a building permit is renewed or issued after the expiration of said 30-day period, then all fees due under the impact fee ordinance must be paid as a condition of the issuance of the building permit.
Any claim of exemption must be made no later than the time of application for a building permit. Any claim not so made shall be deemed waived.
(b) Credits.
(1) Land and/or capital improvements may be offered by the applicant as total or partial payment of one or more of the required development impact fees. The applicant must request a development impact fee credit. If the impact fee administrator accepts such an offer, the credit shall be determined and provided in the following manner:
a. Credit for the dedication of land shall be valued at:
1. One hundred fifteen percent of the most recent assessed value by the property appraiser; or
2. By fair market value established by private appraisers acceptable to the county. Credit for the dedication of land shall be provided when the property has been conveyed at no charge to, and accepted by, the county in a manner satisfactory to the impact fee administrator.
b. Applicants for credit for construction of improvements shall submit acceptable engineering drawings and specifications and construction cost estimates to the impact fee administrator. The impact fee administrator shall determine credit for construction based upon either these cost estimates or upon alternative engineering criteria and construction cost estimates if the impact fee administrator determines that such estimates submitted by the applicant are either unreliable or inaccurate. The impact fee administrator shall provide the applicant with a letter or certificate setting forth the dollar amount of the credit, the reason for the credit, and the legal description or other adequate description of the project or development to which the credit may be applied.
The applicant must sign and date a duplicate copy of such letter or certificate indicating his/her agreement to the terms of the letter or certificate and return such signed document to the impact fee administrator before credit will be given. The failure of the applicant to sign, date, and return such document within 60 days shall nullify the credit.
c. Except as provided in subparagraph d., credit against development impact fees otherwise due will not be provided until:
1. The construction is completed and accepted by the county; and
2. A suitable maintenance and warranty bond is received and approved by the impact fee administrator, when applicable.
d. Credit may be provided before completion of specified improvements if adequate assurances are given by the applicant that the standards set out above will be met and if the applicant posts security as provided below for the costs of such construction. Security in the form of a performance bond, irrevocable letter of credit, or escrow agreement shall be posted with and approved by the impact fee administrator in an amount determined by the impact fee administrator. If the construction project will not be constructed within one year of the acceptance of the offer by the impact fee administrator, the amount of the security shall be increased by ten percent compounded, for each year of the life of the security.
(2) In no circumstance shall credit for private park and/or recreation facilities exceed 50 percent of the park and recreation development impact fees otherwise due. An applicant requesting credit must show that:
a. The private park and/or recreation facility for which credit is sought serves a public recreational need; and
b. The private park and/or recreation facility for which credit is sought is consistent with the Capital Improvement Element of Butts County's
Comprehensive Plan.
(3) Any claim for credit must be made no later than the time of application for a building permit. Any claim not so made shall be deemed waived.
(4) Credits shall not be transferable from one project or development to another unless so provided in a development impact fee credit agreement.
(c) Upon application, the board of commissioners may exempt all or part of a particular development project from development impact fees if the board finds that the following conditions are met:
(1) Such project is determined to create extraordinary economic development and employment growth or affordable housing;
(2) The public policy which supports the exemption is contained within the Butts County Comprehensive Plan; and,
(3) The exempt development project's proportionate share of the system improvement is funded through a revenue source other than development impact fees.
Sec. 7.01.13. Appeals.
(a) Any applicant or feepayor aggrieved by a decision of the impact fee administrator made pursuant to this ordinance shall have the right to appeal to the Butts County Board of Commissioners. Prior to any such appeal, the aggrieved applicant or feepayor shall file a request for reconsideration with the impact fee administrator who shall act upon such request within 15 days.
(b) All appeals shall be taken within 15 days of the impact fee administrator's decision on the request for reconsideration by filing with the impact fee administrator a notice of appeal specifying the grounds therefor. The impact fee administrator shall forthwith transmit to the Butts County Board of Commissioners all papers constituting the record upon which the action appealed from is taken. The Butts County Board of Commissioners shall thereafter establish a reasonable date and time for a hearing on the appeal, give due notice thereof, and decide the same within a reasonable period of time following the hearing. Any applicant or feepayor taking an appeal shall have the right to appear at the hearing to present evidence and may be represented by counsel.
(c) An applicant may pay a development impact fee under protest to obtain a building permit and, by making such payment, shall not be estopped from:
(1) Exercising the right of appeal provided for in this section; or
(2) Receiving a refund of any amount deemed to have been illegally collected.
Sec. 7.01.14. Review.
The fees contained in this ordinance shall be reviewed by the Butts County Board of Commissioners at least once every two years.
CHAPTER 8
ADMINISTRATIVE OFFICIALS AND BOARDS
Sec. 8.00.00. Generally.
The administrative offices and boards described in chapter 8 are established for the purpose of implementing the provisions of the UDO. The committees, boards, and commissions described in this chapter shall have the powers and duties described necessary to achieve the purpose of this UDO.
Sec. 8.01.00. Administrative officials.
Sec. 8.01.01. Zoning administrator.
The zoning administrator has the power and duty to provide the following services related to this ordinance:
(a) Provide initial information about this ordinance upon request.
(b) Advise how to contact members of the planning and zoning commission, the board of appeals, the board of commissioners, or other officials as may be appropriate for services provided by those bodies or officials.
(c) Maintain official maps on public display.
(d) Determine in which zoning district a parcel of land lies.
(e) Issue building permits under procedures outlined in section 10.02.01 of this ordinance.
(f) Issue certificates of occupancy under procedures outlined in section 10.02.02 of this ordinance.
(g) Offer practical suggestions on how to comply with the requirements of this ordinance.
(h) Maintain complete records concerning this ordinance and related matters and make such records available to the public upon request.
(i) Supervise all professional and clerical personnel employed in connection with the performance of the functions of the zoning administrator.
(j) Serve as administrative secretary to the planning and zoning commission and the board of appeals.
(k) Issue certificates of zoning compliance for all permitted uses as well as for variances or other applicable procedures which are granted by the board of appeals.
(l) Collect data and keep informed as to the best zoning practices in order that s/he may be qualified to make recommendations to the planning and zoning commission and the board of commissioners concerning amendments to this ordinance.
(m) Make recommendations in regards to requests for variances and other zoning decisions to the board of zoning appeals, planning commission and board of commissioners.
Sec. 8.02.00. Planning commission.
Sec. 8.02.01. Establishment.
