Carrollton · Zoning Ordinance
Appendix B - ZONING (RESERVED) / Article 7 - STORMWATER MANAGEMENT
7.13.04. Extreme Flooding Protection
About this text
- As published by Municode, current through 2025-11-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Extreme flood and public safety protection shall be provided by controlling and/or safely conveying the 100-year, 24-hour storm event such that flooding is not exacerbated.
B. Extreme flood protection shall be provided either by controlling the 100-year, 24-hour return frequency storm event through on-site or regional structural stormwater controls to maintain the existing 100-year floodplain and/or by sizing the on-site conveyance system to safely pass the 100-year, 24-hour return frequency storm event and allowing it to discharge into a receiving water whose protected floodplain is sufficiently sized to account for extreme flow increases without causing damage.
C. The City Engineer may modify or waive the provisions of subsection (A) for sites where the post-development downstream analysis shows that uncontrolled post-development conditions will not increase downstream peak flows, or that meeting the requirement will cause greater peak flow downstream impacts than the uncontrolled post-development conditions.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.