When required, storm drainage profile drawings shall include:

(1) All information required under Subsection 300-24(b) (unless included elsewhere in the plans);

(2) Storm drainage profiles must be prepared to a scale no smaller than one inch = 100 feet horizontal × one inch = ten feet vertical;

(3) Each profile should be labeled consistent with the labeling scheme used on the drainage plan view;

(4) No main line storm pipe shall be less than 15 inches diameter; (roof laterals and landscape drainage are exempted from this requirement);

(5) No pipe shall have a slope greater than 12 percent;

(6) If a drop in a structure is greater than five feet, a reinforced base shall be provided for that structure;

(7) The 25-year hydraulic grade line shall be shown for all storm pipes. The 100-year HGL shall be shown for all pipes within road rights-of-way;

(8) No corrugated metal pipe shall be used in any road right-of-way;

(9) All utility crossings shall be shown on storm profiles;

(10) All structures shall be labeled as to type and function using standard county or GDOT call outs;

(11) No outfall pipe shall have a slope greater than one percent. Maximum allowable velocity for storm sewer exit pipe is ten feet per second when flowing full or half-full based on Manning's Formula. Energy dissipater is required for exit velocity in excess of five feet per second;

(12) Rip-rap and/or concrete aprons other acceptable aprons shall be shown for all outfalls;

(13) A pipe chart representing all sizing and capacity calculations, including but not limited to, pipe size, capacity, drainage area, velocity, and pipe material, shall be included;

(14) The profile must show the existing and proposed elevations along the length of the drainage system;

(15) Open channel design must show the grade of the flow line of the channel and include a typical ditch section that provides a non-erodible velocity at design flows. Channel slopes less than one percent may be grassed; for channel shapes greater than one but less than three percent the designer must demonstrate calculated velocity at or less than five feet per second including a channel lining for design to accommodate the design philosophy; channel slopes over three percent must be approved by the City;

(16) Channel lining (i.e., grass, concrete, etc.) must be specified along the profile;

(17) Pipe material and bedding shall be specified;

(18) Crown elevations must be matched at each junction structure or the upstream crown must be higher than the downstream crown; and

(19) Shall be compliant with the requirements of Chapter 340, Article 4, Post-Development Stormwater Management.

History

The history line the source prints at the end of the section.

(Ord. No. 743, 12-19-17; Ord. No. 757, 12-18-18; Ord. No. 805, 12-21-21)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:chamblee/zoning/300-38@2026-11-14-5dafacc3e4

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Chamblee Zoning Ordinance, Section 300-38. Storm drainage profile drawing | Georgia Commons