The Butts County Planning and Zoning Commission was first established as a joint board of Butts County and the City of Jackson. It is hereby re-established as a five-member county commission appointed and approved by the board of commissioners. Vacancies shall be filled for unexpired terms in the same manner as initial appointments. Members are removable for cause by the board of commissioners upon written charges and after public hearing. No members of the planning and zoning commission shall hold any elected public office. Terms of appointment shall be set by the board of commissioners according to an approved schedule. Meeting organization and parliamentary procedure shall be carried out as established in the by-laws adopted by the planning and zoning commission.
Sec. 8.02.02. Powers and duties.
The planning and zoning commission has the power and duty to provide the following services related to this ordinance:
(a) Advise the board of commissioners on applications for amendment to this ordinance by examining amendment applications and providing written recommendations with reasons for the recommendations to the board of commissioners.
(b) Dispense general information about this ordinance to the public upon request.
(c) Propose amendments to this ordinance.
(d) Maintain and update the Butts County Comprehensive Plan so that it may provide a current data base with which decisions on proposed amendments to this ordinance may be made that utilize sound planning principles.
(e) Carry out an ongoing comprehensive planning program which, like the comprehensive plan, will provide current data on which decisions regarding this ordinance may be based that utilize sound planning principles.
(f) Maintain and update the Butts County Land Use Plan so that it may provide a current data base with which decisions on proposed amendments to this ordinance may be made that utilize sound planning principles.
(g) Advise the board of commissioners on matters of zoning and annexation, as appropriate.
Sec. 8.02.03. Meetings, rules and procedures, and records.
(a) The planning commission shall make its own by-laws and rules of procedure; provided, however, such by-laws and rules of procedure shall not control over any conflicting ordinances of the county or state law.
(b) The planning commission shall set a regular monthly meeting time. All meetings of the planning commission at which official action is taken shall be open to the public, and all records of the planning commission shall be public records.
(c) To the extent the planning commission is specifically authorized to render any quasi-judicial decision as defined below, the planning commission shall hold a public hearing before making any such quasi-judicial decisions. Such hearing shall be preceded by the county providing publication of a public hearing notice within a newspaper of general circulation in the county no less than 30 days prior to the hearing, and a notice of the hearing shall be mailed at least 30 days prior to the public hearing to the owner of the property that is the subject of the proposed action. Such notices shall include the application number (if any number is assigned), date, time, location, and purpose of the public hearing. Quasijudicial decisions means to exercise delegated, quasi-judicial zoning powers including hearing appeals on administrative decisions and rendering decisions on applications for variances, special administrative permits, special exceptions, conditional use permits, or other similar permits pursuant to standards for the exercise of such quasi-judicial authority adopted by the county.
(Ord. No. CR202334, § 1, 6-26-2023) Sec. 8.03.00. Board of zoning appeals.
Sec. 8.03.01. Established.
The Butts County Board of Zoning Appeals, herein referred to as the Board of Zoning Appeals or BZA, is hereby established.
Sec. 8.03.02. Powers and duties.
The board of appeals has the power and duty to provide the following services:
(a) Authorize variances according to procedures specified in section 9.02.01 and 10.03.00.
(b) Accept applications for appeal of administrative decisions according to procedures specified in section 10.03.00.
(c) Accept applications for appeal of an action of the historic preservation commission (where one exists) and render official decisions on them.
Sec. 8.03.03. Meetings, rules and procedures, and records.
(a) The board of zoning appeals ("BZA") shall elect a chairman and a vice-chairman from its members who shall serve for one year or until reelected or until their successors are elected. The BZA shall adopt rules and by-laws in accordance with the provisions of this chapter and of the Zoning Procedures Law, O.C.G.A. Title 36, Chapter 66.
(b) Meetings of the BZA shall be held at the call of the chairman and at such other times as the BZA may determine. No action may be taken without the approval of a quorum of the BZA. A quorum shall consist of three members of the BZA. The chairman or, in his absence, the vice-chairman, may administer oaths and compel the attendance of witnesses by subpoena.
(c) The BZA shall keep minutes of its proceedings, showing the vote of each member upon each question or, if absent or failing to vote, indicating such fact, and shall keep records of its examinations and other official actions, all of which shall be immediately filed in the department of planning and development and shall be a public record.
(d) All meetings of the BZA shall be open to the public and shall comply with O.C.G.A.
§ 50-14-1 et seq.
(e) To the extent the BZA is specifically authorized to render any quasi-judicial decision as defined below, the BZA shall hold a public hearing before making any such quasi-judicial decisions. Such hearing shall be preceded by the county providing publication of a public hearing notice within a newspaper of general circulation in the county no less than 30 days prior to the hearing, and a notice of the hearing shall be mailed at least 30 days prior to the public hearing to the owner of the property that is the subject of the proposed action. Such notices shall include the application number (if any number is assigned), date, time, location, and purpose of the public hearing. Quasi-judicial decisions means to exercise of delegated, quasi-judicial zoning powers including hearing appeals on administrative decisions and rendering decisions on applications for variances, special administrative permits, special exceptions, conditional use permits, or other similar permits pursuant to standards for the exercise of such quasi-judicial authority adopted by the county.
(Ord. No. CR202334, §§ 2, 3, 6-26-2023) Sec. 8.04.00. Board of commissioners.
Sec. 8.04.01. Powers and duties.
The board of commissioners has the power and duty to provide the following services related to this ordinance:
(a) Accept applications for amendment of this ordinance and render official decisions on them after referring them to the planning and zoning commission for review and recommendations.
(b) Propose amendments to this ordinance.
(c) Issue zoning decisions, and exercise the zoning power, consistently with the standards for the exercise of the zoning power, the Zoning Procedures Law, and the policies and procedures for conduct of public hearings.
(d) Perform all duties and exercise all powers conferred on the board by law.
CHAPTER 9
NONCONFORMITIES AND VARIANCES
Sec. 9.01.00. Nonconforming lots, structures, and uses.
Sec. 9.01.01. Generally.
Invariably, at the time a land use and development control ordinance is adopted or amended, certain uses which lawfully existed prior to the adoption or amendment will not conform to the regulations and standards for the districts in which they are located. These are known as nonconforming uses, and in order to feasibly adopt the ordinance, and so as not to cause undue economic hardship on owners of nonconforming uses, these uses are allowed to continue under special conditions as outlined in the following parts of this section:
(a) Where a nonconforming use of a building or lot has ceased for more than six months or has changed to a permitted or conforming use, further use of the building or lot must be in conformance with the standards and requirements for the district in which it is located.
(b) A nonconforming use must not be extended or altered unless the extension or alteration is in conformance with the requirements of this ordinance.
