111.03.03. Pump restrictions.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Manufacturers meeting approved standards include Wilo, Flygt, and KSB. Others meeting these standards may be approved. The city reserves the right to review each application on an individual basis.
B. Lift stations with pumps up to 25 HP shall be supplied with a complete spare pump at the request of the city. A total rebuild kit, spare impeller and a complete set of manufacturer's recommended spare parts shall be required with all pump stations.
C. All submersible pumps shall be provided with stainless steel chains connected to each pump to facilitate the removal of the pump from the wet well for maintenance.
D. Pump operation shall be by pressure transducer and programmable controller with a 4-20MA output for SCADA. A spare pressure transducer and controller or a redundant level control system shall be supplied at the city's request.
E. A pump operation and elevation schedule shall be provided on the design drawings. This schedule shall call for pump operation elevations, ground water elevations and minimum liquid level in the wet well. The minimum levels of control are as follows:
1) Low level alarm.
2) Pumps off.
3) Lead pump on.
4) Lag pump on.
5) Lag-lag pump on (triplex and quadplex only).
6) Lag-lag-lag pump on (quadplex only).
7) High level alarm.
F. The pump horsepower, pump model and impeller size shall be clearly shown in bold print on the plans next to the drawing of the pumps and wet well. Future impeller cuts and pumping rates must be shown on the plans.
G. Upon installation, all pumps shall be checked by a manufacturer's representative for proper rotation, pumping capacity, amperage draw, lack of vibration, and other checks as may be deemed necessary to assure proper operation. All submersible pumps shall be pulled out of and reinstalled in the wet well in the presence of a representative of the city to assure proper clearances for easy removal of the pumps for maintenance.
(Minimum two day start-up time for all lift stations.)