Skip to content
Georgia Commons
Menu

Cartersville · Zoning Ordinance

Part - CODE OF ORDINANCES / Chapter 7.5 - DEVELOPMENT REGULATIONS / Article IX - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT

Sec. 7.5-233. Final inspection; as-built drawings; delivery of inspection and maintenance agreement.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Upon completion of the development, the applicant is responsible for:

(a) Certifying that the stormwater management system is functioning properly and was constructed in conformance with the

approved stormwater management plan and associated hydrologic analysis;

(b) Submitting as-built drawings showing the final design specifications for all components of the stormwater management system as certified by a professional engineer;

(c) Certifying that the landscaping is established and installed in conformance with the BMP landscaping plan; and

(d) Delivering to the City of Cartersville a signed inspection and maintenance agreeDEVELOPMENT REGULATIONS § 7.5-233 ment that has been recorded by the

owner in the property record for all parcel(s) that make up the site.

The required certification under part (a) shall include a certification of volume, or other performance test applicable to the type of stormwater management system component, to ensure each component is functioning as designed and

built according to the design specifications in the approved stormwater management plan. This certification and the required performance tests shall be performed by a qualified person and submitted to the City of Cartersville with the request for a final inspection. The City of Cartersville shall perform a final inspection with applicant to confirm applicant has fulfilled these

responsibilities.

History

The history line the source prints at the end of the section.

(Ord. No. 28-20, § 1, 11-5-20)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:cartersville/zoning/7.5-233@2026-11-11-d9d9f9d23c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Cartersville Zoning Ordinance, Sec. 7.5-233. Final inspection; as-built drawings; delivery of inspection and maintenance agreement | Georgia Commons