(c) A nonconforming use which is altered or extended must meet applicable Butts County building codes and development regulations. When an applicant seeks a building permit for the extension or alteration of a nonconforming use, the zoning administrator will inspect the unit and determine what (if anything) is needed to bring the unit into conformance with applicable building codes and development regulations. Upon determining that the unit meets applicable building codes and development regulations, s/he will issue the building permit for the nonconforming use.
(d) If a nonconforming residential building or structure suffers damage, the building or structure may be reconstructed and reused as before if completed within 12 months from the time such damage occurred; a damaged residential building or structure may be reconstructed to its original size and dimensions, even if nonconforming under this ordinance, provided that the residence must be rebuilt within 12 months in conformity with the building code requirements in effect at the time of reconstruction.
(e) A use which is nonconforming only with respect to screening or buffer requirements must provide required screens or buffers within a period of three years from the effective date of this ordinance. This time period is to allow for the growth of natural vegetative buffers.
Sec. 9.01.02. Nonconforming lots of record.
(a) Any lot of record for which a plat or legal description has been legally recorded in the office of the clerk of superior court of Butts County at the time of adoption of this UDO and was in compliance with all county zoning regulations at the time of recording but which fails to comply with the dimensional requirements or lot area requirements for the district in which it is located may, if vacant, be used for any of the uses permitted within the district by this UDO, provided that:
(1) The minimum requirements of the district for front, side, and rear yard, open space, height, and floor area shall be complied with; and
(2) The lot is approved by the board of health for the use of a private waste water system.
(b) No permit for the use of any lot which is substandard in terms of the provisions of this UDO shall be issued unless said lot was legally and properly recorded prior to the passage of this UDO. In all cases, construction on any substandard lot of record after the adoption of this UDO shall be required to meet all requirements of the district in which it is located.
(c) No lot, even though it may consist of one or more adjacent lots of record, shall be reduced in size so that the lot frontage or depth; front, side or rear yard; lot area; or other requirements of this UDO are not maintained. This requirement shall not apply when a portion of a lot is required for public purposes.
(d) Permitted modification of setback requirements. When a building is proposed on a lot and when on either or both lots which adjoin such lot at the street right-of-way line there exists a principal building which does not conform to the setback requirements of this UDO, the required setback for such building shall be as follows:
(1) Where only one said adjoining lot contains a principal building with a nonconforming setback, the setback shall be the computed average of the normal setback requirement and the nonconforming setback; or
(2) Where both adjoining lots contain a principal building each with a nonconforming setback, the minimum setback shall be the computed average of the two nonconforming setbacks.
Sec. 9.02.00. Variances.
Sec. 9.02.01. Variances.
(a) A variance is a permit, issued by the board of zoning appeals ("BZA"), which allows use of a parcel of land in a way that does not meet certain requirements for the district in which the property is located. A variance may be granted only in an individual case where an extreme hardship would result if all of the requirements of this section were applied stringently to a particular piece of property. The hardship must be proven by showing that reasonable use of the land is not possible if all of the requirements of this section are to be met. The hardship cannot be self-created, such as:
(1) A lot purchased with knowledge of an existing restriction;
(2) A claim of hardship in terms of prospective sales; or
(3) An expressed economic need requiring a variance, when such a need can be met in other ways which would not require a variance.
(b) Relief from the hardship (i.e., granting the variance) must not cause substantial detriment to the public good or impair the purposes of this ordinance.
(c) When a variance is issued, the spirit of this ordinance must be observed and the public safety and welfare secured. A variance may be granted only for permitted uses in the zoning district in which the property in question is located. (For example, a two-family dwelling would not be allowed to be placed in an R-1 district under a variance.)
(d) The developer or owner wishing to request a variance must have at least 51 percent ownership of the subject property or be the duly authorized agent of such a person, possessing notarized authorization in writing, under the owner's signature. The planning and zoning commission or board of commissioners may also propose a variance. However, the power to approve a variance rests with the board of appeals.
(e) Application for a variance may be made with the zoning administrator. The zoning administrator will take the required information and transmit it to the board of appeals for its consideration.
(f) When an application for a variance is received, the BZA will set a time and place for a public hearing on the variance. Notice of the hearing must be published in a newspaper of general circulation in Butts County at least 30 days before the hearing. Such notice will state the application number (if any number is assigned), owner's name, property location, its area, time, place and subject of the hearing. At least 30 days before the public hearing, notice of the time, place, and subject of the hearing will be sent in writing by U.S. mail to the owner whose property or interest is the subject of such hearing appellant or petitioner in writing by U.S. mail to her/his last known address. Copies of all such letters will be maintained in the applicant's file for permanent record.
(g) The board of appeals will make a decision concerning the variance and record the decision in the minutes for that meeting.
(h) The variance issued by the board of appeals must specify which requirements are to be varied from. It must specify alternative requirements to be met, replacing the requirements varied from.
(i) The board of appeals may establish performance bonds to ensure compliance with any requirements it has set for granting a variance. Where a variance is granted for a construction activity requiring a building permit, the building permit must be obtained and construction must begin within six months of the issuance of the variance. Otherwise, the variance expires after six months.
(j) The decision of the BZA on the application for a variance may be appealed on points of law to the Butts County Superior Court pursuant to the procedures of subsection 10.03.02(a).
(Ord. No. CR202334, § 4, 6-26-2023) Sec. 9.02.02. Administrative variances.
(a) Authority. The zoning administrator shall have the power to authorize upon application in specific cases such administrative variances from the terms of this UDO as will not be contrary to the public interest where, owing to special conditions, a literal enforcement of the provisions of this UDO will in an individual case result in practical difficulty or unnecessary hardship, so that the spirit of this UDO shall be observed, public safety and welfare secured, and substantial justice done.
(b) Provisions that may be administratively varied. The following provisions of this UDO may be administratively varied by the zoning administrator, subject to the specific limitations of this section:
(1) Front building setback for a principal building, reduction not to exceed 30 percent of the minimum requirement.
(2) Side building setback for a principal building, reduction not to exceed 30 percent of the minimum requirement.
(3) Rear building setback for a principal building, reduction not to exceed 30 percent of the minimum requirement.
(4) Setback for an accessory building, reduction not to exceed 30 percent of the minimum requirement.
(5) Landscape strip minimum widths, reduction not to exceed 20 percent of the minimum required width. For example, if the minimum landscape strip width is ten feet, the zoning administrator may authorize a reduction to no less than eight feet.
(6) A reduction in the maximum number of off-street parking spaces required by this ordinance, not to exceed 20 percent.
