Ir al contenido
Georgia Commons
Menú

Cartersville · Ordenanza de zonificación

Part - CODE OF ORDINANCES / Chapter 7.5 - DEVELOPMENT REGULATIONS / Article IX - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT

Sec. 7.5-233. Final inspection; as-built drawings; delivery of inspection and maintenance agreement.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Upon completion of the development, the applicant is responsible for:

(a) Certifying that the stormwater management system is functioning properly and was constructed in conformance with the

approved stormwater management plan and associated hydrologic analysis;

(b) Submitting as-built drawings showing the final design specifications for all components of the stormwater management system as certified by a professional engineer;

(c) Certifying that the landscaping is established and installed in conformance with the BMP landscaping plan; and

(d) Delivering to the City of Cartersville a signed inspection and maintenance agreeDEVELOPMENT REGULATIONS § 7.5-233 ment that has been recorded by the

owner in the property record for all parcel(s) that make up the site.

The required certification under part (a) shall include a certification of volume, or other performance test applicable to the type of stormwater management system component, to ensure each component is functioning as designed and

built according to the design specifications in the approved stormwater management plan. This certification and the required performance tests shall be performed by a qualified person and submitted to the City of Cartersville with the request for a final inspection. The City of Cartersville shall perform a final inspection with applicant to confirm applicant has fulfilled these

responsibilities.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 28-20, § 1, 11-5-20)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:cartersville/zoning/7.5-233@2026-11-11-d9d9f9d23c

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Cartersville Zoning Ordinance, Sec. 7.5-233. Final inspection; as-built drawings; delivery of inspection and maintenance agreement | Georgia Commons