Artículo IX. POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT
19 secciones
Contenido
- Sec. 7.5-221. Purpose and intent
- Sec. 7.5-222. Definitions
- Sec. 7.5-223. Adoption and implementation of the GSMM: Conflicts and inconsistencies
- Sec. 7.5-224. Designation of administrator
- Sec. 7.5-225. Applicability criteria for stormwater management standards
- Sec. 7.5-226. Exemptions from stormwater management standards
- Sec. 7.5-227. Stormwater management standards
- Sec. 7.5-228. Pre-submittal meeting, stormwater concept plan, and stormwater management plan requirements
- Sec. 7.5-229. Application fee
- Sec. 7.5-230. Application procedures
- Sec. 7.5-231. Compliance with the approved stormwater management plan
- Sec. 7.5-232. Inspections to ensure plan compliance during construction
- Sec. 7.5-233. Final inspection; as-built drawings; delivery of inspection and maintenance agreement
- Sec. 7.5-234. Violations and enforcement
- Sec. 7.5-235
- Sec. 7.5-236. Inspection and maintenance agreements
- Sec. 7.5-237. Right of entry for maintenance inspections
- Sec. 7.5-238. Owner's failure to maintain the stormwater management system
- Secs. 7.5-239, 7.5-240. Reserved