(7) Riparian buffer zone, reduction not to exceed 50 percent of the minimum requirement.
(8) Accessory uses in residential zoning districts. Property owners whose property is zoned A-R, R-1, R-2, R-3, R-4, R-5 or R-M and consists of at least five acres may make application to the zoning administrator to locate an accessory use on the property in a location other than the rear setback. Only the zoning administrator can approve or deny the request. Only the property owner is permitted to submit an application and/or appeal the decision of the zoning administrator.
(9) Swimming pools may be located in front yards by administrative variance upon a finding that there is no other suitable location for the swimming pool on site and the location of the swimming pool in the proposed location will not be readily visible to the surrounding properties or so close to surrounding properties as to constitute a noise nuisance.
(c) Application. An application for variance may be initiated by any person, firm, corporation or agency, provided said individual, firm, corporation or agency is the owner or owner's agent of the property for which the administrative variance is sought. Applications for administrative variance shall require submittal of all application requirements as specified by the zoning administrator.
(d) Fees. Application fee as specified by this ordinance or established by resolution of the Butts County Board of Commissioners.
(e) Time for decision. When an application for an administrative variance is received, the zoning administrator shall have 15 business days to make his/her decision to approve or deny the application.
(f) Notification. When an administrative variance application is received, the zoning administrator shall notify all adjacent property owners by regular and certified mail giving the adjacent property owners seven business days to respond, comment, etc. All responses, comments, etc. shall be submitted in writing to the zoning administrator.
(g) Posting of sign. When an administrative variance application is received, the zoning administrator must post a sign in a conspicuous place on the property. The sign must set forth the fact that this is an administrative variance, date to respond and/or comment by, and it must inform the public that additional information may be obtained from the zoning administrator.
(h) Criteria for granting administrative variances. The zoning administrator shall not approve an administrative variance application unless the following conditions exist:
(1) There are extraordinary and exceptional conditions or practical difficulties pertaining to the particular piece of property in question because of its size, shape or topography that are not applicable to other lands or structures in the same district;
(2) A literal interpretation of the provisions of this ordinance would effectively deprive the applicant of rights commonly enjoyed by other properties of the district in which the property is located;
(3) Granting the variance requested will not confer upon the property of the applicant any special privileges that are denied to other properties of the district in which the applicant's property is located;
(4) The requested variance will be in harmony with the purpose and intent of this ordinance and will not be injurious to the neighborhood or to the general welfare;
(5) The special circumstances are not the result of the actions of the applicant;
(6) The variance requested is the minimum variance that will make possible the proposed use of the land, building, or structure in the use district proposed; and/or
(7) The variance shall not permit a use of land, buildings or structures which is not permitted by right in the zoning district or overlay district involved.
CHAPTER 10
ADMINISTRATIVE PROCEDURES
Sec. 10.00.00. Generally.
Sec. 10.00.01. Purpose.
This chapter sets forth the procedures for receiving, reviewing, and rendering decisions on applications for subdivisions, multi-family and nonresidential development, mixed use development, planned developments, rezoning, and all permits. This chapter also sets forth the requirements for appealing decisions and for enforcement. It is the county's intent that the procedures and requirements set forth in this chapter shall be followed in order to seek approval for any development. Note that additional requirements and design criteria are located throughout this UDO in particular sections, regarding particular districts, and in regards to specific uses.
Sec. 10.00.02. Approvals required.
(a) No building is to be erected, used, occupied, moved, or altered in a manner that does not conform to the requirements specified for the district in which it is located.
(b) The only exception to this requirement is that all buildings or uses which lawfully existed at a particular location at the time this ordinance was adopted may be continued as nonconforming uses pursuant to the provisions of chapter 9.
Sec. 10.00.03. Expiration of approvals.
(a) Any building permit or other permit shall become void if the work authorized by the permit has not begun within six months after the date of issuance of the permit.
(b) If construction described in a building permit or other permit is suspended or abandoned after work has commenced, the permit shall expire 12 months after the date that work ceased.
(c) The time period for which a permit is valid may be extended for one or more periods of not more than 90 days each where an application for such extension is filed and such extension has been granted in writing by the zoning administrator.
Sec. 10.00.04. Fees required.
(a) All applications shall be accompanied by payment of application fees, as set forth in the Butts County fee schedule adopted by the board of commissioners. An application shall not be complete until all required fees are paid. Such fees shall include the filing fee, and where notice is required, shall include an additional fee to defray the expense of preparing and mailing such notices.
(b) For land clearing permits, a fee in addition to local permitting fees will be assessed pursuant to Georgia statutes. All applicable fees shall be paid prior to issuance of the land disturbance permit.
Sec. 10.00.05. Requirements regarding developments of regional impact (DRI).
The Georgia Department of Community Affairs (DCA), pursuant to the Georgia Planning Act, has established criteria for the identification of certain large-scale developments, which have the potential to cause land use impacts beyond the boundaries of the respective local government where a project might be proposed. These developments, known as developments of regional impact (DRIs), shall be submitted, based on established DCA standards, procedures, and format, to the Three Rivers Regional Commission for review and recommendation prior to issuance of any local building or development permit, utility tap, or rezoning, whichever occurs first. As such, these requirements establish an official delay in the local permitting and/or review process to allow for compliance with these requirements.
Sec. 10.00.06. Procedures for conducting public hearings on zoning decisions.
These policies and procedures govern the calling and conducting of public hearings on applications for zoning decisions. The following policies and procedures will be observed in conducting the required public hearing:
(a) The hearing will be held in the Butts County administration building or as advertised. Printed copies of these procedures shall be available for public review at the hearing.
(b) Written comments on the subject of the hearing may be submitted by any citizen or property owner at any time prior to the adjournment of the hearing.
(c) The proponent(s) of the zoning decision shall have a minimum of ten minutes for the presentation of data, evidence and opinions. The length of time for presentations permitted to each speaker will be governed by the chairman of the board of commissioners or his/her designee, depending upon the number of persons present and desiring to speak. Personal remarks will not be tolerated.
(d) The opponent(s) of the zoning decision shall have a minimum of ten minutes for the presentation of data, evidence and opinions. The length of time for presentations permitted to each speaker will be governed by the chairman of the board of commissioners or his/her designee, depending upon the number of persons present and desiring to speak, and provided that both proponents and opponents shall have equal opportunity to address the board of commissioners. Personal remarks will not be tolerated.
(e) Any person desiring a transcript of the hearing must arrange for a court reporter at their own expense.
(f) Cross examination of persons making oral presentations will not be permitted.
