Skip to content
Georgia Commons
Menu

Columbus · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 8 / Article 2 - OVERVIEW OF PROJECT CONSTRUCTION

Section 8.2.1. Development Activity.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Preconstruction Activity. Following the issuance of any permit authorizing clearing and grading of a site, areas required to be undisturbed, such as natural buffers or stream greenways, must be designated by survey stakes, flags, ribbon, or other appropriate markings and shall be inspected and approved by the Department of Engineering prior to the commencement of any clearing or grading activities.

B. Grading.

1. Grading Plan Required. Grading shall be done in accordance with the lines and grades drawn on the approved grading plan.

2. Erosion and Sedimentation Control. Required erosion and sedimentation control measures and stormwater drainage facilities are to be installed in accordance with the approved plans as development progresses.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:columbus-muscogee/zoning/8.2.1@2026-11-11-d23417df7e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Columbus Zoning Ordinance, Section 8.2.1. Development Activity | Georgia Commons