(g) All questions will be addressed to the chairman or his/her designee then presiding.
(h) Standing to challenge a zoning decision is not conferred by being permitted to speak orally at a hearing, nor by being permitted to file a statement or pleadings.
Sec. 10.01.00. Application and decision-making requirements.
Sec. 10.01.01. Pre-application conference.
(a) A pre-application conference is a meeting between an applicant and the zoning administrator for the purposes of:
(1) Exchanging information on the potential development of a site;
(2) Providing information on permissible uses of the site proposed for development;
(3) Providing information to an applicant regarding the design standards set forth in this UDO that are applicable to a potential application;
(4) Providing information to an applicant regarding standards of regional, state, or federal agencies that may be applicable to a potential application;
(5) Determining the need and requirements for supporting plans, documents, and studies;
(6) Providing information to an applicant regarding infrastructure requirements and the construction of required improvements; and
(7) Providing information to an applicant regarding the appropriate procedures and schedules for receiving and reviewing applications and rendering decisions regarding a potential application.
(b) Prior to the submission of an application for a subdivision plat, development plan, or improvements plan, an applicant may submit a written request for a pre-application conference.
(c) A pre-application conference should be held not more than two weeks following the date of submission of the written request for such conference.
(d) The pre-application conference may include staff of the building, planning and development office.
(e) It is the intent of the board of commissioners that all requirements be identified during the pre-application conference. However, no person may rely upon any comment concerning a proposed development, or any expression of any nature about the proposal, made by a participant at the pre-application conference as a representation or implication that the proposal will be ultimately approved or rejected in any form.
(f) A prospective applicant may bring members of his project team, such as, but not limited to, the project engineer, land planner, architect, surveyor, or other person who will assist in the preparation of an application. A prospective applicant may provide an informal sketch plan to aid in the discussion. However, such an informal sketch plan shall not be reviewed in any way for compliance with the standards and requirements of this UDO and shall be used only as an aid to the conduct of the pre-application conference.
Sec. 10.01.02. Determination of completeness.
All applications shall be complete before acceptance for review and decision making. A determination of completeness is a determination that all required documents and plans have been submitted in sufficient number, and that all fees have been paid. A determination of completeness is not a determination of compliance with substantive standards and criteria.
Sec. 10.01.03. Responsibilities for final action.
The table below identifies the types of applications and the entity that is responsible for the final decision regarding the application.
Table 10.01.03. Types of applications and entity responsible for final decision Type of Application Entity Responsible for Final Decision
BPD1 BZA
Planning Commission Board of Commissioners Development plans;
as-built plans X Amendments to development plans X Administrative waivers X Minor subdivisions X Preliminary plats X Final plats X Variances X Appeal of administrative decisions X Telecommunication towers and antennas X Rezoning, with or without a conceptual development plan;
special use permits X Amendments to zoning conditions X Amendment to the
UDO
X 1 Building, planning and development office.
Sec. 10.02.00. Submittal and procedural requirements.
Sec. 10.02.01. Building permits.
(a) The developer or other person wishing to do any of the following must first apply to the zoning administrator for a building permit:
(1) Excavation or filling of a lot for the construction of a building;
(2) Erection, movement, extension, or enlargement of a building;
(3) Work on an existing building which increases the assessed value $500.00 or more;
and/or
(4) Installation of a manufactured home or industrialized building.
(b) No electricity, water, or sewage hookup will be made available to the site of new construction until a building permit is secured.
(c) The building permit must be applied for either by the owner of the land upon which the proposed building or alteration is to be located or by the contractor doing the work.
(d) The applicant may obtain a building permit application from the zoning administrator. S/he should complete the application form and submit it to the zoning administrator together with any supporting documentation which the zoning administrator may specify.
(e) Before a building permit is issued by the zoning administrator, the Butts County Health Department must approve the proposed water supply and sewage disposal facilities required in connection with the proposed building or structure. In areas served by a public water and sewage system, the health department may elect to waive the requirement for approval. After study of the site of a proposed use, the health department may require for health reasons that all or any portion of the site not be used for the intended purpose. The health department may also set a minimum lot size larger than that required by this ordinance. The Butts County Health Department will either approve or disapprove the water and sewer facilities within 30 days of receipt of the application from the zoning administrator and may provide a written decision, including reasons for the decision.
(f) An existing use which is altered or extended must meet applicable Butts County building codes and development regulations. When an applicant seeks a building permit for the extension or alteration of an existing use, the zoning administrator will inspect the use and determine what (if anything) is needed to bring the use into conformance with applicable building codes and development regulations before a building permit may be issued.
(g) The zoning administrator is in charge of issuing building permits; however, s/he may delegate the authority to qualified staff. The zoning administrator may contact the applicant at the address shown on the application. The building permit will be issued if, upon review of the application and inspection of the site, the zoning administrator is satisfied that the proposed project will meet the requirements of this ordinance and all other applicable ordinances. The zoning administrator may require the submission of additional materials if s/he feels additional information is needed in order to determine if the proposed project meets the requirements of this ordinance.
(h) If the zoning administrator feels that the proposed project as presented in the building permit application will not satisfy the requirements of this ordinance, s/he will not issue a building permit. S/he will notify the applicant within ten days of the submission of the application, stating reasons for the refusal. S/he may provide the reasons for refusal in writing at the request of the applicant. The applicant will then need to confer with the zoning administrator to determine what s/he needs to do in order to comply with the ordinance and be eligible for a building permit.
(i) Construction on an approved project must start within six months from the date of issue of the building permit, or the permit will become invalid, and a new one must be applied for if construction of the project is desired at a future date. If construction has begun on an approved project and then ceases before the project is completed, construction must be restarted within 12 months from the time that it was stopped, or the permit will become invalid, and a new one must be applied for if construction of the project is desired to resume at a future date. Records of building permit applications and supporting materials will be maintained by the zoning administrator.
(j) All newly constructed buildings, as well as additions, extensions, or enlargements of structures, must comply with all building codes in effect in Butts County. The zoning administrator will explain the procedures and timing of inspections to determine if the work meets applicable codes.
Sec. 10.02.02. Certificate of occupancy.
(a) A certificate of occupancy is required before a structure for which a building permit has been issued may be occupied or used. The building permit becomes the certificate of occupancy when the zoning administrator signs it in the appropriate space, certifying that to the best of her/his knowledge all requirements of this ordinance have been met. The owner/contractor will then receive the certificate of occupancy to be used as confirmation that s/he has complied with the provisions of this ordinance.
(b) The zoning administrator will issue the certificate of occupancy within ten days of receiving the building permit with required certifications if s/he finds that all requirements of this ordinance and all other applicable ordinances have been met. However, if s/he finds that all requirements of such ordinances have not yet been met when the owner/contractor seeks a certificate of occupancy, the zoning administrator will not issue the certificate of occupancy. S/he will notify the owner/contractor within ten days, stating reasons for the refusal. The owner/contractor will then need to confer with the zoning administrator to determine what s/he needs to do in order to comply with the ordinance and be eligible for a certificate of occupancy.
Sec. 10.02.03. Amendments to official map/rezoning.
(a) If a developer or landowner finds that a proposed new use of her/his land does not meet the requirements of this ordinance, s/he may request that this ordinance be amended to permit her/his proposed use. The developer or owner wishing to request an amendment of the official map must have at least 51 percent ownership of the subject property or be the duly authorized agent of such a person, possessing notarized authorization in writing under the owner's signature. The planning and zoning commission or the board of commissioners may also propose an amendment. However, the power to approve and enact an amendment rests with the board of commissioners.
(b) Application for an amendment may be made with the zoning administrator. The zoning administrator will take the required information and transmit it to the planning and zoning commission for its consideration.
(c) When an amendment is initiated which involves changing the zoning district of a parcel of land, the zoning administrator must post a sign at least two feet by three feet in size in a conspicuous place on the property at least 15 days, but not more than 45 days, prior to the date of the scheduled public hearing conducted by the board of commissioners. The sign must set forth the fact that it is a zoning notice. It must show the present zoning classification; the proposed zoning classification; the purpose, date, time, and place of the scheduled public hearing; and it must inform the public that additional information may be obtained from the zoning administrator.
(d) All applications for amendment must first be reviewed by the planning and zoning commission. The planning and zoning commission will study the proposed amendment and determine if it meets the requirements of this ordinance, as well as other applicable ordinances of Butts County. At this time, the zoning administrator may review the proposed amendment and make written recommendations to the planning and zoning commission.
(e) The planning and zoning commission may conduct a public hearing on the amendment. The board of commissioners shall conduct a public hearing. Notice of the public hearing before the board of commissioners must be published in a newspaper of general circulation in Butts County at least 15 days, but not more than 45 days, before the hearing.
The time, place and purpose of the hearing; the location of the property; the present zoning classification; and the proposed zoning classification must be indicated in the newspaper notice.
(f) After conducting a public hearing and considering recommendations from the planning and zoning commission, the board of commissioners will then make an official decision on the proposed amendment. The decision may or may not concur with the recommendations of the planning and zoning commission or the zoning administrator.
(g) Conditional and intermediate zoning.
(1) When a parcel of property is placed in a certain zoning district, all permitted uses for that zoning district are allowed on the property as long as the published requirements of this ordinance and other development regulations of Butts County are met.
However, in certain situations, only one of the permitted uses for a district may be appropriate for a parcel of property while many of the other uses within the range of those permitted would not be appropriate; or certain design, location, aesthetic, or other standards may be needed to mask otherwise undesirable effects of a permitted use. In such cases, conditional zoning may be granted by the board of commissioners with the consent of the applicant.
(2) The following situations are permitted under conditional zoning:
a. The use of land may be specifically limited to any one or more of the permitted uses for the zoning district in which the land is placed.
b. Special requirements of design, location, aesthetics, or other considerations may be imposed for the uses permitted on the land.
c. Any combination of the above two categories of conditions may be imposed.
(3) Conditional zoning is attached to a specific lot or group of lots, not to the owner(s). If ownership of the lot(s) changes, continued compliance with the special conditions must be maintained by the new owner(s).
(4) Conditional zoning may be proposed by the board of commissioners, the planning and zoning commission, the petitioner for a zoning amendment, or any person who may be affected by the subject property.
(5) A tract of land to which special conditions have been attached continues to be subject to all other requirements of this ordinance and other applicable regulations of Butts County which are not in conflict with those special conditions.
(6) Whenever a tract of land has had special conditions imposed upon it and a building permit is applied for, plans and specifications which are drawn in compliance with the special conditions must be submitted with the application for a permit.
(7) The zoning of any parcel of land which is subject to special conditions will be indicated on the official map by its zoning district designation followed by the letter "C" (for example R-1C).
(8) In cases where an applicant seeks rezoning to a classification which the board of commissioners finds to be not appropriate, but where the existing zoning classification does not allow a reasonable use of the property or is too restrictive to the particular property, the board of commissioners may rezone the property to an intermediate classification which allows a reasonable and appropriate use of the property. An intermediate zoning may be assigned without further public notice or hearing beyond that already required by law and this ordinance. A properly placed and advertised public notice of the rezoning application and hearing thereon shall be notice that the board of commissioners may rezone to an intermediate zoning classification between the current zoning classification and the zoning classification sought by the applicant. Conditions may be placed upon the rezoning as well.
(h) If the board of commissioners denies a proposed amendment, a minimum period of 12 months must pass before the amendment proposal for the same property is again submitted for consideration.
Sec. 10.02.04. Special use permits.
(a) Some zoning districts permit certain uses only upon approval of the board of commissioners. These are called special uses. Consideration is given to whether or not the objectives of this ordinance will be hindered in an individual situation.
(b) The developer or owner wishing to request a special use must have at least 51 percent ownership of the subject property or be the duly authorized agent of such a person, possessing notarized authorization in writing, under the owner's signature.
(c) Application for a special use may be made with the zoning administrator. The zoning administrator will take the required information and transmit it to the planning and zoning commission and the board of commissioners for their consideration.
(d) When an application for a special use is received, the planning and zoning commission will set a time and place for a public meeting and/or public hearing on the special use. All applications for special use permits shall receive a public hearing. Such hearing shall be preceded by the county providing publication of a public hearing notice within a newspaper of general circulation in the county at least 30 days prior to the date of the public hearing, and a notice of the hearing shall be mailed at least 30 days prior to the public hearing to the owner of the property that is the subject of the proposed action. Such notices shall include the application number (if any number is assigned), date, time, location, and purpose of the public hearing.
(e) The planning and zoning commission will make its recommendation concerning the special use and record the decision in the minutes of the meeting. The planning and zoning commission will then forward its decision to the board of commissioners for their review and consideration before making their determination on the special use.
(f) The board of commissioners shall hold a duly-noticed public hearing pursuant to the same procedures used by the planning commission. After conducting such hearing, the board of commissioners may grant, deny, or grant with special conditions the special use permit request. The decision of the board of commissioners on the application for special use may be appealed to the Butts County Superior Court by way of a petition for such review pursuant to O.C.G.A. § 36-66-5.1(a)(2) filed in the court within 30 days of the date of the decision of the board of commissioners. Such appeal will be a record review, and the record shall be certified by the zoning administrator or chairman of the board of commissioners and transmitted to the superior court within 30 days of the service of the appeal pleadings on the county.
(g) In addition to the standards for the exercise of the zoning power and specific criteria in this UDO, the planning and zoning commission and board of commissioners will consider the following points in arriving at a decision on the special use:
(1) Whether it is contrary to the purpose of this ordinance;
(2) Whether it is detrimental to the use or development of adjacent properties, or to the general neighborhood; it must not adversely affect the health or safety of residents or workers;
(3) Whether it would constitute a nuisance or hazard because of the number of persons who will attend or use such a facility, vehicular movement, noise or fumes generated, or type of physical activity;
(4) Whether it would adversely affect existing uses, and it must be proposed to be placed on a lot of sufficient size to satisfy the space requirements of the use;
(5) Whether the public infrastructure of Butts County is sufficient to support the proposed use;
(6) How the proposed use would affect the economy of Butts County;
(7) How the proposed use would affect the environment of Butts County; and
(8) Whether it would meet all other requirements of this ordinance.
(h) The board of commissioners may require any additional restrictions and development standards on a special use as may be necessary to protect the health and safety of workers and residents.
(i) If the board of commissioners find that any restrictions upon which a special use was granted are not being complied with, they may revoke the permit. Public notice and hearing on the issue of whether the permit should be revoked shall be provided in the same manner as that provided for the consideration of a rezoning application.
(Ord. No. CR202334, § 5, 6-26-2023) Sec. 10.02.05. Subdivisions—Generally.
(a) When any subdivision of land is proposed, and before any permits for development of the subdivision are granted, the developer or his authorized agent shall apply for and secure approval of the proposed subdivision in accordance with this UDO.
(b) Any subdivision of land, including for the purpose of auction, requires approval by the planning department. Prior to subdivision of any property and prior to recording said subdivision with the county clerk's office, the property owner or his or her representative shall first receive written approval from the planning department to ensure the proposed subdivision meets the standards of this UDO.
(c) For the purpose of auction, the planning department shall determine the extent of required compliance with the standards of this UDO prior to the sale of a subject property.
(d) All fees for subdivision approval shall be established from time to time by resolution of the Butts County Board of Commissioners.
Sec. 10.02.06. Subdivision plats.
General overview of subdivision plat review and approval procedures.
(a) Introduction. The procedure for the formal review and approval of a subdivision plat consists of five stages. These are as follows:
(1) Pre-application review;
(2) Preliminary plat acceptance by the planning and zoning commission;
(3) Construction plan approval by the administrative officer;
(4) Final plat acceptance by the planning and zoning commission and approved by the Butts County Board of Commissioners; and
(5) Recording and dedication.
(b) Minor subdivisions are lot divisions that do not require the installation of streets, utilities, or other public improvements and infrastructure. A proposal to create a minor subdivision shall only require review and approval by the zoning administrator before being recorded in the public records of the clerk of the Butts County superior court. The zoning administrator will approve the minor subdivision if the submitted plat complies with the Georgia statutes pertaining to the recording of plats and all of the substantive requirements of this UDO.
(c) Pre-application review stage. Whenever the subdivision of a tract of land is proposed, the subdivider may consult informally with the zoning administrator prior to filing the application for subdivision. The subdivider may submit sketch plans and data showing existing conditions within the site and in its vicinity and the proposed development layout of the subdivision. The purpose of the pre-application review stage is to facilitate the subsequent preparation of plans and plats by clarifying matters relating to the proposed subdivision and the development ordinance.
(d) Preliminary plat stage. The subdivider must submit to the planning and zoning commission for approval a preliminary plat of the proposed subdivision prepared in accordance with the provisions of this ordinance. If the proposed subdivision abuts a state highway, a certificate of approval by the Georgia Department of Transportation must accompany the preliminary plat submission. The county health department must have reviewed the project, and a letter of preliminary approval must be obtained by the subdivider. The subdivider must also furnish copies of such a preliminary plat to all utility companies serving the area. Approval of the planning and zoning commission will be indicated on the face of the preliminary plat.
(e) Construction plan stage. Prior to making any street improvements or installing any utilities or other improvements, the subdivider must submit to the administrative officer construction plans of the proposed subdivision, prepared in accordance with the provisions of this ordinance. The design presented in the construction plans must be in conformance with the general design information presented in the preliminary plat that was approved by the planning and zoning commission. The construction plans must show all street design profiles, topographic information, utility construction plans, sediment and erosion control plans, and other information as may be required by the administrative officer. The construction plan stage requires the approval of only the administrative officer; however, it is the administrative officer's responsibility to ensure that the plans are reviewed and approved for compliance with technical requirements.
(f) Final plat stage. After completion of the physical development, or arrangements for physical development acceptable to the planning and zoning commission, of all or part of the area shown on the preliminary plat as approved by the planning and zoning commission, and before selling any lots, a final plat together with the required certificates must be submitted to the planning and zoning commission and the Butts County Board of Commissioners for approval. The subdivider must also furnish copies of the approved final plat to all utility companies serving the area.
(g) Recording and dedication. After the final plat is approved by the Butts County Board of Commissioners, the final plat and appropriate documents become the instrument to be recorded in the office of the clerk of the superior court of Butts County, Georgia.
After recording, the appropriate deeds and documents must be presented to the appropriate local government agency for dedication and acceptance.
Sec. 10.02.07. Procedures for subdivision preliminary plat.
(a) Submission and approval of preliminary plat.
(1) Preliminary plat submission. After completing the preliminary review stage, and at the regular time specified by the community development department before the regularly scheduled monthly meeting of the planning and zoning commission at which the subdivider desires planning and zoning commission action, the subdivider must submit the following:
a. A letter requesting review and approval of a preliminary plat and giving the name and address of a person to whom the notice of hearing and action on the preliminary plat is to be sent;
b. The preliminary plat and supporting data in formats specified by the administrative officer;
c. If the subdivision is not to be served by public water and sewage systems, a certificate from the Butts County Health Department approving the proposed water supply and sewage disposal systems; and
d. If the proposed subdivision abuts a state highway, a certificate of approval or comparable permission of access for the proposed subdivision by the Georgia Department of Transportation.
(2) Additional information. The planning and zoning commission may ask for any additional information it feels is needed to evaluate the preliminary plat.
(3) Official date of submission. The official date of submission of the preliminary plat will be the date of the next regularly scheduled monthly meeting of the planning and zoning commission.
(4) Preliminary plat review. The administrative officer, or designee, will review the preliminary plat for the planning and zoning commission for conformance to this section and other relevant regulations. The planning and zoning commission will consider the comments or suggestions of the appropriate review agencies requested to review the preliminary plat. The administrative officer, or designee, will indicate on the preliminary plat (or by a written memorandum attached to the preliminary plat) for the planning and zoning commission any comments or suggested changes that are necessary to meet the intent of this section or to serve the best interests of Butts County.
(5) Public hearing. Before acting on the preliminary plat, the planning and zoning commission will schedule a public hearing on the preliminary plat. Notice of the hearing must be published in a newspaper of general circulation in Butts County at least 15 days before the hearing.
(6) Action of the planning and zoning commission. No more than 45 days after the official date of submission of the preliminary plat, the planning and zoning commission will either approve the plat, conditionally approve the plat (noting the conditions of approval on the plat), or not approve the plat. Action may be taken on the entire preliminary plat or any portion of it.
(7) Failure of planning and zoning commission to act. If the planning and zoning commission fails to act within 45 days of the official date of submission of the preliminary plat, the preliminary plat will be deemed to be automatically approved by the planning and zoning commission.
(8) Approval of preliminary plat. Approval of a preliminary plat is effective and binding upon the planning and zoning commission for a period of no more than three years.
Before the three-year period expires, the subdivider may submit to the planning and zoning commission a request in writing for an extension of time. If the planning and zoning commission grants such an extension, final subdivision construction drawings must be submitted, approved, and work must begin within the limits of the extension.
(b) Specifications for preliminary plat. The preliminary plat must meet the minimum standards of design set forth in this section and must include the following:
(1) General.
a. Title block including proposed name of subdivision and name of former subdivision, if any or all of the proposed subdivision has been previously subdivided.
b. Plat key including:
1. Name and address of person in charge of plat preparation;
2. Date of plat preparation with space for revision dates;
3. Graphic scale of one inch equals 200 feet or larger;
4. North point, identified as magnetic, true, or grid north;
5. Area of proposed subdivision in acres; and
6. Appropriate legend of symbols used on plat.
c. Location sketch map locating the subdivision in relation to the immediately surrounding area and showing generally:
1. Well-known landmarks such as railroads, highways, bridges, creeks, etc.;
2. Zoning district classification(s) of land to be subdivided and adjoining properties; and
3. Government jurisdictional boundaries and land lot lines, if applicable.
d. Entire tract. The subdivider shall submit a preliminary plat of the entire parent tract, even though his present plans may call for the actual development of only a small portion of the property.
e. Resubdivision. In the case of resubdivision, a copy of the existing plat with the proposed resubdivision superimposed on it must be provided.
f. Elevations. All elevations must refer to mean sea level datum.
g. Sheet size must be 34 inches wide and 22 inches long. A margin two inches wide must be on the left side for binding purposes, and margins of one-half inch must be on the other three sides. If the complete plat cannot be shown on one sheet of this size, it may be shown on more than one sheet with an index map on a separate sheet of the same size.
h. Text size. To ensure legibility all text must be shown at a minimum font size of ten points.
(Ord. No. CR2026-04-031, § 1, 4-13-2026) Sec. 10.02.08. Construction plans.
(a) Submission and approval of construction plans.
(1) Construction plan submission. After the preliminary plat of the proposed subdivision has been given approval by the planning and zoning commission, the subdivider may submit construction plans to the administrative officer.
(2) Format. Five copies of the construction plans must be submitted to the administrative officer. The scale on the construction plans must be at least 100 feet to the inch.
(3) Approval of construction plans. Approval of construction plans and issuance of a land disturbance permit constitutes authorization to proceed with the installation of any planned improvements.
(b) Specifications for construction plans. The construction plans must conform to all specifications required for the preliminary plat and include the following:
(1) Detailed plot or site plans may be required for certain lots. Detailed field run topographic surveys may be required for particular lots having site specific drainage problems. All site plans must be based on a field run topographic survey or aerial survey based on standard photogrammetric methods with a maximum contour interval of two feet, right-of-way, property, and lot boundary lines platted sufficiently to reproduce the subdivision in the field.
(2) Provisions for proper drainage.
(3) Soil erosion and sediment control plans as are required by local ordinances.
(4) Such street profiles, cross sections and details as may be necessary to illustrate proposed street construction standards.
(5) Utility plans.
(6) Any tree planting plans or other landscaping plans.
(7) Stormwater system must be designed to adequately contain runoff and shown on drawings, sections, and profiles, with pipe sizes, elevations at inlets, and outfalls with ditching on property lines where required. Current design standard for stormwater control is based on a 25-year event. A 20-foot easement must be provided for these features. Any specifications and details required by the ordinance shall adhere to the "Manual for Erosion and Sediment Control in Georgia" and exhibited on plans submitted by the subdivider.
(8) A bond may be secured by the developer for 100 percent of the estimated cost of the improvements prior to undertaking any site improvements.
(9) Certifications:
a. The following certifications must be in a form and substance approved by the planning and zoning commission and inscribed directly on the construction plans:
1. Construction plans must bear the seal of a registered professional engineer (PE) or landscape architect (RLA).
2. Certificate or statement of approval of the drainage provisions within the proposed subdivision.
b. The following additional certifications must be in a form and substance approved by the administrative officer and inscribed directly on the construction plans or provided as an attachment in a format approved by the administrative officer:
1. Certificates or statements of approval of the sewage disposal system in the proposed subdivision obtained from Butts County, the Butts County
Health Department, and the Environmental Protection Division of the Georgia Department of Natural Resources, as applicable.
2. Certificates or statements of approval of the water system in the proposed subdivision obtained from Butts County, the Butts County Health Department, and the Environmental Protection Division of the Georgia Department of Natural Resources, as applicable.
3. Certificate, written permission or approved plans from the Georgia Department of Transportation, if property connects to a state road.
Sec. 10.02.09. As-built plans.
(a) Submission of as-built plans.
(1) As-built plan submission. After the construction of the following structures, the developer shall submit as-built plans to the administrative officer:
a. New streets to be dedicated for public use. As-built plans shall show horizontal and vertical alignment.
b. Storm drainage infrastructure that is part of a stormwater system being dedicated for public maintenance. As-built plans shall show pipe size, slope, elevation, and construction material and structure type, size and top/bottom elevations.
c. Water utility infrastructure that is to be part of the public water system.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.